Presentation
Planning Advisory Committee Meeting
November 17, 2011
2
2
2
Purpose of Local System Plan
Per Attachment K – Local, this LSP presentation:
• Describes projected improvements to non-PTF
that are needed to maintain reliable customer
service.
• Reflects:
– LSP Needs Assessments
– Corresponding transmission system planning studies
3
3
3
LSP Communication
• LSP is communicated to the PAC at an ISO-NE PAC RSP meeting once a year.
– Separate meetings can be arranged if needed
• PAC, Transmission Customers, and other Stakeholders have 30 days to provide written comments for consideration to CMP
– CMP’s contact:
Curtis Beveridge
Manager System Planning
Central Maine Power Company
83 Edison Drive
Augusta, Maine 04336
(email: [email protected])
4
4
4
LSP Communication cont.
• Each PTO is individually responsible for
publicly posting and updating the status of its
respective LSP and the transmission projects
list on a website in a format similar to the
RSP project list
• The ISO-NE RSP project list contains links to
each individual PTO’s transmission project
list
• CMP’s LSP project list is located at:
http://www.cmpco.com/SuppliersAndPartners/Transmission
Services/CMPTransmissionSvc/lsp.html
5
5
5
CMP LSP Project List
• Central Maine Power will update the LSP project list at least annually.
• A presentation of the LSP will be made annually.
• LSP Project List is a cumulative listing of proposed transmission solutions intended to meet identified needs.
• Similar to PTF projects in the RSP, the LSP project list contains a status of each non-PTF project:
Concept- Project is under consideration as a possible solution to a need, but little or no
analysis is available
Proposed- CMP has determined that the project is an appropriate solution to a need, but
has not yet obtained internal budget approval
Planned- Budgetary approval has been obtained
Under
Construction-
Project is approved and is under design/construction
In-Service- Project is complete
6
6
6
CMP’s Local System Planning
Process
• All CMP system upgrades are determined in accordance with Iberdrola USA Electric System Planning Manual.
• Planning studies can result from:
– Periodic Assessment of CMP’s 14 Local Planning Areas
– Load Growth
– Retail or Wholesale Customer Request
– Generator Interconnection Request
– System-Wide Contingency Analysis
• Studies may utilize both ISO-NE Library Base Cases and/or Local CMP Base Cases.
• Generator Interconnections on the non-PTF Transmission System are guided by the CMP Transmission & Distribution Interconnection Requirements for Generation.
7
7
7
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Augusta
Area Reliability
Study
Bowman St
Substation
Add 2nd 115/34.5
kV transformer
Bowman St 115/34.5
kV transformer
overloaded and low
34.5 kV bus voltage,
post-contingency
2011 Under Construction
Coopers Mills
Substation
Add 115/12.47 kV
transformer at
Coopers Mills
(Maxcy's)
Coordinate
w/MPRP
Voltage violations
following loss of
Maxcys 115/34.5 kV
transformer
2014
Proposed
8
8
8
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Bath Area
Load Study Line work
Rebuild 34.5 kV
Sections 55 & 58
Overloaded under
single element
contingency
conditions
2011
Under Construction
9
9
9
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected In-
Service Date
Status
Berwick -
Lebanon
Area Reliability
Study
Bassett
Substation
New 34/12 kV
Bassett Substation
and 2nd 34.5 kV
transmission line to
Quaker Hill
Experiencing high
load growth,
thermal restriction
on Section 118
2011
Under
Construction
Berwick
Substation
New 34/12 kV
Berwick Substation
and 34.5 kV
transmission line to
Bassett
Load growth,
inadequate 34/12
kV capacity,
overloaded
distribution circuits
2013
Planned
New Lebanon
Substation
Add new Lebanon
Substation and 34.5
kV transmission line
to Butler’s Corner
Load growth in
Lebanon area will
exceed area
capacity
2013
Planned
10
10
10
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Brunswick -
Topsham Area
Study
Bath
Substation
Install a 115 kV
bus-tie breaker at
Bath Substation
Severe Low Voltage
occurs with a Bath
115 kV bus-fault
2013 Proposed
Line work Re-rate 34.5 kV
Section 76
Overloaded under
single element
contingency
conditions
2013 Proposed
Brunswick
Hydro
Substation
Upgrade
Brunswick Hydro
T1 34/12 kV
transformer
Overloaded under
normal operating
conditions
2013 Proposed
Woolwich
Substation
Upgrade
Woolwich T1
34/12 kV
transformer
Overloaded under
normal operating
conditions
2014 Proposed
Topsham
Substation
Upgrade Topsham
T2 34/12 kV
transformer
Overloaded under
normal operating
conditions
2014 Proposed
11
11
11
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Brunswick -
Topsham Area
Study
(Cont)
Topsham 115
kV Substation
Upgrade Topsham
115 kV T1 and T3
115/34.5 kV
transformers
Overloaded under
single element
contingency
conditions
2014 Proposed
12
12
12
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Lewiston -
Auburn Area
Reliability
Study
Leeds
Substation
Build a new Leeds
115/34.5 kV
distribution
substation
Voltage violations
and overloaded
transformer at
Turner
2012
Under Construction
Line work
Change protection
settings on
Section 72
34.5 kV line
overload post-
contingency
2013 Proposed
Great Falls
Substation
Replace Section
148 cable into
Great Falls
Substation
34.5 kV line
overload post-
contingency
2013 Proposed
Gulf Island
Substation
Upgrade Gulf
Island 115/34.5 kV
T1 transformer
Transformer
overloaded with load
growth, with MPRP
reinforcements
2020 Concept
13
13
13
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Lakes Region
Area
Reliability
Study
Lovell Area
Upgrades
New (9.5 mile)
34.5 kV line from
Bridgton to
Kimball Road
Voltage violations
under contingent
system conditions
2015 Concept
Install a 5.4 MVAR
capacitor bank at
Kimball Road
2015 Concept
Install a 5.4 MVAR
capacitor bank at
Lovell
2015 Concept
Remove voltage
supervision for the
reverse power
relaying on Lovell
T1
Back feeding NH
under post-
contingent
conditions creates
voltage and thermal
violations
2013 Proposed
North
Limington
Upgrades
Two 34.5 kV
breakers, two 5.4
MVAR capacitor
banks
Voltage violations
under contingent
system conditions
2015 Concept
14
14
14
LSP Projects
Project
Origin
Major
Project Project Description
Needs
Assessment
Projected In-
Service Date
Status
Lakes Region
Area
Reliability
Study
(Cont)
Raymond
Area
Upgrades
New North Raymond
115/34 kV S/S with a four
breaker ring bus and
115/34 kV transformer
and (10 mile) 115 kV
transmission line to
Surowiec
Voltage and
thermal violations
under contingent
system conditions
2015 Concept
Relocate Raymond 34
kV S/S
Room needed for
expansion 2015 Concept
New (4.5 mile) 34.5 kV
line from Raymond 115
kV to Raymond 34 kV
Voltage and
thermal violations
under contingent
system conditions
2015 Concept
New (6 mile) 34.5 kV line
from North Raymond to
Raymond 34 kV
Voltage and
thermal violations
under contingent
system conditions
2015 Concept
15
15
15
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Midcoast Area
NTA Analysis
(the Camden -
Rockland
Area Reliability
Study)
Park St
Substation
Add 5.4 MVAR
34.5 kV capacitor
bank
Low voltage 2011 Under Construction
Add 3.6 MVAR
34.5 kV capacitor
bank
Low voltage 2013 Proposed
Meadow Rd
Substation
Add two 5.4 MVAR
34.5 kV capacitor
banks
Low voltage 2011 Under Construction
Line Work
Add 1 mile 34.5 kV
line to separate
Section 51 (Warren
– Waldoboro)
Voltage and thermal
violations under
contingent system
conditions
(Not needed if NTA
is approved)
2013 Proposed
16
16
16
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Midcoast Area
NTA Analysis
(Cont)
Boothbay
Upgrades
Add a 2.7 MVAR
capacitor bank at
Boothbay
Low voltage 2013 Proposed
Power Factor
Correction at
Boothbay Harbor
12 kV
Low voltage 2013 Proposed
Mason
Upgrades
Relay
Modifications on
Section 25 at
Mason
34.5 kV line
overload post-
contingency
2013 Proposed
Line Work Rebuild 34.5 kV
Section 23
Voltage violations
under contingent
system conditions
(Not needed if NTA
is approved)
2013 Proposed
Coopers Mills
Upgrades
Upgrade Coopers
Mills T1 115/34 kV
Transformer
overloaded post-
contingency
2013 Planned
17
17
17
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Portland
Area NTA
Analysis
Raven Farm
Expansion
(115/34.5 kV)
New 115 kV bus
with four breaker,
breaker-and-a-half
configuration.
Also, install a
115/34 kV
transformer and
34.5 kV line to
Elm Street
Voltage and thermal
violations under
contingent system
conditions
(Not needed if NTA
is approved)
2015 Proposed
Line work
Rebuild 34.5 kV
Section 181
Overloaded under
single element
contingency
conditions
(Not needed if NTA
is approved)
2015 Proposed
Rebuild a portion
of 34.5 kV Section
180
Overloaded under
single element
contingency
conditions
2015 Proposed
18
18
18
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Portland
Area NTA
Analysis
(Cont)
Red Brook
Upgrade Red
Brook T1 to a
30/50 MVA
Transformer
overloaded under
contingent system
conditions
(Not needed if NTA
is approved)
2015 Proposed
19
19
19
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Portland North
Area Reliability
Study
Line work
Re-rate portions of
34kV line Section
102
Thermal violations
under normal
operating and
contingent system
conditions
2011 Under Construction
Bishop Street
Substation
Add 2-34 kV
breakers on
Section 188
Violation of 25 MW
loss of load criterion 2011
Under Construction
Line work
Rebuild portions
of 34.5 kV line
Section 188
Thermal violations
under normal
operating and
contingent system
conditions
2012 Under Construction
Line work
Re-rate/rebuild
portions of 34kV
line Section 180A
Thermal violations
under normal
operating and
contingent system
conditions
(Not needed if NTA
is approved)
2013
Proposed –
Pending NTA
conclusion
20
20
20
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Portland North
Area Reliability
Study
(Cont)
Voltage
support
Add two 2.7 MVAR
capacitor banks at
Freeport
Voltage violations
under contingent
system conditions
2013 Proposed
Voltage
support
Add two 5.4 MVAR
capacitor banks at
North Windham
S/S
Voltage violations
under contingent
system conditions
2013 Proposed
Bishop Street
Substation
Add a 5.4 MVAR
capacitor bank
Voltage violations
under contingent
system conditions
2013 Proposed
Elm Street
Substation
Bring S164 in/out of
Elm St, re-rate
S164A
Thermal violations
under contingent
system conditions
(Not needed if
Raven Farms 115
kV is built)
2013 Proposed –Pending
NTA conclusion
21
21
21
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Portland North
Area Reliability
Study
(Cont)
Line work Rebuild Section
103
Could overload under
normal operating
and/or single element
contingency conditions
in 2010
2013 Planned
Falmouth
Substation
Add two 34.5 kV
breakers
Voltage and 25 MW
loss of load criteria
violations under
contingent system
(Not needed if hybrid
NTA is approved)
2013
Proposed –Pending
NTA conclusion
Swett Rd.
Substation
Add two 34 kV
breakers
Low Voltages in the
local area under single
element contingencies
2014
Proposed – Pending
Lakes Region Area
Reliability Study
results
East Deering
Substation
115-34 kV
substation with
115 kV line from
Raven Farm.
Additional source
needed in the area
(Not needed if NTA is
approved)
2015
Proposed –Pending
NTA Analysis
22
22
22
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Portland North
Area Reliability
Study
(Cont)
North
Yarmouth
Substation
New 115/34kV
S/S tapped from
Sect 166, and
14.8 mi 34.5 kV
line to Gray &
Freeport with
breakers
Voltage violations
under contingent
system conditions
(Not needed if hybrid
NTA is approved)
2015 Proposed –Pending
NTA Conclusion
Swett Road
Substation
Add 5.4 MVAR
capacitor bank
Voltage violations
under contingent
system conditions
2016
Proposed – Pending
Lakes Region Area
Reliability Study
results
Prides Corner
Substation
Add an additional
5.4 MVAR
capacitor bank
Voltage violations
under contingent
system conditions
(Not needed if hybrid
NTA is approved)
2018 Proposed –Pending
NTA Conclusion
23
23
23
LSP Projects
Project
Origin Major Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Saco Bay
Area
Reliability
Study
New Vallee Lane
Substation
New 115/34.5 kV
Substation in Old
Orchard Beach
and 115 kV
double-circuit line
from Louden to
Old Orchard
Beach
Additional 115 kV
transformer capacity
and voltage support is
needed in the Saco
Bay Area. Loss of
Section 193 violates
CMP’s 25 MW loss of
load criterion.
2012 Under
Construction
New Goosefare
Substation
New 115/12 kV
substation in Saco
24
24
24
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Skowhegan
Area
Reliability
Study
Line work Re-rate Section
73
Overloaded under
single element
contingency
conditions
2011 Under Construction
Norridgewock
Source
Tap Section 73,
install 34/34 delta-
wye isolating
transformer for
new distribution
supply
Distribution circuit
becoming
overloaded, need a
new source
2012 Under Construction
Lakewood
Substation
Expansion
Loop Section 241
into a new 115 kV
ring bus with 2nd
115/34.5 kV
transformer
Voltage violations
under contingent
system conditions
2013 Under Construction
25
25
25
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Waterville -
Winslow Area
Reliability
Study
Line work
Re-rate portions of
34.5 kV line
Section 38.
Overloaded under
single element
contingency
conditions
2012 Planned
Belgrade
Source /
Hospital Feed
Install a 115/34 kV
transformer and
two 115 kV
breakers at North
Augusta with a
new 34.5 kV
distribution circuit
into the Belgrade
area.
Reliability and
voltage concerns on
a very long 34.5 kV
distribution circuit
out of Rice Rips;
need to bring in a
new source to shift
load. The addition of
a new hospital is
also driving these
upgrades.
2012 Planned
Line work
Re-conductor a
portion of 34.5 kV
line Section 56.
Overloaded under
single element
contingency
conditions
2013 Proposed
26
26
26
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Waterville -
Winslow Area
Reliability
Study
(Cont)
Line work
Re-rate portions of
34.5 kV line
Section 13.
Overloaded under
single element
contingency
conditions
2013 Proposed
Line Work
Re-rate 34.5 KV
overhead portion
of Section 38B
Overloaded under
single element
contingency
conditions
2013 Proposed
Rice Rips
Substation
Bring the new line
Section 241 in/out
of Rice Rips by
constructing 7
miles of new 115
kV Transmission.
Also, upgrade
Rice Rips into a 4-
breaker ring bus
with a second
115/34 kV
transformer.
Voltage and thermal
violations under
contingent system
conditions
2014 Proposed
27
27
27
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Maintenance -
Reliability
Inspection
Bristol
Substation
Upgrade Bristol
T1
Overloaded under
normal operating
conditions
2012 Planned
Bar Mills
Substation
Upgrade Bar Mills
T4
South China
Substation
Upgrade South
China T1
Line work
Rebuild Sections;
5A, 48, 172, 187
These 34.5 kV line
sections are in very
poor condition and
need to be rebuilt to
improve reliability.
2013 Planned
Vassalboro
Substation
Move Section 40
termination to
Vassalboro. Move
two 34.5 kV
breakers to
Vassalboro.
CMP Facilities at the
Fort Halifax
Substation are being
retired and moved to
the Vassalboro
Substation
2012 Under Construction
28
28
28
LSP Generation Projects
Generator
ID Project Description Status
Projected In-
Service Date Current Progress
ISO-NE Queue
# 215
Interconnection Request for
50 MW Wind Farm to tap into
CMP 115 kV Section 270
north of Rumford 115 kV
Substation
Planned 2013
System Impact Study Complete
& interconnection agreement
executed
ISO-NE Queue
# 244
Interconnection Request for
117 MW Wind Farm to tie into
CMP Wyman Hydro
Substation
Proposed 2013 System Impact Study Complete
ISO-NE Queue
# 287
Interconnection Request for
33 MW Wind Farm to tie into
CMP 115 kV Line Section 229
between Rumford Substation
and Riley Substation
Planned 2013 Undergoing System Impact
Study
29
29
29
LSP Generation Projects
Generator
ID Project Description Status
Projected In-
Service Date Current Progress
ISO-NE Queue
# 300
Interconnection Request for
20 MW Wind Farm to tie into
CMP 115 kV Line Section 229
between Rumford Substation
and Riley Substation
Planned 2013 System Impact Study Complete
ISO-NE Queue
#310
Tied to
Queue #138
Interconnection Request for
45 MW Wind Farm to tie into
Customer owned 115 kV line
Section 267 north of Bigelow
Substation.
Concept 2012
Undergoing System Impact
Study
ISO-NE Queue
#333
Interconnection Request for
216 MW Wind Farm to tie into
CMP. Three potential
interconnection sites to be
studied.
Concept 2012 Undergoing Feasibility Study
30
30
30
LSP Generation Projects
Generator
ID Project Description Status
Projected In-
Service Date Current Progress
ISO-NE Queue
# 300
Interconnection Request for
20 MW Wind Farm to tie into
CMP 115 kV Line Section 229
between Rumford Substation
and Riley Substation
Planned 2013 System Impact Study Complete
ISO-NE Queue
#310
Tied to
Queue #138
Interconnection Request for
45 MW Wind Farm to tie into
Customer owned 115 kV line
Section 267 north of Bigelow
Substation.
Concept 2012
Undergoing System Impact
Study
ISO-NE Queue
#333
Interconnection Request for
216 MW Wind Farm to tie into
CMP. Three potential
interconnection sites to be
studied.
Concept 2012 Undergoing Feasibility Study
31
31
31
LSP Generation Projects
Generator
ID Project Description Status
Projected In-
Service Date Current Progress
ISO-NE Queue
#335
Interconnection Request for
25 MW biomass generator at
existing customer site.
Planned 2012 System Impact Study Complete
ISO-NE Queue
#337
Interconnection Request to
true-up the existing
generating plant net output
and add a net increase of 26
MW at existing customer site,
Section 227.
Planned 2012 System Impact Study Complete
ISO-NE Queue
#350
Interconnection Request to
interconnect into 3-Points of
interconnection
Concept 2013 Undergoing Feasibility Study
ISO-NE Queue
#366
Interconnection Request for
13.4 MW increased capacity
at existing customer site.
Concept 2012
Undergoing System Impact
Study Study
ISO-NE Queue
#372
Interconnection Request for 3
MW increased capacity at
existing customer site.
Concept 2012 phase A
2013 phase B
Undergoing System Impact
Study
32
32
32
In-Service LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
Projected In-
Service Date Status
Augusta
Area Reliability
Study
Line work
Re-rate 34 kV line
Sections 39 & 41 to
212°F thermal limit
Overloaded under
normal operating
conditions
2011 In Service
33
33
33
In-Service LSP Generation
Projects
Generator
ID Project Description Status
Projected In-
Service Date Current Progress
ISO-NE Queue
# 138
•Rebuild Bigelow Substation
•Wyman Hydro Substation
Upgrades
•Re-rate Sect 215
•Several area capacitor banks
In Service 2009
Met Developer’s
Interconnection Request &
Implemented the
Recommendations contained in
the I.3.9 Proposed Plan
Application
ISO-NE Queue
# 290
System Impact Study
Complete
In Service
Back-feed
10/15/11
2011
Met Developer’s
Interconnection Request for 20
MW Wind Farm to tie into CMP
Woodstock Substation
ISO-NE Queue
# 197
•New 115 kV line Section 270
(old Section 59)
•New Roxbury Substation
•Move 115/34 kV transformer
from Rumford to Roxbury
In Service
2011
Met Developer’s
Interconnection Request to
connect 50.6 MW Wind Farm
to new CMP 115 kV Section 270
34
34
34
LSP Future Studies
Study
Projected
Study
Date
Status Needs Assessment Solutions
Portland North Area
Reliability Study Dec 2010 In Review
Re-affirm timing and need of
projects from the original study.
Re-assessing transmission
and NTA requirements
Mid-coast Area
Reliability Study Dec 2010 In Review Re-affirm timing and need of
projects from the original study.
Re-assessing transmission
and NTA requirements
Lakes Region Area
Reliability Study 2011 In Progress
Contingency processor showed
thermal and voltage violations
under single element contingencies
Conduct area reliability study
and assess possible system
upgrades
Southern Maine
Area Reliability
Study 2012 Concept
Contingency processor showed
thermal and voltage violations
under single element contingencies
Conduct area reliability study
and assess possible system
upgrades
Augusta Area
Reliability Study 2013 Concept
Contingency processor showed
thermal and voltage violations
under single element contingencies
Conduct area reliability study
and assess possible system
upgrades
35
35
35
Augusta Area Go Back to Augusta
Puddledock
Road
North
Augusta
Augusta
East Side
115/34 kV
115/12 kV
Belgrade
D4
D3
D2
D1
Maxcys
Se
ctio
n 3
8
Sidney
Bond Brook
Hospital
Se
ctio
n 2
13
115/34 kV
115/34 kV
Bowman
Street
Gulf Island
Coopers Mills
(Maxcys)
115/34 kV
115/34 kV
Section XX
Blair Rd
McCoy's S. China
Winslow
Rice Rips
Vassalboro
Se
ctio
n 1
Augusta K5
Section 38B
Section 39
Section 39C
Section 39B
Section 33
Winthrop
Manchester
Se
ctio
n 1
4
Capital St
Se
ctio
n 2
Section 19
Cony Rd345/115 kV
115/34 kV
(Upgrade)Section 88
Section 60
Non-PTF Upgrades
PTF Upgrades
Go Back to Winslow
36
36
36
Skowhegan Area Go Back
Williams
Hydro
Sect. 63A
Sect. 66
Wyman Hydro
Se
ct. 2
41
Sect. 15
Anson
North Anson
Harmony
Skowhegan N.
Weston
Skowhegan S.
Shawmut
Lakewood
Se
ct. 6
3
Sappi
Somerset
Sect. 222Sect. 215
Detroit
MoscowBigelow
Heywood
Sturtevant
Rice Rips
Se
ct. 8
3
Sect. 73Sect. 44
Se
ct. 7
9
Madison
Electric
Works
Norridgewock Sect. 9 New Construction
Re-rate
Re-Conductor
New Non-PTF
New PTF
37
37
37
Portland North Area Go Back Surowiec
Moshers
Gray
Spring Street 115
W.F. Wyman
12-kV
Blue Rock Quarry
Brighton Ave.
Bishop St.
Prides Corner
Lambert St.
East Deering
FalmouthElm St.
Freeport
Swett Rd.
12-kV
Se
ct.
18
0A
Sect. 180
Sect. 188
10.8 MVAR
5.4 MVAR
10.8 MVAR
North Gorham
Hydro
10.8 MVAR
Spring Street 34.5
New Construction
Re-rate
Westbrook Pleasant Hill
Se
ct.
10
3
20/37
Sect. 102
Sect. 104S
ec
t. 1
66
North
Yarmouth
S/S
Re-Conductor
Raymond
New Non-PTFNew PTF
38
38
38
Waterville/Winslow Area Go Back
Se
ct. 2
41
(fu
ture
)
Wyman Hydro
Sect. 67
Maxcys
Se
ct. 8
3
Detroit
Heywood
Road
Winslow
Se
ct. 2
42
Sect. 84
Rice Rips
Sect. 56
Fairfield
Augusta East
Side
Shawmut
Se
ct. 1
0
Se
ct. 1
Sect. 47
Keyes Fiber
Hydro
KennebecS
ect. 7
1
Fort HalifaxVassalboro
South
Waterville
Oakland
Sect. 40Sect. 13
Sydney
Se
ct. 3
8
Sect. 38
West
Waterville
Se
ct. 5
6A
Augusta
East Side
Bowman St.Sect. 60
Sect. 80Highland Sect. 88
Mason
Sect. 68
Sect. 38A
Sect. 67A
115/34 kV
20/37 MVA
Sect. 241
New Construction
Re-rate
Re-Conductor
New Non-PTF
New PTF
39
39
39
Lakes Region Area Go Back
Bridgton
Hiram Hydro
Se
ctio
n 9
1S
ectio
n 1
70
Denmark
Hiram
Baldwin
North
Limington
2 x 5.4 MVAR
Raymond
Prides Corner
North Gorham
Se
ctio
n 1
03
Portland
Pipeline
Raymond 34
N. Windham
Swett Rd
T1
20/37
MVA
T2
20/37
MVA20/37
MVA
Alt. to caps
N. Raymond
S208
SYY
5.4 MVAR
5.4 MVAR
Section XX
Bonny Eagle
Se
ctio
n 1
87
Fort Hill
Shaw Mills
Randall Rd
Moshers
Kimball Rd
Saco Valley
Lovell
Section 214Section 214
T1
20/37
MVA
T1
20/37
MVA
5.4 MVAR
W. Bridgton
Section 94
Section ZZ5.4 MVAR
5.4 MVAR
SurowiecS
ectio
n Y
Y
Non-PTF Upgrades
PTF Upgrades
40
40
40
Brunswick/Topsham Area Go Back to Bath
Go Back to Topsham Surowiec
345/115 kV
Se
ctio
n 6
2
Crowleys
115/34 kV
Non-PTF Upgrades
PTF Upgrades
Hardings
Topsham 115 kV
Mason
Bath
Cooks Corner
Section 11
Washington St.
Section 55
Section 58
Mason
Gulf Island
Sabattus
Pejepscot
Section 76
Section 43
Lisbon Falls
Lisbon
Section 72
Section 31
Topsham Old
Se
ctio
n 3
0
Brunswick
West Side
Brunswick
Hydro
Lewiston lower
Woolwich
41
41
41
CMP’s 14 Local Planning Areas Go Back