Asme sec viii div 1 icb

120
Welcome to Training Program on GUIDED TOUR OF Training Program on GUIDED TOUR OF ASME CODES ASME CODES Presented by Presented by P. S. KULKARNI P. S. KULKARNI

Transcript of Asme sec viii div 1 icb

Page 1: Asme sec viii div 1 icb

Welcome to

Training Program on GUIDED TOUR OF ASME Training Program on GUIDED TOUR OF ASME CODESCODES

Training Program on GUIDED TOUR OF ASME Training Program on GUIDED TOUR OF ASME CODESCODES

Presented byPresented by

P. S. KULKARNIP. S. KULKARNI

Presented byPresented by

P. S. KULKARNIP. S. KULKARNI

Page 2: Asme sec viii div 1 icb

Agenda - session 1Agenda - session 1

• This session will provide:– An introduction to Codes and

Standards

– Objectives of Codes/ Standards.

– ASME Code System.

– Introduction To ASME Sec. VIII-1

• Approximate duration – 8.0 Hours

Page 3: Asme sec viii div 1 icb

CODE Credibility

Collective Knowledge and Experience

2 S

Safety(Plant, Personnel, People)

Standardization

2 C

WHY ADOPT CODES ?

Page 4: Asme sec viii div 1 icb

Common pressure vessel codes

• ASME Sec VIII Div 1 and Div 2

• BS 5500

• IS 2825

• Ad Merk Blatter (German)

• AFNOR (French)

Page 5: Asme sec viii div 1 icb

ASME Codes

Issue freq. : New edition every 3 years, on 1st July latest edition was on 1st July 04.

Addenda : In-between revisions, issued yearly also on 1st July.

2004 Edn. & '04 add. --- 1st July '042005 Addenda --- 1st July '052006 Addenda --- 1st July '06Again new edition - 2007 (1st July)

Applicability : Edition & Addendas effective 6 months from date of issue (i.e. 1st Jan of next year)

Issued by : American society of mechanical Engineers, New York.

Page 6: Asme sec viii div 1 icb

ASME SEC. VIII DIV. 1

Pressure vessels within scope:

• Vessels having inside diameter above 6 in. 

• Vessels designed for pressures above 15 psig and not exceeding 3000 psi.

• Unfired steam boilers, evaporators, Heat exchangers

Page 7: Asme sec viii div 1 icb

ASME Sec. VIII div.1--Excluded from scope

• Piping system & components beyond

battery limits.

• Vessels covered by other sections

• Vessels for human occupancy

• Pressure containers which are integral

part of rotating machinery.

Page 8: Asme sec viii div 1 icb
Page 9: Asme sec viii div 1 icb

ASME Boiler & Pressure Vessel Codes

ASME Codes give stipulations and guidelines for the design, materials, manufacture and testing of pressure vessels. These are issued by the American Society of Mechanical Engineers, New York.

The codes were first issued in 1915. Since then, many changes have been made and new sections added to the code as need arose. It is a LIVE code and is revised and updated periodically. It keeps pace with time and is responsive to its users.

Page 10: Asme sec viii div 1 icb

In its present from the ASME Code System is a follows

• Section I Power Boilers. • Section II Material specifications.

Part A Ferrous materials, Part B Non Ferrous Materials Part C Welding rods, electrodes, filler metals. Part D Material properties.

CODE SYSTEM

Page 11: Asme sec viii div 1 icb

CODE SYSTEM

• Section III Nuclear Power Plant Components. Section IV Heating Boilers.• Section V Non destructive Examinations.• Section VI Care and operation of Heating Boilers.• Section VII Rules for care of Power Boilers.• Section VIII Division 1 - Pressure Vessels

Division 2 Alternative Rules ( Pr. Vessel) Division 3 Rules for constructive of High Pressure Vessels.

• Section IX Welding and Brazing Qualifications.

Page 12: Asme sec viii div 1 icb

CODE SYSTEM, cont’d

Section X Fiber glass reinforced Plastic Pressure Vessels. Section XI Rules for in service inspection of Nuclear Power Plant Components.

Page 13: Asme sec viii div 1 icb

APPLICABILITY

The editions and addenda become applicable after six months from date of issue. Thus, 1st Jan. 2000, the construction of Pressure Vessels shall be as per 1998 edition and 1999 addenda. However, for old contracts spilling over beyond 1st Jan 2000, the old applicable edition and addenda are valid.

Page 14: Asme sec viii div 1 icb

CODE INTERPRETATION

ASME issue written replies know as "Interpretations" to the inquiries concerning technical aspects of the code .These are issued twice in a year (July and December) and are sent to "Edition - subscribers" as up-date service.

Page 15: Asme sec viii div 1 icb

CODE CASES Boiler and Pressure Vessels committee meets regularly to consider

Proposed additions and revisions to the code. At the same time it may formulate code cases to clarify ' Intent' of existing requirements. These are published as code Case books. It is published along with new editions and supplements are automatically sent to subscribers of code case book till new edition ispublished.

Page 16: Asme sec viii div 1 icb

ASME Sec. VIII Div. 1 has five different parts

Part 1 : UG – General requirements (Design requirements)

Part 2 : Material Specific RequirementsUCS – Carbon steel & low alloy steelUHA – High alloy steelsUNF – Non ferrous metallurgy

Part 3 : Fabrication method specific requirementsUW – Welded constructionUF – Forging construction

Part 4 : Mandatory Appendices &

Part 5 : Non mandatory Appendices

Page 17: Asme sec viii div 1 icb
Page 18: Asme sec viii div 1 icb

Types of vesselsTypes of vessels

• Cylindrical – Horizontal or Vertical

• Spherical

Page 19: Asme sec viii div 1 icb
Page 20: Asme sec viii div 1 icb

Steps in design -1Steps in design -1• Find service conditions & metallurgy. • Ensure ductility at service conditions• Calculate thickness required (TR).

Page 21: Asme sec viii div 1 icb

Steps in design -2Steps in design -2• Design thickness = TR + Corr Allow • Roundup to commercially available thickness

to get nominal thickness• Find MAWP from nominal thickness

Page 22: Asme sec viii div 1 icb
Page 23: Asme sec viii div 1 icb

Solve a problem

Calculate the minimum thickness of a cylindrical shell of inside diameter 4000mm, tan to tan length of 8300mm and a design pr. of 100 Kg/sq cmg.

Design temperature of the vessel is 343 C

Material of construction – ASTM A 516 Gr 70

Allowable stress of vessel at 343 C = 16500 psi

Corrosion allowance = 3.0 mm

Efficiency of the weld joint – 1.0

Page 24: Asme sec viii div 1 icb

24

Page 25: Asme sec viii div 1 icb

25

Page 26: Asme sec viii div 1 icb

26

Page 27: Asme sec viii div 1 icb

UW – 3 : WELD JOINTS CATEGORIES.

Page 28: Asme sec viii div 1 icb

UW – 3 : WELD JOINTS CATEGORIES.

Category A :

1 Longitudinal weld joints in main shell or nozzles.

2 Any welded joints in spherical shell.

3. Any welded joints in Dished Head.

4. Circumferential Seam , Hemisph. head to shell.

Page 29: Asme sec viii div 1 icb

UW – 3 : WELD JOINTS CATEGORIES.

Category B :

1 Circumferential seam in main shell, or nozzle 2 Circumferential seam connecting formed head (other

than hemi-spherical head) to shell.

Page 30: Asme sec viii div 1 icb

UW – 3 : WELD JOINTS CATEGORIES. Contd.

Category C :

• Weld joints connecting flanges, tube sheets, flat head to main shell or Nozzles (Flange Welds) Category D:

• Welds joining communicating chamber or nozzle to the main shell / heads. (Attachment Welds).

Page 31: Asme sec viii div 1 icb

Types of endsTypes of endsFLAT HEADS :

– For low pressures up to 5 kg/sqcm

FORMED HEADS :

– Torispherical• Generally used up to 15 kg/sqcm

– Ellipsoidal• Generally used between 15 to 25 kg/sqcm

– Hemispherical• Generally used above 25 kg/sqcm.

CONICAL HEADS : for Special purposes.

Page 32: Asme sec viii div 1 icb
Page 33: Asme sec viii div 1 icb
Page 34: Asme sec viii div 1 icb
Page 35: Asme sec viii div 1 icb

35

Page 36: Asme sec viii div 1 icb

For spherical shells / head : t = P x R / (2SE - 0.2P) ….for Thickness P = 2SEt / (R + 0.2t)….for MAWP

FORMED HEADS

For Torisph. Heads : (L = Crown Rad., r = 0.06 x L)

t, = 0.885 x P x L / (SE - 0.1P)… for Thickness

P = SEt / ( 0.885L + 0.1 t ) … for MAWP

For Ellipsoidal Heads : ( 2 : 1 type)

t = P x D / (2SE - 0.2P) ….for Thickness

P = 2SEt / (D + 0.2t) ….for MAWP

Page 37: Asme sec viii div 1 icb
Page 38: Asme sec viii div 1 icb
Page 39: Asme sec viii div 1 icb

UW-11 :RT and UT EXAMINATIONS

Full Radiography is required in following cases : • All butt welds of vessels for lethal substances

• If thickness exceeds given in table UCS-57, UHA - 33,

• Butt welds of unfired boilers, with design pr. > 50 psi.

• For all other vessels, All cat. A welds full radiography . Cat. B & C welds which intersect the Cat. A welds shall be spot radiographed.

• Radiography is not required of category B and C butt welds in nozzles less than NPS 10 or 1 1/8 in. thick.

Page 40: Asme sec viii div 1 icb

UW-11 :RT and UT EXAMINATIONS…contd.

1 Spot Radiography : Spot RT of Butt joints if design efficiency is selected for spot radiography. 2 No Radiography : No RT of weld joints if design efficiency is

selected for no radiography or vessel is designed for external pressure

3 Ultrasonic examination : May be substituted for RT only for

the final closure seam of a pressure vessel.

Page 41: Asme sec viii div 1 icb

41

Page 42: Asme sec viii div 1 icb

42

vvv

v

Page 43: Asme sec viii div 1 icb

43

Page 44: Asme sec viii div 1 icb

44

Page 45: Asme sec viii div 1 icb

45

Page 46: Asme sec viii div 1 icb

46

Page 47: Asme sec viii div 1 icb
Page 48: Asme sec viii div 1 icb

UW – 12 :WELDED JOINT TYPES

Page 49: Asme sec viii div 1 icb

UW – 12 :WELDED JOINT EFFICIENCY

RT – 1 : Full Radiography ( E=1) : Full length radiography of all butt welds RT – 2 : Full Radiography ( E=1): Cat – A: Full length radiography Cat – B: Spot RT per [UW – 11 (a) 5 (b)] RT – 3 : Spot radiography ( E= 0.85)RT – 4 : No radiography ( E= 0.7)

Page 50: Asme sec viii div 1 icb
Page 51: Asme sec viii div 1 icb
Page 52: Asme sec viii div 1 icb

Some key points:Some key points:

Page 53: Asme sec viii div 1 icb
Page 54: Asme sec viii div 1 icb
Page 55: Asme sec viii div 1 icb

55

Page 56: Asme sec viii div 1 icb

Out of roundness of Shell

Difference between the maximum and minimum inside diameter measured at any cross section of the vessel shall not exceed 1% of the nominal diameter at that cross section under consideration. The diameter can be measured from either inside or outside. If measured from outside shall be corrected for the thickness at that cross section.

Page 57: Asme sec viii div 1 icb

57

Page 58: Asme sec viii div 1 icb

NOZZLE REINFORCEMENT Required area of Reinforcement = d X tr

d= Diameter of finished opening tr = Required thickness of shell or head.

Reinforcement is waived off for single openings if:

1. finished opening size is 3 1/2" or less diameter in shell or head of thickness 3/8" or less; or

2. finished opening size 2 3/8" or less diameter in shell or head of thickness over 3/8";

Page 59: Asme sec viii div 1 icb
Page 60: Asme sec viii div 1 icb
Page 61: Asme sec viii div 1 icb
Page 62: Asme sec viii div 1 icb
Page 63: Asme sec viii div 1 icb

UCS-66 : IMPACT TESTING

1 MDMT - Thickness point falls on or above the relevant curve. Impact test is not required

(Curve UCS – 66 )

2 Impact test is must, if MDMT < 120 deg F, and:Thickness Of welded part > 4”Thickness for Non-welded part > 6”

3 Test normally required for MDMT < -55 deg. F

Page 64: Asme sec viii div 1 icb

64

Page 65: Asme sec viii div 1 icb

65

Page 66: Asme sec viii div 1 icb

66

Page 67: Asme sec viii div 1 icb

67

Page 68: Asme sec viii div 1 icb

68

Page 69: Asme sec viii div 1 icb

69

Page 70: Asme sec viii div 1 icb

70

Page 71: Asme sec viii div 1 icb

71

Page 72: Asme sec viii div 1 icb

IMPACT TESTING EXEMPTION -- UG-20 (f) :

Impact test exempt for if,

Materials are P No 1, Gr. No. 1 and 2

1. Materials of curve A : thickness < 0.5 inch

2. Materials curve B, C, D : thickness < 1.0 inch

3. Hydrostatic test performed as required

4. Design temp = -20 deg F to 650deg.F

5. No cyclic or thermal shock loading

Page 73: Asme sec viii div 1 icb

IMPACT TESTINGEXEMPTION…….contd.

1 UCS-68 (c) : If PWHT is performed when not a Code requirement, reduction of 30 deg. F (17 0C) in impact testing exemption temp.(from Fig UCS-66) may be given for P No. 1 materials

2 If coincident ratio is < 1, Reduction to exemption temperature

may be given as per UCS-66.1

Page 74: Asme sec viii div 1 icb

74

Page 75: Asme sec viii div 1 icb

75

Page 76: Asme sec viii div 1 icb

76

Page 77: Asme sec viii div 1 icb

77

Page 78: Asme sec viii div 1 icb

78

Page 79: Asme sec viii div 1 icb

79

Page 80: Asme sec viii div 1 icb

80

Page 81: Asme sec viii div 1 icb

81

Page 82: Asme sec viii div 1 icb

82

Page 83: Asme sec viii div 1 icb

83

Page 84: Asme sec viii div 1 icb

84

Page 85: Asme sec viii div 1 icb

• PWHT temperature is higher of the two for dissimilar metal joints

UW-40 : POST-WELD HEAT TREATMENT• PWHT is Code Requirement if thickness exceeds those given in tables for respective materials .

• Furnace PWHT method is preferred .

• Min. Overlap for PWHT in multiple heats = 5 ft.

• Local PWHT : Min Soak Band = weld width + Lesser of 2’’ or t. and it shall extend full 360 deg for circ. Joint

Page 86: Asme sec viii div 1 icb

· Still air cooling permitted below 800 deg .F.

UCS-56: POST-WELD HEAT TREATMENT

· Max. Loading temp in furnace = 800 deg .F

· Max. heating rate 400 deg F/hr/inch of thickness.

· Soaking period as per UCS-56 tables.

· Temp difference between hottest and coldest parts of vessel shall not exceed 150 deg .F

· Max. cooling rate = 500 deg .F /hr/inch of thk.

· Max. offloading temp = 800 deg. F

Page 87: Asme sec viii div 1 icb
Page 88: Asme sec viii div 1 icb

88

Page 89: Asme sec viii div 1 icb

89

Page 90: Asme sec viii div 1 icb

90

Page 91: Asme sec viii div 1 icb

91

Page 92: Asme sec viii div 1 icb

92

Page 93: Asme sec viii div 1 icb

93

Page 94: Asme sec viii div 1 icb

94

Page 95: Asme sec viii div 1 icb

95

Page 96: Asme sec viii div 1 icb

96

Page 97: Asme sec viii div 1 icb

Summary of NDT

Page 98: Asme sec viii div 1 icb

NDE OF PRESSURE VESSELSSelection of a particular NDT technique :

Applicable NDT methods / Welding Discontinuities

Discontinuities

Applicable NDT Methods

RT T PT MT VT ET

Porosity * a *b a *

Slag Inclusion NA *b NA *

Incomplete fusion * NA *b NA *

Incomplete Penetration NA * NA *

Undercut * * * *

OverlapNA

* * *

Cracks * a b a

LaminationsNA

a,c b,c a,c NA

Page 99: Asme sec viii div 1 icb

Applicable NDT methods for Weld joint types

Joints

NDT Methods

RT UT PT MT VT ET

Butt

Corner * *

T * *

Lap * * *

Page 100: Asme sec viii div 1 icb

Note to NDT Table

a. Surface

b. Surface and slightly subsurface

c. Weld preparation or edge of base metal

Applicable method

* Marginal applicability depending on other factors.

Page 101: Asme sec viii div 1 icb

101

Page 102: Asme sec viii div 1 icb

102

Page 103: Asme sec viii div 1 icb

103

Page 104: Asme sec viii div 1 icb

104

Page 105: Asme sec viii div 1 icb

105

Page 106: Asme sec viii div 1 icb

106

Page 107: Asme sec viii div 1 icb

107

Page 108: Asme sec viii div 1 icb

108

Page 109: Asme sec viii div 1 icb

109

Page 110: Asme sec viii div 1 icb

110

Page 111: Asme sec viii div 1 icb

UG-99 : HYDROSTATIC TEST

• Min. Inspection pressure = Test pressure / 1.3

• Hydrostatic Test pr. = 1.3 X MAWP X stress ratio Stress ratio = Stress at test temp./Stress at design temp.

• Any non-hazardous liquid may be used for the test.

• Min. Test temp = MDMT + 30 deg. F ( 17 C )

• Inspection temperature <= 120 deg. F.

• The MAWP may be same as Design pr.

• Test gauge range = 1.5 to 4 times test pr.

Page 112: Asme sec viii div 1 icb

UG-100 : PNEUMATIC TESTS

• Pneumatic test is used instead of hydro when:

• Vessels cannot be safely filled with water

• Vessels in service in which traces of

testing liquid cannot be tolerated

• Test pr = 1.1 X MAWP X stress ratio.

• Test temp shall exceed MDMT by 30 deg F.

• Pr. Gauge range = 1.5 to 4 times test pressure

Page 113: Asme sec viii div 1 icb

Safety precautions for Pneumatic Test

• All welds around openings and attachment welds with throat >= 6mm ( 0.25”) to be MT or PT tested

• The pr. shall be first raised to 50% of the test pr.

• The pressure then shall be reduced to a value of test pressure /1.1 , to permit inspection.

• Then the pressure shall be raised in steps of 10% of test pr. To reach full test pressure

Page 114: Asme sec viii div 1 icb

CODE STAMPING

Each pressure vessel shall be marked with the following :

1) The official Code U Symbol or the official UM Symbol.

2) Name of the Manufacturer of the pressure vessel

preceded by the words "certified by";

3) Max. allowable working pressure ---- psi at ---- 0F.

4) Minimum design metal temperature ---- 0F ----psi

5) Manufacturer's serial number;

6) Year built.

Page 115: Asme sec viii div 1 icb

115

Page 116: Asme sec viii div 1 icb

116

Page 117: Asme sec viii div 1 icb

117

v

Page 118: Asme sec viii div 1 icb

118

Page 119: Asme sec viii div 1 icb
Page 120: Asme sec viii div 1 icb

Thank You for Thank You for your your

Time and AttentionTime and Attention

Thank You for Thank You for your your

Time and AttentionTime and Attention