Chapter - IV Scheduling and Planning
-
7/29/2019 Chap 4 Sch&Plmin
2/18
Introduction
The Construction time management is the backbone of construction industry as it governs
directly or indirectly the elements involved in the project. As discussed in the earlier chapter, the construction
cost, quality and other related elements gets affected with the delay in construction project. This shows the
vulnerability of construction project due to improper construction time management.
Construction Time management is basically scheduling and planning the constructionprocesses, activities in a logical sequence in accordance to the available resources and project objectives. The
terms Planning and Scheduling do appear as synonyms in general, but they are different in the context of
construction time management. These terms and the scheduling methods will be dealt in this and the further
chapters.
Scheduling and Project Planning
Scheduling and planning are two terms that are often thought to be synonymous. But theyare not. Scheduling is actually a part of planning in construction Project. The term Planning is used in different
fields under different contexts. In case of construction industry and construction projects Planning a project
means
" the process of choosing the one method and order of work to be adopted for a
construction project from all the various ways and sequences in which it could be done "
The PMI (Project management institute) defines the project Planning process in the
PMBOK as " those processes performed to establish the total scope of the effort, define and refine the
objectives, and develop the course of action required to attain Project objectives ". Project planning serves as afoundation for several related functions, such as cost estimating, scheduling, project control, safety management
and others that enhances the construction project.
There are various key terms and various elements that are to be understood before
understanding project scheduling and planning. The descriptions of a few key terms and elements of a schedule
are given below in order.
Deadline : a specific point in time, such as the day on which part of a project must be completed. For example,
the deadline of excavation activity of the construction project means that the excavation part should
be completed at any cost by the end of the specified day in the schedule.
Period : it is the time span taken for ant certain activity or process for its completion. For example, the time
period of 14 days for centering means that the centering activity takes 14 days to be completed.
Tasks : these are the very foundation of the schedule and refer to self - contained work units. For example,
tiling the ground floor is a task. And when several tasks are combined then the result is a Summary
task. Example, tiling and plastering)
-
7/29/2019 Chap 4 Sch&Plmin
3/18
Task Duration & Duration planning : it is the time needed to complete a task. The calculation of duration is
referred to as Duration Planning.
Sequence Planning : the construction project consists of various activities which are formed under the WBS of
Project. These activities are to be linked logically in certain order so as to create a proper
and efficient schedule for the project. This process of establishing the dependencies
between activities is referred to as Sequence Planning.
Fig.4.2 : Duration Planning and Sequence Planning
Construction Scheduling
The duration of the activities and the sequence planning of them when taken together
form the basis of Construction Scheduling. Scheduling is the determination of the Timing and sequence of
operations in a project and their assembly to give the overall completion time of the project. As mentioned
earlier Scheduling focuses on one part of Planning effort.
The difference between project planning and scheduling can be understood from the
figure below. Project planning actually deals with the overall activities relating to the project. The selection of
contractors, where, when, how, by whom, at what cost etc. these all will be answered by the project planning
process. The Scheduling part deals with the "when" part in detailed level.
Fig. 4.3 : Construction project Scheduling
-
7/29/2019 Chap 4 Sch&Plmin
4/18
Fig. 4.4 : The relation between Construction Project Planning and Scheduling
Milestone
A milestone is a task without any duration. It is a special event entered separately into the
schedule. Typical scheduling milestones include the start of construction, completion of the building structure,
sealing the building envelope, final inspection and putting the building into operation.
Sequential dependencies
In most cases, tasks are not isolated items on the schedule but are integrated into a web of
dependencies with other tasks. There can be several reasons for this. The normal case is a Sequential
dependency. Task B can begin only when task A is finished i.e. for e.g. ground floor walls ground floor
ceiling upper floor walls.
Some tasks can only be performed jointly in a parallel process e.g. setting up scaffolding
floor by floor as the structure of a multistory building goes up. Often these process dependencies can be broken
into sequential dependencies by using a higher level of detail. It is often impossible for contractors to work in
parallel during a number of construction phases where one activity (task) interferes with another. This is why it
is essential for planners to examine mutual dependencies between specialized tasks and, if necessary, to divide
the project into optimal construction phases.
Various types of relationships play an important role in the graphic representation of
dependencies between two tasks. Construction scheduling distinguishes between four types :
Finis-to-start : Task B can only start after task A is finished. This is the most common type of relationship and
may apply to activities such as the construction of interior walls (A) and interior plastering (B).
-
7/29/2019 Chap 4 Sch&Plmin
5/18
Finish-to-finish : Task A an task B must be completed by the same time. This type of relationship exists when
tasks A and B provide the foundation for an additional task. Examples are installing windows (A) and sealing
the roof (B), which create the airtight building envelope necessary for interior work.
Start-to-Finish : Task B must end when task A begins. In this type of relationship, one task can be scheduled at
the least possible point in time before it interferes with another task.
Start -to-start : Task A and task B must start at the same time. This makes sense if the work can be performedin parallel - if, for instance, workers from one trade can use a crane that is operated by another contractor to
deliver large building elements.
Fig. 4.5 : Different types of Relationships between activities.
Forms of Representation
There are different ways to represent a schedule graphically. The following forms of
representation are used to communicate schedule contents in a clear and useful manner, depending on the goal
and purpose of the Schedule.
-
7/29/2019 Chap 4 Sch&Plmin
6/18
-
7/29/2019 Chap 4 Sch&Plmin
7/18
Scheduling is the determination of the timing and sequence of operations in the
project and their assembly to give the overall completion time. As mentioned
previously, scheduling focuses on one part of the planning effort.
Project planning answers the questions What is going to be done? How? Where?
By
whom? and When (in general terms, the projects start and end)? Scheduling deals
with
when on a detailed level.
In fact, scholars have generally separated planning from scheduling CPM
separates
planning and scheduling, and once project information is collected and expressed
as a network plan and activity time estimates assigned, CPM calculations can be
made.
Planning ceases and scheduling starts when the first computation is performed that
shows a project duration. The project duration is then compared with the desired
schedule and scheduling begins. (OBrien and Plotnick, 2009, p. 417)
To get an idea about the relationship between project planning and scheduling,
-
7/29/2019 Chap 4 Sch&Plmin
8/18
assume that you are planning a family vacation project for next summer. Your
plan
may include considerations such as these:
-
7/29/2019 Chap 4 Sch&Plmin
9/18
-
7/29/2019 Chap 4 Sch&Plmin
10/18
-
7/29/2019 Chap 4 Sch&Plmin
11/18
-
7/29/2019 Chap 4 Sch&Plmin
12/18
-
7/29/2019 Chap 4 Sch&Plmin
13/18
-
7/29/2019 Chap 4 Sch&Plmin
14/18
-
7/29/2019 Chap 4 Sch&Plmin
15/18
-
7/29/2019 Chap 4 Sch&Plmin
16/18
-
7/29/2019 Chap 4 Sch&Plmin
17/18
-
7/29/2019 Chap 4 Sch&Plmin
18/18