Analisa Standard Material
Transcript of Analisa Standard Material
ANALISA MATERIAL
SITE
LANTAI KERJA TOWER PASANGAN BATU BATA
VOLUME 1.00 VOLUME 1.00
SEMEN 0.25 ZAAK SEMEN 0.32 ZAAK
PASIR BETON 0.04 PASIR PASANG 0.03
SPLIT 0.07 BATU BATA 70.00 BUAH
PONDASI TOWER ( READY MIX) SLOOF, KOLOM DAN RING BALOK
VOLUME 1.00 VOLUME 1.00
READY MIX 1.00 SEMEN 4.00 ZAAK
PASIR BETON 0.52
SPLIT 0.86
PONDASI TOWER ( SITE MIX) PLESTERAN DAN ACIAN PAGAR BATA
VOLUME 1.00 VOLUME 1.00
SEMEN 6.80 ZAAK SEMEN 0.21 ZAAK
PASIR BETON 0.54 PASIR PASANG 0.02
SPLIT 0.90
LANTAI KERJA PONDASI SHELTER ( SITE MIX) BETON RABAT ACCESS ROAD
VOLUME 1.00 VOLUME 1.00
SEMEN 0.25 ZAAK SEMEN 6.80 ZAAK
PASIR BETON 0.04 PASIR BETON 0.52
SPLIT 0.07 SPLIT Analisa Mae
PONDASI SHELTER ( SITE MIX) SIRTU ACCESS ROAD
VOLUME 1.00 VOLUME 1.00
SEMEN 6.40 ZAAK SIRTU 1.20
PASIR BETON 0.54
SPLIT 0.90
PONDASI BATU KALI PAGAR BETON JEMBATAN
VOLUME 1.00 VOLUME 1.00
SEMEN 2.72 ZAAK SEMEN 6.40 ZAAK
PASIR PASANG 0.54 PASIR BETON 0.52
BATU KALI 1.20 SPLIT 0.90
TANAH URUGAN BATU KALI JEMBATAN
VOLUME 1.00 VOLUME 1.00
TANAH URUGA 1.20 SEMEN 2.72 ZAAK
M2 M2
M3 M3
M3
M3 M2
M3
M3
M3
M3 M2
M3 M3
M3
M2 M3
M3 M3
M3 M3
M3 M3
M3
M3
M2 M3
M3 M3
M3 M3
M3 M3
M3
PASIR PASANG 0.54
BATU KALI 1.20
PASANGAN CONBLOCK HALAMAN
VOLUME 1.00 URUGAN PASIR PONDASI TOWER
CONBLOCK 36.00 VOLUME 0.05
PASIR BETON 0.04 PASIR 0.05
PASANGAN CONBLOCK ACCESS KANSTEEN ACCESS ROAD
VOLUME 1.00 VOLUME 1.00 M
CONBLOCK 36.00 BATU BATA 25.00 BH
PASIR BETON 0.04 SEMEN 0.05 ZAAK
PASIR 0.005
M3
M3
M2
M3 M3
M3
M2
M3
M3
M3
ANALISA PEKERJAAN
PASANGAN BATU BATA 1/2 BATA 1 ad. 1:4(100% tahun 2008) VOLUME PEKERJAAN 1 m2 TIME 1 MAN POWERHARGA 1M2 HARGA TOTAL Rp 405,000 86%
0 Rp - PASANGAN BATU BATA 1M2 ad. 1:4
JENIS PEKERJAAN KOEF VOLUME SATUAN HARGA SATUAN TOTAL HARGA/1M2 PERSENTASE
BATU BATA 70.000 1 70 70.00 Buah Rp 800 Rp 56,000 PASIR PASANG 0.030 1 0 0.03 M3 Rp 250,000 Rp 7,500 SEMEN 0.030 1 0 0.03 zak Rp 70,000 Rp 2,100 PELAKSANA 1.000 1 1 1.00 org Rp 95,000 Rp 95,000 MANDOR 0.048 1 0 1.00 org Rp 90,000 Rp 90,000 KEPALA TUKANG 0.016 1 0 1.00 org Rp 85,000 Rp 85,000 TUKANG 0.160 1 0 1.00 org Rp 70,000 Rp 70,000 PEKERJA 0.480 1 0 1.00 org Rp 65,000 Rp 65,000
TOTAL Rp 470,600 #DIV/0!
PLESTERAN 1 M2 ad. 1:4, tebal 15 mmVOLUME PEKERJAAN 1 m2 TIME 1HARGA 1M2 HARGA TOTAL Rp - Rp - PLESTERAN 1 M2 ad. 1:4, tebal 15 mm
JENIS PEKERJAAN KOEF VOLUME SATUAN HARGA SATUAN (2008) TOTAL HARGA/1M2 PERSENTASE
SEMEN 6.240 1 6.24 KG Rp 70,000 Rp 436,800 PASIR PASANG 0.024 1 0.02 M3 Rp 250,000 Rp 6,000 PELAKSANA 1.000 1 1.00 org Rp 95,000 Rp 95,000 MANDOR 0.015 1 1.00 org Rp 90,000 Rp 90,000 KEPALA TUKANG 0.015 1 1.00 org Rp 85,000 Rp 85,000 TUKANG 0.150 1 1.00 org Rp 70,000 Rp 70,000 PEKERJA 0.300 1 1.00 org Rp 65,000 Rp 65,000
TOTAL Rp 847,800 #DIV/0!
PEKERJAAN 1M2 LANTAI KERJA TOWERVOLUME PEKERJAAN 1 m2 TIME 1HARGA 1M2 HARGA TOTAL Rp - Rp - PEKERJAAN 1M2 LANTAI KERJA TOWER
JENIS PEKERJAAN KOEF VOLUME SATUAN HARGA SATUAN (2008) TOTAL HARGA/1M2 PERSENTASE
SEMEN 0.250 1 0.25 zak Rp - Rp - PASIR BETON 0.040 1 0.04 m3 Rp 140,000 Rp 5,600 SPLIT 0.070 1 0.07 m3 Rp 140,000 Rp 9,800 PELAKSANA 1.000 1 1.00 org Rp 95,000 Rp 95,000 MANDOR 0.026 1 1.00 org Rp 90,000 Rp 90,000 KEPALA TUKANG 0.026 1 1.00 org Rp 85,000 Rp 85,000 TUKANG 0.026 1 1.00 org Rp 70,000 Rp 70,000 PEKERJA 0.520 1 1.00 org Rp 65,000 Rp 65,000
TOTAL Rp 420,400 #DIV/0!
PEKERJAAN 1M2 BEKISTING PONDASIVOLUME PEKERJAAN 1 m2 TIME 1HARGA 1M2 HARGA TOTAL Rp - Rp - PEKERJAAN 1M2 BEKISTING PONDASI
JENIS PEKERJAAN KOEF VOLUME SATUAN HARGA SATUAN (2008) TOTAL HARGA/1M2 PERSENTASE
TRIPLEK 9mm 0.040 1 0.04 m2 Rp 102,000 Rp 4,080 PAKU 0.300 1 0.30 kg Rp 12,500 Rp 3,750 MINYAK BEKISTING 0.100 1 0.10 ltr Rp 30,000 Rp 3,000 PELAKSANA 1.000 1 1.00 org Rp 95,000 Rp 95,000 MANDOR 0.026 1 1.00 org Rp 90,000 Rp 90,000 KEPALA TUKANG 0.026 1 1.00 org Rp 85,000 Rp 85,000 TUKANG 0.026 1 1.00 org Rp 70,000 Rp 70,000 PEKERJA 0.520 1 1.00 org Rp 65,000 Rp 65,000
TOTAL Rp 415,830 #DIV/0!
PEKERJAAN 1M2 BEKISTING KOLOMVOLUME PEKERJAAN 1 m2 TIME 1HARGA 1M2 HARGA TOTAL Rp - Rp - PEKERJAAN 1M2 BEKISTING KOLOM
JENIS PEKERJAAN KOEF VOLUME SATUAN HARGA SATUAN (2008) TOTAL HARGA/1M2 PERSENTASE
TRIPLEK 9mm 0.040 1 0.04 m2 Rp 102,000 Rp 4,080 PAKU 0.300 1 0.30 kg Rp 12,500 Rp 3,750 MINYAK BEKISTING 0.100 1 0.10 ltr Rp 30,000 Rp 3,000 PELAKSANA 1.000 1 1.00 org Rp 95,000 Rp 95,000 MANDOR 0.026 1 1.00 org Rp 90,000 Rp 90,000 KEPALA TUKANG 0.026 1 1.00 org Rp 85,000 Rp 85,000 TUKANG 0.026 1 1.00 org Rp 70,000 Rp 70,000 PEKERJA 0.520 1 1.00 org Rp 65,000 Rp 65,000
TOTAL Rp 415,830 #DIV/0!
PEKERJAAN 1M2 BEKISTING BALOKVOLUME PEKERJAAN 1 m2 TIME 1HARGA 1M3 HARGA TOTAL Rp - Rp - PEKERJAAN 1M2 BEKISTING BALOK
JENIS PEKERJAAN KOEF VOLUME SATUAN HARGA SATUAN (2008) TOTAL HARGA/1M2 PERSENTASE
TRIPLEK 9mm 0.040 1 0.04 m2 Rp 102,000 Rp 4,080 PAKU 0.300 1 0.30 kg Rp 12,500 Rp 3,750 MINYAK BEKISTING 0.100 1 0.10 ltr Rp 30,000 Rp 3,000 PELAKSANA 1.000 1 1.00 org Rp 95,000 Rp 95,000 MANDOR 0.026 1 1.00 org Rp 90,000 Rp 90,000 KEPALA TUKANG 0.026 1 1.00 org Rp 85,000 Rp 85,000 TUKANG 0.026 1 1.00 org Rp 70,000 Rp 70,000 PEKERJA 0.520 1 1.00 org Rp 65,000 Rp 65,000
TOTAL Rp 415,830 #DIV/0!
PEKERJAAN 1 M2 LANTAI KERJA TOWERVOLUME PEKERJAAN 1 m2 TIME 1HARGA 1M2 HARGA TOTAL Rp - Rp - PEKERJAAN 1 M2 LANTAI KERJA TOWER
JENIS PEKERJAAN KOEF VOLUME SATUAN HARGA SATUAN (2008) TOTAL HARGA/1M2 PERSENTASE
SEMEN 0.250 1 0.25 zak Rp - Rp - PASIR BETON 0.040 1 0.04 m3 Rp 140,000 Rp 5,600 SPLIT 0.070 1 0.07 m3 Rp 140,000 Rp 9,800 PELAKSANA 1.000 1 1.00 org Rp 95,000 Rp 95,000 MANDOR 0.026 1 1.00 org Rp 90,000 Rp 90,000 KEPALA TUKANG 0.026 1 1.00 org Rp 85,000 Rp 85,000 TUKANG 0.026 1 1.00 org Rp 70,000 Rp 70,000 PEKERJA 0.520 1 1.00 org Rp 65,000 Rp 65,000
TOTAL Rp 420,400 #DIV/0!
MAN POWERPELAKSANA Rp 95,000 MANDOR Rp 90,000 KEPALA TUKANG Rp 85,000 TUKANG Rp 70,000 PEKERJA Rp 65,000
BALI
PASIR PASANG 1 M3 Rp 250,000 BATU BATA PRESS 1 BUAH Rp 450 BATU BATA MANUAL/TANGAN 1 BUAH Rp 300 PASIR LAMPUNG 1 M3 Rp 170,000 PASIR BETON 1 M3 Rp 140,000 PASIR MONDU 1 M3 Rp 160,000 PASIR URUG 1 M3 Rp 95,000 PASIR PUTIH BANGKA 1 M3 Rp 175,000 SIRTU 1 M3 Rp 95,000 SPLIT 1 M3 Rp 140,000 BATU KALI BELAH 1 M3 Rp 125,000 SIRDAM 1 M3 Rp 125,000 ABU BATU 1 M3 Rp 125,000 TANAH MERAH 1 M3 Rp 95,000 SEMEN TIGA RODA 1 ZAK Rp 70,000 SEMEN TIGA RODA PUTIH 1 ZAK Rp 18,000 SEMEN GRESIK 1 ZAK Rp 10,500 SEMEN HOLCIM 1 ZAK Rp 53,000
HEBELPANEL 1 M3 Rp 250,000 ANAK TANGGA 1 M3 Rp 2,000,000
BESI BETOND.6mm 1 BH Rp 20,000 D.8mm Rp 32,000 D.10mm Rp 45,000 D.12mm Rp 65,000 D.16mm Rp 110,000
PAKUPAKU TRIPLEK/KAYU 1 KG Rp 12,500 PAKU BETON BIASA 1 DUS Rp 25,000 PAKU BETON MUTU BAGUS 1 DUS Rp 30,500 KAWAT BETON 1 Rp 16,000 PAKU GRC 1 DUS Rp 20,000 MINYAK BEKISTING 1 LITER Rp 30,000
KAYURENGMERANTI 2X3 1 BTG Rp 12,500 MERANTI 3X4 1 BTG Rp 15,000 BORNEO 2X3 Rp 13,000 BORNEO 3X4 Rp 20,000 KAMPER 2X3 Rp 17,000 KAMPER 3X4 Rp 20,000 KASOMERANTI 4X6 Rp 30,000
MERANTI 5X7 Rp 37,500 BORNEO 4X6 Rp 28,000 BORNEO 5X7 Rp 43,000 KAMPER 4X6 Rp 45,000 KAMPER 5X7 Rp 65,000
TRIPLEK3MM Rp 39,500 4MM Rp 52,000 6MM Rp 72,000 9MM Rp 102,000 12MM Rp 140,000 15MM Rp 175,000
BOUPLANK 39000BONGKAR BOUPLANK 3500GALIAN TANAH PONDASI 35000URUGAN PASIR 192000
berat/m = 0.617 kg
m3 0.04 0.06 4 0.0096 105 Rp 30,000 Rp 3,150,000
m3 0.05 0.07 4 0.014 72 Rp 40,000 Rp 4,200,000 m3 0.04 0.06 4 0.0096 105 Rp 25,000 Rp 2,625,000 m3 0.05 0.07 4 0.014 72 Rp 35,000 Rp 3,675,000 m3 0.04 0.06 4 0.0096 105 Rp 40,000 Rp 4,200,000 m3 0.05 0.07 4 0.014 72 Rp 60,000 Rp 6,300,000
Besi D.10panjang = 6 mn = 4 bh
Menghitung kebutuhan besi tulangan pokok :- Volume besi D.10 = 24 m- panjang besi = 11 mmaka besi yang dibutuhkan = 2 kg
- berat per m' besi D.10 = 0.617 total kebutuhan besi D.10 = 14.808 kg
Menghitung sengkang/cincinpanjang = 90 0.9 mjarak pemasangan = 0.15 mbyk sengkang = 40 buah
panjang total sengkang = 36 mkebutuhan besi sengkang = 3 buahberat per m' besi D.8 = 0.395 kgtotal kebutuhan besi D.8 = 14.22 kg