PROGRAM : PERENCANAAN INFRASTRUKTUR PERDESAAN DAN PERKOTAANKEGIATAN : PENYUSUNAN DETAIL ENGGINEER DESIGN (DED) AIR BERSIHPEKERJAAN : PENYUSUNAN DED AIR BERSIH LOKASI : KECAMATAN NUHONTH. ANGGARAN : 2015
A. BIAYA LANGSUNG PERSONIL
A.1 TENAGA AHLIA.2 TENAGA PENDUKUNG
B. BIAYA LANGSUNG NON PERSONIL
B.1 BIAYA OPERASIONAL KANTORB.2 BIAYA TRANSPORTASI/AKOMODASIB.3 LAPORAN
REAL COST
PPN 10 %TOTALDIBULATKAN
TERBILANG :
........................., ..................... 2015Penawar,
PT./CV. ..................
Nama Pimpinan PerusahaanJabatan
R E K A P I T U L A S I
No. U R A I A NJUMLAH HARGA
( Rp )
-
Page 1
PROGRAM : PERENCANAAN INFRASTRUKTUR PERDESAAN DAN PERKOTAANKEGIATAN : PENYUSUNAN DETAIL ENGGINEER DESIGN (DED) AIR BERSIHPEKERJAAN : PENYUSUNAN DED AIR BERSIH LOKASI : KECAMATAN NUHONTH. ANGGARAN : 2015
I. BIAYA LANGSUNG PERSONILA.1 TENAGA AHLI
JUMLAH PERSONIL
JUMLAH BULAN
HARGA SATUAN JUMLAH HARGA
(Orang) ( Rp ) ( Rp )
1 OB 1,00 4,0
2 Ahli Geodesi OB 1,00 4,03 Ahli Teknik Bangunan Gedung OB 1,00 4,0
Jumlah A.1A.2 TENAGA PENDUKUNG
(Orang) ( Rp ) ( Rp )
1 Tenaga Surveyor (Juru Ukur) OB 5,00 3,02 Draftman OB 3,00 3,03 Juru Hitung Kwantitas OB 1,00 3,04 Operator Komputer OB 1,00 4,0
Jumlah A.2
II. BIAYA LANGSUNG NON PERSONILB.1 BIAYA OPERASIONAL KANTOR
VOLUME HARGA SATUAN JUMLAH HARGA
Unit ( Rp ) ( Rp )
1 Sewa Kantor UB 1,00 4,02 Sewa Alat Theodolit + Bak Ukur UB 3,00 3,03 Sewa Alat GPS UB 1,00 3,04 Sewa Komputer + Printer UB 3,00 4,05 ATK Paket 1,00 4,06 Foto copy/Penggandaan Paket 1,00 3,07 Dokumentasi Ls 1,00 -
Jumlah B.1
B.2 BIAYA TRANSPORTASI/AKOMODASI
HARGA SATUAN JUMLAH HARGA
( Rp ) ( Rp )
1 Sewa Kendaraan Roda Empat Unit 1,00 4,02 Sewa Kendaraan Roda Dua Unit 3,00 3,03 Akomodasi/Penginapan LS 1,00 3,0
Jumlah B.2
No.
No.HARGA SATUAN JUMLAH HARGA
JUMLAH PERSONIL
JUMLAH BULANU R A I A N SATUAN
HARGA PERKIRAAN SENDIRI (HPS)
No.JUMLAH BULAN
No. VOLUMEJUMLAH BULAN
U R A I A N SATUAN
U R A I A N
U R A I A N
SATUAN
SATUAN
Team Leader
-
Page 2
B.3 LAPORAN
HARGA SATUAN JUMLAH HARGA
( Rp ) ( Rp )
1 Laporan Bulanan buku 8,00 - 2 Laporan Pendahuluan buku 3,00 - 3 Laporan Antara (Interim Report) buku 3,00 - 4 Laporan Akhir buku 5,00 - 5 Executive Summary buku 5,00 - 6 Album Gambar dan Desain Uk A3 buku 4,00 - 7 Peta Jaringan Pipa Uk A1 lembar 5,00 - 8 Spesifikasi Teknis buku 3,00 - 9 CD keping 9,00 -
10 Pertemuan Presentasi kali 2,00 - Jumlah B.3
No. U R A I A NJUMLAH BULAN
VOLUMESATUAN
rekapRAB