1 1 1 Central Maine Power Company Local System Plan Presentation Planning Advisory Committee Meeting November 17, 2011

Transcript of Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP...

Page 1: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

1

1

1

Central Maine Power

Company

Local System Plan

Presentation

Planning Advisory Committee Meeting

November 17, 2011

Page 2: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

2

2

2

Purpose of Local System Plan

Per Attachment K – Local, this LSP presentation:

• Describes projected improvements to non-PTF

that are needed to maintain reliable customer

service.

• Reflects:

– LSP Needs Assessments

– Corresponding transmission system planning studies

Page 3: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

3

3

3

LSP Communication

• LSP is communicated to the PAC at an ISO-NE PAC RSP meeting once a year.

– Separate meetings can be arranged if needed

• PAC, Transmission Customers, and other Stakeholders have 30 days to provide written comments for consideration to CMP

– CMP’s contact:

Curtis Beveridge

Manager System Planning

Central Maine Power Company

83 Edison Drive

Augusta, Maine 04336

(email: [email protected])

Page 4: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

4

4

4

LSP Communication cont.

• Each PTO is individually responsible for

publicly posting and updating the status of its

respective LSP and the transmission projects

list on a website in a format similar to the

RSP project list

• The ISO-NE RSP project list contains links to

each individual PTO’s transmission project

list

• CMP’s LSP project list is located at:

http://www.cmpco.com/SuppliersAndPartners/Transmission

Services/CMPTransmissionSvc/lsp.html

Page 5: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

5

5

5

CMP LSP Project List

• Central Maine Power will update the LSP project list at least annually.

• A presentation of the LSP will be made annually.

• LSP Project List is a cumulative listing of proposed transmission solutions intended to meet identified needs.

• Similar to PTF projects in the RSP, the LSP project list contains a status of each non-PTF project:

Concept- Project is under consideration as a possible solution to a need, but little or no

analysis is available

Proposed- CMP has determined that the project is an appropriate solution to a need, but

has not yet obtained internal budget approval

Planned- Budgetary approval has been obtained

Under

Construction-

Project is approved and is under design/construction

In-Service- Project is complete

Page 6: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

6

6

6

CMP’s Local System Planning

Process

• All CMP system upgrades are determined in accordance with Iberdrola USA Electric System Planning Manual.

• Planning studies can result from:

– Periodic Assessment of CMP’s 14 Local Planning Areas

– Load Growth

– Retail or Wholesale Customer Request

– Generator Interconnection Request

– System-Wide Contingency Analysis

• Studies may utilize both ISO-NE Library Base Cases and/or Local CMP Base Cases.

• Generator Interconnections on the non-PTF Transmission System are guided by the CMP Transmission & Distribution Interconnection Requirements for Generation.

Page 7: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

7

7

7

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Augusta

Area Reliability

Study

Bowman St

Substation

Add 2nd 115/34.5

kV transformer

Bowman St 115/34.5

kV transformer

overloaded and low

34.5 kV bus voltage,

post-contingency

2011 Under Construction

Coopers Mills

Substation

Add 115/12.47 kV

transformer at

Coopers Mills

(Maxcy's)

Coordinate

w/MPRP

Voltage violations

following loss of

Maxcys 115/34.5 kV

transformer

2014

Proposed

Page 8: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

8

8

8

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Bath Area

Load Study Line work

Rebuild 34.5 kV

Sections 55 & 58

Overloaded under

single element

contingency

conditions

2011

Under Construction

Page 9: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

9

9

9

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected In-

Service Date

Status

Berwick -

Lebanon

Area Reliability

Study

Bassett

Substation

New 34/12 kV

Bassett Substation

and 2nd 34.5 kV

transmission line to

Quaker Hill

Experiencing high

load growth,

thermal restriction

on Section 118

2011

Under

Construction

Berwick

Substation

New 34/12 kV

Berwick Substation

and 34.5 kV

transmission line to

Bassett

Load growth,

inadequate 34/12

kV capacity,

overloaded

distribution circuits

2013

Planned

New Lebanon

Substation

Add new Lebanon

Substation and 34.5

kV transmission line

to Butler’s Corner

Load growth in

Lebanon area will

exceed area

capacity

2013

Planned

Page 10: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

10

10

10

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Brunswick -

Topsham Area

Study

Bath

Substation

Install a 115 kV

bus-tie breaker at

Bath Substation

Severe Low Voltage

occurs with a Bath

115 kV bus-fault

2013 Proposed

Line work Re-rate 34.5 kV

Section 76

Overloaded under

single element

contingency

conditions

2013 Proposed

Brunswick

Hydro

Substation

Upgrade

Brunswick Hydro

T1 34/12 kV

transformer

Overloaded under

normal operating

conditions

2013 Proposed

Woolwich

Substation

Upgrade

Woolwich T1

34/12 kV

transformer

Overloaded under

normal operating

conditions

2014 Proposed

Topsham

Substation

Upgrade Topsham

T2 34/12 kV

transformer

Overloaded under

normal operating

conditions

2014 Proposed

Page 11: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

11

11

11

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Brunswick -

Topsham Area

Study

(Cont)

Topsham 115

kV Substation

Upgrade Topsham

115 kV T1 and T3

115/34.5 kV

transformers

Overloaded under

single element

contingency

conditions

2014 Proposed

Page 12: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

12

12

12

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Lewiston -

Auburn Area

Reliability

Study

Leeds

Substation

Build a new Leeds

115/34.5 kV

distribution

substation

Voltage violations

and overloaded

transformer at

Turner

2012

Under Construction

Line work

Change protection

settings on

Section 72

34.5 kV line

overload post-

contingency

2013 Proposed

Great Falls

Substation

Replace Section

148 cable into

Great Falls

Substation

34.5 kV line

overload post-

contingency

2013 Proposed

Gulf Island

Substation

Upgrade Gulf

Island 115/34.5 kV

T1 transformer

Transformer

overloaded with load

growth, with MPRP

reinforcements

2020 Concept

Page 13: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

13

13

13

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Lakes Region

Area

Reliability

Study

Lovell Area

Upgrades

New (9.5 mile)

34.5 kV line from

Bridgton to

Kimball Road

Voltage violations

under contingent

system conditions

2015 Concept

Install a 5.4 MVAR

capacitor bank at

Kimball Road

2015 Concept

Install a 5.4 MVAR

capacitor bank at

Lovell

2015 Concept

Remove voltage

supervision for the

reverse power

relaying on Lovell

T1

Back feeding NH

under post-

contingent

conditions creates

voltage and thermal

violations

2013 Proposed

North

Limington

Upgrades

Two 34.5 kV

breakers, two 5.4

MVAR capacitor

banks

Voltage violations

under contingent

system conditions

2015 Concept

Page 14: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

14

14

14

LSP Projects

Project

Origin

Major

Project Project Description

Needs

Assessment

Projected In-

Service Date

Status

Lakes Region

Area

Reliability

Study

(Cont)

Raymond

Area

Upgrades

New North Raymond

115/34 kV S/S with a four

breaker ring bus and

115/34 kV transformer

and (10 mile) 115 kV

transmission line to

Surowiec

Voltage and

thermal violations

under contingent

system conditions

2015 Concept

Relocate Raymond 34

kV S/S

Room needed for

expansion 2015 Concept

New (4.5 mile) 34.5 kV

line from Raymond 115

kV to Raymond 34 kV

Voltage and

thermal violations

under contingent

system conditions

2015 Concept

New (6 mile) 34.5 kV line

from North Raymond to

Raymond 34 kV

Voltage and

thermal violations

under contingent

system conditions

2015 Concept

Page 15: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

15

15

15

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Midcoast Area

NTA Analysis

(the Camden -

Rockland

Area Reliability

Study)

Park St

Substation

Add 5.4 MVAR

34.5 kV capacitor

bank

Low voltage 2011 Under Construction

Add 3.6 MVAR

34.5 kV capacitor

bank

Low voltage 2013 Proposed

Meadow Rd

Substation

Add two 5.4 MVAR

34.5 kV capacitor

banks

Low voltage 2011 Under Construction

Line Work

Add 1 mile 34.5 kV

line to separate

Section 51 (Warren

– Waldoboro)

Voltage and thermal

violations under

contingent system

conditions

(Not needed if NTA

is approved)

2013 Proposed

Page 16: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

16

16

16

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Midcoast Area

NTA Analysis

(Cont)

Boothbay

Upgrades

Add a 2.7 MVAR

capacitor bank at

Boothbay

Low voltage 2013 Proposed

Power Factor

Correction at

Boothbay Harbor

12 kV

Low voltage 2013 Proposed

Mason

Upgrades

Relay

Modifications on

Section 25 at

Mason

34.5 kV line

overload post-

contingency

2013 Proposed

Line Work Rebuild 34.5 kV

Section 23

Voltage violations

under contingent

system conditions

(Not needed if NTA

is approved)

2013 Proposed

Coopers Mills

Upgrades

Upgrade Coopers

Mills T1 115/34 kV

Transformer

overloaded post-

contingency

2013 Planned

Page 17: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

17

17

17

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Portland

Area NTA

Analysis

Raven Farm

Expansion

(115/34.5 kV)

New 115 kV bus

with four breaker,

breaker-and-a-half

configuration.

Also, install a

115/34 kV

transformer and

34.5 kV line to

Elm Street

Voltage and thermal

violations under

contingent system

conditions

(Not needed if NTA

is approved)

2015 Proposed

Line work

Rebuild 34.5 kV

Section 181

Overloaded under

single element

contingency

conditions

(Not needed if NTA

is approved)

2015 Proposed

Rebuild a portion

of 34.5 kV Section

180

Overloaded under

single element

contingency

conditions

2015 Proposed

Page 18: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

18

18

18

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Portland

Area NTA

Analysis

(Cont)

Red Brook

Upgrade Red

Brook T1 to a

30/50 MVA

Transformer

overloaded under

contingent system

conditions

(Not needed if NTA

is approved)

2015 Proposed

Page 19: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

19

19

19

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Portland North

Area Reliability

Study

Line work

Re-rate portions of

34kV line Section

102

Thermal violations

under normal

operating and

contingent system

conditions

2011 Under Construction

Bishop Street

Substation

Add 2-34 kV

breakers on

Section 188

Violation of 25 MW

loss of load criterion 2011

Under Construction

Line work

Rebuild portions

of 34.5 kV line

Section 188

Thermal violations

under normal

operating and

contingent system

conditions

2012 Under Construction

Line work

Re-rate/rebuild

portions of 34kV

line Section 180A

Thermal violations

under normal

operating and

contingent system

conditions

(Not needed if NTA

is approved)

2013

Proposed –

Pending NTA

conclusion

Page 20: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

20

20

20

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Portland North

Area Reliability

Study

(Cont)

Voltage

support

Add two 2.7 MVAR

capacitor banks at

Freeport

Voltage violations

under contingent

system conditions

2013 Proposed

Voltage

support

Add two 5.4 MVAR

capacitor banks at

North Windham

S/S

Voltage violations

under contingent

system conditions

2013 Proposed

Bishop Street

Substation

Add a 5.4 MVAR

capacitor bank

Voltage violations

under contingent

system conditions

2013 Proposed

Elm Street

Substation

Bring S164 in/out of

Elm St, re-rate

S164A

Thermal violations

under contingent

system conditions

(Not needed if

Raven Farms 115

kV is built)

2013 Proposed –Pending

NTA conclusion

Page 21: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

21

21

21

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Portland North

Area Reliability

Study

(Cont)

Line work Rebuild Section

103

Could overload under

normal operating

and/or single element

contingency conditions

in 2010

2013 Planned

Falmouth

Substation

Add two 34.5 kV

breakers

Voltage and 25 MW

loss of load criteria

violations under

contingent system

(Not needed if hybrid

NTA is approved)

2013

Proposed –Pending

NTA conclusion

Swett Rd.

Substation

Add two 34 kV

breakers

Low Voltages in the

local area under single

element contingencies

2014

Proposed – Pending

Lakes Region Area

Reliability Study

results

East Deering

Substation

115-34 kV

substation with

115 kV line from

Raven Farm.

Additional source

needed in the area

(Not needed if NTA is

approved)

2015

Proposed –Pending

NTA Analysis

Page 22: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

22

22

22

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Portland North

Area Reliability

Study

(Cont)

North

Yarmouth

Substation

New 115/34kV

S/S tapped from

Sect 166, and

14.8 mi 34.5 kV

line to Gray &

Freeport with

breakers

Voltage violations

under contingent

system conditions

(Not needed if hybrid

NTA is approved)

2015 Proposed –Pending

NTA Conclusion

Swett Road

Substation

Add 5.4 MVAR

capacitor bank

Voltage violations

under contingent

system conditions

2016

Proposed – Pending

Lakes Region Area

Reliability Study

results

Prides Corner

Substation

Add an additional

5.4 MVAR

capacitor bank

Voltage violations

under contingent

system conditions

(Not needed if hybrid

NTA is approved)

2018 Proposed –Pending

NTA Conclusion

Page 23: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

23

23

23

LSP Projects

Project

Origin Major Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Saco Bay

Area

Reliability

Study

New Vallee Lane

Substation

New 115/34.5 kV

Substation in Old

Orchard Beach

and 115 kV

double-circuit line

from Louden to

Old Orchard

Beach

Additional 115 kV

transformer capacity

and voltage support is

needed in the Saco

Bay Area. Loss of

Section 193 violates

CMP’s 25 MW loss of

load criterion.

2012 Under

Construction

New Goosefare

Substation

New 115/12 kV

substation in Saco

Page 24: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

24

24

24

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Skowhegan

Area

Reliability

Study

Line work Re-rate Section

73

Overloaded under

single element

contingency

conditions

2011 Under Construction

Norridgewock

Source

Tap Section 73,

install 34/34 delta-

wye isolating

transformer for

new distribution

supply

Distribution circuit

becoming

overloaded, need a

new source

2012 Under Construction

Lakewood

Substation

Expansion

Loop Section 241

into a new 115 kV

ring bus with 2nd

115/34.5 kV

transformer

Voltage violations

under contingent

system conditions

2013 Under Construction

Page 25: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

25

25

25

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Waterville -

Winslow Area

Reliability

Study

Line work

Re-rate portions of

34.5 kV line

Section 38.

Overloaded under

single element

contingency

conditions

2012 Planned

Belgrade

Source /

Hospital Feed

Install a 115/34 kV

transformer and

two 115 kV

breakers at North

Augusta with a

new 34.5 kV

distribution circuit

into the Belgrade

area.

Reliability and

voltage concerns on

a very long 34.5 kV

distribution circuit

out of Rice Rips;

need to bring in a

new source to shift

load. The addition of

a new hospital is

also driving these

upgrades.

2012 Planned

Line work

Re-conductor a

portion of 34.5 kV

line Section 56.

Overloaded under

single element

contingency

conditions

2013 Proposed

Page 26: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

26

26

26

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Waterville -

Winslow Area

Reliability

Study

(Cont)

Line work

Re-rate portions of

34.5 kV line

Section 13.

Overloaded under

single element

contingency

conditions

2013 Proposed

Line Work

Re-rate 34.5 KV

overhead portion

of Section 38B

Overloaded under

single element

contingency

conditions

2013 Proposed

Rice Rips

Substation

Bring the new line

Section 241 in/out

of Rice Rips by

constructing 7

miles of new 115

kV Transmission.

Also, upgrade

Rice Rips into a 4-

breaker ring bus

with a second

115/34 kV

transformer.

Voltage and thermal

violations under

contingent system

conditions

2014 Proposed

Page 27: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

27

27

27

LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected

In-Service

Date

Status

Maintenance -

Reliability

Inspection

Bristol

Substation

Upgrade Bristol

T1

Overloaded under

normal operating

conditions

2012 Planned

Bar Mills

Substation

Upgrade Bar Mills

T4

South China

Substation

Upgrade South

China T1

Line work

Rebuild Sections;

5A, 48, 172, 187

These 34.5 kV line

sections are in very

poor condition and

need to be rebuilt to

improve reliability.

2013 Planned

Vassalboro

Substation

Move Section 40

termination to

Vassalboro. Move

two 34.5 kV

breakers to

Vassalboro.

CMP Facilities at the

Fort Halifax

Substation are being

retired and moved to

the Vassalboro

Substation

2012 Under Construction

Page 28: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

28

28

28

LSP Generation Projects

Generator

ID Project Description Status

Projected In-

Service Date Current Progress

ISO-NE Queue

# 215

Interconnection Request for

50 MW Wind Farm to tap into

CMP 115 kV Section 270

north of Rumford 115 kV

Substation

Planned 2013

System Impact Study Complete

& interconnection agreement

executed

ISO-NE Queue

# 244

Interconnection Request for

117 MW Wind Farm to tie into

CMP Wyman Hydro

Substation

Proposed 2013 System Impact Study Complete

ISO-NE Queue

# 287

Interconnection Request for

33 MW Wind Farm to tie into

CMP 115 kV Line Section 229

between Rumford Substation

and Riley Substation

Planned 2013 Undergoing System Impact

Study

Page 29: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

29

29

29

LSP Generation Projects

Generator

ID Project Description Status

Projected In-

Service Date Current Progress

ISO-NE Queue

# 300

Interconnection Request for

20 MW Wind Farm to tie into

CMP 115 kV Line Section 229

between Rumford Substation

and Riley Substation

Planned 2013 System Impact Study Complete

ISO-NE Queue

#310

Tied to

Queue #138

Interconnection Request for

45 MW Wind Farm to tie into

Customer owned 115 kV line

Section 267 north of Bigelow

Substation.

Concept 2012

Undergoing System Impact

Study

ISO-NE Queue

#333

Interconnection Request for

216 MW Wind Farm to tie into

CMP. Three potential

interconnection sites to be

studied.

Concept 2012 Undergoing Feasibility Study

Page 30: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

30

30

30

LSP Generation Projects

Generator

ID Project Description Status

Projected In-

Service Date Current Progress

ISO-NE Queue

# 300

Interconnection Request for

20 MW Wind Farm to tie into

CMP 115 kV Line Section 229

between Rumford Substation

and Riley Substation

Planned 2013 System Impact Study Complete

ISO-NE Queue

#310

Tied to

Queue #138

Interconnection Request for

45 MW Wind Farm to tie into

Customer owned 115 kV line

Section 267 north of Bigelow

Substation.

Concept 2012

Undergoing System Impact

Study

ISO-NE Queue

#333

Interconnection Request for

216 MW Wind Farm to tie into

CMP. Three potential

interconnection sites to be

studied.

Concept 2012 Undergoing Feasibility Study

Page 31: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

31

31

31

LSP Generation Projects

Generator

ID Project Description Status

Projected In-

Service Date Current Progress

ISO-NE Queue

#335

Interconnection Request for

25 MW biomass generator at

existing customer site.

Planned 2012 System Impact Study Complete

ISO-NE Queue

#337

Interconnection Request to

true-up the existing

generating plant net output

and add a net increase of 26

MW at existing customer site,

Section 227.

Planned 2012 System Impact Study Complete

ISO-NE Queue

#350

Interconnection Request to

interconnect into 3-Points of

interconnection

Concept 2013 Undergoing Feasibility Study

ISO-NE Queue

#366

Interconnection Request for

13.4 MW increased capacity

at existing customer site.

Concept 2012

Undergoing System Impact

Study Study

ISO-NE Queue

#372

Interconnection Request for 3

MW increased capacity at

existing customer site.

Concept 2012 phase A

2013 phase B

Undergoing System Impact

Study

Page 32: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

32

32

32

In-Service LSP Projects

Project

Origin

Major

Project

Project

Description

Needs

Assessment

Projected In-

Service Date Status

Augusta

Area Reliability

Study

Line work

Re-rate 34 kV line

Sections 39 & 41 to

212°F thermal limit

Overloaded under

normal operating

conditions

2011 In Service

Page 33: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

33

33

33

In-Service LSP Generation

Projects

Generator

ID Project Description Status

Projected In-

Service Date Current Progress

ISO-NE Queue

# 138

•Rebuild Bigelow Substation

•Wyman Hydro Substation

Upgrades

•Re-rate Sect 215

•Several area capacitor banks

In Service 2009

Met Developer’s

Interconnection Request &

Implemented the

Recommendations contained in

the I.3.9 Proposed Plan

Application

ISO-NE Queue

# 290

System Impact Study

Complete

In Service

Back-feed

10/15/11

2011

Met Developer’s

Interconnection Request for 20

MW Wind Farm to tie into CMP

Woodstock Substation

ISO-NE Queue

# 197

•New 115 kV line Section 270

(old Section 59)

•New Roxbury Substation

•Move 115/34 kV transformer

from Rumford to Roxbury

In Service

2011

Met Developer’s

Interconnection Request to

connect 50.6 MW Wind Farm

to new CMP 115 kV Section 270

Page 34: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

34

34

34

LSP Future Studies

Study

Projected

Study

Date

Status Needs Assessment Solutions

Portland North Area

Reliability Study Dec 2010 In Review

Re-affirm timing and need of

projects from the original study.

Re-assessing transmission

and NTA requirements

Mid-coast Area

Reliability Study Dec 2010 In Review Re-affirm timing and need of

projects from the original study.

Re-assessing transmission

and NTA requirements

Lakes Region Area

Reliability Study 2011 In Progress

Contingency processor showed

thermal and voltage violations

under single element contingencies

Conduct area reliability study

and assess possible system

upgrades

Southern Maine

Area Reliability

Study 2012 Concept

Contingency processor showed

thermal and voltage violations

under single element contingencies

Conduct area reliability study

and assess possible system

upgrades

Augusta Area

Reliability Study 2013 Concept

Contingency processor showed

thermal and voltage violations

under single element contingencies

Conduct area reliability study

and assess possible system

upgrades

Page 35: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

35

35

35

Augusta Area Go Back to Augusta

Puddledock

Road

North

Augusta

Augusta

East Side

115/34 kV

115/12 kV

Belgrade

D4

D3

D2

D1

Maxcys

Se

ctio

n 3

8

Sidney

Bond Brook

Hospital

Se

ctio

n 2

13

115/34 kV

115/34 kV

Bowman

Street

Gulf Island

Coopers Mills

(Maxcys)

115/34 kV

115/34 kV

Section XX

Blair Rd

McCoy's S. China

Winslow

Rice Rips

Vassalboro

Se

ctio

n 1

Augusta K5

Section 38B

Section 39

Section 39C

Section 39B

Section 33

Winthrop

Manchester

Se

ctio

n 1

4

Capital St

Se

ctio

n 2

Section 19

Cony Rd345/115 kV

115/34 kV

(Upgrade)Section 88

Section 60

Non-PTF Upgrades

PTF Upgrades

Go Back to Winslow

Page 36: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

36

36

36

Skowhegan Area Go Back

Williams

Hydro

Sect. 63A

Sect. 66

Wyman Hydro

Se

ct. 2

41

Sect. 15

Anson

North Anson

Harmony

Skowhegan N.

Weston

Skowhegan S.

Shawmut

Lakewood

Se

ct. 6

3

Sappi

Somerset

Sect. 222Sect. 215

Detroit

MoscowBigelow

Heywood

Sturtevant

Rice Rips

Se

ct. 8

3

Sect. 73Sect. 44

Se

ct. 7

9

Madison

Electric

Works

Norridgewock Sect. 9 New Construction

Re-rate

Re-Conductor

New Non-PTF

New PTF

Page 37: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

37

37

37

Portland North Area Go Back Surowiec

Moshers

Gray

Spring Street 115

W.F. Wyman

12-kV

Blue Rock Quarry

Brighton Ave.

Bishop St.

Prides Corner

Lambert St.

East Deering

FalmouthElm St.

Freeport

Swett Rd.

12-kV

Se

ct.

18

0A

Sect. 180

Sect. 188

10.8 MVAR

5.4 MVAR

10.8 MVAR

North Gorham

Hydro

10.8 MVAR

Spring Street 34.5

New Construction

Re-rate

Westbrook Pleasant Hill

Se

ct.

10

3

20/37

Sect. 102

Sect. 104S

ec

t. 1

66

North

Yarmouth

S/S

Re-Conductor

Raymond

New Non-PTFNew PTF

Page 38: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

38

38

38

Waterville/Winslow Area Go Back

Se

ct. 2

41

(fu

ture

)

Wyman Hydro

Sect. 67

Maxcys

Se

ct. 8

3

Detroit

Heywood

Road

Winslow

Se

ct. 2

42

Sect. 84

Rice Rips

Sect. 56

Fairfield

Augusta East

Side

Shawmut

Se

ct. 1

0

Se

ct. 1

Sect. 47

Keyes Fiber

Hydro

KennebecS

ect. 7

1

Fort HalifaxVassalboro

South

Waterville

Oakland

Sect. 40Sect. 13

Sydney

Se

ct. 3

8

Sect. 38

West

Waterville

Se

ct. 5

6A

Augusta

East Side

Bowman St.Sect. 60

Sect. 80Highland Sect. 88

Mason

Sect. 68

Sect. 38A

Sect. 67A

115/34 kV

20/37 MVA

Sect. 241

New Construction

Re-rate

Re-Conductor

New Non-PTF

New PTF

Page 39: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

39

39

39

Lakes Region Area Go Back

Bridgton

Hiram Hydro

Se

ctio

n 9

1S

ectio

n 1

70

Denmark

Hiram

Baldwin

North

Limington

2 x 5.4 MVAR

Raymond

Prides Corner

North Gorham

Se

ctio

n 1

03

Portland

Pipeline

Raymond 34

N. Windham

Swett Rd

T1

20/37

MVA

T2

20/37

MVA20/37

MVA

Alt. to caps

N. Raymond

S208

SYY

5.4 MVAR

5.4 MVAR

Section XX

Bonny Eagle

Se

ctio

n 1

87

Fort Hill

Shaw Mills

Randall Rd

Moshers

Kimball Rd

Saco Valley

Lovell

Section 214Section 214

T1

20/37

MVA

T1

20/37

MVA

5.4 MVAR

W. Bridgton

Section 94

Section ZZ5.4 MVAR

5.4 MVAR

SurowiecS

ectio

n Y

Y

Non-PTF Upgrades

PTF Upgrades

Page 40: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

40

40

40

Brunswick/Topsham Area Go Back to Bath

Go Back to Topsham Surowiec

345/115 kV

Se

ctio

n 6

2

Crowleys

115/34 kV

Non-PTF Upgrades

PTF Upgrades

Hardings

Topsham 115 kV

Mason

Bath

Cooks Corner

Section 11

Washington St.

Section 55

Section 58

Mason

Gulf Island

Sabattus

Pejepscot

Section 76

Section 43

Lisbon Falls

Lisbon

Section 72

Section 31

Topsham Old

Se

ctio

n 3

0

Brunswick

West Side

Brunswick

Hydro

Lewiston lower

Woolwich

Page 41: Central Maine Power Company - ISO New · PDF fileCentral Maine Power Company ... 9 9 9 LSP Projects Project ... and (10 mile) 115 kV transmission line to Surowiec Voltage and thermal

41

41

41

CMP’s 14 Local Planning Areas Go Back