BML 322Workshop 5
Quality, Risk, & Closure….
![Page 2: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/2.jpg)
What to expect tonight:
• Lecture • Work time• Presentations
• Room 109• Begin at 8pm• Review ground
rules
• Papers and deadlines• Requirements• March 17, 11:59
pm
![Page 3: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/3.jpg)
Some follow-up …
• Critical path = longest path or only those critical tasks?
• Why the project logic diagram…we have software for that!
![Page 4: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/4.jpg)
What does “DONE” look
like?Define success……define
quality
![Page 5: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/5.jpg)
Quality
• Acceptance criteria• Tolerance Levels• Define
requirements• Understand
purpose• Monitor• Reporting
![Page 6: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/6.jpg)
Quality
BUILD IT IN•Increase cost?
•What is the cost of failure?
![Page 7: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/7.jpg)
Quality ApproachesWhat school of thought to use?
Cost Prevention = conformance (improve)
appraisal (evaluate)
Cost Failure = Internal (fixing in-house) External (lawsuits,
recalls)
![Page 8: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/8.jpg)
Project Risk
• Quality and Risk interrelated in any project
• Identify and plan for what is KNOWN
• Determine severity and frequency
• Test before deploy (play in the sandbox)
![Page 9: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/9.jpg)
What is a RISK?
• A bad thing….• Possibility of loss or
injury• Negative result• Undesired result
![Page 10: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/10.jpg)
Types of Risk
• Internal & External• Known & Unknown• Project Vs. Organizational
![Page 11: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/11.jpg)
Risk ImpactOne of many ways to set priority; a
scoring method
High Low Severity/Impact
High
Low
High SeverityHigh Frequency
Low SeverityHigh Frequency
High SeverityLow Frequency
Low SeverityLow Frequency
![Page 12: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/12.jpg)
Rules of Risk
1. IF you accept then you agree to the consequences AND you the consequences are cheaper than the cure.
2. Comparing actual results to estimates must be consistent to be effective
3. Communicate with the right people to make the right decisions
![Page 13: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/13.jpg)
Risk Mitigation
• AVOID• SHARE• REDUCE• TRANSFER
![Page 14: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/14.jpg)
Examples1. A 48 year old single woman with no
relatives purchases a long-term care policy.2. A daycare center requires all employees to
have annual CPR training.3. OSHA conducts workplace safety
inspections and provides recommendations to employers
4. Playing slot machines5. Fire extinguisher 6. Educating the client on the cost of expected
results7. I don’t know how to swim so I never go
fishing
![Page 15: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/15.jpg)
Manage Risks
• Identify – WBS to RBS• Evaluate – set priorities• Mitigate – back-up plan INNOVATION
COMMUNICATION
![Page 16: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/16.jpg)
I have some bad news…
![Page 17: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/17.jpg)
• Done Row• Cinch the Sack• Close the Loop• Pull Chocks• Completed• All Laced Up• Finished CLOSURE
![Page 18: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/18.jpg)
What does it really mean?
Formal acceptance of the final product, service or result.
![Page 19: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/19.jpg)
Formal acceptance of the final product, service or result.
1. Obtain signoffs for contracts; financial, legal, administrative closure
2. Release resources3. Document & Communicate Lessons
learned4. Record Retention5. Measure Satisfaction6. Prepare and share final report
![Page 20: BML322 - Wk 5 Slides 031511](https://reader035.fdocument.pub/reader035/viewer/2022062615/547f108db4af9f093a8b45b1/html5/thumbnails/20.jpg)
• Presentations • Room 109• Begin at 8pm
Ground Rules:1. Each person
must speak once
2. The listening team must ask one project specific question
3. The presenting team must answer
4. Complete peer review for own team
*Innovative = fun+focus
• Papers and deadlines• Describe one risk and
impact on the project– Internal or External– Known or Unknown
• Describe controls or monitoring were in place – When to implement?– Type of mitigation plan?
• Describe impact • Was the project still
successful? Quality?– Did you spend more
money or take more time?– Were the client still happy?
*Use terminology from text– March 17, 11:59 pm