    Content

    I.The Electric Map and

    Circuits on family

    III. Motor 3 phase and motor 1 phase

    VI.Control circuit

    II. Power supply cord connection and

    V.O.M

    V.Measurement And Control Fan

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    3/36

    I.The Electric Map

    1.Layout diagram

    1.Layout diagram 2.Schematic diagram

    2.Schematic diagram 3.Wiring Diagram

    3.Wiring Diagram

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    4/36

    1.Layout diagram

    Funtion:Locate loads

    KWh

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    5/36

    2.Schematic diagram

    Includes circuit:- Three Phase Transformer

    6KVA/0.38KV- Single phase electric meters- CB- 2 Fuses- 2 Switch- 2 Light,2 socket (10A,20A)

    6KV 0,38KV

    10KVA3 4

    KWh

    KWh

    CB 30A

    R

    R

    R

    R

    R

    K1

    K2

    K3

    10A

    20A

    1~40

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    6/36

    3.Wiring Diagram

    6KV/ 0,38KV

    10A 20A

    KWh

    1~40

    - 4 light

    - 2 switch

    - 2 socket

    - Single phase electric meters

    - 5 Fuse

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    7/36

    - System have wire mass

    - Wire on plastic pipe

    - Socket distance land 1.3m

    - Pile resistance < or = 4 om

    Note

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    8/36

    Circuits on family

    Includes circuit:

    - 1 light

    -1 switch

    -2 socket

    - 1 Fuses

    - CB

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    9/36

    Includes circuit:

    - 1 light

    -1 switch

    - 1 Fuses

    - CB

    -Socket

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    10/36

    II. Power supply cord connection and V.O.M

    1.Power supply cord connection

    a. direct connection (communication connection head)- Crossed the wire 2 A and B (already broaching the shell and cleaned)

    should join together

    - A wire wound on the body B (close to around 10 rounds each)

    - B winding wire on the body A (close to each other about 10 rounds)

    Use pliers to tighten connections.

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    11/36

    b. Branch connections (T-connector):

    - Place the wire A wire is perpendicular to the body B (the shell hasbeen grooming and cleaning).

    - Wrap the wire A wire around the body behind the head string B of A,

    the first wire wrap

    - A round wire A to the front lines A and B wire wound on the body

    for about 7 to

    10 ring-side.

    - Use pliers to tighten connections again

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    12/36

    c. Lead solder- Plug the burner to reach maximum temperature.

    - Clean the surface with sandpaper connection.

    - Resin dots on the burner (the burner cleaned by acid in the resin).

    - Place the burner at an angle of 45 joints dovoi about 3 to 5 minutes

    (depending on the type of burner 40W or 60W) for connection to heat up.

    - How to put lead solder burner 1 to 2 mm for lead free flowing around thejoints.

    - Connect the burner to reach maximum temperature.

    - Rats need to shell the string si.

    - Clean the surface of the wire.

    - Resin dots on the burner (the burner cleaned by acid in the resin).

    - Place the burner at an angle of 45 dovoi the wire about 3 to 5 minutes

    (depending on the type of burner 40W or 60W) for the wire to heat up.

    - How to put lead solder burner 1 to 2 mm for lead free flowing around the

    wire.

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    13/36

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    14/36

    2. VOM- Meters VOM meter is called universal because it does much

    use.

    - VOM meter can measure currents, voltages, resistance. In addition, the

    - VOM can be used for Testing Transistor, determine the polarity of the

    diode ...

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    15/36

    -Elevator (A): Calibration for Ohm (-0 from right to left as the -).- Elevator (B) and (C) dividing the Volt, Ampere DC, AC

    (DC.VA & AC.V) left to right, the maximum number of 0.

    - Scale (D) read Trasistor amplification factor (HFE = Ic / Ib).- Elevator (E) and uterus (F): read current polarization upon or against

    (leakage) of

    Diode.- Scale (G): one is to read the leaked ICEO of transistors

    ** Practices

    1.Voltage measurements:

    - When you want to measure voltage alternating current (AC) or DC

    (DC), we adjust

    switch on the meter of the measuring period is denoted AC.V or DC.V

    - Select appropriate measurement period (larger) with a voltage to be

    measured.

    - Install parallel to the clock source to be measured.

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    16/36

    -Read the voltage value measured on this scale.

    + 10 volt scale: each bar is 0.2 units.

    + 50 volt scale: each bar unit LA1.

    + 250 volt scale: each bar is 5 units.

    For example: choose period, we measured 250 index on the scale read 250

    AC.V.

    Note: - When measuring AC voltage, attention select appropriatemeasurement range, avoiding- choose smaller voltage range to be measured or choose another

    measurement range

    voltage measurement.2. DC current measurement:

    -- When you want to measure DC DC (DC), we adjust the switch onclock period of measurement is denoted DC.mA

    - Select the period to match the measured current to be measured.

    - Install with the serial clock source to be measured.

    - Read the voltage value measured on the scale corresponds to the range

    measured.

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    17/36

    3. Testers- When you want to measure the electrical resistance R, we adjust the

    switch on the measuring range is denoted

    .

    - Choose a suitable measuring range resistor to be measured.

    - Chap 2 measuring stick together and adjust the knob for the needle 0

    standards.- Put the rod 2 measured in the first two resistors to be measured.

    - Read the index measured on the scale corresponds to the range

    measured.

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    18/36

    III Motor 3 phase and motor 1 phase

    1. Testers heat engine

    Step 1: Measure R insulation (check for shells being touched or not)> 1 mg

    - If the first measure in turn the AX, BY, CZ with shell insulation resistance> 1 mg

    shall meet the requirements => do not touch the shell => machine operating

    conditions

    Step 2: Measure R (coil resistance) AX, BY, CZ are equal

    - Measure the pairs AX and determine the resistance of the coil day.Sau it shall bethe same for the pair BY, CZ

    - Case 1:

    1. Voltage coil 3 is measured at several volts, the coil (I, II) will have the

    following: A_X_B_Y

    2.Neu measuring coil 3 is the U = 0V (X_Y) first rolled coil connecting the 2nd

    strategy was as follows: A_X_Y_B-Case 2: After measuring the change determined before the 3rd roll to roll 1 or roll

    2 rolls to determine the remainder of the 3rd roll

    * Experimental:

    Scroll I: 1-4

    Scroll II :2-5

    Scroll III :3-6

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    19/36

    U = 0vV

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    20/36

    2.3-phase motor conector

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    21/36

    Motor 3 phase Xung shun

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    22/36

    Picture of motor 3 phase

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    23/36

    Y 900

    A 1050

    E 1200

    B 1300

    F 1550

    H 1800

    C >1800

    *INS:insclass

    *S.F: service factor

    *Frame:- structural parameters, such

    as structure height of the motor shaft

    from the floor, the distance of the axisof the fixed point the base installation.

    - example:Engine Frame: 215, then

    we get the first two numbers divided 4

    so 5 * 1 / 4, this is the height of the

    shaft from the floor and 5 are set

    distance from a fixed point on the axis

    of the base (inch )

    * U1U2=W1W2=V1V2

    *

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    24/36

    3. 1-phase phase motor conector

    S. W : stort winding

    R. W: run winding

    RR. W > RS. W

    Experimental: RR. W = 50V, RS. W =20V

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    25/36

    Picture of motor 1 phase

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    26/36

    VI. Control circuit

    1. Components in control circuits

    a.CB

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    27/36

    b.Contactor

    NC(normally closed):0

    NO(normally opened):

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    28/36

    c.Thermal relay

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    29/36

    d. Time relay

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    30/36

    2.Control Circuit

    a. Jumpstart circuit Direct Engine 3 Phase Asynchronous

    Step 1: Close CB

    Step 2: Press FOR

    Step 3: Test Machine Runs And then OFF Press

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    31/36

    b. Boot directly Asynchronous Motor 3 Phase reversal Back

    Step 1: Close CB

    Step 2: Press FOR

    Step 3: Press OFF and note direction of rotation of

    the engine REV Then click Back to make

    comparison engine => press OFF to stop engine

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    32/36

    c. Motor starter circuit / of asynchronous three-phase relay time

    Step 1:close CB

    Step 2: Adjustment time relay 3 to 5 seconds

    Step 3:press FOR after 3 seconds of the transfer

    Step 4: press OFF

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    33/36

    d. Change Speed circuit 3-phase motor

    Step 1:close CB

    Step 2: press FOR

    Step 3: Mt press, engine performance at low speeds,

    the stator windings of the motor's auction

    Step 4: Mc Press, engine performance at high

    speeds, the stator windings of the motor's auction=> Press OFF to stop engine

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    34/36

    Requirements:

    - determine the correct position of the Closing Next, Open Your Contactor,

    Thermal relay, buttons

    - Check Point Next Good Or Not There

    - Connect the wires in place

    - Electrical Inspection Before Closing

    - Connect and notice how

    - Control relay time

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    35/36

  • 7/31/2019 Bai Giang Thuc Hanh Mon Dien Co Ban 9748

    36/36

    V. Measurement And Control Fan

    1. Map here of a Phase Electric Fan

    Requirements: - Determine the wire- Investment in Title Roll

    - Fan runs

    Step 1: Wire played by 2 first, determine R4-R5 = Rmax

    Step 2: 3 wire connection head left and measurement with R4, R5

    will determine R4, R5 (R5> R4)

    Step 3:Measure R4 top line top line with 3 remaining, define R1, R2, R3 (R1 >R2 >R3 )

    The End