BKPM · 2018. 6. 22. · 38.560 Ha 150 MW 210 oc (Geothermometer) 110 MW Total Pro ect 15,9 cent...

2

Transcript of BKPM · 2018. 6. 22. · 38.560 Ha 150 MW 210 oc (Geothermometer) 110 MW Total Pro ect 15,9 cent...

Page 1: BKPM · 2018. 6. 22. · 38.560 Ha 150 MW 210 oc (Geothermometer) 110 MW Total Pro ect 15,9 cent US$/kWh (Permen ESDM Nomor 17 Tahun 2014 2025 1. 2. The eligibility to participate
Page 2: BKPM · 2018. 6. 22. · 38.560 Ha 150 MW 210 oc (Geothermometer) 110 MW Total Pro ect 15,9 cent US$/kWh (Permen ESDM Nomor 17 Tahun 2014 2025 1. 2. The eligibility to participate