Cable Size Calculation
Max. Fault Level = 200 3.49913311
t (sec) = 0.5De - Rating Factor 0.466088
Substaion
33 kV System 11 kV System
1 Sonarpur (6.3//6.3) 3 6.3 5.445 110.22 172.86 12.36 6.18 11.62 1.29 4.92 3.48 2000 105.0 225 270.27 120
2 Barrackpore (6.3//6.3) 2 6.3 5.445 110.22 172.86 12.36 6.18 11.62 1.29 4.92 3.48 1000 52.5 113 135.13 953 Anantpur (6.3//6.3) 3 6.3 5.445 110.22 172.86 12.36 6.18 11.62 1.29 4.92 3.48 200 10.5 23 27.03 954 Abdalpur (6.3//6.3) 3 6.3 5.445 110.22 172.86 12.36 6.18 11.62 1.29 4.92 3.48 200 10.5 23 27.03 95
5Kalitala (6.3//3.0) 3 6.3 5.445 110.22 172.86 12.36 8.00 13.45 1.49 4.25 3.01 750 39.4 84 101.35 95 (3//3.15) 3.15 5.445 55.111 345.71 21.61 11.06 16.51 1.83 3.46 2.45 500 26.2 56 67.57 95
6 Belmuri (6.3//6.3.0) 2 6.3 5.445 110.22 172.86 12.36 6.18 11.62 1.29 4.92 3.48 1500 78.7 169 202.70 957 Tarui (6.3//6.3) 4 6.3 5.445 110.22 172.86 12.36 6.18 11.62 1.29 4.92 3.48 1500 78.7 169 202.70 95
(6.3//3.0) 6.3 5.445 110.22 172.86 12.36 8.00 13.45 1.49 4.25 3.01 1250 65.6 141 168.92 958 Chapra (6.3//3.0) 3 6.3 5.445 110.22 172.86 12.36 8.00 13.45 1.49 4.25 3.01 750 39.4 84 101.35 95
(3.0//3.0) 3 5.445 52.486 363.00 21.61 11.06 16.51 1.83 3.46 2.45 500 26.2 56 67.57 959 Joyshree (6.3//6.3) 2 6.3 5.445 110.22 172.86 12.36 6.18 11.62 1.29 4.917 3.48 1000 52.5 113 135.13 9510 Raninagar (3.0//3.0) 2 3 5.445 52.486 363.00 22.69 11.06 16.51 1.83 3.463 2.45 200 10.5 23 27.03 9511 Nakashipara (5//3) 2 5 5.445 87.477 217.80 15.57 9.24 14.69 1.63 3.892 2.75 500 26.2 56 67.57 95
(3//3.15) 2 3.15 5.445 55.111 345.71 21.61 11.06 16.505 1.8339 3.463 2.45 500 26.2 56 67.57 9512 University Gate (6.3//5) 2 6.3 5.445 110.22 172.86 12.36 6.90 12.345 1.3717 4.63 3.27 1750 91.9 197 236.48 12013 Raghunathpur 3 6.3 5.445 110.22 172.86 12.36 4.42 9.869 1.0966 5.792 4.095 250 13.12 28.15 33.78 95
ISC (kA) =VH (kV) =VL (kV)=
Sl.No.
No. of Power Traf
Power Trafo.
Capacity (MVA)
ZSYS
(Ω) IF
(kA)ZBASE
(Ω)
ZTRANSF.
(Ω)
ZTRANS
F.(EQVT.) (Ω)
ZTOTAL
(Ω) ZL (Ω) ISC
(kA)I
(kA)
Bank Size
(kVAR)
IFL
(A)
IFL (De-
Rated) (kA)
IFL (IFL+20
% OF IFL) (kA)
Cable Size (sq.
mm.)