BILL OF QUANTITY BILL OF QUANTITY (BQ) (BQ) KEGIATAN KEGIATAN KEGIATAN : : : PENGADAAN SARANA DAN PRASARANA PENUNJANG PENGADAAN SARANA DAN PRASARANA PENUNJANG PENGADAAN SARANA DAN PRASARANA PENUNJANG PERPUSTAKAAN KABUPATEN BENGKALIS PERPUSTAKAAN KABUPATEN BENGKALIS PERPUSTAKAAN KABUPATEN BENGKALIS PEKERJAAN PEKERJAAN PEKERJAAN : : : PENGADAAN KONSTRUKSI BANGUNAN PENGADAAN KONSTRUKSI BANGUNAN PENGADAAN KONSTRUKSI BANGUNAN PERPUSTAKAAN PERPUSTAKAAN PERPUSTAKAAN LOKASI LOKASI LOKASI : : : JL. PERTANIAN NO. JL. PERTANIAN NO. JL. PERTANIAN NO. BENGKALIS BENGKALIS BENGKALIS Jalan Pertanian No. - Bengkalis PEMERINTAH KABUPATEN BENGKALIS BADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI

description

iii

Transcript of Bill of Quantity Pagar

Page 1: Bill of Quantity Pagar

BILL OF QUANTITYBILL OF QUANTITY (BQ)(BQ)

KEGIATANKEGIATANKEGIATAN :::

PENGADAAN SARANA DAN PRASARANA PENUNJANG PENGADAAN SARANA DAN PRASARANA PENUNJANG PENGADAAN SARANA DAN PRASARANA PENUNJANG PERPUSTAKAAN KABUPATEN BENGKALISPERPUSTAKAAN KABUPATEN BENGKALISPERPUSTAKAAN KABUPATEN BENGKALIS PEKERJAANPEKERJAANPEKERJAAN :::

PENGADAAN KONSTRUKSI BANGUNANPENGADAAN KONSTRUKSI BANGUNANPENGADAAN KONSTRUKSI BANGUNAN PERPUSTAKAANPERPUSTAKAANPERPUSTAKAAN LOKASILOKASILOKASI ::: JL. PERTANIAN NO. JL. PERTANIAN NO. JL. PERTANIAN NO. ———BENGKALISBENGKALISBENGKALIS

Jalan Pertanian No. - Bengkalis

PEMERINTAH KABUPATEN BENGKALIS BADAN PERPUSTAKAAN UMUM, ARSIP

DAN DOKUMENTASI

Page 2: Bill of Quantity Pagar

KEGIATAN : PENGADAAN SARANA DAN PRASARANA PENUNJANG PERPUSTAKAAN KABUPATEN BENGKALIS

PEKERJAAN : PENGADAAN KONSTRUKSI BANGUNAN PERPUSTAKAAN

LOKASI : KANTOR BPUAD JL. PERTANIAN NO. BENGKALIS

I PEKERJAAN PERSIAPAN 4,000,000.000

II PEKERJAAN PINTU GERBANG STAINLESS STEEL 23,485,600.000

III PEKERJAAN PAGAR DEPAN 103,837,448.701

IV PEKERJAAN PAGAR SAMPING 226,051,972.523

V PEKERJAAN PAGAR BELAKANG 97,833,828.613

VI PEKERJAAN LAIN-LAIN 500,000.000

JUMLAH 455,708,849.84 Pajak Pertambahan Nilai (PPn) 45,570,884.98

JUMLAH TOTAL 501,279,734.82 DIBULATKAN 501,280,000.00

Terbilang :

BENGKALIS, 2013PENAWAR

PT. / CV. ………………….

NAMA JELASJABATAN

KECAMATAN BENGKALIS

JA'AFAR ARIEF, S.SosNIP. 010142954

Lima Ratus Satu Juta Dua Ratus Delapan Puluh Ribu Rupiah

MENGETAHUI/MENYETUJUI

PENGGUNA ANGGARAN

R E K A P I T U L A S I BILL OF QUANTITYY

NO URAIAN KEGIATAN JUMLAH HARGA

Page 3: Bill of Quantity Pagar

I PEKERJAAN PERSIAPAN1 Pek. Papan Nama Proyek Bh 1.00 500,000.00 500,000.002 Pek. Pasangan Bouwplank Ls 1.00 3,500,000.00 3,500,000.00

JUMLAH PEKERJAAN I 4,000,000.00

II PEKERJAAN PINTU GERBANG STAINLESS STEEL1 Pek. Pintu Gerbang Depan Stainless Steel (2 unit) M2 15.67 950,000.00 14,890,300.002 Pek. Pintu Gerbang Samping Stainles Steel (1 Unit) M2 3.22 900,000.00 2,895,300.003 Pek. Sclupture Di atas Kolom Pintu Gerbang Stainless Steel (4 unit) M2 2.00 500,000.00 1,000,000.004 Pek. Pemasangan Pintu Gerbang dan Accessories Ls 1.00 700,000.00 700,000.00

JUMLAH PEKERJAAN II 23,485,600.00

III PEKERJAAN PAGAR DEPANa PEKERJAAN PONDASI1 Pek. Galian Tanah Pondasi M3 7.36 33,600.00 247,438.802 Pek. Lapisan Pasir di Bawah Pondasi M3 1.23 214,400.00 263,149.203 Pek. Cor Beton 1:3:5 Lantai Kerja Bawah Pondasi dan Pot Bunga M3 2.36 930,900.00 2,194,247.664 Pek. Pasang Cerocok Dia 10-12 cm L = 6 M Btg 246.00 24,300.00 5,977,800.005 Pek. Pondasi Pelat Setempat Type P1 80.80.15 camp. 1:2:3 M3 1.44 4,085,467.48 5,883,073.166 Pek. Pondasi Pelat Setempat Type P2 80.35.15 camp. 1:2:3 M3 0.42 4,956,949.19 2,081,918.667 Pek. Sloof S1 20/30 camp. 1:2:3 M3 2.35 4,069,034.94 9,570,370.178 Pek. Menimbun Bekas Galian M3 2.21 16,100.00 35,569.33

SUB TOTAL a 26,253,566.98

b PEKERJAAN KOLOM, BALOK DAN PELAT1 Pek. Kolom Beton Bertulang K1 13 x 56 Camp 1:2:3 M3 4.95 4,613,713.12 22,839,725.422 Pek. Balok Beton Bertulang 13 x 56 Camp 1:2:3 M3 0.73 4,613,713.12 3,358,783.153 Pek. Pelat Penutup Kolom 60x60 Beton Bertulang t= 7 cm Camp 1:2:3 M3 0.38 3,400,115.96 1,285,243.83

SUB TOTAL b 26,198,508.57

c PEKERJAAN DINDING DAN PLESTER1 Pek. Pasangan Dinding 1/2 Bata 1 : 4 M2 89.96 140,410.00 12,631,775.042 Pek. Plesteran Dinding 1 : 4 + Acian M2 134.95 44,880.00 6,056,342.823 Pek. Pasangan Batu Tempel (Kolom) M2 38.91 183,560.00 7,142,319.604 Pek. Pasangan Roaster Beton 20x20 Bh 200.00 15,000.00 3,000,000.005 Pek. Pasangan Roaster Beton 15x40 Bh 50.00 30,000.00 1,500,000.006 Pek. Profil pada Dinding dan Pot Bunga Tebal 10 Cm M1 187.57 40,000.00 7,502,800.007 Pek. Profil Kolom K1 M1 42.00 40,000.00 1,680,000.008 Pek. Pas. Besi Pagar M2 8.99 650,000.00 5,843,500.00

SUB TOTAL c 45,356,737.46

d PEKERJAAN PENGECATAN1 Pek. Cat Air Dinding Setara Nippon Paint M2 255.09 16,756.00 4,274,241.962 Pek. Cat Minyak Batu Alam dan Besi Railing Setara Nippon Paint M2 56.89 30,838.35 1,754,393.73

SUB TOTAL d 6,028,635.69JUMLAH PEKERJAAN III 103,837,448.70

IV PEKERJAAN PAGAR SAMPINGa PEKERJAAN PONDASI1 Pek. Galian Tanah Pondasi M3 13.84 33,600.00 465,158.402 Pek. Lapisan Pasir di Bawah Pondasi M3 3.46 214,400.00 742,038.403 Pek. Cor Beton 1:3:5 Lantai Kerja Bawah Pondasi M3 3.46 930,900.00 3,221,844.904 Pek. Pasang Cerocok Dia 10-12 cm L = 6 M Btg 663.00 24,300.00 16,110,900.005 Pek. Pondasi Pelat Setempat Type P1 80.80.15 camp. 1:2:3 M3 4.22 4,085,467.48 17,257,014.626 Pek. Pondasi Pelat Setempat Type P2 80.35.15 camp. 1:2:3 M3 0.42 4,956,949.19 2,081,918.667 Pek. Sloof S1 20/30 camp. 1:2:3 M3 7.78 4,069,034.94 31,665,229.878 Pek. Menimbun Bekas Galian M3 4.15 16,100.00 66,866.52

SUB TOTAL a 71,610,971.37

BILL OF QUANTITYY

NO. ITEM PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA

KEGIATAN : PENGADAAN SARANA DAN PRASARANA PENUNJANG PERPUSTAKAAN KABUPATEN BENGKALIS

BADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASIPEKERJAAN :

PENGADAAN KONSTRUKSI BANGUNAN PERPUSTAKAAN

PEMERINTAH KABUPATEN BENGKALIS

Page 4: Bill of Quantity Pagar

NO. ITEM PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA

b PEKERJAAN KOLOM, BALOK DAN PELAT1 Pek. Kolom Beton Bertulang K1 13 x 56 Camp 1:2:3 M3 3.64 4,613,713.12 16,793,915.752 Pek. Kolom Beton Bertulang K2 20 x 30 Camp 1:2:3 M3 6.20 3,454,611.24 21,401,316.623 Pek. Balok Beton Bertulang 13 x 56 Camp 1:2:3 M3 0.73 4,613,713.12 3,358,783.154 Pek. Pelat Penutup Kolom 60x60 Beton Bertulang t= 7 cm Camp 1:2:3 M3 0.38 3,400,115.96 1,285,243.835 Pek. Balok Atas Beton Bertulang 15 x 20 Camp 1:2:3 M3 2.61 5,143,797.56 13,425,311.63

SUB TOTAL b 56,264,570.99

c PEKERJAAN DINDING DAN PLESTER1 Pek. Pasangan Dinding 1/2 Bata 1 : 4 M2 250.90 140,410.00 35,228,869.002 Pek. Plesteran Dinding 1 : 4 + Acian M2 439.08 44,880.00 19,705,686.003 Pek. Pasangan Batu Tempel (Kolom) M2 25.94 183,560.00 4,761,546.404 Pek. Pasangan Roaster Beton 20x20 Bh 200.00 15,000.00 3,000,000.005 Pek. Pasangan Roaster Beton 15x40 Bh 211.00 30,000.00 6,330,000.006 Pek. Profil Dinding 10 cm M1 249.40 40,000.00 9,975,920.007 Pek. Profil Kolom K1 M1 52.80 40,000.00 2,112,000.008 Pek. Pas. Besi Pagar M2 8.99 650,000.00 5,843,500.00

SUB TOTAL c 86,957,521.40

d PEKERJAAN PENGECATAN1 Pek. Cat Air Dinding Setara Nippon Paint M2 588.71 16,756.00 9,864,488.432 Pek. Cat Minyak Batu Alam dan Besi Railing Setara Nippon Paint M2 43.92 30,838.35 1,354,420.33

SUB TOTAL d 11,218,908.76JUMLAH PEKERJAAN IV 226,051,972.52

V PEKERJAAN PAGAR BELAKANGa PEKERJAAN PONDASI1 Pek. Galian Tanah Pondasi M3 12.81 33,600.00 430,348.802 Pek. Lapisan Pasir di Bawah Pondasi M3 1.60 214,400.00 343,254.403 Pek. Cor Beton 1:3:5 Lantai Kerja Bawah Pondasi M3 1.60 930,900.00 1,490,370.904 Pek. Pasang Cerocok Dia 10-12 cm L = 6 M Btg 304.00 24,300.00 7,387,200.005 Pek. Pondasi Pelat Setempat Type P1 80.80.15 camp. 1:2:3 M3 2.11 4,085,467.48 8,628,507.316 Pek. Sloof S1 20/30 camp. 1:2:3 M3 3.62 4,069,034.94 14,721,768.407 Pek. Menimbun Bekas Galian M3 3.84 16,100.00 61,862.64

SUB TOTAL a 33,063,312.45

b PEKERJAAN KOLOM DAN BALOK1 Pek. Kolom Beton Bertulang K2 20 x 30 Camp 1:2:3 M3 3.89 4,613,713.12 17,965,798.882 Pek. Balok Atas Beton Bertulang 15/20 cm Camp 1:2:3 M3 1.81 3,400,115.96 6,150,809.77

SUB TOTAL b 17,965,798.88

c PEKERJAAN DINDING DAN PLESTER1 Pek. Pasangan Dinding 1/2 Bata 1 : 4 M2 147.25 140,410.00 20,675,091.682 Pek. Plesteran Dinding 1 : 4 + Acian M2 294.50 44,880.00 13,216,980.483 Pek. Pasangan Roaster Beton 15x40 Bh 105.00 30,000.00 3,150,000.004 Pek. Profil Dinding 10 cm M1 96.46 40,000.00 3,858,320.00

SUB TOTAL c 40,900,392.16

d PEKERJAAN PENGECATAN1 Pek. Cat Air Dinding Setara Nippon Paint M2 352.37 16,756.00 5,904,325.12

SUB TOTAL d 5,904,325.12JUMLAH PEKERJAAN V 97,833,828.61

VI PEKERJAAN LAIN-LAIN1 Pek. Pembersihan Akhir Ls 1.00 500,000.00 500,000.00

JUMLAH PEKERJAAN VI 500,000.00

JUMLAH PEKERJAAN TOTAL 455,708,849.84

Page 5: Bill of Quantity Pagar

HARGASATUAN SATUAN

Rp.1 3 4

A. UPAH TENAGA :1 Pekerja hari 70,000 2 Tukang Gali hari 70,000 3 Mandor hari 140,000 4 Tukang cat / plitur / batu hari 100,000 5 Kepala tukang cat / plitur / batu hari 120,000 6 Tukang kayu hari 115,000 7 Kepala tukang kayu hari 120,000 8 Tukang Besi hari 100,000 9 Kepala Tukang besi hari 120,000

12 Tukang Listrik hari 115,000 13 Kepala Tukang Listrik hari 120,000 14 Tukang Las hari 100,000 16 Tukang Instalasi hari 100,000

B. B A H A N :Kelompok Material Alam :

37 A i r liter 25 38 Tanah urug m³ 104,000 39 Tanah urug Pilihan m³ 240,000 40 Pasir urug m³ 160,000 41 Pasir batu (sirtu) m³ 350,000 42 Pasir pasang / Pasir Beton m³ 270,000 51 Batu Granit ex Tjg Balai m³ 380,000 56 Batu Tempel Palimanan Hijau m² 138,000 57 Batu Tempel Palimanan Kuning m² 138,000 61 Batu Candi Tempel 20/20, 5/20 m² 130,000 68 Pasir bersih ( agregat halus ) m³ 240,000 69 Batu bata buah 1,100

Kelompok Kayu83 Kayu Balok Kelas I m³ 3,000,000 84 Kayu Balok Kelas II m³ 2,500,000 85 Kayu Papan Kelas I m³ 3,000,000 86 Kayu Papan Kelas II m³ 2,500,000 88 Papan Cetak ( Kelas II ) uk 2 x 20 x 400 m³ 1,800,000 89 Papan Bouwplank m³ 1,800,000 93 Kayu stoot ( Cerocok dia 6 - 8 cm ), pjg 6 m btg 11,000

2

BADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASIBADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI

DAFTAR HARGA SATUAN BAHAN DAN UPAHTAHUN ANGGARAN 2012

NO. U R A I A N

Page 6: Bill of Quantity Pagar

1 3 42

95 Tripleks tebal 4 mm lbr 67,000 96 Tripleks tebal 3 mm uk. 120 x 240 cm lbr 53,000 97 Tripleks tebal 4 mm uk. 120 x 240 cm lbr 57,000

105 Multipleks 9 mm lbr 125,000 110 Plywood 4 mm lbr 67,000 114 Dolken / Cerocok Ø 5 m' 8,000 115 Dolken / Cerocok Ø 12 m' 18,000 116 List Profil Gypsum m' 10,000

Kelompok Besi / Baja :117 Rangka Kuda-kuda Baja Ringan m² 283,000 118 Alumunium Foil m² 16,667 120 Paku Biasa 1" - 5" kg 21,000 124 Paku Beton kg 25,000 125 Paku Seng / Payung kg 24,800 126 Paku Halus kg 20,483 127 Paku Gypsum kg 20,500 128 Besi beton/baja tulangan beton kg 14,058 141 Besi Strip ( tebal 5 mm, lebar 5 Cm ) kg 16,000 143 Kawat beton (bindrad) kg 18,685 144 Wiremesh M6 Ø6 mm - 150 mm m² 36,630 145 Wiremesh M8 Ø8 mm - 150 mm m² 54,945 153 Baja plat kg 18,000 154 Baja baud - baud/ baud beugel kg 20,735 171 Shower kualitas baik buah 1,306,305 172 Kran air standar buah 15,000 173 Kran air kualitas baik buah 72,570 177 Kunci tanam 2 X Slaag buah 83,000 178 Kunci tanam kwalitas baik buah 150,000 179 Engsel pintu Nylon buah 15,000 180 Engsel pintu kuningan buah 45,000 181 Engsel jendela Nylon buah 15,000 182 Engsel jendela kuningan buah 35,000 183 Kait angin 6" psg 15,000 184 Kait angin 8" psg 18,000 185 Kait angin 10" psg 21,000 186 Hak angin buah 15,000 187 Hak angin kuningan buah 35,000 188 G r e n d e l buah 15,000 189 Tarikan / Pegangan pintu buah 35,000 199 Pintu PVC (lengkap; kusen + daun) unit 350,000 200 Kosen Alumunium 4" Coklat m' 50,000 201 Kosen Alumunium 4" Putih m' 90,000 218 Railing stainless t = 0,9 m m' 700,000 219 Gipsum Board 9mm + Rangka Furing m² 99,500 221 Formite / penjaga jarak bekisting / spacer buah 2,500

Page 7: Bill of Quantity Pagar

1 3 42

222 Mur Baut Panjang buah 20,735 223 Mur Baut Pendek buah 20,000 225 Pagar besi reling besi / tralis besi polos kg 25,000 226 Pagar besi reling besi / tralis besi ulir kg 30,000

Kelompok Penutup Lantai / Dinding :234 Keramik polos kw.1 ukuran 30 x 30 cm m² 80,000 235 Keramik motif kw.1 ukuran 30 x 30 cm m² 85,000 236 Keramik motif granit kw.1 ukuran 30 x 30 cm m² 95,000 238 Keramik motif kw.1 ukuran 40 x 40 cm m² 95,000 240 Keramik polos kw.1 ukuran 60 x 60 cm m² 95,000 243 Keramik dinding polos kw.1 ukuran 20 x 25 cm m² 89,530 244 Keramik dinding motif kw.1 uikuran 20 x 25 cm m² 99,530 245 Keramik dinding polos kw 1 uk. 10 x 20 cm m² 79,530 246 Keramik dinding polos kw 1 uk. 10 x 25 cm m² 89,530 259 Kanstin buah 45,000 293 Roster bata (10x20) buah 12,250 294 Roster beton (20x20) buah 15,000 295 Roster beton(15x40) buah 30,000

Kelompok Atap :324 Genteng Metal Kualitas Baik setara Sakura Roof m² 99,492 325 Bola-bola Genteng Metal m' 73,609 326 Perabung Genteng Metal m' 78,800 327 Atap Polikarbonat; lebar = 120 cm tebal m' 264,000 328 Atap Polikarbonat; lebar = 120 cm tipis m' 154,000 329 Fiberglass gelombang uk. 180 x 80 cm lbr 49,400 330 Fiberglass plat lebar 100 cm m' 35,750

Kelompok Cat / Minyak :331 Cat Minyak ( Kayu ). kg 35,000 332 Cat Minyak ( besi ). kg 35,000 333 Cat dasar ( meni kayu ) kg 7,255 334 Cat dasar ( meni besi ) kg 7,255 335 Cat Air setara Nippon Paint kg 20,000 336 Plamur Kayu kg 7,500 337 Plamur Tembok kg 7,500 338 Flincote kg 20,000 339 Minyak cat kg 8,000 340 Minyak Terpentin kg 10,500 341 Minyak Bekisting ( olie bekas ) ltr 2,000 342 Politur kg 28,000 343 Dempul kg 14,930 344 Amplas lbr 6,000 345 Batu kambang (batu apung) kg 13,000 346 Sirlak/Vernis ltr 25,000

Page 8: Bill of Quantity Pagar

1 3 42

347 S p i r t u s ltr 11,000 348 T e e r kg 5,000 375 Kuas cat buah 7,500 376 Kuas cat 2" buah 4,500 377 Kuas cat 3" buah 7,500 378 Roll Cat buah 12,025 379 Residu / Soligium ltr 5,000 380 Lem Kayu kg 17,875 381 Lem Kuning kg 34,800 382 Wood Filler kg 33,500

Kelompok Cement, Kaca dan Lain-lain :383 Portland Cement ( PC ) 50 kg zak 70,000 384 Portland Cement ( PC ) kg 1,400 385 Cement warna kg 3,000 386 Cement putih kg 2,935 394 Kaca bening tebal 3 mm m² 80,000 395 Kaca bening tebal 5 mm m² 130,000 402 Glassblock buah 20,000 403 Bak Mandi Fiberglass, volume 120 ltrr (sudut) buah 250,000 416 Floordrain (saringan buangan air KM/WC) buah 20,000 419 Wastafel Kw.1 pedes steel unit 425,000 423 Geotextile Non Woven 400 gr m² 22,500 424 Geotextile Non Woven 700 gr m² 26,500 425 Polyester Single Layer 200 hf m² 450,000 426 Plastik Alas m² 7,255 427 Tiang Pancang ukuran 20 x 20 P=6 M m' 268,000 428 Tiang Pancang ukuran 25 x 25 P=6 M m' 342,130

Mengetahui, BENGKALIS, 2013KEPALA DINAS CIPTA KARYA PENAWAR

DAN TATA RUANG PT. / CV. ………………….KABUPATEN BENGKALIS

Ir. M. FAUZI NAMA JELASNIP. JABATAN

Page 9: Bill of Quantity Pagar

BADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASIBADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI

HARGA SAT. JUMLAHRp. Rp.

1 2 3 4 5 6=(3x5)A. PEKERJAAN PERSIAPAN SNI 03-2835-2002

A.004 Mengerjakan 1 m' pengukuran dan pemasangan bouwplankBahanBalok Kayu Kelas II - 5/7 0.0120 m³ 1,800,000.00 21,600.00 Paku Biasa 2" - 5" 0.0200 kg 21,000.00 420.00 Kayu Papan Kelas II - 3/20 0.0070 m³ 1,800,000.00 12,600.00

Jumlah (1) 34,620.00 TenagaPekerja 0.1000 OH 70,000.00 7,000.00 Tukang Kayu 0.1000 OH 115,000.00 11,500.00 Kepala Tukang 0.0100 OH 120,000.00 1,200.00 Mandor 0.0050 OH 140,000.00 700.00

Jumlah (2) 20,400.00 Jumlah (1) + (2) 55,020.00

A.008 Membersihkan 1 m² lapangan dan perataanTenagaPekerja 0.1000 OH 70,000.00 7,000.00 Mandor 0.0500 OH 140,000.00 7,000.00

Jumlah (2) 14,000.00 B. PEKERJAAN TANAH

B.001 Menggali 1 m³ tanah biasa sedalam 1 meterTenagaPekerja 0.4000 OH 70,000.00 28,000.00 Mandor 0.0400 OH 140,000.00 5,600.00 Jumlah 33,600.00

B.010 Mengurug kembali 1 m³ galianTenagaPekerja 0.1920 OH 70,000.00 13,440.00 Mandor 0.0190 OH 140,000.00 2,660.00 Jumlah 16,100.00

B.011 Memadatkan 1 m³ tanah (per 20 cm)TenagaPekerja 0.5000 OH 70,000.00 35,000.00 Mandor 0.0500 OH 140,000.00 7,000.00 Jumlah 42,000.00

B.012 Mengurug 1 m³ pasir urugBahanPasir Urug 1.2000 m³ 160,000.00 192,000.00

Jumlah (1) 192,000.00 TenagaPekerja 0.3000 OH 70,000.00 21,000.00 Mandor 0.0100 OH 140,000.00 1,400.00

Jumlah (2) 22,400.00 Jumlah (1) + (2) 214,400.00

B.018 Mengurug 1 m³ tanah dengan tanah urugTenagaBeli Tanah + Angkut; Max. 10 km (tanah urug) 1.2000 m³ 104,000.00 124,800.00 Perataan Tanah Urug 0.0500 m³ 104,000.00 5,200.00 Jumlah 130,000.00

C. PEKERJAAN PONDASIC.019 Memasang 1 btg Cerocok dia 6 -8 cm (pakai alat)

BahanCerocok dia 12 - 15 cm 1.0000 btg 8,000.00 8,000.00

Jumlah (1) 8,000.00 Tenaga(Upah = 20% x bahan) 0.2000 8,000.00 1,600.00

Jumlah (2) 1,600.00 Jumlah (1) + (2) 9,600.00

SNI

SNI 03-2836-2002

ANALISA HARGA SATUAN PEKERJAANTAHUN ANGGARAN 2013

NO. URAIAN KOEF. SAT.

Page 10: Bill of Quantity Pagar

HARGA SAT. JUMLAHRp. Rp.

NO. URAIAN KOEF. SAT.

C.020 Memasang 1 btg Cerocok dia 12 -15 cm (pakai alat)BahanCerocok dia 12 - 15 cm 1.0000 btg 18,000.00 18,000.00

Jumlah (1) 18,000.00 Tenaga(Upah = 35% x bahan) 0.3500 18,000.00 6,300.00

Jumlah (2) 6,300.00 Jumlah (1) + (2) 24,300.00

D. PEKERJAAN DINDINGD.003

BahanBata Merah 140.0000 buah 1,100.00 154,000.00 Portland Cement (PC) 32.9500 kg 1,400.00 46,130.00 Pasir Pasang (PP) 0.0910 m³ 270,000.00 24,570.00

Jumlah (1) 224,700.00 TenagaPekerja 0.6500 OH 70,000.00 45,500.00 Tukang Batu 0.2000 OH 100,000.00 20,000.00 Kepala Tukang 0.0200 OH 120,000.00 2,400.00 Mandor 0.0300 OH 140,000.00 4,200.00

Jumlah (2) 72,100.00 Jumlah (1) + (2) 296,800.00

D.009BahanBata Merah 70.0000 buah 1,100.00 77,000.00 Portland Cement (PC) 18.9500 kg 1,400.00 26,530.00 Pasir Pasang (PP) 0.0380 m³ 270,000.00 10,260.00

Jumlah (1) 113,790.00 TenagaPekerja 0.3200 OH 70,000.00 22,400.00 Tukang Batu 0.1000 OH 100,000.00 10,000.00 Kepala Tukang 0.0100 OH 120,000.00 1,200.00 Mandor 0.0150 OH 140,000.00 2,100.00

Jumlah (2) 35,700.00 Jumlah (1) + (2) 149,490.00

D.011BahanBata Merah 70.0000 buah 1,100.00 77,000.00 Portland Cement (PC) 11.5000 kg 1,400.00 16,100.00 Pasir Pasang (PP) 0.0430 m³ 270,000.00 11,610.00

Jumlah (1) 104,710.00 TenagaPekerja 0.3200 OH 70,000.00 22,400.00 Tukang Batu 0.1000 OH 100,000.00 10,000.00 Kepala Tukang 0.0100 OH 120,000.00 1,200.00 Mandor 0.0150 OH 140,000.00 2,100.00

Jumlah (2) 35,700.00 Jumlah (1) + (2) 140,410.00

E. PEKERJAAN PLESTERANE.002

BahanPortland Cement (PC) 8.5200 kg 1,400.00 11,928.00 Pasir Pasang (PP) 0.0170 m³ 270,000.00 4,590.00

Jumlah (1) 16,518.00 TenagaPekerja 0.2000 OH 70,000.00 14,000.00 Tukang Batu 0.1500 OH 100,000.00 15,000.00 Kepala Tukang 0.0150 OH 120,000.00 1,800.00 Mandor 0.0100 OH 140,000.00 1,400.00

Jumlah (2) 32,200.00 Jumlah (1) + (2) 48,718.00

Memasang 1 m² plesteran 1 PC : 2 PP; tebal 15 mmSNI 03-2837-2002

Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 2 PP

Memasang 1 m² dinding bata merah (5x11x22) cm; tebal ½ bata; campuran 1 PC : 4 PP

SNI 03-2837-2002Memasang 1 m² dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 3 PP

Page 11: Bill of Quantity Pagar

HARGA SAT. JUMLAHRp. Rp.

NO. URAIAN KOEF. SAT.

E.004BahanPortland Cement (PC) 5.2000 kg 1,400.00 7,280.00 Pasir Pasang (PP) 0.0200 m³ 270,000.00 5,400.00

Jumlah (1) 12,680.00 TenagaPekerja 0.2000 OH 70,000.00 14,000.00 Tukang Batu 0.1500 OH 100,000.00 15,000.00 Kepala Tukang 0.0150 OH 120,000.00 1,800.00 Mandor 0.0100 OH 140,000.00 1,400.00

Jumlah (2) 32,200.00 Jumlah (1) + (2) 44,880.00

E.026BahanPortland Cement (PC) 9.3000 kg 1,400.00 13,020.00 Pasir Pasang (PP) 0.0180 m³ 270,000.00 4,860.00

Jumlah (1) 17,880.00 TenagaPekerja 0.2600 OH 70,000.00 18,200.00 Tukang Batu 0.2000 OH 100,000.00 20,000.00 Kepala Tukang 0.0200 OH 120,000.00 2,400.00 Mandor 0.0130 OH 140,000.00 1,820.00

Jumlah (2) 42,420.00 Jumlah (1) + (2) 60,300.00

E.027BahanPortland Cement (PC) 7.0700 kg 1,400.00 9,898.00 Pasir Pasang (PP) 0.0210 m³ 270,000.00 5,670.00

Jumlah (1) 15,568.00 TenagaPekerja 0.2600 OH 70,000.00 18,200.00 Tukang Batu 0.2000 OH 100,000.00 20,000.00 Kepala Tukang 0.0200 OH 120,000.00 2,400.00 Mandor 0.0130 OH 140,000.00 1,820.00

Jumlah (2) 42,420.00 Jumlah (1) + (2) 57,988.00

E.028BahanPortland Cement (PC) 0.5000 kg 1,400.00 700.00 Pasir Pasang (PP) 0.0020 m³ 270,000.00 540.00

Jumlah (1) 1,240.00 TenagaPekerja 0.5700 OH 70,000.00 39,900.00 Tukang Batu 0.3800 OH 100,000.00 38,000.00 Kepala Tukang 0.0380 OH 120,000.00 4,560.00 Mandor 0.0030 OH 140,000.00 420.00

Jumlah (2) 82,880.00 Jumlah (1) + (2) 84,120.00

E.033BahanPortland Cement (PC) 3.2500 kg 1,400.00 4,550.00

Jumlah (1) 4,550.00 TenagaPekerja 0.1500 OH 70,000.00 10,500.00 Tukang Batu 0.1000 OH 100,000.00 10,000.00 Kepala Tukang 0.0100 OH 120,000.00 1,200.00 Mandor 0.0080 OH 140,000.00 1,120.00

Jumlah (2) 22,820.00 Jumlah (1) + (2) 27,370.00

Memasang 1 m² acian

Memasang 1 m² plesteran beton 1 PC : 2 PP; tebal 15 mm

Memasang 1 m² plesteran beton 1 PC : 3 PP; tebal 15 mm

Memasang 1 m' plesteran skoning 1 PC : 2 PP; lebar 10 mm

Memasang 1 m² plesteran 1 PC : 4 PP; tebal 15 mm

Page 12: Bill of Quantity Pagar

HARGA SAT. JUMLAHRp. Rp.

NO. URAIAN KOEF. SAT.

F. PEKERJAAN KAYUF.002

BahanKayu Balok Kelas I 1.1000 m³ 3,000,000.00 3,300,000.00 Paku 10 cm 1.2500 kg 21,000.00 26,250.00 Lem Kayu 1.0000 kg 17,875.00 17,875.00

Jumlah (1) 3,344,125.00 TenagaPekerja 6.0000 OH 70,000.00 420,000.00 Tukang Kayu 18.0000 OH 115,000.00 2,070,000.00 Kepala Tukang 2.0000 OH 120,000.00 240,000.00 Mandor 0.3000 OH 140,000.00 42,000.00

Jumlah (2) 2,772,000.00 Jumlah (1) + (2) 6,116,125.00

G. PEKERJAAN BETONG.001

BahanPortland Cement (PC) 218.0000 kg 1,400.00 305,200.00 Pasir Beton (PB) 0.5200 m³ 270,000.00 140,400.00 Koral Beton (maksimum 30 mm) 0.8700 m³ 380,000.00 330,600.00

Jumlah (1) 776,200.00 TenagaPekerja 1.6500 OH 70,000.00 115,500.00 Tukang Batu 0.2500 OH 100,000.00 25,000.00 Kepala Tukang 0.0250 OH 120,000.00 3,000.00 Mandor 0.0800 OH 140,000.00 11,200.00

Jumlah (2) 154,700.00 Jumlah (1) + (2) 930,900.00

G.005BahanPortland Cement (PC) 300.0000 kg 1,400.00 420,000.00 Pasir Beton (PB) 0.5200 m³ 270,000.00 140,400.00 Koral Beton (maksimum 30 mm) 0.7800 m³ 380,000.00 296,400.00

Jumlah (1) 856,800.00 TenagaPekerja 1.6500 OH 70,000.00 115,500.00 Tukang Batu 0.2500 OH 100,000.00 25,000.00 Kepala Tukang 0.0250 OH 120,000.00 3,000.00 Mandor 0.0800 OH 140,000.00 11,200.00

Jumlah (2) 154,700.00 Jumlah (1) + (2) 1,011,500.00

G.015BahanPortland Cement (PC) 326.0000 kg 1,400.00 456,400.00 Pasir Beton (PB) 0.5429 m³ 270,000.00 146,571.43 Koral Beton (maksimum 30 mm) 0.7622 m³ 380,000.00 289,644.44 Air 215.0000 liter 25.00 5,375.00

Jumlah (1) 897,990.87 TenagaPekerja 1.6500 OH 70,000.00 115,500.00 Tukang Batu 0.2750 OH 100,000.00 27,500.00 Kepala Tukang 0.0280 OH 120,000.00 3,360.00 Mandor 0.0830 OH 140,000.00 11,620.00

Jumlah (2) 157,980.00 Jumlah (1) + (2) 1,055,970.87

G.017BahanPortland Cement (PC) 371.0000 kg 1,400.00 519,400.00 Pasir Beton (PB) 0.4986 m³ 270,000.00 134,614.29 Koral Beton (maksimum 30 mm) 0.7756 m³ 380,000.00 294,711.11 Air 215.0000 liter 25.00 5,375.00

Jumlah (1) 954,100.40 TenagaPekerja 1.6500 OH 70,000.00 115,500.00 Tukang Batu 0.2750 OH 100,000.00 27,500.00 Kepala Tukang 0.0280 OH 120,000.00 3,360.00 Mandor 0.0830 OH 140,000.00 11,620.00

Jumlah (2) 157,980.00 Jumlah (1) + (2) 1,112,080.40

Membuat 1 m³ beton mutu f'c=19,3 Mpa (K 225); slump (12 ± 2) cm; w/c = 0,58

Membuat 1 m³ beton mutu f'c=14,5 Mpa (K 175); slump (12 ± 2) cm; w/c = 0,66

Membuat 1 m³ beton 1 PC : 2 PB : 3 KR

RSNI-T-13-2002Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR

SNI 03-3434-2002Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Balok Kelas I

Page 13: Bill of Quantity Pagar

HARGA SAT. JUMLAHRp. Rp.

NO. URAIAN KOEF. SAT.

G.023BahanBesi Beton (polos/ulir) 10.5000 kg 14,057.85 147,607.46 Kawat Beton 0.1500 kg 18,685.00 2,802.75

Jumlah (1) 150,410.21 TenagaPekerja 0.0800 OH 70,000.00 5,600.00 Tukang Besi 0.0400 OH 100,000.00 4,000.00 Kepala Tukang 0.0040 OH 120,000.00 480.00 Mandor 0.0040 OH 140,000.00 560.00

Jumlah (2) 10,640.00 Jumlah (1) + (2) 161,050.21

G.025BahanKayu Kelas II 0.0400 m³ 1,800,000.00 72,000.00 Paku 5 cm - 10 cm 0.3000 kg 21,000.00 6,300.00 Minyak Bekisting 0.1000 liter 2,000.00 200.00

Jumlah (1) 78,500.00 TenagaPekerja 0.3000 OH 70,000.00 21,000.00 Tukang Kayu 0.2600 OH 115,000.00 29,900.00 Kepala Tukang 0.0260 OH 120,000.00 3,120.00 Mandor 0.0050 OH 140,000.00 700.00

Jumlah (2) 54,720.00 Jumlah (1) + (2) 133,220.00

G.026BahanKayu Kelas II 0.0450 m³ 1,800,000.00 81,000.00 Paku 5 cm - 10 cm 0.3000 kg 21,000.00 6,300.00 Minyak Bekisting 0.1000 liter 2,000.00 200.00

Jumlah (1) 87,500.00 TenagaPekerja 0.3000 OH 70,000.00 21,000.00 Tukang Kayu 0.2600 OH 115,000.00 29,900.00 Kepala Tukang 0.0260 OH 120,000.00 3,120.00 Mandor 0.0050 OH 140,000.00 700.00

Jumlah (2) 54,720.00 Jumlah (1) + (2) 142,220.00

G.027BahanKayu Kelas II 0.0400 m³ 1,800,000.00 72,000.00 Paku 5 cm - 12 cm 0.4000 kg 21,000.00 8,400.00 Minyak Bekisting 0.2000 liter 2,000.00 400.00 Balok Kayu Kelas II 5/7 0.0150 m³ 1,800,000.00 27,000.00 Plywood tebal 9 mm 0.3500 lembar 170,000.00 59,500.00 Dolken Ø (8-10) cm 2.0000 btg 8,000.00 16,000.00

Jumlah (1) 183,300.00 TenagaPekerja 0.3000 OH 70,000.00 21,000.00 Tukang Kayu 0.3300 OH 115,000.00 37,950.00 Kepala Tukang 0.0330 OH 120,000.00 3,960.00 Mandor 0.0060 OH 140,000.00 840.00

Jumlah (2) 63,750.00 Jumlah (1) + (2) 247,050.00

G.028BahanKayu Kelas II 0.0400 m³ 1,800,000.00 72,000.00 Paku 5 cm - 12 cm 0.4000 kg 21,000.00 8,400.00 Minyak Bekisting 0.2000 liter 2,000.00 400.00 Balok Kayu Kelas II 5/7 0.0180 m³ 1,800,000.00 32,400.00 Plywood tebal 9 mm 0.3500 lembar 170,000.00 59,500.00 Dolken Ø (8-10) cm 2.0000 btg 8,000.00 16,000.00

Jumlah (1) 188,700.00 TenagaPekerja 0.3200 OH 70,000.00 22,400.00 Tukang Kayu 0.3300 OH 115,000.00 37,950.00 Kepala Tukang 0.0330 OH 120,000.00 3,960.00 Mandor 0.0060 OH 140,000.00 840.00

Jumlah (2) 65,150.00 Jumlah (1) + (2) 253,850.00

Pembesian 10 kg dengan besi polos atau besi ulir

Memasang 1 m² bekisting untuk pondasi

Memasang 1 m² bekisting untuk sloof

Memasang 1 m² bekisting untuk kolom

Memasang 1 m² bekisting untuk balok

Page 14: Bill of Quantity Pagar

HARGA SAT. JUMLAHRp. Rp.

NO. URAIAN KOEF. SAT.

G.029BahanKayu Kelas II 0.0400 m³ 1,800,000.00 72,000.00 Paku 5 cm - 12 cm 0.4000 kg 21,000.00 8,400.00 Minyak Bekisting 0.2000 liter 2,000.00 400.00 Balok Kayu Kelas II 5/7 0.0150 m³ 1,800,000.00 27,000.00 Plywood tebal 9 mm 0.3500 lembar 170,000.00 59,500.00 Dolken Ø (8-10) cm 6.0000 btg 8,000.00 48,000.00

Jumlah (1) 215,300.00 TenagaPekerja 0.3200 OH 70,000.00 22,400.00 Tukang Kayu 0.3300 OH 115,000.00 37,950.00 Kepala Tukang 0.0330 OH 120,000.00 3,960.00 Mandor 0.0060 OH 140,000.00 840.00

Jumlah (2) 65,150.00 Jumlah (1) + (2) 280,450.00

G.030BahanKayu Kelas II 0.0300 m³ 1,800,000.00 54,000.00 Paku 5 cm - 12 cm 0.4000 kg 21,000.00 8,400.00 Minyak Bekisting 0.2000 liter 2,000.00 400.00 Balok Kayu Kelas II 5/7 0.0200 m³ 1,800,000.00 36,000.00 Plywood tebal 9 mm 0.3500 lembar 170,000.00 59,500.00 Dolken Ø (8-10) cm 3.0000 btg 8,000.00 24,000.00 Formite/Penjaga jarak Bekisting/spacer 4.0000 buah 2,500.00 10,000.00

Jumlah (1) 192,300.00 TenagaPekerja 0.3200 OH 70,000.00 22,400.00 Tukang Kayu 0.3300 OH 115,000.00 37,950.00 Kepala Tukang 0.0330 OH 120,000.00 3,960.00 Mandor 0.0060 OH 140,000.00 840.00

Jumlah (2) 65,150.00 Jumlah (1) + (2) 257,450.00

G.031BahanKayu Kelas II 0.0300 m³ 1,800,000.00 54,000.00 Paku 5 cm - 12 cm 0.4000 kg 21,000.00 8,400.00 Minyak Bekisting 0.1500 liter 2,000.00 300.00 Balok Kayu Kelas II 5/7 0.0150 m³ 1,800,000.00 27,000.00 Plywood tebal 9 mm 0.3500 lembar 170,000.00 59,500.00 Dolken Ø (8-10) cm 2.0000 btg 8,000.00 16,000.00

Jumlah (1) 165,200.00 TenagaPekerja 0.3200 OH 70,000.00 22,400.00 Tukang Kayu 0.3300 OH 115,000.00 37,950.00 Kepala Tukang 0.0330 OH 120,000.00 3,960.00 Mandor 0.0060 OH 140,000.00 840.00

Jumlah (2) 65,150.00 Jumlah (1) + (2) 230,350.00

G.050BahanBesi Beton U-24 1.0500 kg 14,057.85 14,760.75 Kawat Beton 0.0150 kg 18,685.00 280.28

Jumlah (1) 15,041.02 TenagaPekerja 0.0400 OH 70,000.00 2,800.00 Tukang Besi 0.0150 OH 100,000.00 1,500.00 Kepala Tukang 0.0150 OH 120,000.00 1,800.00 Mandor 0.0075 OH 140,000.00 1,050.00

Jumlah (2) 7,150.00 Jumlah (1) + (2) 22,191.02

Pembesian 1 kg dengan besi beton U-24

Memasang 1 m² bekisting untuk lantai

Memasang 1 m² bekisting untuk dinding

Memasang 1 m² bekisting untuk tangga

Page 15: Bill of Quantity Pagar

HARGA SAT. JUMLAHRp. Rp.

NO. URAIAN KOEF. SAT.

G.051BahanBesi Beton U-39 1.0500 kg 14,057.85 14,760.75 Kawat Beton 0.0150 kg 18,685.00 280.28

Jumlah (1) 15,041.02 TenagaPekerja 0.0400 OH 70,000.00 2,800.00 Tukang Besi 0.0150 OH 100,000.00 1,500.00 Kepala Tukang 0.0150 OH 120,000.00 1,800.00 Mandor 0.0075 OH 140,000.00 1,050.00

Jumlah (2) 7,150.00 Jumlah (1) + (2) 22,191.02

G.052BahanPapan Kayu Kelas II 0.0240 m³ 1,800,000.00 43,200.00 Paku 5 cm - 12 cm 0.3000 kg 21,000.00 6,300.00 Minyak Bekisting 0.1000 liter 2,000.00 200.00 Balok Kayu 5/7 Kayu Kelas II 0.0240 m³ 1,800,000.00 43,200.00

Jumlah (1) 92,900.00 TenagaPekerja 0.3000 OH 70,000.00 21,000.00 Tukang Kayu 0.1500 OH 115,000.00 17,250.00 Kepala Tukang 0.1500 OH 120,000.00 18,000.00 Mandor 0.0500 OH 140,000.00 7,000.00 Pekerja (bongkar cetakan) 0.1500 OH 70,000.00 10,500.00

Jumlah (2) 73,750.00 Jumlah (1) + (2) 166,650.00

G.053BahanMultipleks 9 mm 0.3470 lbr 125,000.00 43,375.00 Paku 5 cm - 12 cm 0.4000 kg 21,000.00 8,400.00 Balok Kayu 5/7 Kayu Kelas II 0.0170 m³ 1,800,000.00 30,600.00

Jumlah (1) 82,375.00 TenagaPekerja 0.1200 OH 70,000.00 8,400.00 Tukang Kayu 0.1500 OH 115,000.00 17,250.00 Kepala Tukang 0.1500 OH 120,000.00 18,000.00 Mandor 0.0500 OH 140,000.00 7,000.00 Pekerja (bongkar cetakan) 0.1200 OH 70,000.00 8,400.00

Jumlah (2) 59,050.00 Jumlah (1) + (2) 141,425.00

G.054BahanMultipleks 12 mm 0.3470 lbr 183,750.00 63,761.25 Paku 5 cm - 12 cm 0.4000 kg 21,000.00 8,400.00 Balok Kayu 5/7 Kayu Kelas II 0.0170 m³ 1,800,000.00 30,600.00

Jumlah (1) 102,761.25 TenagaPekerja 0.1200 OH 70,000.00 8,400.00 Tukang Kayu 0.1500 OH 115,000.00 17,250.00 Kepala Tukang 0.1500 OH 120,000.00 18,000.00 Mandor 0.0500 OH 140,000.00 7,000.00 Pekerja (bongkar cetakan) 0.1200 OH 70,000.00 8,400.00

Jumlah (2) 59,050.00 Jumlah (1) + (2) 161,811.25

G.055BahanKayu Stoot (2x pakai) 9.0000 bt 2,500.00 22,500.00 Paku 5 cm - 12 cm 0.5000 kg 21,000.00 10,500.00 Papan Terentang (2x pakai) 75% 0.0160 m³ 1,250,000.00 20,000.00

Jumlah (1) 53,000.00 TenagaPekerja 0.1200 OH 70,000.00 8,400.00 Tukang Kayu 0.1500 OH 115,000.00 17,250.00 Kepala Tukang 0.1500 OH 120,000.00 18,000.00 Mandor 0.0500 OH 140,000.00 7,000.00

Jumlah (2) 50,650.00 Jumlah (1) + (2) 103,650.00

Memasang 1 m² bekisting multipleks 9 mm

Memasang 1 m² bekisting multipleks 12 mm

Memasang 1 m² stootwerk

Pembesian 1 kg dengan besi beton U-39

Memasang 1 m² bekisting dengan papan

Page 16: Bill of Quantity Pagar

HARGA SAT. JUMLAHRp. Rp.

NO. URAIAN KOEF. SAT.

H. PEKERJAAN PENUTUP ATAPI. PEKERJAAN LANGIT-LANGITJ. PEKERJAAN SANITASIK. PEKERJAAN BESI DAN ALUMUNIUM

K.001BahanBesi Profil IWF 1.1000 kg 14,300.00 15,730.00 Meni Besi 0.0800 kg 7,255.00 580.40

Jumlah (1) 15,730.00 TenagaPekerja 0.0600 OH 70,000.00 4,200.00 Tukang Besi 0.0060 OH 100,000.00 600.00 Kepala Tukang 0.0060 OH 120,000.00 720.00 Mandor 0.0003 OH 140,000.00 42.00

Jumlah (2) 5,562.00 Jumlah (1) + (2) 21,292.00

K.002BahanBesi Profil 1.1500 kg 12,000.00 13,800.00

Jumlah (1) 13,800.00 TenagaPekerja 0.0600 OH 70,000.00 4,200.00 Tukang Besi 0.0600 OH 100,000.00 6,000.00 Kepala Tukang 0.0060 OH 120,000.00 720.00 Mandor 0.0030 OH 140,000.00 420.00

Jumlah (2) 11,340.00 Jumlah (1) + (2) 25,140.00

K.003BahanSolar 1.0000 ltr 5,500.00 5,500.00 Minyak Pelumas 0.1000 ltr 23,400.00 2,340.00

Jumlah (1) 7,840.00 TenagaPekerja 0.1000 OH 70,000.00 7,000.00 Tukang Besi 0.1000 OH 100,000.00 10,000.00 Kepala Tukang 0.0010 OH 120,000.00 120.00 Mandor 0.0050 OH 140,000.00 700.00 Sewa Alat 0.0080 Jam 75,000.00 600.00

Jumlah (2) 18,420.00 Jumlah (1) + (2) 26,260.00

K.004BahanKawat Las Listrik 0.04 kg 18,750.00 750.00 Solar 0.0300 ltr 5,500.00 165.00 Minyak Pelumas 0.0040 ltr 23,400.00 93.60

Jumlah (1) 1,008.60 TenagaPekerja 0.0040 OH 70,000.00 280.00 Tukang Besi 0.0020 OH 100,000.00 200.00 Kepala Tukang 0.0002 OH 120,000.00 24.00 Mandor 0.0002 OH 140,000.00 28.00 Sewa Alat 0.0170 Jam 75,000.00 1,275.00

Jumlah (2) 1,807.00 Jumlah (1) + (2) 2,815.60

K.012BahanBesi Strip 2 x 3 11.5000 m' 16,000.00 184,000.00

Jumlah (1) 184,000.00 TenagaPekerja 1.2000 OH 70,000.00 84,000.00 Tukang Las 1.2000 OH 100,000.00 120,000.00 Kepala Tukang 0.0120 OH 120,000.00 1,440.00 Mandor 0.0006 OH 140,000.00 84.00

Jumlah (2) 205,524.00 Jumlah (1) + (2) 389,524.00

L. PEKERJAAN KUNCI DAN KACAM. PEKERJAAN PENUTUP LANTAI DAN DINDING SNI-Pt-T2000-C

SNI

Memasang 1 m² terali besi

Revisi SNI T-16-2002Memasang 1 kg rangka atap baja

Memasang 1 kg Besi Profil

Mengerjakan 100 kg pekerjaan perakitan

Mengerjakan 1 cm pengelasan dengan las listrik

SNISNI 03-2838-2002SNI 03-3436-2002

Page 17: Bill of Quantity Pagar

HARGA SAT. JUMLAHRp. Rp.

NO. URAIAN KOEF. SAT.

M.008BahanPlint Keramik Artistik 10.6000 bh 2,500.00 26,500.00 Portland Cement (PC) 1.1400 kg 1,400.00 1,596.00 Pasir Pasang 0.0030 m³ 270,000.00 810.00 Semen Warna 0.0250 kg 3,000.00 75.00

Jumlah (1) 28,981.00 TenagaPekerja 0.0900 OH 70,000.00 6,300.00 Tukang Batu 0.0900 OH 100,000.00 9,000.00 Kepala Tukang 0.0090 OH 120,000.00 1,080.00 Mandor 0.0050 OH 140,000.00 700.00

Jumlah (2) 17,080.00 Jumlah (1) + (2) 46,061.00

M.011BahanKeramik 20.0000 bh 4,476.50 89,530.00 Portland Cement (PC) 9.3000 kg 1,400.00 13,020.00 Pasir Pasang 0.0180 m³ 270,000.00 4,860.00 Semen Warna 1.9400 kg 3,000.00 5,820.00

Jumlah (1) 113,230.00 TenagaPekerja 0.6000 OH 70,000.00 42,000.00 Tukang Batu 0.4500 OH 100,000.00 45,000.00 Kepala Tukang 0.0450 OH 120,000.00 5,400.00 Mandor 0.0300 OH 140,000.00 4,200.00

Jumlah (2) 96,600.00 Jumlah (1) + (2) 209,830.00

M.013BahanBatu Tempel Hitam/batu Candi 1.1000 m² 130,000.00 143,000.00 Portland Cement (PC) 9.3000 kg 1,400.00 13,020.00 Pasir Pasang 0.0180 m³ 270,000.00 4,860.00

Jumlah (1) 160,880.00 TenagaPekerja 0.1200 OH 70,000.00 8,400.00 Tukang Batu 0.1200 OH 100,000.00 12,000.00 Kepala Tukang 0.0120 OH 120,000.00 1,440.00 Mandor 0.0060 OH 140,000.00 840.00

Jumlah (2) 22,680.00 Jumlah (1) + (2) 183,560.00

M.014BahanPapan Kayu Bengkirai 0.0030 m³ 5,700,000.00 17,100.00 Paku Sekrup 5 cm 0.0500 kg 21,000.00 1,050.00

Jumlah (1) 18,150.00 TenagaPekerja 0.1200 OH 70,000.00 8,400.00 Tukang Kayu 0.1200 OH 115,000.00 13,800.00 Kepala Tukang 0.0120 OH 120,000.00 1,440.00 Mandor 0.0060 OH 140,000.00 840.00

Jumlah (2) 24,480.00 Jumlah (1) + (2) 42,630.00

M.015BahanUbin Keramik 20 x 20 cm 1.0000 m² 85,000.00 85,000.00 Portland Cement (PC) 10.4000 kg 1,400.00 14,560.00 Pasir Pasang 0.0450 m³ 270,000.00 12,150.00 Semen Warna 1.5000 kg 3,000.00 4,500.00

Jumlah (1) 116,210.00 TenagaPekerja 0.2500 OH 70,000.00 17,500.00 Tukang Batu 0.1200 OH 100,000.00 12,000.00 Kepala Tukang 0.0120 OH 120,000.00 1,440.00 Mandor 0.0130 OH 140,000.00 1,820.00

Jumlah (2) 32,760.00 Jumlah (1) + (2) 148,970.00

Memasang 1 m' plint kayu kelas II ukuran 2 x 10 cm

Memasang 1 m² lantai keramik ukuran 20 x 20 cm

Memasang 1 m' plint keramik ukuran 10 x 20 cm

Memasang 1 m² dinding keramik ukuran 20 x 25 cm

Memasang 1 m² dinding batu tempel hitam/Batu Candi

Page 18: Bill of Quantity Pagar

HARGA SAT. JUMLAHRp. Rp.

NO. URAIAN KOEF. SAT.

M.016BahanUbin Keramik 30 x 30 cm 1.0080 m² 85,000.00 85,680.00 Portland Cement (PC) 10.0000 kg 1,400.00 14,000.00 Pasir Pasang 0.0450 m³ 270,000.00 12,150.00 Semen Warna 1.5000 kg 3,000.00 4,500.00

Jumlah (1) 116,330.00 TenagaPekerja 0.2500 OH 70,000.00 17,500.00 Tukang Batu 0.1200 OH 100,000.00 12,000.00 Kepala Tukang 0.0120 OH 120,000.00 1,440.00 Mandor 0.0130 OH 140,000.00 1,820.00

Jumlah (2) 32,760.00 Jumlah (1) + (2) 149,090.00

M.017BahanUbin Keramik 40 x 40 cm 1.0080 m² 95,000.00 95,760.00 Portland Cement (PC) 9.8000 kg 1,400.00 13,720.00 Pasir Pasang 0.0450 m³ 270,000.00 12,150.00 Semen Warna 1.3000 kg 3,000.00 3,900.00

Jumlah (1) 125,530.00 TenagaPekerja 0.2500 OH 70,000.00 17,500.00 Tukang Batu 0.1200 OH 100,000.00 12,000.00 Kepala Tukang 0.0120 OH 120,000.00 1,440.00 Mandor 0.0130 OH 140,000.00 1,820.00

Jumlah (2) 32,760.00 Jumlah (1) + (2) 158,290.00

M.018BahanUbin Keramik 60 x 60 cm 1.1160 m² 95,000.00 106,020.00 Portland Cement (PC) 9.6000 kg 1,400.00 13,440.00 Pasir Pasang 0.0450 m³ 270,000.00 12,150.00 Semen Warna 1.3000 kg 3,000.00 3,900.00

Jumlah (1) 135,510.00 TenagaPekerja 0.2500 OH 70,000.00 17,500.00 Tukang Batu 0.1200 OH 100,000.00 12,000.00 Kepala Tukang 0.0120 OH 120,000.00 1,440.00 Mandor 0.0130 OH 140,000.00 1,820.00

Jumlah (2) 32,760.00 Jumlah (1) + (2) 168,270.00

N. PEKERJAAN PENGECATANN.001

BahanDempul Jadi 0.0500 kg 14,930.00 746.50 Minyak Cat 0.0500 kg 8,000.00 400.00 Batu Apung 0.0500 kg 13,000.00 650.00

Jumlah (1) 1,796.50 TenagaPekerja 0.0400 OH 70,000.00 2,800.00 Tukang Cat 0.0400 OH 100,000.00 4,000.00 Kepala Tukang 0.0040 OH 120,000.00 480.00 Mandor 0.0025 OH 140,000.00 350.00

Jumlah (2) 7,630.00 Jumlah (1) + (2) 9,426.50

N.003BahanCat Meni 0.2000 kg 7,255.00 1,451.00 Plamir 0.1500 kg 7,500.00 1,125.00 Cat Dasar 0.1700 kg 7,255.00 1,233.35 Cat Penutup 0.2600 kg 35,000.00 9,100.00

Jumlah (1) 11,458.35 TenagaPekerja 0.0700 OH 70,000.00 4,900.00 Tukang Cat 0.0090 OH 100,000.00 900.00 Kepala Tukang 0.0060 OH 120,000.00 720.00 Mandor 0.0025 OH 140,000.00 350.00

Jumlah (2) 6,870.00 Jumlah (1) + (2) 18,328.35

Mendempul dan Menggosok 1 m² kayu

Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)

Memasang 1 m² lantai keramik ukuran 30 x 30 cm

Memasang 1 m² lantai keramik ukuran 40 x 40 cm

Memasang 1 m² lantai keramik ukuran 60 x 60 cm

SNI

Page 19: Bill of Quantity Pagar

HARGA SAT. JUMLAHRp. Rp.

NO. URAIAN KOEF. SAT.

N.004BahanCat Meni 0.2000 kg 7,255.00 1,451.00 Plamir 0.1500 kg 7,500.00 1,125.00 Cat Dasar 0.1700 kg 7,255.00 1,233.35 Cat Penutup 0.3500 kg 35,000.00 12,250.00

Jumlah (1) 14,608.35 TenagaPekerja 0.0700 OH 70,000.00 4,900.00 Tukang Cat 0.1050 OH 100,000.00 10,500.00 Kepala Tukang 0.0040 OH 120,000.00 480.00 Mandor 0.0025 OH 140,000.00 350.00

Jumlah (2) 16,230.00 Jumlah (1) + (2) 30,838.35

N.008BahanPlamir 0.1000 kg 7,500.00 750.00 Cat Dasar 0.1000 kg 20,000.00 2,000.00 Cat Penutup 0.2600 kg 20,000.00 5,200.00

Jumlah (1) 7,950.00 TenagaPekerja 0.0200 OH 70,000.00 1,400.00 Tukang Cat 0.0630 OH 100,000.00 6,300.00 Kepala Tukang 0.0063 OH 120,000.00 756.00 Mandor 0.0025 OH 140,000.00 350.00

Jumlah (2) 8,806.00 Jumlah (1) + (2) 16,756.00

N.010BahanMeni Besi 0.1000 kg 7,255.00 725.50 Kuas 0.0100 bh 7,500.00 75.00

Jumlah (1) 800.50 TenagaPekerja 0.0200 OH 70,000.00 1,400.00 Tukang Cat 0.2000 OH 100,000.00 20,000.00 Kepala Tukang 0.0200 OH 120,000.00 2,400.00 Mandor 0.0100 OH 140,000.00 1,400.00

Jumlah (2) 25,200.00 Jumlah (1) + (2) 26,000.50

O. PEKERJAAN PAVING, JALAN DAN LAIN-LAINO.005

BahanPaving Segi Empat Warna; tebal 8 cm 1.0100 m² 150,000.00 151,500.00 Pasir Urug 0.1000 m³ 160,000.00 16,000.00

Jumlah (1) 151,500.00 TenagaPekerja 0.2500 OH 70,000.00 17,500.00 Tukang Batu 0.5000 OH 100,000.00 50,000.00 Kepala Tukang 0.0500 OH 120,000.00 6,000.00 Mandor 0.0250 OH 140,000.00 3,500.00

Jumlah (2) 77,000.00 Jumlah (1) + (2) 228,500.00

O.006BahanPaving Segi Enam Warna; tebal 8 cm 1.0100 m² 150,000.00 151,500.00 Pasir Urug 0.1000 m³ 160,000.00 16,000.00

Jumlah (1) 151,500.00 TenagaPekerja 0.2500 OH 70,000.00 17,500.00 Tukang Batu 0.5000 OH 100,000.00 50,000.00 Kepala Tukang 0.0500 OH 120,000.00 6,000.00 Mandor 0.0250 OH 140,000.00 3,500.00

Jumlah (2) 77,000.00 Jumlah (1) + (2) 228,500.00

O.008BahanGalian Tanah (B.001) 0.0120 m³ 24,500.00 294.00 Spesi 1 PC : 3 PP (E.003) 0.0043 m³ 41,230.00 177.29 Kansteen Beton Cetak 15 x 30 x 60 cm 1.6700 bh 35,000.00 58,450.00 Upah Kerja Pasang Kansteen 1.0000 ls 10,000.00 10,000.00 Jumlah 68,921.29

Memasang 1 m' kansteen beton cetak 15 x 30 x 60 cm

Memasang 1 m² paving block warna segi empat; tebal 8 cm

Memasang 1 m² paving block warna segi enam; tebal 8 cm

Mengecat 1 m² bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)

Mengecat 1 m² permukaan baja dengan meni besi

HSPK

Mengecat 1 m² bidang kayu baru (1 lps plamir, 1 lps cat dsr, 3 lps cat penutup)

Page 20: Bill of Quantity Pagar

HARGA SAT. JUMLAHRp. Rp.

NO. URAIAN KOEF. SAT.

O.009BahanBatu Koral 1.0200 m² 210,000.00 214,200.00 Semen PC 8.8000 kg 1,400.00 12,320.00 Semen Warna 0.3000 kg 3,000.00 900.00 Pasir Pasang 0.0120 m³ 270,000.00 3,240.00

Jumlah (1) 230,660.00 TenagaPekerja 0.0140 OH 70,000.00 980.00 Tukang Batu 0.1440 OH 100,000.00 14,400.00 Kepala Tukang 0.0140 OH 120,000.00 1,680.00 Mandor 0.0014 OH 140,000.00 196.00

Jumlah (2) 17,256.00 Jumlah (1) + (2) 247,916.00

P. PEKERJAAN LISTRIKP.001

BahanUnit Panil Box 1.0000 Unit 150,000.00 150,000.00

Jumlah (1) 150,000.00 TenagaTukang Listrik 0.1000 OH 115,000.00 11,500.00

Jumlah (2) 11,500.00 Jumlah (1) + (2) 161,500.00

P.002BahanStop Kontak 1.0000 Unit 25,000.00 25,000.00

Jumlah (1) 25,000.00 TenagaTukang Listrik 0.1000 OH 115,000.00 11,500.00

Jumlah (2) 11,500.00 Jumlah (1) + (2) 36,500.00

P.003BahanSaklar Ganda 1.0000 Unit 27,500.00 27,500.00

Jumlah (1) 27,500.00 TenagaTukang Listrik 0.1000 OH 115,000.00 11,500.00

Jumlah (2) 11,500.00 Jumlah (1) + (2) 39,000.00

P.004BahanSaklar Tunggal 1.0000 Unit 21,300.00 21,300.00

Jumlah (1) 21,300.00 TenagaTukang Listrik 0.1000 OH 115,000.00 11,500.00

Jumlah (2) 11,500.00 Jumlah (1) + (2) 32,800.00

P.005BahanLampu TL 2 x 36 Watt 1.0000 Unit 68,000.00 68,000.00

Jumlah (1) 68,000.00 TenagaTukang Listrik 0.1000 OH 115,000.00 11,500.00

Jumlah (2) 11,500.00 Jumlah (1) + (2) 79,500.00

P.006BahanLampu SL 18 Watt 1.0000 Unit 36,000.00 36,000.00

Jumlah (1) 36,000.00 TenagaTukang Listrik 0.1000 OH 115,000.00 11,500.00

Jumlah (2) 11,500.00 Jumlah (1) + (2) 47,500.00

P.007BahanLampu Pijar 20 Watt 1.0000 Unit 8,000.00 8,000.00

Jumlah (1) 8,000.00 TenagaTukang Listrik 0.1000 OH 115,000.00 11,500.00

Jumlah (2) 11,500.00 Jumlah (1) + (2) 19,500.00

Memasang 1 bh Stop Kontak

Memasang 1 bh Saklar Ganda

Memasang 1 bh Saklar Tunggal

Memasang 1 bh Lampu TL 2 x 36 Watt

Memasang 1 bh Lampu SL 18 Watt

Memasang 1 bh Lampu Pijar 20 Watt

Memasang 1 bh Fuse Box 3 Group

Memasang 1 m² Batu Koral Sikat

Page 21: Bill of Quantity Pagar

HARGA SAT. JUMLAHRp. Rp.

NO. URAIAN KOEF. SAT.

P.008BahanLampu Baret 25 Watt 1.0000 Unit 36,000.00 36,000.00

Jumlah (1) 36,000.00 TenagaTukang Listrik 0.1000 OH 115,000.00 11,500.00

Jumlah (2) 11,500.00 Jumlah (1) + (2) 47,500.00

P.009BahanLampu Merkuri 250 watt 1.0000 Unit 750,000.00 750,000.00

Jumlah (1) 750,000.00 TenagaTukang Listrik 0.1000 OH 115,000.00 11,500.00

Jumlah (2) 11,500.00 Jumlah (1) + (2) 761,500.00

P.010BahanSorot Artholite 1000 watt 1.0000 Unit 7,500,000.00 7,500,000.00

Jumlah (1) 7,500,000.00 TenagaTukang Listrik 1.0000 OH 115,000.00 115,000.00

Jumlah (2) 115,000.00 Jumlah (1) + (2) 7,615,000.00

P.011BahanArmature Artholite 2 x 40 watt 1.0000 Unit 465,000.00 465,000.00

Jumlah (1) 465,000.00 TenagaTukang Listrik 0.1000 OH 115,000.00 11,500.00

Jumlah (2) 11,500.00 Jumlah (1) + (2) 476,500.00

P.012BahanArmature Artholite 2 x 20 watt 1.0000 Unit 345,000.00 345,000.00

Jumlah (1) 345,000.00 TenagaTukang Listrik 0.1000 OH 115,000.00 11,500.00

Jumlah (2) 11,500.00 Jumlah (1) + (2) 356,500.00

P.013BahanPanel 35 A 1.0000 Unit 3,000,000.00 3,000,000.00

Jumlah (1) 3,000,000.00 TenagaTukang Listrik 1.0000 OH 115,000.00 115,000.00

Jumlah (2) 115,000.00 Jumlah (1) + (2) 3,115,000.00

BENGKALIS, 2013PENAWAR

PT. / CV. ………………….

NAMA JELASJABATAN

Memasang 1 bh Lampu Baret 25 Watt

Memasang 1 bh Lampu Merkuri 250 watt

Memasang 1 bh Sorot Artholite 1000 watt

Memasang 1 bh Armature Artholite 2 x 40 watt

Memasang 1 bh Armature Artholite 2 x 20 watt

Memasang 1 bh Panel

Page 22: Bill of Quantity Pagar

PEMERINTAH KABUPATEN BENGKALISBADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI

1 Hasil Analisa Pekerjaan Cor Beton Site Mix Camp. 1:2:3 05 1,011,500.002 Hasil Analisa Pekerjaan Cor Beton Site Mix K-175 15 1,055,970.873 Hasil Analisa Pekerjaan Cor Beton Site Mix K-225 17 1,112,080.404 Hasil Analisa Pekerjaan Cor Beton Site Mix K-250 18 1,126,871.405 Hasil Analisa Pekerjaan Cor Beton Site Mix K-300 20 1,160,283.316 Hasil Analisa Pekerjaan Pembesian 1 kg (Besi Polos / Besi Ulir) 23 16,105.027 Hasil Analisa Pekerjaan 1 M2 Jaring Kawat Baja/Wiremesh 24 75,226.818 Hasil Analisa Pekerjaan Bekisting untuk Pondasi 25 133,220.009 Hasil Analisa Pekerjaan Bekisting untuk Sloof 26 142,220.00

10 Hasil Analisa Pekerjaan Bekisting untuk Kolom 27 247,050.0011 Hasil Analisa Pekerjaan Bekisting untuk Balok 28 253,850.0012 Hasil Analisa Pekerjaan Bekisting untuk Lantai 29 280,450.0013 Hasil Analisa Pekerjaan Bekisting untuk Dinding 30 257,450.0014 Hasil Analisa Pekerjaan Bekisting untuk Tangga 31 230,350.0015 Hasil Analisa Pekerjaan Jembatan untuk pengecoran beton 32 81,950.0016 Hasil Analisa Pekerjaan Begisting Papan 52 166,650.0017 Hasil Analisa Pekerjaan Begisting Multiplek 9 mm 53 141,425.0018 Hasil Analisa Pekerjaan Begisting Multiplek 12 mm 54 161,811.2519 Hasil Analisa Pekerjaan Stoot Werk 55 103,650.00

11.00 m3 Beton Site Mix camp. 1:2:3 @ 1,011,500.00 = 1,011,500.00

149.51 kg Besi Polos / Besi Ulir @ 16,105.02 = 2,407,867.485.00 m2 Bekisting untuk Pondasi @ 133,220.00 = 666,100.00

J u m l a h 4,085,467.48

21.00 m3 Beton Site Mix camp. 1:2:3 @ 1,011,500.00 = 1,011,500.00

177.03 kg Besi Polos / Besi Ulir @ 16,105.02 = 2,851,142.058.21 m2 Bekisting untuk Pondasi @ 133,220.00 = 1,094,307.14

J u m l a h 4,956,949.19

31.00 m3 Beton Site Mix camp. 1:2:3 @ 1,112,080.40 = 1,112,080.40

95.30 kg Besi Polos / Besi Ulir @ 16,105.02 = 1,534,754.5410.00 m2 Bekisting untuk Sloof @ 142,220.00 = 1,422,200.00

J u m l a h 4,069,034.94

41.00 m3 Beton Site Mix camp. 1:2:3 @ 1,112,080.40 = 1,112,080.40

146.67 kg Besi Polos / Besi Ulir @ 16,105.02 = 2,362,200.4113.33 m2 Bekisting untuk Sloof @ 142,220.00 = 1,896,266.67

J u m l a h 5,370,547.47

51.00 m3 Beton Site Mix camp. 1:2:3 @ 1,112,080.40 = 1,112,080.40

94.71 kg Besi Polos / Besi Ulir @ 16,105.02 = 1,525,232.728.00 m2 Bekisting untuk Kolom @ 247,050.00 = 1,976,400.00

J u m l a h 4,613,713.12

KOLOM K1 - 13 X 56 (Besi Polos / Besi Ulir =94.7 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Kolom)

B. PERHITUNGAN HARGA SATUAN BETON BERTULANG

PONDASI PLAT SETEMPAT P1 - 80 X 80 x 20 (Besi Polos / Besi Ulir =149.51 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Pondasi)

PONDASI PLAT SETEMPAT P2 - 45 X 45 X 15 (Besi Polos / Besi Ulir =177.03 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Pondasi)

SLOOF S1 - 20 X 30 (Besi Polos / Besi Ulir =95.29 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Sloof)

SLOOF S2 - 15 X 25 (Besi Polos / Besi Ulir =146.67 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Sloof)

ANALISA HARGA SATUAN BETON BERTULANG

A. DATA - DATA HASIL ANALISA

NO URAIAN HASIL ANALISANOMOR HASIL

ANALISA HARGA SATUAN

Page 23: Bill of Quantity Pagar

61.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87

85.02 kg Besi Polos / Besi Ulir @ 16,105.02 = 1,369,265.374.17 m2 Bekisting untuk Kolom @ 247,050.00 = 1,029,375.00

J u m l a h 3,454,611.24

71.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87

115.53 kg Besi Polos / Besi Ulir @ 16,105.02 = 1,860,553.748.89 m2 Bekisting untuk Balok @ 253,850.00 = 2,256,444.44

J u m l a h 5,172,969.05

81.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87

109.34 kg Besi Polos / Besi Ulir @ 16,105.02 = 1,760,868.359.17 m2 Bekisting untuk Balok @ 253,850.00 = 2,326,958.33

J u m l a h 5,143,797.56

91.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87

146.67 kg Besi Polos / Besi Ulir @ 16,105.02 = 2,362,200.418.67 m2 Bekisting untuk Balok @ 253,850.00 = 2,200,033.33

J u m l a h 5,618,204.61

101.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87

109.34 kg Besi Polos / Besi Ulir @ 16,105.02 = 1,760,868.359.17 m2 Bekisting untuk Balok @ 253,850.00 = 2,326,958.33

J u m l a h 5,143,797.56

111.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87

124.15 kg Besi Polos / Besi Ulir @ 16,105.02 = 1,999,435.1010.19 m2 Bekisting untuk Balok @ 253,850.00 = 2,587,317.31

J u m l a h 5,642,723.28

121.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87

12.50 kg Besi Polos / Besi Ulir @ 54,945.05 = 686,813.1910.50 m2 Bekisting untuk Dinding @ 257,450.00 = 2,703,225.00

J u m l a h 4,446,009.06

131.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87

93.30 kg Besi Polos / Besi Ulir @ 54,945.05 = 5,126,521.098.33 m2 Bekisting untuk Lantai @ 280,450.00 = 2,337,083.33

J u m l a h 8,519,575.30

PLAT LANTAI T=12 CM (Besi Polos / Besi Ulir =93.3 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Lantai)

BALOK B1 - 20 x 30 (Besi Polos / Besi Ulir =115.52 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Balok)

BALOK B2 - 15 x 20 (Besi Polos / Besi Ulir =109.33 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Balok)

BALOK RB1 - 15 x 25 (Besi Polos / Besi Ulir =146.67 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Balok)

BALOK RB2 - 15 x 20 (Besi Polos / Besi Ulir =109.33 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Balok)

BALOK BP1- 13 x 20 (Besi Polos / Besi Ulir =124.14 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Balok)

LISTPLANK BETON T= 8 CM (Besi Polos / Besi Ulir =12.5 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Dinding)

KOLOM K2 20 x 30 (Besi Polos / Besi Ulir =85.02 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Kolom )

Page 24: Bill of Quantity Pagar

141.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87

10.00 m2 Wiremesh M8-150 @ 54,945.05 = 549,450.5510.00 m2 Bekisting untuk Lantai @ 280,450.00 = 2,804,500.00

J u m l a h 4,409,921.42

151.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87

37.43 kg Besi Polos / Besi Ulir @ 54,945.05 = 2,056,389.892.16 m2 Bekisting untuk pondasi @ 133,220.00 = 287,755.20

J u m l a h 3,400,115.96

161.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87

31.46 kg Besi Polos / Besi Ulir @ 54,945.05 = 1,728,789.382.30 m2 Bekisting untuk pondasi @ 133,220.00 = 306,406.00

J u m l a h 3,091,166.25

171.00 m3 Beton Site Mix camp. 1:2:3 @ 1,055,970.87 = 1,055,970.87

12.50 m2 Besi Polos / Besi Ulir @ 54,945.05 = 686,813.1910.50 m2 Bekisting untuk Dinding @ 257,450.00 = 2,703,225.00

J u m l a h 4,446,009.06

JABATAN

DINDING PLAT, T=10 CM (Besi Polos / Besi Ulir =12.5 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Dinding)

BENGKALIS, 2013PENAWAR

PLAT LANTAI T=10 CM (Wiremesh M8-150 =10 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk Lantai)

LANTAI BETON BERTULANG T=8 CM (Besi Polos / Besi Ulir =37.42 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk pondasi)

LANTAI BETON BERTULANG T=15 CM (Besi Polos / Besi Ulir =31.46 Kg/M3, Beton Site Mix camp. 1:2:3, Bekisting untuk pondasi)

PT. / CV. ………………….

NAMA JELAS

Page 25: Bill of Quantity Pagar

PEMERINTAH KABUPATEN BENGKALISBADAN PERPUSTAKAAN UMUM, ARSIP DAN DOKUMENTASI

A C D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

I PEKERJAAN PERSIAPAN 4,000,000.00 0.8778 0.88

II PEKERJAAN PINTU GERBANG STAINLESS STEEL 23,485,600.00 5.1536 1.29 1.29 1.29 1.29

III PEKERJAAN PAGAR DEPAN 103,837,448.70 22.7859 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90

IV PEKERJAAN PAGAR SAMPING 226,051,972.52 49.6045 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31 3.31

V PEKERJAAN PAGAR BELAKANG 97,833,828.61 21.4685 1.79 1.79 1.79 1.79 1.79 1.79 1.79 1.79 1.79 1.79 1.79 1.79

VI PEKERJAAN LAIN-LAIN 500,000.00 0.1097 0.11

0.88 1.90 5.21 5.21 5.21 5.21 5.21 5.21 6.99 6.99 6.99 6.99 8.28 6.38 6.38 6.38 5.10 1.79 1.79 1.90 TOTAL 455,708,849.84 100.00 0.88 2.78 7.98 13.19 18.39 23.60 28.81 34.01 41.01 48.00 55.00 61.99 70.27 76.66 83.04 89.43 94.52 96.31 98.10 100.00

BENGKALIS, 2013PENAWAR

PT. / CV. ………………….

NAMA JELASJABATAN

BLN V

TIME SCHEDULEPENGADAAN SARANA DAN PRASARANA PENUNJANG PERPUSTAKAAN KABUPATEN BENGKALIS

TAHUN ANGGARAN 2013

No

PENGADAAN KONSTRUKSI BANGUNAN PERPUSTAKAAN

BLN IVB

URAIAN PEKERJAANBLN I BLN II BLN III

KETJADWAL PELAKSNAAN JUMLAH PEMELIHARAAN

180 HK BOBOT (%)

100

90

80

70

60

50

40

30

20

10