利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance...
Transcript of 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance...
![Page 1: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/1.jpg)
Environmental Management Plan
for
Bayannaoer Water Reclamation and Environment
Improvement Project
Hetao Water Affair Group, Ltd. . Bayannaoer City, Inner Mongolia
Oct. 2010
E2498 vol. 4
![Page 2: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/2.jpg)
1. General Information1.1 Project profile
Located in the west of Inner Mongolia autonomous region, a border area
province in North China, Bayannaoer City is amongst 105°12′~109°53′E and 40°13′
~42°28′N, connecting with Baotu City and Wulanchabu City at the east, abutting on
Alxa League at the west, close to the Yellow River at the south opposite to Yike Zhao
League, bordering the People's Republic of Mongolia at the north with a boundary
line of 368.89 km, covering an area of 65788 km2, with the length of 378 km form
east to west and the width of 238 km from south to north, governing the
administrative divisions of Linhe District, Wulateqianqi County, Urad Middle Banner,
Wulatehouqi County, Hangjin Back Banner, Wuyuan County and Dengkou County,
with Hetao Irrigation Area as the core. In 2003, approved by the State Council, this
City was upgraded from League into a prefecture-level City in the west of Inner
Mongolia autonomous region.
In accordance with the economic development strategy of the autonomous region
and Bayannaoer City, in order to make full use of the abundant mineral resources
within the city as well as that from Mongolia, it is planned to build up Qingshan
Industrial Zone, Jinquan Industrial Zone, Shahai Industrial Zone, Linhe Chemical
Industrial Zone and Urad Industry Base and therefore, Bayannaoer City will be the
key heavy chemical industry base in Inner Mongolia autonomous region.
Accordingly, the water requirements of the perspective long-term plan will be up to
about 520 million m3, of which the water requirements of long-term plan by the
industrial zones within the mountainous areas serious lack of water resources will be
up to 410 million m3. According to the estimate in the Report on the Comprehensive
Planning with regard to Water Resources in Bayannaoer City, the gross amount of the
water resources along the south foot of Yinshan Mountain within Bayannaoer City in
![Page 3: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/3.jpg)
the Yellow River Valley is 587 million m3, of which the gross amount of groundwater
is 380 million m3, mainly used as domestic water for urban and rural residents. And
industrial water is mainly from the recycled water according to relevant industrial
policies of the State.
Covering a water surface of 293km3, with an aggregate storage capacity of 330
million m3, Wuliangsuhai Lake Lake is the largest riverside fresh water lake in the
upper and middle reaches of the Yellow River, where, in recent years, the industrial
waste water and urban domestic sewage increases year by year and the pollution from
the general drainage canal is increasingly severe with the development of industrial
production and the increase of urban population in the irrigation area, in particular, the
trend of eutrophication in Wuliangsuhai Lake Lake is increasingly severe, resulting in
three to five times of the total phosphorus, total nitrogen and chemical oxygen-
consumption in the lake beyond National Grade III standard for surface water and the
quality of the water being worse than Grade V, which speeds up the biological fill up
rate of the lake and the eco-function of the lake is fading away. What’s more, in order
to reserve enough storage capacity for floodwater before flood season, it is necessary
to open the check gate at the outlet of the general drainage canal to discharge water
into the Yellow River, so the polluted water stored in the lake causes severe pollution
threat to the Yellow River.
In order to further promote the comprehensive treatment of water environment in
Bayannaoer City, to strengthen greatly the infrastructural construction of the urban
environment, to reduce the pollution load of Wuliangsuhai Lake Lake, to relieve
environmental degradation, to improve the quality of urban water environment and
further to promote the process of urbanization and the increase of economy,
Bayannaoer municipal party committee and government make decision to cooperate
with the World Bank to implement the Project of Comprehensive Treatment of Water
Environment in Bayannaoer City by loan from the World Bank. Through a great deal
of pre-phase the preliminary investigation and study as well as careful preparations, in
August 2006, Bayannaoer municipal party committee and government lodged a
![Page 4: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/4.jpg)
formal application with National Development and Reform Commission for the
utilization of the loan of 150 million USD from the World Bank (plus domestic
counterpart funding of about RMB 2.125 Yuan) to implement the Project of
Comprehensive Treatment of Water Environment in Bayannaoer City (hereafter
referred to as simply “this Project”), which was approved in July 2009 and listed into
the National Projects Alternatives Planning to use loans from World Bank during
2010~2012 fiscal years.
The Project of Comprehensive Treatment of Water Environment in Bayannaoer
City (hereafter referred to as simply “this Project”) comprises of nine sub-projects (of
which eight involves in takeover of land, civil engineering, equipment procurement
and competence construction), mainly including the constructions of the water supply
engineering of recycled water of Wulatehouqi County Industrial Zone, the water
supply engineering of recycled water of Ganqimaodao customs port Processing Zone,
the water supply engineering of recycled water of the third drainage canal, the water
supply engineering of recycled water of the seventh drainage canal, the sewage
disposal and reuse project of Wulatehouqi County Industrial Zone (Huhe Town), the
sewage disposal and reuse project of Ganqimaodao customs port Processing
Zone(Delinshan Town), the sewage disposal and reuse project of Wulateqianqi
County Industrial Zone(Xianfeng Town), the excavating engineering of grid water
channels in Wuliangsuhai Lake Lake area, the project of artificial wetland as the
biological transition zone in Wuliangsuhai Lake Lake area. Each sub-project and the
distribution location are shown in Table 1.1-1.
Table 1.1-1: Each sub-project and the distribution locationS.N. Name of sub-project Location Evaluated by
1The water supply engineering of recycled water of Wulatehouqi County Industrial Zone
Wulatehouqi County
CRAES
2the sewage disposal and reuse project of Wulatehouqi County Industrial Zone (Huhe Town)
Wulatehouqi County
CRAES
3the water supply engineering of recycled water of the third drainage canal
Hangjin Back Banner
Bayannaoer IES
![Page 5: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/5.jpg)
4the water supply engineering of recycled water of the seventh drainage canal
Wuyuan County
CRAES
5the water supply engineering of recycled water of Ganqimaodao customs port Processing Zone
Urad Middle Banner
CRAES
6the sewage disposal and reuse project of Ganqimaodao customs port Processing Zone(Delinshan Town)
Urad Middle Banner
Bayannaoer IES
7the sewage disposal and reuse project of Wulateqianqi County Industrial Zone(Xianfeng Town)
Wulateqianqi County
Bayannaoer IES
8the excavating engineering of grid water channels in Wuliangsuhai Lake Lake area
Wulateqianqi County
CRAES
9The promotion and demonstration project of artificial wetland as the biological transition zone and the non-point source in Wuliangsuhai Lake Lake area
Wulateqianqi County
CRAES
Whereas the seven sub-projects in respect to the sewage disposal and the water
supply engineering of recycled water in the industrial zones belong to the projects
within the environment protection category with less impact on the environment,
these projects are just required to compile environmental impact statement without
compilation of respective environment management plan according to relevant
provisions of domestic environment impact evaluation and the requirements of the
safety assurance policy by World Bank.
1.2 Objectives of environment management plan
The purpose to formulate EMP means to formulate a set of technically feasible,
financially sustainable and exercisable environmental cures against inevitable
environment impact to define the measurements and arrangements in respect to the
environment mitigation, environment management and institution construction carried
out by project contractors, supervisors, operators and environmental management
departments during the period of project construction and operation so as to eliminate
or offset the adverse impacts caused by this project on the society and the
environment to the fullest extent possible and to lower the risk to an acceptable lever.
The specific objectives are as follows:
(1)Making clear the environment management obligations of the contractors and
operators
Department of Environmental Protection of Inner Mongolia, the environment
![Page 6: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/6.jpg)
evaluation units and design units conduct careful on-site review and confirmation of
the environment protection targets and to put forward effective measures for
environment mitigation, which are included into the engineering design and taken as
the contractual responsibility of the contractors and operators of the project
construction.
(2)Operating instructions for environment management
The environment monitoring plan during the construction period and operation
period proposed in EMP can ensure the effective implantation of the measures for
environment mitigation, which, as the environment protection documentation, shall be
offered to the construction and supervision units, environmental supervision units and
other relevant units during the periods of the construction and operation, to define the
responsibilities and roles of relevant functional departments and administrative
organizations and to provide the communication channels and methods among
different departments.
(3)Guarantee the fund for environment management activity
Preliminary estimate shall be made for the fund used for environment management,
environment supervision and competence construction involving in EMP so as to
ensure various environment management activities can be carried out, of which the
administrative fees include staff salary, administrative expenses and cost of travel.
The function of EMP is to avoid and to control the environment impacts during
projects implementation and operation, according to which the measures as required
to be carried out with regard to impact mitigation, monitoring and legal regulation
model as well as the safeguard measures for such measures should be put forward,
and at the same time, EMP is the key ligament to connect with the impact mitigation
measures and the alternative measures to be assessed and described in details during
environment impact and environment impact assessment. EMP defines the technical
connotation, investment estimate, implementation schedule, the functions of
government authorities, fund resources and monitoring programs for each
![Page 7: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/7.jpg)
environment measure. In order to actualize the reduction targets, all the measures
involved in environmental impact assessment report and EMP shall be got the details
in place.
1.3 EMP compilation
The Environmental Management Plan for “Implementation of the Project of
Comprehensive Treatment of Water Environment in Bayannaoer City by Loan from
the World Bank” is comprised of the overall project EMP and the EMP for 2 sub-
projects, of which the sub-project EMP shall be compiled by owners of the sub
projects as well as their environment impact assessment units, focusing on description
with regard to the project budgets and the EMP organization of the projects. The
Overall project EMP to be submitted to World Bank for review shall be jointly
compiled by World Bank Loans Supporting Project Management Office of Inner
Mongolia and CRAES, which shall be worked out strictly according to the laws and
regulations in line with environment management at the State and provincial levels.
Meanwhile, under the precondition to meet the requirements of the environment
assessment in China, special attentions shall be paid to the safety assurance
regulations of the World Bank, specifically referring to relevant regulations in
Operation Ordinance 4.01.
The information sources for EMP of the overall report are as follows:
(1)Environment assessment for overall project
(2)Summary of environment assessment for overall project
(3)Environment assessment for sub- projects
(4)EMP of environment assessment for sub projects
(5)Immigration allocation schedule of environment assessment for overall
project
![Page 8: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/8.jpg)
(6)Feasibility study report for sub- projects
1.4 EMP design
In order to interpret the contents in respect to environment management,
environment supervision and environment monitoring in details, the EMP to be
complied is the instructive document for environment management during
implementation, and its action plan mainly contains the following three parts:
Environment impact and measures for mitigation: significant environment impacts
during the periods of project construction and operation, the engineering measures
and management measures adopted to prevent or relieve the adverse environment
impacts caused by this project.
Environment management and supervision schedule: environment actions adopted
to ensure the synchronized implementation between the measures for environment
protection and the project construction.
Environment monitoring schedule: the environment monitoring action adopted to
eliminate the environment pollution during construction and operation periods and to
ensure the safety operation of the project and to improve the environment conditions
within the project area.
Competence construction (personnel training) schedule: the knowledge and skills
training conducted for the management staff, the environmental supervisors and the
environment managers in spare time or in full time to ensure the implementation of
EMP.
1.5 Details in compilation technology
Based on the Comprehensive Report on the Environment Assessment of
Implementation of the Project of Comprehensive Treatment of Water Environment in
Bayannaoer City by Loan from the World Bank and the EMPs of other two sub-
projects, this EMP is compiled with applicable supplementary amendments. As an
independent document, this EMP contains all the environment management actions to
be carried out during the construction and operation periods, offering the guide to
action and working framework for this project in respect to measures to mitigate the
![Page 9: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/9.jpg)
adverse impacts, the environment supervision, environment management and
environment monitoring during the construction and operation periods.
No EMPs has been compiled respectively for the seven sub-projects with regard
to the sewage disposal engineering and the water supply engineering of the recycled
water, but their fund for environment management has been included into the budget
of environment management fund in this EMP.
2. Framework for Policy, Law and Administration
2.1 Documents on Environment Policy and Law
2.1.1 Outline
On the basis of the comprehensive analysis on the type, scale, location and
environmental sensibility of the project and the character and size of the potential
environmental impact, the main policy, law and standards governing or involved with
the environmental assessment of this Project include:
(1) Laws and rules on environmental protection;
(2) Technology policy for pollution prevention;
(3) Plans and layout of social and economic development and environmental
protection;
(4) Urban master planning;
(5)Technology guideline for environmental impact assessment;
(6) Environmental quality standard;
(7) Control standards for pollution discharge; and
(8) World Bank safeguard policies.
![Page 10: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/10.jpg)
The aforesaid policies, laws and standards constitute the document framework of
policy, law and standards guiding and standardizing the environmental assessment of
this Project. Each sub-project is governed by different policy, law and standards
because of the different type and character.
Other than aforesaid documents, one of the basis for the environmental
assessment of this Project includes the outline of environmental impact assessment
(TOR), the feasibility study report, the administrative examination and approval
documents of the government authorities and other related documents in which the
said policy, law and standards are embodied and applied concretely.
2.1.2 Laws and rules on environmental protection
(1) The Environmental Protection Law of the People's Republic of China,
1989.12.26;
(2) The Environmental Impact Assessment Law of the People's Republic of
China, 2002.10.28;
(3) The Water Pollution Prevention and Control Law of the People's Republic of
China, 2008.06.01;
(4) The Air Pollution Prevention and Control Law of the People's Republic of
China, 2000.04.29;
(5) The Environmental Noise Pollution Prevention and Control Law of the
People's Republic of China, 1996.10.29;
(6) The Law of the People's Republic of China on the Prevention and Control of
Environmental Pollution by Solid Waste, 2004.12.29;
(7) The Water Law of the People's Republic of China, 1988.01.21;
(8) The Law of the People's Republic of China on Water and Soil Conservation,
1991.06.29;
(9) The Law of the People's Republic of China on the Protection of Cultural
Relics, 2002.10.28;
(10) The Regulations on the Administration of Construction Project
Environmental Protection, 1992.08.17;
(11) The Regulations on the Protection of Basic Farmland, 1998.12.27;
![Page 11: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/11.jpg)
(12) The Rules for the Implementation of the Water Pollution Prevention and
Control Law of the People's Republic of China, 2000.3.20;
(13) The Regulations of the People's Republic of China on Nature Reserves,
1994.12.01;
(14) The Circular of the General Office of the State Council on Strengthening the
Administration of the Wetland Protection, 2004.06.05;
(15) The Circular of the State Council on Strengthening Urban Water Supply and
Saving and Water Pollution Prevention, 2000.11.7;
(16) The Opinions on Strengthening Industrial Water Saving, 2000.10.25;
(17) The Circular on Strengthening the Administration of Environmental Impact
Assessment of the Construction Projects with Loans from International Financial
Organizations, 1993.6.21;
(18) The Provisions on Hierarchical Examination and Approval of the
Environmental Impact Assessment of Construction Projects, 2008.12.11;
(19) The Guiding Catalog of Industrial Structure Adjustment, 2007;
(20) The Categorized List of the Environmental Impact Assessment of
Construction Projects, 2008.10.01;
(21) The Interim Measures on Public Participation in Environmental Impact
Assessment, 2006.02.22;
(22) The Measures for the Disclosure of Environmental Information (Trial
Implementation), 2007.04.21;
(23) The Regulations on Water Resources Justification for Construction Projects,
2002.05;
(24) The Interim Provisions on the Punishment of Activities Violating the Law
and Discipline on Environmental Protection, 2006.02.20;
(25) The Opinions on Strengthening the Environmental Protection of
Construction Projects in the Development of the West Regions, 2001.01.08;
(26) The Regulations on Water Pollution Prevention of Yellow River Basin
within the Territory of Inner Mongolia Autonomous Region, 1996.09.28;
(27) The Implementation Opinions of the People's Government of Inner
![Page 12: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/12.jpg)
Mongolia Autonomous Region on Strengthening Energy Saving and Emission
Reduction in the 11th Five Years, 2007.04.29;
(28) The Regulations of Inner Mongolia Autonomous Region on the
Environmental Protection (revised in 2002), 2002.03.21;
(29) The Implementation Measures of Inner Mongolia Autonomous Region on
the Law of the People's Republic of China on Water and Soil Conservation,
1997.09.24; and
(30) The Announcement of the People's Government of Inner Mongolia
Autonomous Region on the Division of the Main Prevention Areas of Water and Soil
Loss, 1999.05.20.
2.1.3 Technology policy for pollution prevention;(1) The disposal and the technology policy for pollution prevention of urban
domestic wastes
(2) The disposal and the technology policy for pollution prevention of urban
domestic sewage
(3) The prevention and control technology policy for lake and reservoir
eutrophication.
(4) The technology policy for the sludge treatment and disposal and the pollution
prevention and control in municipal wastewater treatment plant (trial implementation)
(5) The prevention and control technology policy for hazardous wastes pollution
(6) Opinions on strengthening the water environmental protection of important
lakes.
2.1.4 Plans and layout of social and economic development and
environmental protection;
(1) Outline of the Eleventh Five-Year Plan for National Economic and Social
Development in Inner Mongolia Autonomous Region
(2) Outline of the Eleventh Five-Year Plan for National Economic and Social
Development in Bayannaoer City
(3) The Eleventh Five-year Plan of Water Pollution Prevention and Control in
Key River Basins
![Page 13: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/13.jpg)
(4) The Comprehensive Planning for the Water Resources in Yellow River Basin
(5) The Function Division of the Inland Rivers in Northwestern and Yellow
River Basin
(6) The Environmental Protection Planning of Bayannaoer City (2005-2010)
2.1.5 The urban master planning and related plans
(1) The Compilation of the Urban Master Planning of Bayannaoer City (2004-
2020)
(2) The Industrial Water Supply Planning in Bayannaoer City, Inner Mongolia
Autonomous Region (2007)
(3) The Water Resources Comprehensive Planning in Bayannaoer City
(4) The Urban Water System Planning in Bayannaoer City, Inner Mongolia
Autonomous Region (F208G-A1)
2.1.6 The technology guideline and standards for environmental impact
assessment
(1) HJ/T2.1-93 Technology Guideline for Environmental Impact Assessment
General Provisions
(2) HJ2.2-2008 Technology Guideline for Environmental Impact Assessment
Atmospheric Environment
(3) HJ/T2.3-93 Technology Guideline for Environmental Impact Assessment
Surface Water Environment
(4) HJ/T2.4-1995 Technology Guideline for Environmental Impact Assessment
Sound Environment
(5) HJ/T19-1997 Technology Guideline for Environmental Impact Assessment
Non-Pollution Ecological Impact
(6) HJ/T169-2004 Technical Guidelines for Environmental Risk Assessment
on Projects
(7) HJ/T192-2006 Technical Criterion for Eco-environmental Status
Evaluation (Trial Implementation)
(8) GB/T16453.1~6-1996 Technical specification for comprehensive control
![Page 14: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/14.jpg)
of soil and water conservation
(9) SL204-98 Technical Regulation on Water and Soil Conservation Plan of
Development and Construction Projects
2.1.7 Environmental quality standard
(1) GB3095-1996 Ambient Air Quality Standard
(2) GB3838-2002 Environmental quality Standards for Surface Water
(3) GB/T14848-93 Quality Standard for ground Water
(4) CJ/T206-2005 Quality Standard for Urban Water Supply
(5) GB5749-2006 Sanitary Standard for Drinking Water
(6) CJ 3020-93 Water Quality Standard for Drinking Water Sources
(7) GB5084-92 Standards for Irrigation Water Quality
(8) GB15618-1995 Environmental Quality Standard for Soils
(9) GB3096-2008 Environmental Quality Standards for Noise
(10) TJ36-79 Sanitary Standard for the Design of Industrial Enterprise
(the Maximum Allowable Concentration of Hazardous Substances in Atmosphere of
Residential Area)
(11) GB/T18883-2002 Indoor Air Quality Standard
2.1.8 Control standards for pollution discharge
(1) GB16297-1996 Integrated Emission Standard of Air Pollutants
(2) GB14554-93 Emission Standard for Odor Pollutants
(3) GB8978-1996 Integrated Wastewater Discharge Standard
(4) GB18918-2002 Discharge Standard of Pollutants for Municipal
Wastewater Treatment Plant
(5) GB12523-90 Noise Limits for Construction Site
(6) GB12348-2008 Standard of Noise at Boundary of Industrial Enterprises
(7) GB18599-2001 Standards for Pollution Control on the Storage and
Disposal Site for General Industrial Solid Wastes
(8) GB5085-1996 Identification Standard for Hazardous Wastes
(9) GB8172-87 Control Standards for Urban Wastes for Agricultural Use
(10) GB4284-84 Control Standards for Pollutants in Sludges from
![Page 15: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/15.jpg)
Agricultural Use
2.1.9 World Bank safeguard policies.
(1)OP/BP 4.01 Environmental Assessment
(2)OP/BP 4.04 Natural Habitats
(3)OP 4.09 Pest Management
(4)OP 4.37 Safety of Dams
(5)OP 4.11 Physical Cultural Resources
(6)OP/BP 4.12 Involuntary Resettlement
(7)OD 4.20 Indigenous Peoples
(8)OP 7.50 Projects on International Waterways
(9)BP17.50 Information Disclosure
(10) Environmental, Health, and Safety General Guidelines
2.1.10 Documents related to the Project
(1) The proposals for the project of the comprehensive treatment of the water
environment in Bayannaoer City, Inner Mongolia Autonomous Region (SC2006-101-
(H)-49);
(2) The proposals for the project of the comprehensive treatment of
Wuliangsuhai Lake, the project of environmental treatment in Yellow River basin in
Inner Mongolia;
(3) The feasibility study report for the ecological treatment project of
Wuliangsuhai Lake in Bayannaoer,Inner Mongolia;
(4) The implementation plan of the ice jam flood detention project from
![Page 16: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/16.jpg)
Sanshenggong to Sanhehukou of Yellow River in Inner Mongolia (BSSDY·SJ-039-
2005);
(5) The outline of the water ecosystem recovery plan of Wuliangsuhai Lake
(2008-2033);
(6) The report of water resources in Bayannaoer (2002-2006);
(7) The report on the investigation of the reasonable disposition of the water
resources in Bayannaoer City; and
(8) The reply on the standard of environmental assessment of the water
environment comprehensive treatment in Bayannaoer City with the loan from World
Bank (Ba Huan Han Fa [2009] No.79).
2.2 Environmental Management Institutions and Their
Responsibilities
PRC Central People's Government and the People's Governments in all
provinces(municipalities directly under the central government and autonomous
regions ), cities(municipalities) and counties(prefectures) all have their own
environmental management institutions which perform their environmental
management duties according to law. The environmental management institutions in
relation with this Project mainly include: State Environment Protection
Administration (SEPA), the Department of Environmental Protection of Inner
Mongolia Autonomous Region and the environmental protection bureaus in all cities,
municipalities and banners(counties and districts).
(1) State Environment Protection Administration (SEPA)
In March 1998, the former State Environment Protection Administration became
the organization directly under the State Council. It is in charge of the administrative
management and enforcement of the environmental protection all over the country
and its main tasks and responsibilities include: to draw up the environmental
protection guideline, policy, laws and rules, planning and administrative regulations;
to supervise the exploitation and utilization of natural resources, the main ecological
![Page 17: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/17.jpg)
environment construction and the ecological damage restoration that have an
influence on the ecological environment; to check and supervise the biodiversity
protection, the wildlife protection, wetland environment protection and the desert
prevention; to supervise and manage the national nature reserves; to direct and
harmonize the significant environmental matters among all localities and departments
and the multi-locations and multi-basins; to establish and organize to implement all
environmental management systems; to examine and approve the environmental
impact reports of development and construction activities according to laws and rules;
to direct the comprehensive environmental regulation in cities and towns; in charge of
rural eco-environmental protection; to manage the international cooperation and
communication on environmental protection; to involve the harmonization of the
important international activities on environmental protection; to mange, organize and
harmonize the domestic implementation of the international treaties in relation with
the environmental protection; to unify contacts with other countries and territories; to
manage the foreign economic cooperations of the environmental protection system; to
harmonize and implement the related foreign-funded projects; to deal with foreign-
related environmental protection matters authorized by the State Council; and in
charge of contacting with the environmental protection international organizations.
State Environment Protection Administration establishes an Environmental
Impact Assessment Department in special charge of the administrative management of
environmental impact assessment and its main tasks and responsibilities include: to
draw up and organize to implement environmental impact assessment, "three
simultaneousness" and other environment management policy, laws and rules; to
undertake the environmental impact assessment of significant economic and
technology policy, development plans and important economic development plans; to
draw up the categorized list of environmental impact assessment; and to examine and
approve the environmental impact reports of the significant development and
construction activities.
(2) Department of Environmental Protection of Inner Mongolia Autonomous
![Page 18: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/18.jpg)
Region
The Department of Environmental Protection of Inner Mongolia Autonomous
Region is in charge of the administrative management and enforcement of the
environmental protection in all the region and its main tasks and responsibilities
include: to implement the State environmental protection guideline, policy, laws and
rules, administrative regulations and standards; to draw up and supervise the
implementation of the environmental protection rules and administrative regulations
in all the region; to undertake, upon the authorization by the People's Government of
Inner Mongolia Autonomous Region, the environmental impact assessment of
significant economic and technology policy, development plans and important
economic development plans in all the region; to draw up the environmental
protection plans, to organize the compilation of the environmental function division,
the regional and basinal pollution prevention plans and the ecological protection
plans, and to supervise the implementation thereof; to involve the establishment of the
environmental protection industrial policy and development plans; to manage and
supervise the environmental protection of the natural ecology and construction
projects; to organize to draw up and supervise the implementation of the prescribed-
time treatment plan of pollution resources; to make the control plan of the total
amount of pollution discharge in all the region, in charge of the registration of the
pollution discharge and the management of the pollution discharge license, and to
organize and supervise the collection of pollution discharge fees; in charge of the
environmental supervision and the environmental protection administrative check; to
organize the implementation of the international treaties in relation with the
environmental protection in all the region; in charge of the international economic and
technology cooperation and communication related to the environmental protection;
and to deal with foreign-related environmental protection matters authorized by the
People's Government of Inner Mongolia Autonomous Region.
The Department of Environmental Protection of Inner Mongolia Autonomous
Region establishes an environmental impact assessment administrative office in
![Page 19: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/19.jpg)
special charge of the administrative management of environmental impact assessment
and its main tasks and responsibilities include: to supervise and manage the
implementation of the environmental impact assessment and the "three
simultaneousness" system in all the region; to implement the State laws, rules,
regulations and policy in relation with environmental impact assessment and the
"three simultaneousness" system; to draw up, implement and supervise the local
regulations, rules and policy in relation with the environmental impact assessment and
the "three simultaneousness" system; in charge of the examination of environmental
impact assessment documents of the plans examined and approved by the People's
Government and its departments in the region; to guide and supervise the examination
and approval of environmental impact assessment of construction projects in all the
region; in charge of the administrative license of environmental impact assessment
documents of construction projects within the authorization of the Department of
Environmental Protection of the region; in charge of the administrative license of the
trial production (operation) and the environmental protection check and acceptance of
construction projects within the authorization of the Department of Environmental
Protection of the region; and to guide the business of the environment examination
centers of construction project in the region.
The Department of Environmental Protection of Inner Mongolia Autonomous
Region establishes an foreign cooperation and communication office in charge of the
international cooperation and communication related to environmental protection in
all the region and its main tasks and responsibilities include: to organize, in
cooperation with related offices and branches, the filtration, recommendation and
application of foreign cooperation and investment projects on environmental
protection in all the region; in charge of the negotiation on environmental protection
between Inner Mongolia Autonomous Region and international organizations, foreign
governments and organizations and on-governmental organizations and the
management of the organization and implementation of the cooperation projects; and
to undertake the business of foreign-funded projects in relation with environmental
![Page 20: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/20.jpg)
protection.
(3) Environmental Protection Bureau in Bayannaoer City
The Environmental Protection Bureau in Bayannaoer City is in charge of the
administrative management and enforcement of the environmental protection in the
city and its main tasks and responsibilities include: to implement the State
environmental protection guideline, policy, laws and rules, administrative regulations
and standards; to draw up and supervise the implementation of the environmental
protection rules and administrative regulations in the city; to undertake, upon the
authorization by the People's Government of the city, the environmental impact
assessment of significant economic and technology policy, development plans and
important economic development plans in the city; to draw up the environmental
protection plans, to organize the compilation of basinal pollution prevention plans and
ecological protection plans, and to supervise the implementation thereof; to manage
and supervise the environmental protection of the natural ecology and construction
projects; to organize to draw up and supervise the implementation of the prescribed-
time treatment plan of pollution resources; to make the control plan of the total
amount of pollution discharge in the city, in charge of the registration of the pollution
discharge and the management of the pollution discharge license, and to organize and
supervise the collection of pollution discharge fees; in charge of the environmental
supervision and the environmental protection administrative check; in charge of the
international economic and technology cooperation and communication related to the
environmental protection; and to deal with foreign-related environmental protection
matters authorized by the People's Government of Bayannaoer City.
The Environmental Protection Bureau in Bayannaoer City establishes an
environmental impact assessment administrative office (or pollution control office,
supervision and management office) in special charge of the administrative
management of environmental impact assessment and its main tasks and
responsibilities include: to supervise and manage the implementation of the
environmental impact assessment and the "three simultaneousness" system in the city;
![Page 21: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/21.jpg)
to implement the laws, rules, regulations and policy, stipulated by the State or Inner
Mongolia Autonomous Region, in relation with environmental impact assessment and
the "three simultaneousness" system; to draw up, implement and supervise the local
regulations, rules and policy in relation with the environmental impact assessment and
the "three simultaneousness" system; to guide and supervise the examination and
approval of environmental impact assessment of construction projects in the city; in
charge of the administrative license guideline of environmental impact assessment
documents of construction projects within the authorization of the Environmental
Protection Bureau in the city; and in charge of the administrative license of the trial
production (operation) and the environmental protection check and acceptance of
construction projects within the authorization of Environmental Protection Bureau in
the city.
(4) Environmental Protection Bureaus in all counties (districts)
The Environmental Protection Bureaus in all banners (counties, districts) where
the sub-projects of this Project located are in charge of the administrative
management and enforcement of the environmental protection in the banner (county,
district) and their main tasks and responsibilities include: to implement the State
environmental protection guideline, policy, laws and rules, administrative regulations
and standards; to draw up and supervise the implementation of the environmental
protection plan in the banner (county, district); to manage and supervise the
environmental protection of the natural ecology and construction projects; to organize
to draw up and supervise the implementation of the prescribed-time treatment plan of
pollution resources; to make the control plan of the total amount of pollution
discharge in the banner (county, district), in charge of the registration of the pollution
discharge and the management of the pollution discharge license within the
authorization thereof, and to organize and supervise the collection of pollution
discharge fees; and in charge of the environmental supervision and the environmental
protection administrative check.
In order to generally organize, harmonize and manage the filtration,
![Page 22: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/22.jpg)
recommendation, application, business negotiation and check and acceptance of the
environment projects with the loan from World Bank in Bayannaoer City, the
government of Bayannaoer City establishes the project cooperation and lead group
(PCLG) the leader of which is the deputy mayor in main charge of environmental
protection. PCLG have a project management office (YNPMO), administratively
established in Hetao Water Affairs Group Limited, which is the representative of the
municipal project cooperation and lead group to undertake the related business.
3. Project description3.1 Project objectives
The primary objectives of this Project of Comprehensive Treatment of Water
Environment in Bayannaoer City are to purify the water body of Hetao Irrigation Area
of the Yellow River and Wuliangsuhai Lake Lake area, to increase the quality of water
environment in Bayannaoer City at a larger extent, to reasonably adjust the storage of
water resources so as to promote the sustainable development of the eco-environment
and economic society within the City through the construction of this project.
The primary contents of this project contain: the sewage disposal and reuse project
within the industrial zones (the sewage disposal and reuse project of Wulatehouqi
County Industrial Zone, the sewage disposal and reuse project of Ganqimaodao
customs port Processing Zone and the sewage disposal and reuse project of
Wulateqianqi County Industrial Zone) and the water supply engineering of recycled
water within the industrial zones (The water supply engineering of recycled water of
Wulatehouqi County Industrial Zone, the water supply engineering of recycled water
of Ganqimaodao customs port Processing Zone, the water supply engineering of
recycled water of the third drainage canal and the water supply engineering of
recycled water of the seventh drainage canal), and the treatment engineering in
Wuliangsuhai Lake Lake area (the excavating engineering of grid water channels in
Wuliangsuhai Lake Lake area and the promotion and demonstration project of
artificial wetland as the biological transition zone and the non-point source in
Wuliangsuhai Lake Lake area).
![Page 23: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/23.jpg)
1) The sewage disposal and reuse project and the water supply engineering of
recycled water
The construction of the sewage disposal and reuse project and the water supply
engineering of recycled water can, on the one hand, to actualize the objective to
ensure utilization of the industrial water within the industrial zones, and on the other
hand, reduce the total quantity of water pollutants along the general drainage canal
and decrease the pollution load into Wuliangsuhai Lake Lake from the general
drainage canal so as to improve the water quality in Wuliangsuhai Lake Lake.
2) Comprehensive treatment project in Wuliangsuhai Lake Lake
Several projects construction is needed to improve the water quality in
Wuliangsuhai Lake Lake and to give full play to the function of water storage and
regulation in Wuliangsuhai Lake Lake.
①The garden-farming grid water channel project in Wuliangsuhai Lake Lake
By the excavating engineering of grid water channels in Wuliangsuhai Lake
Lake area, strengthen the circulation of the water body, control the endogenous
pollution within Wuliangsuhai Lake Lake, keep the creeping of the plants in
Wuliangsuhai Lake Lake within limits and reap the water plants to transfer nitrogen
and phosphor, which can effectively reduce the nutrient salt content and mitigate the
development trend of eutrophication of the lake area.
②The promotion and demonstration project of artificial wetland as the biological
transition zone and pollution control of the non-point source in Wuliangsuhai Lake
Lake area
Through the construction of project of artificial wetland as the biological
transition zone in the west part and northwest part of Wuliangsuhai Lake Lake area,
this project can dispose the irrigation return flow from the general drainage canal and
the third and seventh drainage canals to treat with the non-point source pollution at
the end.
Based on the national Water Special Projects, the promotion and demonstration
![Page 24: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/24.jpg)
of non-point source pollution control mainly centers on the publicity and promotion
during middle and later periods. The agricultural non-point source pollution control is
a drainage area non-point source control systems engineering that should be
completed in steps or phases, from pilot to the entire irrigation area. Several measures
favorable for this project are under construction or in preparation so as to improve the
quality of water environment in Bayannaoer City:
In terms of urban sewage and industrial waste water, each Banner or County
within Bayannaoer City is planning to build up the sewage disposal plant and reuse
engineering of recycled water and the construction and operation of the sewage
disposal facilities will greatly reduce the total amount of water environment pollution
and will greatly improve the water quality in Wuliangsuhai Lake Lake.
In terms of rural sewage and the wastes from animal breeding, the “biogas
project” is being promoted during new rural community construction, actualizing the
reclamation, decrement and bio-safety disposal of rural sewage and wastes to purify
the rural environment.
In terms of the irrigation return flow pollution, through the national major
scientific and technological special project of water body pollution control and
treatment in process, the channels of irrigation return flow are being restored, the
major pollutants from irrigation return flow are being eliminated, the key technology
of wetland ecological restoration is being researched and the comprehensive pilot
demonstration base has been set up within the irrigation area to demonstrate the key
technology of treatment of agricultural irrigation return flow pollution.
To ensure the ecological water in Wuliangsuhai Lake Lake, the project for
expansion and dredge of the conveyance canals within the irrigation area to ensure
that the water from the Yellow River can be channeled into Wuliangsuhai Lake Lake
during ice flood season and at the same time, a water ecological recovery project has
being conducted within Wuliangsuhai Lake Lake area, combining with substrate
sludge dredging and water supply during ice flood season, to improve the water
quality in Wuliangsuhai Lake Lake and to prevent Wuliangsuhai Lake Lake from
![Page 25: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/25.jpg)
eutrophication and wetland degradation.
The implementation of this project, together with the above water pollution
treatment projects, will reduce the pollution load flowing into Wuliangsuhai Lake
Lake and remarkably improve the pollution status of water quality within the
irrigation area and the Wuliangsuhai Lake Lake.
This project of comprehensive treatment of the water environment in Bayannaoer
City mainly contains the contents in three aspects: the sewage disposal and reuse
engineering in industrial zones, the water supply engineering of recycled water and
the comprehensive treatment project for the environment in Wuliangsuhai Lake Lake
area.
3.2 General situation of this project3.2.1 Project investment
The total investment of this project is 1092.032million Yuan, of which 513.91
million Yuan of the loan from the World Bank is proposed to be used, accounting for
47.06% of the total investment.
3.2.2 Formation, construction contents and scale of this project
The formation, construction contents and scale of various sub-projects of the
Project of Comprehensive Treatment of Water Environment in Bayannaoer City by
Loan from the World Bank are shown in Table 3.2-1.
3.2.3 The proposed construction locations of the projects
3.2.3.1 Geographic location of the projects
This project comprises of nine sub-projects, distributing over five Banners or
Counties within the City, the proposed construction locations are as follows:
(1)Urad Middle Banner(2):near to Delinshan Town, Wangba Reservoir
in Urad Middle Banner;( 2)Wuyuan County( 1): Located at Longxinchang Town, Wuyuan
County;
![Page 26: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/26.jpg)
(3)Hangjin Back Banner(1):Located at Shanba Town, Hangjin Back
Banner;(4)Wulatehouqi County(2):Located at Huhewenduer Town, Wulatehouqi
County;(5)Wulateqianqi County(3):Located at Xianfeng Town, Wulateqianqi
County and Wuliangsuhai Lake Lake area.
The Geographic location of the proposed construction locations in Bayannaoer
City is shown in Fig. 3.2-1
Fig. 3.2-1 The Geographic location of the proposed construction locations in
Bayannaoer City
3.1.3.2 Plant location of project construction
Based on on-site survey and comparison analysis on the technical economy and
environmental conditions, the recommended plant location for construction is shown
![Page 27: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/27.jpg)
in Table 3.2-2.
![Page 28: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/28.jpg)
Table 3.2-1 Composition, Construction Content and Size of Various Subprojects
No. Type Name Content Construction Size Location1 Supply of
Reclaimed Water
Water Supply Project of
Wulatehouqi CountyProcessin
g Park
1) Water intake works: consist of the intake pump station, water pipeline and ancillary facilities, and the water intake works shall utilize the existing intake pump station and water pipeline, and increase a standby water pump (Q=580m3,H=35m) and a ductile cast iron pressure pipe of DN500, with a design flow of 255L/s for water piping network. 2) One water reclamation plant shall be built at southeast of the processing park, including the buildings and structures such as, contact tank, chlorination-feeding chamber, clean water tank, pumping station, etc.; 3) Water distribution network is laid out along the planned route toward the northwest, southwest and southeast of the processing park and PE pipes and ductile cast iron pipes of DN 200 are used.
35,000 t/dHohwedor Town, Urat
Rear Banner
Water Supply Project of
Ganqimaodu Port Processing
Park
1) Water intake works: consist of the intake pump station, water pipeline and ancillary facilities, with an intake capacity of 6.25m3/d. Intake pump station belongs to the combined structure at bank and adopts 6 horizontal centrifugal pumps. The water pipeline is connected from the intake pump station to the water reclamation plant along the pathway; 2) One water reclamation plant shall be built near Wangba Reservoir, including the buildings and structures such as lift pump station, pre-aeration basin, flocculation tank, filter station, contact tank, sludge discharge tank and backwash tank, chlorination-
40,000t/d Near Wangba Reservoir of
Wulatezhongqi County
![Page 29: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/29.jpg)
feeding chamber, anti-seepage chamber and clean water tank and pumping station; 3) Water distribution network: Double ductile cast iron pressure pipes of DN500 are laid out along the planned route to the clean water tank of sewage treatment & reuse of the park, totaling 28km, with a design flow of 509l/s.
Reclaimed Water Supply Project
of Drainage Canal 3
1) Water intake works: its intake capacity is 33,000m³/d and it adopts the gravity pipe intake structure and the pumping station is built together with the suction well. Four horizontal centrifugal pumps are used (Q=340m3). Double pipes are used for the water delivery pipeline and subject to the supporting construction with the water reclamation plant; 2) One water reclamation plant shall be built in the north of sewage treatment plant of drainage canal 3, including the buildings and structures such as distributing well, pipeline mixer, one mesh reactor, one sloping plate sedimentation tank, one V-type filter tank, chlorination chamber, reflux tank, sludge equalization basin, anti-seepage chamber and pumping station, etc.; 3) Water distribution network: two water pipelines are drawn out from pumping station of water reclamation plant to water supply piping network of Hanggin Rear Banner Industrial Park.
20,000t/dShanba Town, Hangjinhouqi
County
Reclaimed Water Supply Project
of Drainage Canal 7
1) Water intake works: its intake capacity is 33,000m³/d and it adopts the gravity pipe intake structure and the pumping station is built together with the suction well (20m×16m). Four horizontal centrifugal pumps are used (Q=340m3). Double pipes are used for
20,000t/d Longxingchang Town, Wuyuan County
![Page 30: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/30.jpg)
the water delivery pipeline and two ductile cast iron pipes of DN400 are laid out, totaling 0.2km; 2) One water reclamation plant shall be built, including the buildings and structures such as, one distributing well, one static mixer, one mesh reactor, one sloping plate sedimentation tank, one common filter tank, one reflux tank, one sludge equalization basin, one clean water tank, one chlorination-feeding or dosing chamber, one ultrafiltration & anti-seepage chamber, etc.; 3) Water distribution network: two pipelines of DN400 are laid out, with a design flow of 20,000m3/d×1.1 =255l/s, and a length of 19km.
2 Sewage Treatment & Reuse Project of Processin
g Park
Sewage Treatment Project of
Wulatehouqi CountyProcessin
g Park (Hoh Town)
1) Sewage collection system: the sewer network shall be laid out as per the planning of the processing park, and the sewage main pipes of DN400-DN700 are laid out from the north to the south along Jingyi Road, Jingsan Road, Jingwu Road and Jingqi Road, and the main trunk pipes are laid out at Jingwu Road, which are undertaken by the government. The construction commitment letter of sewage collection network of the processing park is shown in the attachment; 2) The buildings and structures for the sewage treatment engineering include bar screen, intake pump station, aeration tank, equalization basin, primary sedimentation tank, biological tank, secondary sedimentation tank, flocculation tank, filter station, sludge thickening & dewatering house, blower room, chlorination chamber, odor-removing chamber, etc.
20,000t/d Hohwedor Town,
Wulatehouqi County
![Page 31: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/31.jpg)
Sewage Treatment &
Reuse Project of Ganqimaodu
Port Processing Park
1) Sewage collection network: the sewage main pipes are built by the government and excluded in the Project, and the construction commitment letter of sewage collection network of the processing park is shown in the attachment; 2) Process flow includes pre-treatment work stage, secondary bio-treatment work stage, reclaimed water deep-treatment stage, and sludge treatment stage. Main buildings and structures include equalization basin, bar screen, sewage pump room, grit chamber, biological tank, contact tank, distributing well, small-hole mesh reactor, sloping plate sedimentation tank, V-type filter tank, sludge pump room, sludge thickening & dewatering house, blower room, chlorination chamber, odor-removing chamber, etc.;
3 ) Total length of water distribution network is 45.08km and
the ductile cast iron pipes and PE pipes of DN 100-DN600 are used, with a maximum design flow of 902.7L/s.
Sewage treatment capacity::30,000t/d; Reclaimed water capacity:20,000t/d
Delingshan Town,
Wulatezhongqi County
Sewage Treatment &
Reuse Project of Wulateqianqi
County (Xianfeng Town) Processing Park
1) Sewage collection network: the sewage main pipes are built by the government and excluded in the Project, and the construction commitment letter of sewage collection network of the processing park is shown in the attachment;2) Sewage treatment & reuse project: it covers a land area of 370m×300m, 11.0ha, and the main buildings and structures include equalization basin, bar screen, sewage pump room, grit chamber, biological tank, secondary sedimentation tank, flocculation tank, filter station, sludge pump room, sludge
Sewage treatment capacity::30,000t/d; Reclaimed water capacity:20,000t/d
Xianfeng Town,
Wulateqianqi County
![Page 32: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/32.jpg)
dewatering house, lift pump room, blower room, chlorination-feeding & dosing chamber, odor-removing chamber, etc. 3) it is necessary to build the sewage main pipes of DN800-DN1400 from drainage main trunk to sewage treatment plant, totaling 9.00km, reclaimed water pipelines of 23.4km (DN500-DN300) and necessary supporting facilities.
3
Harness Project of Wuliangsu Lake
Pastoral Grid Channel Project of Wuliangsu
Lake
The main drainage canal of grid channel system is 45m wide, 1.4m deep and 40.00km long, and the branch canal is 10m wide, 2m deep and 100.00km long. Excavation works of main channels and branch channels.
Construction area 2.8×106m2, excavated sediment
3.35×106m3
Wuliangsuhai Lake,
Wulateqianqi County
Artificial wetland project and Non-point
Source Demonstration
Project in Biologic
Transition Belt of Wuliangsu
Lake
1) Biologic transition belt artificial wetland project in the west and northwest of Wuliangsu Lake, including general drainage canal wetland area of 90514mu, with pumping station flow of 15 m3/s. 2) Area-source demonstration project is located in the Beichang Branch Ditch experimental area of drainage canal 9 at Qinghua Village Beichang Community and Dengcundian Village Tabu Community of Beiqidu Township, Wulateqianqi County of Inner Mongolia Autonomous Region, with a total area of 3 km2.
6134.3ha
Wuliangsuhai Lake,
Wulateqianqi County
![Page 33: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/33.jpg)
Table 3.2-2 Construction site recommended by all kinds of projectSN Type Project name Recommended site
1Regenerated
water supply
type
Wulatehouqi County
Processing Zone
regenerated water
supply project
SE of Wulatehouqi County Processing Zone
Gan qi mao du port
processing zone
regenerated water
supply project
It is planned to be built near Wangba Reservoir at De ling
shan Town of Wulatezhongqi County
the third drainage ditch
regenerated water
supply project
To the North of the third drainage ditch Waste Water
Treatment Plant at Shanba Town, Hangjinhouqi County
the seventh drainage
ditch regenerated water
supply project
At northern side of the seventh drainage ditch waste water
treatmet plant at Longxin Town, Wuyuan Couty
2
Processing
Zone waste
water
treatment and
reuse project
Wulatehouqi County
Processing Zone(Hu He
Town) waste water
treatment and reuse
project
At NE side of Wulatehouqi County Processing Zone
Gan qi mao du port
processing zone (De
Ling Shan Town) waste
water treatment and
reuse project
At southern end of Gan qi mao du port processing zone at
(De Ling Shan Town) , Wulatezhongqi County
Wulateqianqi County
Processing Zone(Pilot
Town) waste water
treatment and reuse
project
At SE end of Processing Zone at (Pilot Town)Wulateqianqi
County
3
Wuliangsuhai
Lake area
control
project
Wulaingsuhai Lake grid
waterways project Wuliangsuhai Lake
constructed wetland
project and source
demonstration and
extension projects at
biological transition
zone, Wuliangsuhai
Lake
At western and northern of Wuliangsuhai Lake, wetland in
biological transition zone is established based on original
reed field belonging to small sea area, non-point source
pollution control demonstration zone is constructed at
branch ditch of northern site of 9-row field near
Wuliangsuhai Lake
3.1.4 Project land and Plant Layout
See table 3.1-3 for Project land and Layout
![Page 34: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/34.jpg)
Table 3.1-3 Floor Area of the Project and Plane Layout of Factory Area
No. TypeName of
SubprojectFloor Area Overall Layout
1 Supply of
Reclaimed
Water Water Supply
Project of
Wulatehouqi
CountyProcessing
Park
Permanent floor area of the
project is 5.58ha, including the
floor area of 5.51ha for water
reclamation plant, floor area of
0.06ha for roads out of the
factory, and floor area of 0.01ha
for piping valve well. Temporary
floor area is 18.5ha.
Structures are laid out as per the process flow and the vertical arrangement of structures is made
rationally in combination with the vertical condition of the factory area to ensure the raw water can
automatically flow into the next structure; road width is identical to the structure. In the west of water
reclamation plant from the south to the north are laid out warehouse repair workshop, comprehensive
building, contact tank, clean water tank, intake pump room, chlorination-feeding chamber and
switchgear room, and the east of the reclamation plant is for future expansion. The roads in the factory
area are divided by functions and shall be circulated around the buildings and structures, of which the
width of main trunk roads is 7m and width of secondary trunk roads is 4m, and the width of walkway is
1.5m. The width of workshop approach roads is identical to the door width and the road pavement shall
be concreted.
Water Supply
Project of
Ganqimaodu Port
Processing Park
Permanent floor area of the
project is 10.59ha, including the
floor area of 0.02ha for intake
pump station, floor area of 10.5ha
for water reclamation plant, floor
area of 0.06ha for roads out of the
factory, and floor area of 0.01ha
for piping valve well. Temporary
floor area is 18.5ha.
Structures are laid out as per the process flow and the vertical arrangement of structures is made
rationally in combination with the vertical condition of the factory area to ensure the raw water can
automatically flow into the next structure; road width is identical to the structure. In the water
reclamation plant from the south to the north are laid out warehouse repair workshop, comprehensive
building, sludge treatment tank, backwash tank, contact tank, collecting well, intake pump room,
distributing well, pre-aeration tank, sedimentation tank, filter station, clean water tank, pumping station,
chlorination-feeding chamber, contact tank, RO workshop and switchgear room.
The roads in the factory area are divided by functions and shall be circulated around the buildings and
structures, of which the width of main trunk roads is 7m and width of secondary trunk roads is 4m, and
the width of walkway is 1.5m. The width of workshop approach roads is identical to the door width and
the road pavement shall be concreted.
Reclaimed Water The floor area of the project is According to the recommended process flow, selection of buildings & structures and land use condition
![Page 35: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/35.jpg)
Supply Project of
Drainage Canal 3
2.50ha, 125m in length and 200m
in width.
and in full consideration of various factors, the factory area of water reclamation plant for drainage
canal 3 is divided into two function areas: one is production and management area, which is located in
the west of the factory area, arranged with reception room, comprehensive building, repair workshop,
warehouse, switchgear room & auxiliary structures; the other is the production structure area of water
reclamation plant, located in the east of the factory area, and arranged with from the south to the north
small-hole mesh reactor, V-type filter tank, clean water tank, and pumping station. The width of main
trunk roads is 7m and the width of secondary trunk roads is 4m. The roads are built into the screen
traffic network in the factory area. Rain/sewage diversion system is applied to the drainage system of
the factory area. And the sewer will collect the domestic sewage and discharge them into the supporting
sewer network of sewage treatment plant in the south. There are rain pipelines in the factory area and
the rain water will automatically flow into the Drainage Canal 3. Water supply of the factory is from the
underground water supply system and the water distribution network shall be designed into the ring-like
structure, and the fire hydrants shall be equipped as per the fire-prevention requirement, with a
protection radius of less than 60m.
Reclaimed Water
Supply Project of
Drainage Canal 7
The floor area of water
reclamation plant of Drainage
Canal 7 is 2.50ha, 100m in length
and 250m in width.
According to the recommended process flow, selection of buildings & structures and land use condition
and in full consideration of various factors, the factory area of water reclamation plant for drainage
canal 7 is divided into two function areas: one is production and management area, which is located in
the west of the factory area, arranged with reception room, comprehensive building, repair workshop,
warehouse, switchgear room & auxiliary structures; the other is the production structure area of water
reclamation plant, located in the east of the factory area, and arranged with from the south to the north
small-hole mesh reactor, common filter tank, ultrafiltration anti-seepage chamber, ultrafiltration tank,
backwash tank, wastewater neutralization pool, clean water tank, and pumping station. The width of
main trunk roads is 7m and the width of secondary trunk roads is 4m. The roads are built into the screen
traffic network in the factory area. Rain/sewage diversion system is applied to the drainage system of
the factory area. And the sewer will collect the domestic sewage and discharge them into the supporting
![Page 36: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/36.jpg)
sewer network of sewage treatment plant in the south. There are rain pipelines in the factory area and
the rain water will automatically flow into the Drainage Canal 7. Water supply of the factory is from the
underground water supply system and the water distribution network shall be designed into the ring-like
structure, and the fire hydrants shall be equipped as per the fire-prevention requirement, with a
protection radius of less than 60m.
2 Sewage
Treatment
& Reuse
Project of
Processing
Park
Sewage
Treatment Project
of Wulatehouqi
CountyProcessing
Park (Hoh Town)
The project covers a land area of
7.0ha, and a building area of
1.13ha. Roads and square cover a
land area of 3.9ha, and the
greening area is 0.65453ha.
According to the characteristics of sewage treatment process and function partitioning principle, the
project can be divided into the production area and front plant area. The production area is laid out as
per the process flow; coarse bar screen and intake pump house are arranged in the south of the factory
area and the pipelines to the plant shall be unblocked and the selection tank and oxidation ditch and
secondary sedimentation tank shall be laid out in order, and the sewage shall be discharged into the
water reclamation plant; the sludge system shall be convenient to the sludge discharge and outward
transportation, which shall be arranged in the middle of the factory area. Switchgear room is located in
the central load center of the factory area. The front plant area is located in the north of the factory area
and the leeward side with the minimum wind direction frequency in summer, complying with the
direction of pedestrian flow into the plant. Under the precondition of meeting the fire prevention and
transportation requirements, the roads in the plant shall adopt the feeder roads, with a width of 5m, and
the turning radius of road curb stones is 6m and the roads shall be the urban concreted pavement.
Sewage
Treatment &
Reuse Project of
Ganqimaodu Port
(Delingshan
Town) Processing
Park
The project covers a land area of
11.1ha, and a building area of 1.
20ha. Roads and square cover a
land area of 0.81ha, and the
greening area is 5.3ha.
According to the characteristics of sewage treatment process and function partitioning principle, the
project can be divided into the production area and front plant area. The production area is laid out as
per the process flow; coarse bar screen and intake pump house are arranged in the south of the factory
area and the pipelines to the plant shall be unblocked and the selection tank and oxidation ditch and
secondary sedimentation tank shall be laid out in order, and the sewage shall be reused upon the
treatment; the sludge system shall be convenient to the sludge discharge and outward transportation,
which shall be arranged in the middle of the factory area. Switchgear room is located in the central load
center of the factory area. The front plant area is located in the north of the factory area and the leeward
![Page 37: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/37.jpg)
side with the minimum wind direction frequency in summer, complying with the direction of pedestrian
flow into the plant. Under the precondition of meeting the fire prevention and transportation
requirements, the roads in the plant shall adopt the feeder roads, with a width of 7m, and the turning
radius of road curb stones is 6m and the roads shall be the urban concreted pavement.
Sewage
Treatment &
Reuse Project of
Wulateqianqi
County (Xianfeng
Town) Processing
Park
The project covers a land area of
11.1ha, and a building area of 1.
18ha. Roads and square cover a
land area of 0.81ha, and the
greening area is 5.3ha.
According to the characteristics of sewage treatment process and function partitioning principle, the
project can be divided into the production area and front plant area. The production area is laid out as
per the process flow; coarse bar screen and intake pump house are arranged in the south of the factory
area and the selection tank and oxidation ditch and secondary sedimentation tank shall be laid out in
order, and the sewage shall be reused upon the treatment; the sludge system shall be convenient to the
sludge discharge and outward transportation, which shall be arranged in the middle of the factory area.
Switchgear room is located in the central load center of the factory area. The front plant area is located
in the north of the factory area and the leeward side with the minimum wind direction frequency in
summer, complying with the direction of pedestrian flow into the plant.
3
Wuliangsu
hai Lake
area
control
project
\Grid Channel
Project of
Wuliangsu Lake
Grid channels composed of the main drainage canals and branch canals out of the core area and buffer
area within the scope of 293km2 around Wuliangsu Lake.
Artificial wetland
project and non-
point Source
Demonstration
Project in
Biologic
Transition Belt of
Wuliangsu Lake
Area-source pollution control
demonstration area of Beichang
Branch Ditch of Drainage Canal 9
is 3km. the wetland of General
Drainage Canal, with a total area
of 7345.5ha
Wetland of general drainage canal occupies the reed marshes No. 2, 3 and 4, with a total area of
6034.3ha, and the water of the wetland is discharged into military farm reed marsh No.4 via Honggepu
pumping station and into reed marsh No.2 via the diversion dam set up in the reed marsh and then into
reed marsh No.3, afterward flows into hydrologic buffer zone of the Lake from three outlets and finally
flows into the grid channels of the Lake.
![Page 38: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/38.jpg)
3.1.5 Project implementation schedule and personnel quota
3.1.5.1 Project implementation schedule
Preliminary preparation of the project starts in 2009, project construction period
is 2010 -2015, and construction and implementation schedule is indicated in table 3.1-
4.
Table 3.1-4 Construction Progress Schedule of the Project
No. Activity Time (Month) Implementation Schedule
1 Preliminary preparation 15 2009.3-2010.5
2 Preparation Delegation of
Experts from World’s Bank
2 2009.8,2009.11
3 Evaluation Delegation of Experts
from World’s Bank
2 2010.1,2010.3
4 Executive Board 3 2010.7-2010.9
5 Prepare and review bidding
documents
6 2010.4-2010.9
6 Enter into the purchase& contribution
agreement
1 2010.10
7 Submission of
tender
sewage treatment
project
8 2010.3-2010.10
regenerated water
project
17 2011.2-2012.6
Harness Project of
Wuliangsu Lake
5 2014.2-2014.6
8 Drawing
design
sewage treatment
project
8 2010.1-2010.8
regenerated water
project
19 2011.2-2012.8
Harness Project of
Wuliangsu Lake
16 2010.6-2011.9
9 Civil
engineering
and Equipment
installation
sewage treatment
project
20 2010.6-2012.1
regenerated water
project
26 2011.11-2013.12
Harness Project of 19 2014.4-2015.10
![Page 39: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/39.jpg)
Wuliangsu Lake
10 Commissionin
g
sewage treatment
project
3 2011.9-2011.10 , 2012. 1 -2012.2
regenerated water
project
3 2012.12-2013.1 , 2013.12 -2014.1
Harness Project of
Wuliangsu Lake
2 2015.9-2015.10
11 Trial run and
final
acceptance
Sewage treatment
project
4 2011.10-2011.11 , 2012. 2 -2012.3
Regenerated water
project
4 2013.2-2013.3 , 2013.12 -2014.1
Harness Project of
Wuliangsu Lake
2 2015.10-2015.11
12 Organization capacity-building 2010.1-2015.12
4 Environmental Impacts of the Project and Mitigation
Measures
4.1 environmental impact of the project
4.1.1 Impact of Immigration and Land Requisition and Removal
Each sub-project of the project involves Bayannaoer City Wulatehouqi County,
Wulateqianqi County, Hangjinhouqi County, Wu Yuan County and Wulatehouqi
County, totaled up to four administrative villages of five banners (county) four towns
and one state owned farm and one state owned pasture, project construction will cause
negative impact such as land requisition and removal etc. inevitablly. According to
design result of feasibility of each project, the project needs to collect all kinds of land
758.00 Mu, where farm land is 195.50 Mu, construction land is 165.00 Mu and
unused land is 397.50 Mu, it is necessary to collect all kinds of land4039.5 Mu,
where, farmland is201.5Mu, unused land is 3785.75Mu, at the same time, the project
will cause certain negative impact to the local environment during construction.
During implementation of the project, project owner unit and relative unit will
![Page 40: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/40.jpg)
establish proper resettlement plan and environmental protection plan to mitigate the
negative impact of of the construction to local environment according to state and
local corresponding rules and regulations.
But the construction of the project has great positive effect on local social and
economic development and environment, esp. local water environment is greatly
improved. Implementation of the project will promote effectively development and
use of mineral resource of coal, iron and copper etc. in The State of Mongolia that is
next to the project zone, promote cooperation of international regional economy,
purify the water of important wetland Wuliangsuhai Lake, protect Yellow River
against pollution, it is a comprehensive control project with apparent environmental
benefit, social benefit and economic benefit. According to site survey and visit,
residents in project affected zone hold higher support attitude to the project
construction.
Main service scope of each sub-project of the project is mainly Processing Zone
enterprises of the project related banner (county), project construction will save water
consumption, increase the use efficiency of water resource and improve water
environment.
4.1.2 Environmental Effect during Project Construction
4.1.2.1 Environmental Effect during Construction
4.1-1 Environmental Impacts during ConstructionSN Source item Bad Environmental Effect
1Construction
dust
Generally, main affected scope of project excavation, construction, material
transportation and treatment process is within 150m of the site.
OdourMalodor emitted during excavation and transportation of bottom sludge of
Wuliangsuhai Lake area grid will affect the surrounding environment.
Vehicle
emissions
Tail gas produced by construction machinery and transportation vehicle has little
impact to surrounding environment because emission intensity is less, flat terrain is
helpful for emission dilution and spreading etc.
2Construction
waste water
Sanitary sewage from construction worker and waste water from construction may
affect surface water quality if drained into surface water directly.
3 Water
Environment
of Grid
Excavation
and Sediment
Disturbance brought by the dredging will facilitate the mix and exchange between mud
and water, causing the increase of pollutants and SS content in water body, as well as
the increase of organic matters and nutrients
![Page 41: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/41.jpg)
Release in
Lake Area
4 Noise Construction and transportation machinery will have potential effect on surrounding
resident, esp. hospital and school etc., the scope is within 0~100m.
5 Traffic jam
Pipeline construction at roadside, pump station construction and update of residential
area , increase in transportation machinery in downtown, closed of part of or all roads
during construction will bring temporary inconvenience and time delay to residents,
commerial activity and public institution.
6
Pollutant
emission of
temporary
construction
site
Waste water from temporary construction site will produce potential new pollution
source, these pollution will produce sludge, solid waste and waste oil from machinery
maintenance.
7Construction
waste
Construction waste, construction spoils and sanitary waste produced by contruction and
bottom sludge produced by excavation of sea area grid needs to be treated.
8Damage to
vegetation
Construction of water distribution pipe networks, Waste Water Treatment Plant and
regenerated water plant will damage the vegetation to some degree in the area.
9Water and
soil erosion
Project land, pipe network construction and earthwork etc. will produce large amount
of bare surface and spoil bank, which will cause Water and soil erosion in rainy season.
10 Land useLand used by the project will be permanently or temporarily used due to project
construction, and will result in certain damage to the vegetation.
11 Road damage Heavy truck transportation will damage the road surface seriously, esp. in rainy season
and when surface is wet.
12Health and
safety
During construction, mobile population will be distributed at all sites, migrant
population may bring infectious disease to local residents.
13 Cultural relics Project construction and excavation may involve the cultural relics
In construction period, according to the result of environmental effect
assessment, environmental effect mitigation goals and the following mitigation
measrures established according to domestic relative environment laws and
regulations, standard and world bank security policy will be identified and
implemented. Before the project starts, all project owners, construction contractor
and supervisory engineers are required to take part in the compulsory environment,
health and safety training.
4.1.2.2 Environmental Impacts during Operation
Main Environmental Effect of All Kinds of Sub-item is indicated in table 4.1-2-
4.1-3. Table 4.1-2 Environmental Effect of the Sub-item of Regenerated Water Supply
SN Project Environmental Pollution source Environmental Effect
![Page 42: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/42.jpg)
name Effect factors
1
Wulatehouqi
County
Processing
Zone
regenerated
water
supply
project
Waste water Sanitary sewage: 0.13m3/h.
Entering into Wulatehouqi County
Processing Zone Waste Water
Treatment Plant
Waste gas Odor
Odor produced is slightly, which will
not endanger the surrounding
environment.
Noise Equipment noise, 80-110 dB (A).
In-Factory Noise Emission meets
national standard by all kinds of noise
reduction measures
Solid waste
Regenerated water treats sludge
3066.0 t/a;
Sanitary waste 10.59t/a.
If not treated properly in time, it will
give off odor, or flow into surface water
with surface runoff, resulting in
secondary pollution of the environment.
2
The third
drainage
ditch
regenerated
water
supply
project
Waste water
Muddy water removal of
sedimentation pool 1.61 m3/h;
Backwash water of filter tank
20.25 m3/h;
waste water of sludge press-filter
0.71 m3/h;
Ultrafiltration reverse osmosis
tail water 416.7 m3/h;
sanitary sewage0.07 m3/h.
Mud removal water of sedimentation
pool, backwash water of filter tank and
waste water of sludge press-filter is
reused by the system;Sanitary sewage
enters into the third drainage ditch
Waste Water Treatment Plant;Tail
water of ultrafiltration RO sends To the
front distribution well after Coagulation
and sedimentation
Waste gas odor
Odor produced is slightly, which will
not endanger the surrounding
environment.
Noise environment Equipment noise, 80-110 dB(A).
In-Factory Noise Emission meets
national standard by all kinds of noise
reduction measures
Solid waste
Regenerated water treats sludge
339.88 t/a;
sanitary waste 5.93 t/a.
If not treated properly in time, it will
give off odor, or flow into surface water
with surface runoff, resulting in
secondary pollution of the environment.
3 The seventh
drainage
ditch
regenerated
water
supply
project
Waste water
Muddy water removal of
sedimentation pool 2.42 m3/h;
Backwash water of filter
tank20.25 m3/h;
waste water of sludge press-filter
1.06 m3/h;
Ultrafiltration reverse osmosis
tail water 416.7 m3/h;
sanitary sewage0.07 m3/h.
Mud removal water of sedimentation
pool, backwash water of filter tank and
waste water of sludge press-filter is
reused by the system;Sanitary sewage
enters into the third drainage ditch
Waste Water Treatmen;Tail water of
ultrafiltration RO sends To the front
distribution well after Coagulation and
sedimentation
Waste gas Odor Odor produced is slightly, which will
![Page 43: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/43.jpg)
not endanger the surrounding
environment.
Noise environment Equipment noise, 80-110 dB(A).
In-Factory Noise Emission meets
national standard by all kinds of noise
reduction measures
Solid waste
Regenerated water treats sludge
573.48 t/a;
sanitary waste 5.93 t/a.
If not treated properly in time, it will
give off odor, or flow into surface water
with surface runoff, resulting in
secondary pollution of the environment.
4
Gan qi mao
du port
processing
zone
regenerated
water
supply
project
Waste water
Muddy water removal of
sedimentation pool 3.94 m3/h;
Backwash water of filter
tank50.4 m3/h;
waste water of sludge press-filter
1.68 m3/h;
ultrafiltration reverse osmosis
tail water 591.67 m3/h;
sanitary sewage0.15 m3/h.
Mud removal water of sedimentation
pool, backwash water of filter tank and
waste water of sludge press-filter is
reused by the system, ultrafiltration
reverse osmosis tail water and sanitary
sewage are used in the system after
treated by self established treatment
device.
Waste gas Odor
Odor produced is slightly, which will
not endanger the surrounding
environment.
Noise environment Equipment noise, 80-110 dB(A).
In-Factory Noise Emission meets
national standard by all kinds of noise
reduction measures
Solid waste
Regenerated water treats sludge
621.36t/a;
sanitary waste 12.7t/a.
If not treated properly in time, it will
give off odor, or flow into surface water
with surface runoff, resulting in
secondary pollution of the environment.
Table 4.1-3 Environmental Impact of Sub-project of Sewage
Treatment Project of Processing Zone
SN Project name
Environment
al Effect
factors
Pollution source Possible Environmental Effect
1 Wulatehouqi
County
Processing
Zone(Hu He
Town) sewage
treatment project
Waste water
Sludge dewatering
1.71m3/h;
Cleaning waste water
0.083 m3/h;
sanitary sewage0.24
m3/h.
Collect and flow back to front end of
waste water treatment plant, without
drainage to outside
Waste gas Odor Vented by vent stack after odor
treatment, vented concentration of NH3
![Page 44: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/44.jpg)
and H2S is very little, which will not
have bad effect on surrounding
environment.
Noise Equipment noise,
85-105 dB(A).
In-Factory Noise Emission meets
national standard by all kinds of noise
reduction measures
Solid waste
Gate slag and sand
949t/a;
sludge 1155t/a;
sanitary waste
If not treated properly in time, it will
give off odor, or flow into surface water
with surface runoff, resulting in
secondary pollution of the environment.
2
Gan qi mao du
port processing
zone (De Ling
Shan Town)
waste water
treatment and
reuse project
Waste water
sludge
dewatering2.57 m3/h;
Backwash water
1.67m3/h;
RO membrane
concentrated
water17.12m3/h;
Cleaning waste water
0.083m3/h;
sanitary
sewage0.24m3/h.
Collect and flow back to front end of
waste water treatment plant, without
drainage to outside
Waste gas Odor
Vented by vent stack after odor
treatment, vented concentration of NH3
and H2S is very little, which will not
have bad effect on surrounding
environment.
Noise Equipment noise, 85-
105 dB (A).
In-Factory Noise Emission meets
national standard by all kinds of noise
reduction measures
Solid waste
Gate slag and sand
1265t/a;
sludge 1576t/a;
sanitary waste
If not treated properly in time, it will
give off odor, or flow into surface water
with surface runoff, resulting in
secondary pollution of the environment.
3 Wulateqianqi
CountyProcessin
g Zone(Pilot
Town) waste
water treatment
and reuse project
Waste water Sludge dewatering
2.57 m3/h;
Backwash water
1.67m3/h;
RO membrane
concentrated water
17.12m3/h;
Cleaning waste water
0.083m3/h;
sanitary
Collect and flow back to front end of
waste water treatment plant, without
drainage to outside
![Page 45: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/45.jpg)
sewage0.13m3/h.
Waste gas odor
Vented by vent stack after odor
treatment, vented concentration of NH3
and H2S is very little, which will not
have bad effect on surrounding
environment.
Noise Equipment noise,
85-105 dB(A).
In-Factory Noise Emission meets
national standard by all kinds of noise
reduction measures
Solid waste
Gate slag and sand
1265t/a;
sludge 1576t/a;
sanitary waste
If not treated properly in time, it will
give off odor, or flow into surface water
with surface runoff, resulting in
secondary pollution of the environment.
Table 4.1-3 Environmental Impact of Sub-project of
Wuliangsuhai Lake Area Control Project
Project name
Environment
al Effect
factors
Pollution
source Environmental Effect
Constructed wetland
and source pollution
control and
demonstration project
in ecological transition
belt of Wuliangsuhai
Lake
Noise
Mixed-flow
pump of
pumping
station90-100dB(A), In-Factory Noise Emission meets
national standard by all kinds of noise reduction
measuresAir
compressuor
of aeration
pond
Solid waste
Sludge of
sedimentatio
n pond
If not treated properly in time, it will give off odor,
or flow into surface water with surface runoff,
resulting in secondary pollution of the
environment. Sanitary
waste
5 Environmental Management Plan
5.1 Environmental Management System
As the main body in charge of the administrative management and administrative
![Page 46: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/46.jpg)
enforcement of law in respect to environmental protection throughout the country,
the Ministry of Environmental Protection supervises the implementation of this
project; as the competent administrative department of the natural reserve, national
forestry sector supervises and administrates the protection of this natural reserve in
the course of project implementation. According to the spirit of the administration
authority as prescribed by the Law of Environmental Protection of the People's
Republic of China and Regulations on the Administration of Construction Project
Environmental Protection, the Environment Appraisal Report of this project shall be
examined and approved by Department of Environmental Protection of Inner
Mongolia Autonomous Region. Bayannur Municipal Bureau of Environmental
Protection is the environment supervision institution for this project and its main
functions are to propose the environmental protection requirements in accordance
with the contents of Environmental Impact Assessment Statement of this project, to
harmonize the administrations of environmental protection among various
departments, and to take charge of organization of the Three Simultaneous check and
acceptance for environmental-protection facilities; Bayannur Municipal Bureau of
Forestry and Wulateqian Banner Bureau of Forestry are responsible for the
supervision and administration of the Natural Reserve. Under the general framework
of the administrative management institutions for this project, Bayannur WB Loan
Project Office, under the leadership of Bayannur Municipal Government, takes charge
of the management of implementation of the entire project; below the WB Loan
Project Office, the project employers carry out the sub-projects if their own. In order
to ensure the smooth implementation of the environmental management activities of
this project, several full-time or part-time environmental management personnel has
been set up among the WB Loan Project Office, the project employers, the contractors
and operators to specifically carry out EMP. Bayannur WB Loan Project Office is
responsible for the planning and design of this project as well as the provision of
superintendence to the environmental protection of this project according to the
procedures; organizes and develops skills training for the environmental management
personnel of this project all over the region and carries out the project implementation
schemes and various technical standards. Bureaus of Environmental Protection and
Bureaus of Forestry at the level of Municipality and Banner/County are mainly
responsible for the daily supervision for the environmental management of this
project; the Environment Monitoring Stations of Banner/County accept the
![Page 47: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/47.jpg)
commission of the project employers to be in charge of the monitoring of the
environmental quality within the project region during the construction and operation
of the projects; environment supervising engineers entrusted by the project employers
are responsible for the environment supervision during the construction of the
projects. The project employers are planning to appoint dedicated environmental
management personnel to take the charge of the environmental management for their
own projects at various stages, to follow out environmental protection laws and
regulations as well as the schemes, to inspect the implementation of the environmental
solutions for their own projects, to promote the application of advanced technologies
and experiences with regard to environmental protection, to organize to engage in the
training of environmental protection technology for relevant personnel working for
the sub-projects to raise the overall quality of such personnel.
Since the contents in respect to the environmental management between the
period of project construction and the operation period vary considerably and the
working hours of such two circumstances have the differences between the
provisionality and the protracted nature, the contractors and operators shall
respectively establish organizational institutions according to various stages in a
manner of staging responsibility. When completion of the construction period,
relevant administrative organizations shall be revoked, while the administrative
organizations within the operation period shall start operation, during which a certain
amount of overlapping time intervals are allowed according to specific work
circumstances. Schematic Diagram of Organizational Institution is shown in Fig5.1-1
and Scheme for Environmental Management and Supervision of the projects is shown
in Table 5.1-1.
![Page 48: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/48.jpg)
Figure 5.1-1 Schematic Diagram of Organizational Institution for Environmental Protection of the Project
Table 5.1-1 Scheme for Environmental Management and Supervision
Links and key elements
Mitigation measures for environmental impact to be adopted
Implemented by
Supervised by
A.Construction periodAir pollution Prevention measures for odor pollution
The Grid Water Channel Project of Wuliangsuhai Lake Area is constructed section by section during dry period to dredge sediment, which shall be transported immediately to local refuse landfill for disposal;The sediment shall be transported in closed containers to prevent from scattering on the way and affecting the urban landscape;
Mitigation measures for dust pollutionWhen leaving the construction site, vehicles shall be cleaned off the dirt attached; When transporting the powder materials that are easy to generate air-borne, the vehicles shall be covered with tarpaulins;
Contractors Bureaus of Environmental Protection of Municipality /Banner/County/Hetao Water Affaire Group
![Page 49: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/49.jpg)
Links and key elements
Mitigation measures for environmental impact to be adopted
Implemented by
Supervised by
Lime and sand or soil shall not be piled up in the open air whereas possible; if such materials have to be piled up in open air, water shall be sprayed over it to increase surface moisture content;. Spraying water and cleaning measures shall be conducted to prevent the dust from the construction site and construction roads (spraying water for 4-5 times per day).Waste shall be cleaned and transported to the low-lying area designated by the municipal administration for grade filling or to the landfill.
Control measures for vehicular emissionThe construction veicles shall be equipped with tail-gas purifying devices before operation on the site and use high-grade lead-free fuel so as to ensure the tail gas in conformity with emission criteria.
Water pollution During construction, the contractors should set up sedimentation basins to dispose of the rain wastewater, muddy water from pile driving and on-site water logging, which, when reaching the standard after sedimentation, can be discharged out;
Constructors shall used the existing civil facilities near the construction site as much as possible;
Where the dining rooms are necessary, wastewater from kitchen must be first pre-treated through oil separation tank and then discharged with the domestic wastewater to the municipal sewers; in case that no sewers are nearby, the domestic wastewater can be used as fertilizer by the framers nearby after it is treated by sedimentation;.
Site management should be enhanced so as to control material loss, scattering and overflowing to reduce the amount of wastewater.
Reasonable solutions shall be selected for
Contractors Bureaus of Environmental Protection of Municipality /Banner/County/Hetao Water Affaire Group
![Page 50: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/50.jpg)
Links and key elements
Mitigation measures for environmental impact to be adopted
Implemented by
Supervised by
the construction of the Grid Water Channel Project of Wuliangsuhai Lake Area to minimize the pollution of water quality in Wuliangsuhai Lake Area caused by pollutants release from excavating the grid.
Construction materials such as cement, sand and lime shall be piled up collectively, but it is not suitable to pile up such materials near the rivers or water bodies; it is necessary for theses materials to be far from rivers and to have some water-resistant measures; such building materials scattered during the construction shall be cleaned in time to prevent such materials from being washed into the water bodies nearby.
Strengthen environmental management;to reduce oil leakage from the construction machines or vessels; waste oils should be collected; oils leaked from construction machines shall be collected regularly.
It is prohibited to drain the construction waste water that has not been treated into the surface water bodies near the construction site
2 ) Control measures for water pollution in construction of grid channels in Wuliangsuhai lake A reasonable schedule should be prepared,
so as to minminze the degardation of water environment quality of Wuliangsu Lake caused by the release of pollutants from sediment.
Hydraulic backhoe dredger & grab-type dredger with little disturbance should be used in the construction. No leakage of sediment will occur during the dredging process. The dredged sediment will be directly conveyed to the barge s, which will haul the sediment to the stockpile sites.
Hydraulic backhoe dredger and grab-type
![Page 51: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/51.jpg)
Links and key elements
Mitigation measures for environmental impact to be adopted
Implemented by
Supervised by
dredger work on designated positions in the construction, so as to reduce the disturbance upon sediment.
Seepage interception ditch is set up at stockpile sites of sediment, and the residual water will be timely pumped into the reed fields for treatment after at least 48h settlement.
Water and soil loss
Excavating should be well scheduled to avoid rainy season;
earth balance shall be well conducted during construction, where the excavated earthwork shall be used for grade filling and backfill of the construction site as much as possible; the rest after backfill shall be transported in time to other construction sites for site grade filling or greening or to landfill;
The construction should be scheduled phases and in different sections; it is no need to fully start the construction to shorten the construction time of the whole project
The earthwork on the construction site shall be piled up reasonably to keep a certain distance from the surface water body to avoid it flowing into rivers or sewers;
Vegetation shall be restored on the land for temporary use immediately after construction is completed.
Contractors
Bureaus of Environmental Protection of Municipality /County/Hetao Water Affaire Group
Solid waste Dredged sediment shall be transported away as soon as possible.
Dredged sediment shall be stored in an enclosed site and reused for construction of artificial islands; Enhance the management of the residual water treatment facilities to ensure it to reach the standards.
Waste earth and construction waste shall be filled at the designated places according to the requirements of municipal planning departments.
Contractors Bureaus of Environmental Protection of Municipality /County/Hetao Water Affaire Group
![Page 52: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/52.jpg)
Links and key elements
Mitigation measures for environmental impact to be adopted
Implemented by
Supervised by
Sandstones, building materials, steels and packing materials abandoned during construction shall be collected by dedicated personnel and sites shall be cleaned in time,
Domestic garbage shall be collected seperately and shall be sent to refuse landfill regularly for disposal;
In case of poisonous and harmful wastes are found, the construction shall be stopped temporarily and the contractors shall contact local departments of environmental protection and sanitation to take steps to treat such matters.
Eco-environment
Construction shall be conducted during dry season to avoid the flood season from June to Aug;
Through reasonable planning and design to use the existing roads as much as possible.
The top soils should be removed and collected by the contractors on construction site for reuse in the land reclamation after the site is completed;
Contractors shall use the existing residential houses or lease local civilian buildings whereas possible to reduce the need for construction camps; domestic wastewater and garbage shall separately drain into civilian facilities at the place of residence.
Minimize the destruction to the vegetation during construction; measures such as artificial planting of trees and grass shall be taken to fasten the vegetation recovery and at the same time certain protective measures shall be taken after construction.
Contractors
Bureaus of Environmental Protection of Municipality /County/Hetao Water Affaire Group
Physical Cultural Resource
The construction should be stoped immediately once any physical cultural heritages are discovered and the local cultural department and specialist should be report;
The site should be protected by the
Contractors Hetao Water Affaire Group, local cultural deparment
![Page 53: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/53.jpg)
Links and key elements
Mitigation measures for environmental impact to be adopted
Implemented by
Supervised by
contractor and should not constructed until the local cultural department issued a permit.
Social environment
Pipelines and works in the Wuliangsuhai Lake shall be constructed section by section; temporary access road shall especially set up for the public facilities such as hospital, school and stations and traffic alarm signs shall be provided to reduce the traffic blocking at rush hour; transportation for materials shall avoid the rush hours.
Strengthen the education of environmental friendly manner to the managers and constructors in respect to cultural relic’s protection.
Transportation of building materials and waste earth and stone shall avoid rush hours or transported at night to reduce traffic jams and to reduce the impact on residents’ trips.
Contractors
Bureaus of Environmental Protection of Municipality /County/Hetao Water Affaire Group
B.Operation period
Noise pollution①②③
Equipment with low noise should be purchased. The equipment shall be connected with the pipes by flexible joint in order to avoid the vibration; ①②③
Noise absorption materials and structures should be adopted; ①②③
Equipment with larger vibration shall be provided with anti-vibration pad. ①②③
Muffler equipment shall be installed to reduce the noise from blowers;①②③
Dense greening barrers should be provided for further noise insulation and noise reduction. ①②③
Hetao Water Affaire Group
Bureaus of Environmental Protection of Municipality /Banner/County
Solid waste pollution ①②③
Sludge from reclaimed water treatment shall be first thickened and dewatered to the water content less than 80% and then be used comprehensively as the cover soil in the sanitary landfill or the backfilling earth for roadconstruction or for brick making.
①
Hetao Water Affaire Group
Bureaus of Environmental Protection of Municipality /Banner/County
![Page 54: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/54.jpg)
Links and key elements
Mitigation measures for environmental impact to be adopted
Implemented by
Supervised by
Environmental sanitation department shall be responsible for the cleaning and transporting domestic garbage. ①②③
Sludge from wastewater treatment plant shall be analyzed to identify its constituents of heavy matal content; in case of harmful wastes, it shall be transported to Harmful Wastes Disposal Center of Baotou, Inner Mongolia for disposal, if not, it can be used as the cover soil in the sanitary landfill or the backfilling earth for road construction or for brick making. ②
In terms of domestic garbage, an agreement has been reached with local department of environmental sanitation that is responsible for immediate cleaning and transportation. It shall be transported to Wulatehouqi
county Refuse Landfill 、 Hangjinhouqi county Refuse Landfill、Wuyuan County Refuse Landfill 、 Wulatezhongqi county Refuse Landfill and Wulateqianqi county Refuse Landfill for disposal.①②③
If the sludge from reclaimed water treatment plants is identified to be hazardous waste, it shall be disposed by Inner Mongolia Baotou (Mid-west area of Inner Mongolia) Hazardous Waster Disposal Center; if not, it shall be transported together with the domestic solid waste to the municipal landfill sites for disposal in each project county.②
sediment from the sedimentation pond of Wuliangsuhai Lake area shall be cleaned at the time interval of 5-10 years, used as fertilizer for farming. ③
Water pollution①②
Waste water produced from reclaimed water plant and tail water from ultra filtration and reverse osmosis processes will be pumped into front distribution well
Hetao Water Affaire Group
Bureaus of Environmental Protection of Municipality
![Page 55: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/55.jpg)
Links and key elements
Mitigation measures for environmental impact to be adopted
Implemented by
Supervised by
① Domestic wastewater from reclaimed water
plant①Water supply engineering of recclaimed water of Wulatehouqi County Industrial Zone→Wastewater treatment plant of Wulatehouqi County Industrial Zone;Water supply engineering of reclaimed water of 3rd Drainage Canal →Wastewater treatment plant of Wulatehouqi County;Water supply engineering of reclaimed water of 7th Drainage Canal →
Wastewater treatment plant of Wuyuan County ; Domestic wastewater from water supply
engineering of reclaimed water of Ganqimaodao Port Processing park is treated by its underground biochemistry treatment facility to the standards as prescribed by Urban Wastewater Reclamation and Reuse—Urban Non-
drinking Water Quality ( GB/T18920-2002) for the use of non-drinking water within the zone without discharge.
Wastewater and domestic wastewater from the sludge dewatering rooms during the operation shall be collected through the wastewater pipelines within the plant or area into the wastewater treatment process for treatment. ②
Online monitoring facilities shall be installed at the inlet and outfall of wastewater treatment plant, which shall be connected to local environmental protection network; and emergency response ponds shall be set up in various wastewater treatment plants ②
Establish responsibility system for management and operation of the
/County
![Page 56: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/56.jpg)
Links and key elements
Mitigation measures for environmental impact to be adopted
Implemented by
Supervised by
wastewater treatment plant; training for employees should be provided on the good practice of operation; technical appraisal archives should be kept and unqualified employees are forbidden to work ②
“Heat insulation technology” and “oxygen adding technology” should be provided in the design of the artificial wetland.
Air pollution②
Strengthen green belt within the plant area with greening area no less than 30%;
Strengthen the management of various system of the wastewater treatment plant and clean up the sludge in time;
It is suggested that the area outside the plant within 40 m shall be preserved as buffer zone, within which no residential buildings or other sensitive permanent buildings be constructed.
Hetao Water Affaire Group
Bureaus of Environmental Protection of Municipality /County
Eco-environment①②
Pay attention to the proportion of arbor trees, shrubbery and grass;
Select mixed forest in place of pure forest Make the use of local species; Strengthen management.
Hetao Water Affaire Group
Bureaus of Environmental Protection of Municipality /County
Note: Component of Reclaimed Water Supply; Component of Wastewater Treatment and Reuse① ② within Industrial Processing Parks; Treatment project of Wuliangsuhai Lake Area③
5.1.1 Wetland Management
The Inner Mongolia Autonomous Region government and the organization committee of Bayannaoer city have jointly pproved the establishment of the Wulate National Level Natural Reserves Administration( directly supervised under the Bayannaoer Forestry Bureau and sub-set the Wuliangsuhai Lake Wetland Waterfowl Natural Reserves Management Station. Its main fuctions related to the screening, approval and supervision and evaluation of any schemes to be developed and impelmented within the natural reserve are as follows:
The Bayannaoer Forestry Bureau has approved the management plan for the Wuliangsuhai Nature Reserve submitted by the Administration of the Reserve which will guide and review the whole process of development and implementation and evaluation of any projects within the management zone;
The Administration of the Wuliangsuhai Lake Nature Reserve is in charge of the daily management of the reserve and organize the project development within the management zone
![Page 57: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/57.jpg)
which are to be developed in line with relevant national and local regulations; The Bayannaoer Forestry Bureau and the Bayannaoer Reform and Development Bureau will
jointly organize an expert panel to review and appraise any project to be developed within the management zone, including all of the design documents, including the feasibility study report and the preliminary design;
The Administration of the Wuliangsuhai Lake Nature Reserve will be responsible for the management of the project implementation including the environemntal management and supervision and preparation of the completion report of the project;
The Bayannaoer Forestry Bureau is responsible for review and evaluation of the completion of the project.
5.1.2 Organization of Environmental Protection in Construction
Period
5.1.2.1 Organization
Technical level: on the technical level of environmental management, the
municipal project office will employ five experts for project management.
Project office level: the municipal project office will send an environment
manager for the project, who will supervise implementation of environmental
management plan and be liable for all the issues related to the World Bank and the
environment. The project office of county/banner shall be staffed with one
environment manager, who is liable for the implementation of environmental
management plan of the project in its area and the communication on relevant
environment issues with the municipal project office.
Contractor level: one or two environment managing coordinators will be
provided by itself, liable for supervising the implementation of environmental
protection measures in construction period, and negotiating with surrounding
residents for resolving environment issue and communicating with the project office
and environment authorities.
Operator level: each enterprise is set up with an environmental managing
division comprising two full-time environmental protection engineers. Other
employees of the corporation will assist these two engineers in carrying out the
environmental management in operation period. The corporation will provide Internet,
telephone and other communication facilities for keeping in touch with the
![Page 58: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/58.jpg)
environmental management authorities.
The level of environment supervising engineer: each project employer will
employ one environment supervising engineer for the project, who will present field
supervision on the site in the construction period.
5.1.1.2 Position and Liability
A. Technical Environment Expert
Technical environment expert, the technical support of local project office will
track the whole course of the project in the first six months and offer regular service
of two weeks quarterly within four years after the project implemented. Technical
environment expert will ensure that all compulsory requirements are met when the
project starts and environmental management rules effectively implemented in
conformity with the environment laws and regulations and the safety rules of the
World Bank.
(1) Provide necessary training for environment managers of project office, and
environmental managing personnel & environment supervising engineers of
contractor and operator.
(2) Offer expert consulting service for project office, employer, contractor and
operator.
(3) Assist environmental managing personnel of enterprise in organizing
monitoring activities.
B. Project office: Environment Manager
The municipal project office, Hangjin Banner, Wulatehou Banner, Wulatezhong
Banner, Wulatehou Banner and Wuyuan County each are set up with one environment
manager. The environment manager of the municipal project office is the expert liable
for reporting to WB and supervising project environment. Environment manager of
project office of banner/county is liable for the supervision of local project and
reporting to the municipal project office. Environment manager will assist land
authorities and immigration authorities in preventing the above-said from obstructing
the implementation of the project, with liabilities as follows:
(1) Provide training for managers in charge of environmental management with
the help of assistant.
(2) Define monitoring plan with the help of assistant.
(3) Communicate with managers in chare of environmental management and
construction workers, with methods as follows:
![Page 59: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/59.jpg)
—Provide regular monitoring report for project office and the World Bank
monthly.
—Provide special non-conformity report in case of the 2nd and 3rd cases;
—Communicate orally with the staff of construction unit and operating unit and
jointly define a solution proposal in case of any solution to the problem available;
—Present remedy measures with environmental managing engineer and the
manager in charge of environmental management jointly in case of non-conformity
(4) Attend the joint meeting that the environment engineers of the project office
and manager in charge of environmental management of the corporation, construction
unit and operating unit take part in.
(5) Coordinate the communication & report of environmental management
experts with the World Bank.
C. Project Employer: environment manager coordinator EMC
The employer is provided with EMC liable for environment monitoring, who
reports environmental protection implementation of the construction unit and
operating unit to the project office of banner/county and governmental institutions.
Detailed liabilities of EMC are as follows:
(1) Compile the detailed rules on environmental protection, and detailed
monitoring rules and environmental protection procedures of construction unit and
operating unit, and collect the outlines of managing and design personnel of the
project on the preliminary stage of the project with the help of technical assistant.
(2) Authorize the items in need of special equipments for monitoring, such as air,
water environment quality monitoring.
(3) Provide monthly monitoring update for project office, implementation of the
project and feasibility study and the remedy measures. Organize meetings with the
project office for reporting project monitoring, and discuss conformity of the project.
(4) Select experts and counselors from the universities and institutions for
consulting on training methodology and technology as per the demands.
(5) Organize the special study and public survey related to special building
requirement or compulsory alteration according to the actual situation of the project.
(6) Report solution and emergency handling measures to environment manager
of the project office and environment supervising authorities in case of any non-
conformity with the feasibility study report.
(7) Information Disclosure through Meeting and Local Media.
![Page 60: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/60.jpg)
D. environment supervising engineer
Environment supervising engineer is mainly responsible for architectural
engineering activities of the supervising party and other related activities such as land
occupation and resident relocation. It’ll guarantee that the above-said activities
comply with the environmental protection requirement, environmental protection
investment and protection target. It’s liable for coordinating the land authorities,
migration and relocation authorities and environment monitoring & control authorities
on the site. The main liabilities of environment supervising engineer are as follows:
(1) Ensure the implementation of all project licenses and requirements and
environmental management plans before commencement of the project.
(2) Check and verify that all employees of construction unit and operating unit
have implemented environmental protection measures as per the contract.
(3) Compile standard report statements on monthly remuneration as per their
qualification in light of the contribution of construction unit and operating unit to
environmental protection activities of the project.
(4) Compile the documents on environmental protection monitoring.
(5) Identify the case in need of special study and activity, communicate with
EMC, and implement effective special measures regularly.
(6) Communicate with the construction personnel for explaining the field
environment requirement; provide proposal on remedy measures, offer some remedy
measures for the items not in conformity with the original purpose of the project; and
issue very formal guide to construction unit and operating unit as required.
(7) Communicate with the construction unit, operating unit and building
consultant for strengthening information exchange; obtain some other points of view
on special issues for the purpose of rapidly feeding back some problem in the
construction to the building managing engineer so as to facilitate solution of the
problem; and shutdown should be immediately applied for in case that the project
causes potential damage to sensitive targets or serious non-conformity case in the
existence of the project.
(8) Communicate with building supervising engineer of the project and the
building workers; compile regular monitoring weekly update; compile records on
non-conformity, and bring forward remedy measures with project designer if
necessary in case of non-conformity of the project with the design.
![Page 61: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/61.jpg)
5.1.3 Environmental Management Organization in Operation Period
Project operator will have a special-purpose environmental management division
that is liable for the implementation of the environmental management plan in
operation period. Detailed liabilities of the environmental management division are:
(1) Manage the implementation of environmental protection measures of the
project;
(2) Coordinate relevant environment problem with environment authorities and
surrounding residents;
(3) Authorize monitoring station of banner/county for regular monitoring of three
wastes discharged by the facilities of the project and environment quality in the
region;
(4) Implement emergency handling of the environment risk in case of any
environment risk;
(5) Report environmental management-related information of enterprise in time
to Bureau of Environmental Protection of the Prefecture/Municipality and provincial
project office;
(6) Be liable for sorting out the environmental management archives of
enterprise and putting in archives.
5.1.4 Schedule of Environmental Management Institutions for Sub-projects
Configuration of the environmental management institutions for sub-projects is
shown in Table5.1-2 and Table 5.1-3.
Table5.1-2. Configuration of environmental management personnel of Project Office
Institution Environmental managers Environmental experts
Bayannur Project Coordination Leading Group
—— ——
Bayannur WB Loan Project Office 1 5
Project supervision and management Team of Hangjin Banner
1 1
Project supervision and management Team of Wulatehou Banner
1 1
Project supervision and management Team of Wulatezhong Banner
1 1
Project supervision and management Team of Wulateqian Banner
1 1
Project supervision and management Team 1 1
![Page 62: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/62.jpg)
of Wuyuan County
Total 6 10
Table 5.1-3 Personnel Setup of Environmental Management Organ of the Sub-project
Project name
Building contractor Operator
Sub-totalEnvironment manager coordinator
Environment supervising engineer
Environmental management personnel
Emergency risk handling personnel
Water supply works of Wulatehou Banner Industrial Park
1 1 1 0 3
Sewage treatment and recycling works of Wulatehou Banner Industrial Park
1 1 1 1 4
Water supply works of Processing Park of Ganqimaodu Port
1 1 1 0 3
Sewage treatment and recycling works of Processing Park of Ganqimaodu Port
1 1 1 1 4
Sanpaigan reclaimed water supply works 1 1 1 0 3
Qipaigan reclaimed water supply works 1 1 1 0 3
Sewage treatment and recycling works of Wulateqian Banner Industrial Park
1 1 1 1 4
Landscape grid waterway works of Wuliangsu Lake
2 1 0 0 3
Artificial wetland works of transitional biological belt of Wuliangsu Lake
2 2 3 1 8
Total 11 10 10 4 35
5.2 Implementation of Environmental Management Plan
![Page 63: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/63.jpg)
5.2.1 Detailed Tasks of Environmental Management Plan
The project has impact upon the environment in both construction period and
operation period. In light of different characteristics of environment impact in
construction period and operation period, relevant environmental protection measures
should be taken for minimizing various impacts. To ensure the role of environmental
countermeasures, environmental managing and monitoring procedures are defined.
Besides its managing function for the project, WB project office will track and
report the monitoring of the environment measures. Average environment measures
and the liability of relevant units are introduced in this chapter. In the project, the
project office is liable for tracking and reporting the implementation of various
environment monitoring measures. The list of behaviors managing and monitoring
environment countermeasures is included in Table 5.2-1.
Table 5.2-1 List of Detailed Activities of Environmental Managing Organization
Plan ActivityPerson liable
NotesImplementation
Supervision Investment
Early stage of the construction
1 yearSet up environmental management organ of the project
PMU PMU PMUConvene the personnel, select office, purchase traffic equipment and raise funds
1 yearSelect environment supervisor for each CSE and carry out training
EMD CSE CSE
1 yearCompile and implement the training plan for EMD & PMO environment manager
TA PMO PMO Carry out overall training of the part of the project
1 year Compile work plan for EMD and environment supervisor TA PMO PMO
Including the definition of the role and liability of EMD and environment supervisor
1 year
Compile work document: standard, field inspection list, and different activity report formats
EMD PIUs/PMO PMO
Carry out necessary adjustment for the mode of the original document in field use
1 year Compile emergency handling proposal for EMD TA PIUs/
PMO PMO
1 year
Work out technical introduction on environmental and social evaluation for contractor
TA&ESD PMU PMUInclude various technical introduction articles in the public bidding document
1 year
Take part in bid evaluation and contract negotiation of environmental and social evaluation part
TA&PMU PMO/WB PMU
1 year Coordinate compensation for PMU Land PMO ESD ensures the
![Page 64: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/64.jpg)
land purchase
Management Bureau & Bureau of Environmental Protection
& others
implementation of the measures and the land usability by stages
Construction period
1 year(0-3 months)
Environment supervisor and EMD discuss the adjustment and revision of project file and measure
PMU PMO - Adjustment made for improving the efficiency
1 year(0-3 months)
Engineering contractor designates one person liable for environment work, who will coordinate with PMU
contractor PMU contractor
1 year
Construction and operating units organize the working personnel for studying the common knowledge on environment
contractor
EMD/environment supervisor
contractorEMD will introduce field management and relevant environment issues
1 yearOrganize the public for communication and provide support materials
TA&EMD contractor PMO
Put up bulletins on the construction site and surrounding areas, issue the exchange rules and process, and release on the media
1 yearRegularize the cooperation with other provincial and municipal institutions
EMD PMU PMO/PMU
Operation period
Confirm the procedures for reporting environment problem in operation period
employer
Relevant bureau of environmental protection
Confirm that solid waste in the project is piled up together and safely handled
employer
Relevant bureau of environmental protection
Monitor the outlet water of sewage treatment plant and reclaimed water plant
operating unit
Relevant bureau of environmental protection
operating unit
Monitor the water quality of artificial wetland and the growth of aquatic living beings
operating unit
Relevant bureau of environmental protection
operating unit
5.2.2 Contractual Requirement on Environmental Management
![Page 65: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/65.jpg)
In project construction, the contractor will play a key role in environmental
management, pollution control and the prevention measure implementation. As a
result, the requirements for the contractor are as follows:
(1) Qualified contractor is selected for ensuring effective implementation of
environmental management plan;
(2) The contractor and construction supervisor must receive the trainings on
environment protection and environment management before construction;
(3) The environmental impact reducing measures in construction period in above
should be included in the bidding document of the contractor and finally in the
construction contract as contractual requirement of project contractor.
(4) The contractor should monitor its environment activity, daily or weekly
submit an environmental performance record report. The project office and the
construction supervising team will supervise and verify these records.
(5) The contractor should provide at least one full-time employee liable for the
environment for each sub-project. These employees liable for environment must
receive the training as scheduled so as to be competent for their job.
(6) In the construction, the contractor should communicate and negotiate with the
people in the region of the project, set up bulletin at each construction unit for
announcing specific construction activities, time, contact and telephone so that the
public can present their complaint or proposal for the construction activity.
(7) A deposit for environmental management and etc. should be planned in the
contractual funds of the project of the contractor as per annual budget, with a
proportion of about 3% of the budgetary funds.
5.2.3 Information Exchange and Solution to Non-conformity Case
In environment monitoring, information needs to be disclosed to the field
environment supervisor, environmental management manager of enterprise and
project office. To focus the attention of management on the most important issues, the
non-conformity of the project is divided at three levels as follows as per the difference
of importance.
Level 1: definition: the non-conformity status is defined as non-conformity with
the original requirement while is deemed to have no short-term impact on very
important resources. The repetitive occurrence of Level 1 may cause the appearance
of Level 2 if not properly handled. Measures: proper cooperation and regular
![Page 66: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/66.jpg)
communication can deal with the case of Level 1. For example, the construction unit
discusses with the employees of operating unit. As a result, remedy measures can be
implemented soon. The formal communication mode is typically a weekly report that
environment supervising engineer submits to environmental management manager
and field building manager of enterprise.
Level 2: definition: the non-conformity status doesn’t produce an obvious
damage or inconvertible impact for the sensitive and important resources while needs
immediate remedy and field disposal for preventing above-said impact. The repetitive
occurrence of Level 2 may cause the appearance of Level 3 if not properly handled.
Measures: In case of the event of Level 2, environmental management manager of the
enterprise must report to environment manager of project office and field building
manager on the day of occurring and remedy measures should be defined as soon as
possible. Generally, remedy measure must be submitted in one week upon the
occurrence.
Level 3: definition: the level includes a damage to sensitive target in focus or
predictable and instant damage. Special behaviors prohibited internationally are also
included in Level 3. Measures: In case of the event of Level 3, environmental
management manager must report to environment manager of project office and field
building manager on the site immediately and remedy measures should be defined as
soon as possible. Generally, remedy measure must be submitted in three days upon
the occurrence except special cases in need of more time. If necessary, the
environmental management manager of the enterprise can require the building
manager to stop some special works in order to protect the resources before
implementation of remedy measures.
5.2.4 Training—Necessary Capability Development and Means
Development
5.2.4.1 Training Requirement
The main target of environmental capability development is environmental
management personnel & environment supervisor. Their training is component of the
technical support of the project. Training courses are provided for the construction
party and workers as well in the implementation of the project. Before
commencement of project construction, all construction units, operating units and
![Page 67: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/67.jpg)
building supervisors must take part in the compulsory trainings on environment,
health and safety.
5.2.4.2 Training Items
(1) Environmental Management Personnel and Environment Supervising
Engineer
The training is organized by the municipal project office one year before the
implementation of the project for environment manager of project office of
banner/county, environment manager coordinator, environment supervising engineer
of sub-project and other personnel. Technical environment experts will be liable for
detailed implementation. Training items are included in Table 5.2-2.
Table 5.2-2 Training for Environment Manager and Environment Supervising Engineer
Theme Training items Time
Operating capability
(environment manager and
environment supervisor)
Rapidly browse and identify hotkey function of Word, Excel and
PowerPoint;
Learn the security policies of the World Bank;
Intensively study the detailed rules on environmental protection
designated for the construction party. After technical consultant
compiles a list of environmental protection, each list includes the notes
on monitoring.
Study environment impact of the project and environment items in need
of monitoring.
4 days
Conformity monitoring
(environment manager and
environment supervisor)
Training on the field monitoring processes of the project (including
organization, communication, role and liability, decision making
process, report, and standard observing procedures).
1 day
Emergency team
(environment manager and
environment supervisor )
Knowledge on dangerous materials on the site;
Potential disclosure and overflow;
Disclosure and overflow environment and personal impact ;
Emergency reaction process, including priority reaction;
Location and use of reaction facilities;
Communication and reporting facilities.
1/2
days
Emergency treatment and
medical care (environment
manager and environment
supervisor )
The process of seeking medical assistance in emergency and non-
emergency status, and seeking other related medical care. (such trunk
call, medical consulting)
1/2
days
Dangerous material and
waste management,
including the disposal of
explosive wastes
(environment manager and
Correct use and storage process;
Correct use process includes fuel adding workflow, dosage calculation
and effective use of equipments;
Correct disposal of used storage tank;
Storage process of dangerous waste;
1/2
days
![Page 68: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/68.jpg)
environment supervisor )
Borrowed land and cut-over land management;
Non-dangerous waste management;
Medical problem exposed in dangerous wastes;
Emergency process.
Health and safety
inspection and declaration
process (environmental
management manager and
environment supervisor )
Health and safety issue;
Health and safety requirement;
How to implement health and safety inspection;
Problem reporting and resolving process
1 day
Traffic safety
(environmental
management manager and
environment supervisor )
Traffic rules;
Safe driving training ;
Vehicle repair and maintenance process;
Fuel adding process;
Emergency reaction process.
1/2
days
Water quality, air and
noises monitoring and
analysis (environmental
management manager and
environment supervisor )
The use of equipments includes standard, testing, method, sample
transport and digital monitoring;
Monitoring and reporting requirement
1/2
days
(2) Contractor and Building Worker
The project office of banner/county or construction employer of sub-project will
organize relevant personnel and carry out training at the site of the project before the
implementation of the engineering works. Environmental management experts or
well-trained environment manager of enterprise can be liable for specific
implementation. Specific training items and periods are included in Table5.2-3.
Table 5.2-3 Training for Construction Personnel
Training mode Training items Training period
Average
environment
knowledge for
building workers
Introduction to environment-related environment impact factor and
environmental protection measures;
Introduction to extremely environment-sensitive areas and problems
in the building area, and introduction to adjacent areas in building
area;
Role and liability of environmental managing and design engineer,
environment supervisor and building supervisor, and the report
outlines of environmental problem;
Waste management of construction camp and construction site;
Pollution control measures of construction site;
Cultural heritage issue;
Penalty for violating the laws and statutes
Half-day
training
course at each
site
![Page 69: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/69.jpg)
Average health and
safety of building
workers
Including the channel of propagation and protection for preventing
HIV/AIDS and STD;
Prohibit alcohol and narcotics;
Process of seeking medical assistance in emergency and non-
emergency status, and seeking other related medical care. (e.g. STD
detection and consulting);
Common knowledge on health and safety includes some basic
process: traffic safety, electricity use safety, explosion, fire and
dangerous waste management;
Use personal protective apparatus;
Penalty for violating the laws and statutes.
Half-day
training
course at each
site
(3) Operator (Table 5.2-4)
Table 5.2-4 Training for Environmental Management Personnel of the Operator
Target Training items Training period
Environmental management personnel
WB project management procedures; Mechanism for environment information archiving, disclosure, exchange and report;Emergency handling of environment risk; Health and safety inspection and declaration process.
One-day training course in Bayannur
Sophisticated process and environmental management survey
Survey on up-to-dated public utility works at home
Working personnel of environment
The use of equipments includes standard, testing,
method, sample transport and digital monitoring;
Monitoring and reporting requirement
Two-day training course in Bayannur
5.2.4.3 Funds Budget for Personnel Training
The funds budget for the capability development of the project is included in
Table 5.2-5.
Table 5.2-5 Training Plan for Environmental Protection Personnel of Various Sub-projects
Stage Category Qty (person) Time Fund/RMB10,000
Construction period
Environment manager training 6 2010 24
Project manager coordinator 14 2010 28
Environment supervising engineer 10Before the implementation of the project
20
Building workers All workers of contractor
Before commencement 24
Sub-total 96
Operation period
Training for full-time environmental management personnel of the enterprise
15 Before enterprise operation
60
![Page 70: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/70.jpg)
Emergency environment risk handling personnel 4
Before enterprise operation
8
Skill training for working personnel of enterprise Several
Before enterprise operation
20
Subtotal 88
Total funds 184
5.3 Environment Monitoring Plan
5.3.1 Monitoring Purpose
Environment monitoring includes two stages of the project: construction period
and operation period. The purpose of monitoring is to obtain pollution update of the
planned project in an all-around way in time, find out the change of environment
quality of the region of the project caused by the construction of the project, impact
scope and environment quality trend of operation period, and feed back information to
the authorities in time and provide scientific basis for the environmental management
of the project.
5.3.2 Environment Monitoring Organ
The environment monitoring station of banner/county where the project is
located authorized by project contractor or operator will undertake environment
monitoring in construction period and operation period. The implementing units all
are attested by national environment quality monitoring system, equipped with
complete equipments and powerful technical strength, and able to carry out the
environment monitoring task smoothly.
The sensitive highlight points with obvious pollution according to the result of
the predictions on environmental impact are used as monitoring points for tracking
and monitoring the pollution of the project in construction period and operation
period. Noises, air and surface water environment with high impact on the
environment are selected as monitoring items. Monitoring factors are defined
according to the pollution feature factor of the project. The monitoring analysis
method is subject to Technical Criteria on Environment Monitoring of the State
Bureau of Environmental Protection. Evaluation standards should be governed by the
national criteria confirmed in the environmental appraisal in each sub-project.
Detailed key steps for effective monitoring of construction site and activity are
![Page 71: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/71.jpg)
listed in Table5.3-1.
Table 5.3-1 Monitoring in Operation Period and Construction Period
Plan Activity Liability
Notes Implementation
Supervision
Funds raising
Construction period
1 year (1-2 months)
Compile field environmental management plan
the contract party
EMC/PIU/ EPB
the contract party
Plan defined within one month after the contract is signed, finally completed within two months, and appraisal and approval by EMC
construction period
Project construction unit and operating unit of the project present the boundary of project implementation for each site for approval
the contract party
EMC/PIU/ EPB
-
Construction unit and operating unit should compile a map before project implementation
1 year (1-3 months)
Compile pollution control plan, air pollution and trend
the contract party
EMC/PIU/ EPB
the contract party
EMC appraisal and approval available after consulting with relevant institutions and residents
Construction period
Air, noises and water monitoring Referring to special parts
Construction period
The pollution control plan also includes the implementation of all pollution control measures mentioned by CSEM, and all retarding measures required for construction unit and operating unit must be done. All surrounding construction camps and facilities must be inspected
the contract party
EMC/PIU/ EPB
-CSEE daily inspects construction camps and facilities, EMC bi-monthly
Construction period
Environmental protection measures of construction unit and operating unit should be filled in monthly statement and reported
the contract party
EMC/PIU/ EPB
-The suggestion of CSE is final payment basis of PIU/PMO
Construction period
Report is based on categories as per different processes and pollution levels
the contract party
EMC/PIU/ EPB
Level 1: EMCLevel 2: EMC and PIULevel 3: EMC, PIU, PMO
Construction period
Determine delay or rejection of engineering payment for construction unit and operating unit
the contract party
EMC/PIU/ EPB
Construction period
Ensure the land purchase process in conformity with the building plan
the contract party
POIU and Migration Bureau
Construction period
Traffic information involved in the building process must be provided
the contract party
EMC/PIU/ EPB
the contract party
The construction party of the project provides the traffic information update, which CSEE & EMC will
![Page 72: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/72.jpg)
check up with the traffic authorities and EMC finally approves
Construction period
Necessary traffic lights are required around the construction site
the contract party
Traffic authorities
the contract party
Construction period
A bulletin on suspension of public facility service at least three days in advance is required
the contract party
EPB and relevant departments
the contract party
The construction party provides the up-to-dated plan, which relevant institutions and EMC will evaluate jointly
Construction period Daily declaration Inspector
EMC/PIU/ EPB
Weekly field report, monthly SRS report
Construction period Weekly declaration
the contract party
EMC/PIU/ EPB
Weekly field report, monthly SRS report
Construction period Monthly declaration
the contract party
EMC/PIU/ EPB
Weekly field report, monthly SRS report
Construction period Quarterly declaration
the contract party
PIU
Declaration provided if
required by other relevant
organizations
Construction period Semiyearly declaration
the contract party
EMC/PIU/ EPB
Declaration provided if required by other relevant organizations
Construction period is over
Restoration of temporary land occupation, withdrawal of all building materials and equipments
the contract party
EMC/PIU/ EPB
the contract party
construction period is over
Replanting of trees felled in
construction contractor PIUs
the contract party
At least the same planting
quantity as the felling
Operation period
One year after the restoration
of temporary site when the
construction is completed
operator EPB
PIU
Claim for the remaining
payment if no non-
conformity in the
declaration
The experiences of the
project is summed up for
applying in similar projects
operator EPB
Standardized process, and
participation in training
courses of intermediate
institutions, revealing the
results and incomes of the
project
5.3.3 Environment Monitoring Plan
The monitoring equipments required in monitoring plan of sub-project are owned
by monitoring unit. Sub-project employer units should pay equipment depreciation
![Page 73: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/73.jpg)
charges at proper amount, instead of any new purchase, which is included in
monitoring expenses. The estimate on monitoring charges of each sub-project is
included in Table 5-3-2. According to the feature of engineering and environment,
environment monitoring items in the construction period and operation period are
included in Table 5-3-3.
Table 5.3-2 Estimate on Monitoring Expenses of Each Sub-project Unit: RMB10,000
Name of project
Monitoring expenses in construction period Monitoring expenses in operation period Contingency
monitoring
expenses for
accident
Equipment expenses Monitoring expenses Equipment expenses
Monitoring
expenses
Water supply works of
Wulatehou Banner
Industrial Park
5.7 1.55 56.36 3.6 0
Sewage treatment and
recycling works of
Wulatehou Banner
Industrial Park
5.7 1.55 56.36 3.6 5
Water supply works of
Processing Park of
Ganqimaodu Port
5.7 1.55 56.36 3.6 0
Sewage treatment and
recycling works of
Processing Park of
Ganqimaodu Port
5.7 1.55 56.36 3.6 5
Sanpaigan reclaimed
water supply works5.7 1.55 56.36 3.6 0
Qipaigan reclaimed
water supply works5.7 1.55 56.36 3.6 0
Sewage treatment and
recycling works of
Wulateqian Banner
Industrial Park
5.7 1.55 56.36 3.6 5
Landscape grid
waterway works of
Wuliangsu Lake
5.7 3.46 0 0 0
Artificial wetland 5.7 3.46 6.36 1.5 5
![Page 74: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/74.jpg)
works of transitional
biological belt of
Wuliangsu Lake
Total 51.3 17.77 400.88 26.7 20
![Page 75: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/75.jpg)
Table 5.3-3 Environment Monitoring Plan
Sub-
project
Monitori
ng period
Environm
ent factor Monitoring point Monitoring items Monitoring frequency
Reclaimed
water
supply and
midwater
recycling
works
constructi
on period
Environme
ntal air
Residential locations around construction site
and both sides of road TSP 6 periods/year, 2 days/period, 2 times/day
Water
quality
Catch sink of construction wastewater pH, SS, COD, , petroleum 6 periods/year, 1 day/period, 1 time/day
Upper and lower 500m of reception water
system temperature, pH, COD, petroleum
3 periods/year, one period in dry, monsoon and
average period respectively, 3 days/period, 1
time/day
Noises Boundary of construction site Leq dB (A)6 periods/year, 1 day/period, 2 times/day, one
time in day and night separately
operation
period
Water
quality Water outlet of factory
pH、 DO 、 SS、 BOD5 、 COD 、 NH3-
N 、 TP、 heavy
metal ( As、 Hg、 Pb 、 Cr 、 Cd、 Cu)Automatic online monitoring
Noises Factory area and pump station boundary Leq dB(A)4 periods/year, 1 day/period, 2 times/day, one
time in day and night separately
Substrate
sludge Sludge discharged from sludge sink Heavy metal (As, Hg, Pb, Cr, Cd, Cu) 2 periods/year, 1 day/period, 1 time/day
Sewage
treatment
works
constructi
on period
Environme
ntal air
Residential locations around construction site
and both sides of road TSP 6 periods/year, 2 day/period, 2 times/day
water
quality
Catch sink of construction wastewater pH, SS, COD, , petroleum 6 periods/year, 1 day/period, 1 time/day
Upper and lower 500m of reception water
system
temperature, pH, COD, petroleum 3 periods/year, one period in dry, monsoon and
average period respectively, 3 days/period, 1
![Page 76: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/76.jpg)
time/day
noises Boundary of construction site Leq dB (A)6 periods/year, 1 day/period, 2 times/day, one
time in day and night separately
operation
period
environme
ntal air Boundary of factory area NH3. H2S, CH4 4 periods/year, 2 days/period, 2 times/day
water
quality
Monitoring points set up on inlets and outlets
of sewage treatment plant pH, DO, SS, COD, BOD5, NH3-N, TP, heavy
metal ( As、 Hg、 Pb 、 Cr 、 Cd、 Cu)
Automatic online monitoring
Monitoring sections set up on upper and
lower 500m of reception water system
3 periods/year, one period in dry, monsoon and
average period respectively, 3 days/period, 1
time/day
noises Factory area and pump station boundary Leq dB (A)4 periods/year, 1 day/period, 2 times/day, one
time in day and night separately
substrate
sludge Sludge discharged from sludge sink Heavy metal (As, Hg, Pb, Cr, Cd 、 Cu) 2 periods/year, 1 day/period, 1 time/day
Sea area
treatment
works of
Wuliangsu
Lake
constructi
on period
environme
ntal air
Residential locations around construction site
and both sides of road NH3. H2S,, TSP 6 periods/year, 2 days/period, 2 times/day
water
quality
Catch sink of construction wastewater pH, SS, COD, petroleum 6 periods/year, 1 day/period, 1 time/day
Upper and lower 500m of reception water
systemtemperature, pH, COD, petroleum
3 periods/year, one period in dry, monsoon and
average period respectively, 3 days/period, 1
time/day
noises Boundary of construction site Leq dB(A)6 periods/year, 1 day/period, 2 times/day, one
time in day and night separately
operation
period
water
quality
Monitoring points set up on inlet and outlets
of sea area pH, DO, SS, COD, BOD5, NH3-N, TP
3 periods/year, one period in dry, monsoon and
average period respectively, 3 days/period, 1
time/day
![Page 77: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/77.jpg)
5.4 Estimates on Environmental Management Expenses and
Source of Capital
5.4.1 Budget Distribution
The implementation of EMP measures involves many units. As a result, different
sources of capital exist. Most environmental protection activities are engineering
measures. Therefore, the construction unit and operating unit of the project should
provide the expenses and include in their engineering costs, which are defined and
listed in their bidding documents.
The expenses in EMP are mainly used in environmental management in
construction period and operation period, primarily including: environment
monitoring expenses, environment supervisor expenses, personnel training expenses,
running costs of environmental management institutions as well as risk preventing
expenses in some projects. EMC activities will be included in the international project
management expenses of PMO and PIUs. So does the monitoring of water quality,
atmosphere and noises, CSEE and EFSI. The CSEE monitoring and supervising
activity is part of building and supervising expenses. Local environment monitoring
stations will monitor water, noises and atmosphere in the operation of project as
authorized by project employer, where project employer pays the monitoring
expenses. If regular monitoring of local environmental protection authorities
synchronizes with the project, their data of regular monitoring can be used.
5.4.2 Capital Source and EMP Budget
Table 11.4-1 is a list of environmental management expenses (excluding contingency monitoring
expenses for accident) of sub-project in construction period and operation period.
![Page 78: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/78.jpg)
Table 5.4-1 List of Environmental Management Budget of Sub-project
Ref. Name of sub-project
Annual average expenses in construction period
(RMB10,000) Pollution
prevention
and control
in
constructio
n period
Treatm
ent
expense
s of
substrat
e
sludge
Trainin
g for
environ
mental
protecti
on
person
nel
Years of
constructi
on period
Total
expense
s in
constru
ction
period
Annual expenses in operation period
(RMB10.000) Pollution
prevention
and control
expenses in
operation
period
Slud
ge
treat
ment
expe
nses
Training
for
environme
ntal
protection
personnel
Expenses in
five-year
operation
period
To
tal
PMU operation
enviro
nment
monit
oring
environ
ment
supervis
or
PMU operation
Environm
ent
monitorin
g
W
a
g
e
Offi
ce
expe
nses
Traf
fic
exp
ens
es
W
a
g
e
Offi
ce
exp
ens
es
Tra
ffic
exp
ens
es
1
Water supply works
of Wulatehou
Banner Industrial
Park
3
.
6
5 1.5 1.45 5 3..98 6 8 92.73
3
.
6
5 1.5 11.99 4.82 30.77 6
294.4 38
7.
13
2
Sewage treatment
and recycling works
of Wulatehou
Banner Industrial
Park
7
.
2
5 1.5 1.45 6 5.29 8 8 119.04
1
0
.
8
5 1.5 11.99 4.82 44.14 12
403.25 52
2.
29
3
Water supply works
of Processing Park
of Ganqimaodu Port
3
.
6
5 1.5 1.45 6 4.21 6 8 97.96
3
.
6
5 1.5 11.99 6.39 6.34 6
180.1 27
8.
06
4 Sewage treatment
and recycling works
of Processing Park
7
.
2
5 1.5 1.45 8 3.77 8 8 127.52 1
0
.
5 1.5 11.99 7.04 59.93 12 493.3 62
0.
82
![Page 79: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/79.jpg)
of Ganqimaodu Port 8
5Sanpaigan reclaimed
water supply works
3
.
6
5 1.5 1.45 3 0.98 6 8 79.73
3
.
6
5 1.5 11.99 7.04 3.46 6
168.95 24
8.
68
6Qipaigan reclaimed
water supply works
3
.
6
5 1.5 1.45 4 2.39 6 8 86.14
3
.
6
5 1.5 11.99 7.04 5.79 6
180.6 26
6.
74
7
Sewage treatment
and recycling works
of Wulateqian
Banner Industrial
Park
7
.
2
5 1.5 1.45 5 4.15 8 8 112.9
1
0
.
8
5 1.5 11.99 4.91 59.93 12
482.65 59
5.
55
8
Landscape grid
waterway works of
Wuliangsu Lake
7
.
2
5 1.5 1.83 3 0.3 57.38 8 8 158.33
7
.
2
5 1.5 0 10
78.5 23
6.
83
9
Artificial wetland
works of transitional
biological belt of
Wuliangsu Lake
7
.
2
5 1.5 1.83 5 0.37 10 8 113.02
1
4
.
4
5 1.5 1.57 16
128.35 24
1.
37
Total
5
0
.
4
4513.
513.81 45 21.29 57.38 66 983.22
6
8
.
4
4513.
585.5 42.05
210.3
686
2410.05 33
93
.2
7
![Page 80: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/80.jpg)
According to the construction time limit of the project, the annual budget for
every construction period must be guaranteed. Some building payment in the budget
is the deposit for construction unit and operating unit to complete the relevant
management requirement. The deposit weight of different activities is listed in Table
5.4-2 as percentage of contractual funds of the construction.
Table 5.4-2 Percentage Distribution of the Deposits for Environmental Management and etc. in the Budget of the Construction Party
Ref. Requirement for construction party
Percentage of funds budget of each sub-project Capital source
1 Environmental protection management 0.5
2Labor organization and
occupational health management
0.5
3 Public safety management 1
4 Social management 1
5.5 Information Management of Environmental Management
Plan
5.5.1 Information Exchange
Environmental management demands a necessary information exchange among
different departments and posts of project offices inside organization, employer,
contractor and operator and moreover, an information disclosure to the outside
(related parties and the public). Internal information exchange can be done in meeting,
internal update and other modes, for which at least one formal meeting is monthly
required. All information in the exchange must be recorded and put in archives.
External information exchange should be done semiyearly or yearly. The information
exchange with cooperation units must be recorded in a summary and put in archives.
5.5.2 Recording Mechanism
To ensure the effective operation of environmental management system, a
perfect recording system must be set up for maintaining the records in the fields as
follows:
(1) Requirements of the laws and statutes;
![Page 81: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/81.jpg)
(2) License;
(3) Environment factor and related environment impact;
(4) Training;
(5) Inspection, verifying and maintaining activities;
(6) Monitoring data;
(7) Validity of rectifying and prevention measures;
(8) Information of related parties;
(9) Approval;
(10) Appraisal.
Moreover, a necessary control over the above-said records must be done,
including the links: record identifying, collection, catalogue, archiving, storage,
management, maintenance, inquiry, storage period and disposal.
5.5.3 Report Mechanism
Contractor, operator, monitoring unit, environment supervising engineer and
project office should record the progress of project, EMP implementation and
environment monitoring result in the project implementation and report to relevant
departments in time, including six major parts as follows:
(1) The environment supervising engineer of the project compiles detailed
monthly records on EMP implementation, and timely submits the weekly and monthly
reports to the project employer and the project office of banner and county. The
weekly and monthly reports should comprise the implementation of environmental
protection measure and environment monitoring as well as monitoring data.
(2) Contractor and operator compiles detailed quarterly records on project
progress and EMP implementation, submits the quarterly report to the project office in
time, and sends a copy of the report to the bureau of environmental protection of
banner and county.
(3) The monitoring unit submits a monitoring report to contractor (operator) and
environment supervising engineer in time after completing the authorized monitoring
task.
(4) The project office of banner and county submits the report on project
progress to the municipal project office in time, and sends a copy of the report to
Municipal Bureau of Environmental Protection. A report on project progress compiled
by the project office (monthly, quarterly and yearly) must comprise EMP progress,
![Page 82: 利用世界银行贷款实施巴彦淖尔市水环境综合治理项 … · Web viewIn accordance with the economic development strategy of the autonomous region and Bayannaoer City,](https://reader034.fdocument.pub/reader034/viewer/2022042417/5f326cdb4b6e1e40ad4ded83/html5/thumbnails/82.jpg)
such as EMP implementing progress and result, especially the environment
monitoring result.
(5) In case of any violation of the regulations in environmental protection, the
environment supervising engineer and the project office will notify the local
environmental protection authorities and report level-by-level if necessary.
(6) Annual EMP implementation report of the project must be completed and
submitted to WB before March 31 of the following year. EMP implementing report
can include the items as follows:
a. The implementation of training plan;
b. Project progress, such as riverway improvement works, garbage burial yard,
sewage treatment plant, and completed length and construction progress of pipelines;
c. The implementation of environmental protection measures of the project,
environment monitoring and main monitoring results;
d. Main items of the complaints from the public, solution and satisfaction of the
public if any;
e. EMP implementing plan of the next year.