ANALISA LAMBERSERING.xls
-
Upload
lucky-yohanes -
Category
Documents
-
view
485 -
download
50
Transcript of ANALISA LAMBERSERING.xls
DAFTAR HARGA BAHAN DAN UPAH
NO KEAHLIANUPAH(Rp)
1 2 31 Pekerja 40,000.00 2 Mandor 45,000.00 3 Tukang 50,000.00 4 Kepala Tukang 60,000.00
BAHAN
NO JENIS BAHAN SATUANHARGA SATUAN
(Rp)1 2 3 4
1 Tanah Urug M³ 17,500.00 2 Pasir M³ 60,000.00 3 Batu Dasar M³ 60,000.00 4 Semen Sak 37,500.00 5 Kerikil M³ 120,500.00 6 Besi Beton Kg 6,000.00 7 Kawat Bengrat Kg 9,000.00 8 Kayu Mal Kls. III M³ 650,000.00 9 Paku Kg 9,800.00
10 Batu Bata Bh 450.00 11 Keramik 30 x 30 Bh 1,100.00 12 Keramik 20 x25 Bh 2,931.82 13 Keramik 20 x 20 Bh 2,391.28 14 Keramik 10 x20 Bh 1,900.00 15 Paku seng kg 14,500.00 16 Tripleks lbr 37,500.00 17 Paku Tripleks Kg 10,500.00 18 Kayu Cempaka 8/12 dan 5/10 M³ 1,350,000.00 19 Cat Tembok Kg 17,000.00 20 Cat Mengkilat Kg 25,000.00
NO JENIS BAHAN SATUANHARGA SATUAN
(Rp)1 2 3 4
21 Minyak Cat Ltr 9,000.00 22 Vernis Politur Ltr 15,500.00 23 Kabel NYM 3 X 2,5 mm M¹ 5,000.00 24 Pipa Listrik Ujung 3,000.00 25 Lot klem PVC 1/2 " Bh 400.00 26 T. Dos PVC 1/2" Bh 350.00 27 Bok PVC 1/2" Bh 300.00 28 Isolatip Bh 6,000.00 29 Box Sekring MCB 2A Bh 350,000.00 30 Lampu Bh 18,500.00 31 Lampu TL 10 Watt Bh 5,000.00 32 Lampu Pijar 25 Watt Bh 7,500.00 33 Stop Kontak 225 V Bh 50,000.00 34 Saklar Tunggal 225 V Bh 15,000.00 35 Saklar Ganda 225V Bh 35,000.00 36 Pipa PVC 2 " M¹ 15,000.00 37 Pipa PVC 4 " M¹ 35,000.00 38 Pipa Galvanis 1/2 " M¹ 10,500.00 39 Pipa Galvanis 3/4 " M¹ 15,000.00 40 Seng Gelombang Alumanium Lbr 48,500.00 41 Seng Plat Alumanium Lbr 40,000.00 42 Kunci 1 slaag Bh 50,000.00 43 Kunci 2 slaag Bh 84,000.00 44 Espanyoli tanam Bh 35,000.00 45 Engsel pintu 3x4 Bh 7,000.00 46 Engsel jendela 2x3 Bh 5,000.00 47 Tarikan jendela Bh 5,000.00 48 Hak angin Bh 5,000.00 49 Wastafel TOTO Bh 650,000.00 50 Closed Duduk TOTO Bh 1,550,000.00 51 Closed Jongkok Bh 155,000.00 52 Mata Kran Ø 1/2 " Bh 35,000.00 53 Stop Kran Ø 3/4 " Bh 50,000.00 54 Pasangan Floor Drain Kuningan Bh 25,000.00 55 Shower Cebo Bh 135,000.00 56 Kipas Angin Besar ( VERNEKEL ) Bh 1,000,500 57 Kipas Angin Kecil ( PLASTIK ) Bh 245,000 58 Lambersering lbr 32,500.00 59 Teakwood Lbr 88,500.00
40,000.00 45,000.00 50,000.00 60,000.00
DAFTAR ANALISA
PEKERJAAN REHAB RUANG KADISA. PEKERJAAN PARTISI1 M2 PASANG RANGKA PARTISI
0.220 Tukang @ Rp. 50,000 = Rp. 11,000.00 0.022 Kepala tukang @ Rp. 60,000 = Rp. 1,320.00 0.120 Pekerja @ Rp. 40,000 = Rp. 4,800.00
0.085 Mandor @ Rp. 45,000 = Rp. 3,825.00 0.180 KG Paku biasa @ Rp. 9,800 = Rp. 1,764.00
= Rp. 22,709.00 0.018 M3 Balok kayu 5/10 @ Rp. ### = Rp. 24,300.00
( A + B1 ) Rp. 47,009.00 Biaya umum dan keuntungan = Rp. 4,700.90
Rp. 51,709.90
1 M2 PASANG PARTISI TEAKWOOD
0.100 Tukang @ Rp. 50,000 = Rp. 5,000.00 0.010 Kepala tukang @ Rp. 60,000 = Rp. 600.00 0.070 Pekerja @ Rp. 40,000 = Rp. 2,800.00
0.004 Mandor @ Rp. 45,000 = Rp. 157.50 0.030 KG Paku tripleks @ Rp. 9,000 = Rp. 270.00
= Rp. 8,827.50 0.375 Lbr Teakwood @ Rp. 88,500 = Rp. 33,187.50
( A + B1 ) Rp. 42,015.00 Biaya umum dan keuntungan = Rp. 4,201.50
Rp. 46,216.50
B. PEKERJAAN PLAFON1 M2 PASANG RANGKA PLAFOND
0.220 Tukang @ Rp. 50,000 = Rp. 11,000.00 0.022 Kepala tukang @ Rp. 60,000 = Rp. 1,320.00 0.120 Pekerja @ Rp. 40,000 = Rp. 4,800.00
0.085 Mandor @ Rp. 45,000 = Rp. 3,825.00 0.180 KG Paku biasa @ Rp. 9,800 = Rp. 1,764.00
= Rp. 22,709.00 0.018 M3 Balok kayu 5/10 @ Rp. ### = Rp. 24,300.00
( A + B1 ) Rp. 47,009.00 Biaya umum dan keuntungan = Rp. 4,700.90
Rp. 51,709.90
1 M2 PASANG PLAFOND TEAKWOOD
0.100 Tukang @ Rp. 50,000 = Rp. 5,000.00 0.010 Kepala tukang @ Rp. 60,000 = Rp. 600.00
0.070 Pekerja @ Rp. 40,000 = Rp. 2,800.00 0.004 Mandor @ Rp. 45,000 = Rp. 157.50
0.030 KG Paku tripleks @ Rp. 10,500 = Rp. 315.00 = Rp. 8,872.50
0.375 Lbr Teakwood @ Rp. 88,500 = Rp. 33,187.50 ( A + B1 ) Rp. 42,060.00
Biaya umum dan keuntungan = Rp. 4,206.00 Rp. 46,266.00
1 M2 PASANG PLAFOND LAMBERSERING
0.100 Tukang @ Rp. 50,000 = Rp. 5,000.00 0.010 Kepala tukang @ Rp. 60,000 = Rp. 600.00 0.070 Pekerja @ Rp. 40,000 = Rp. 2,800.00
0.004 Mandor @ Rp. 45,000 = Rp. 157.50 0.030 KG Paku tripleks @ Rp. 10,500 = Rp. 315.00
= Rp. 8,872.50 3.125 Lbr Lambersering @ Rp. 32,500 = Rp. 101,562.50
( A + B1 ) Rp. 110,435.00 Biaya umum dan keuntungan = Rp. 11,043.50
Rp. 121,478.50 1 M' PAS. LIST PLAFOND Sp 3
0.020 Tukang @ Rp. 50,000 = Rp. 1,000.00 0.002 Kepala tukang @ Rp. 60,000 = Rp. 120.00 0.020 Pekerja @ Rp. 40,000 = Rp. 800.00
0.001 Mandor @ Rp. 45,000 = Rp. 45.00 1.050 M' List profil Sp3 @ Rp. 6,500 = Rp. 6,825.00 0.050 KG Paku biasa @ Rp. 9,800 = Rp. 490.00
= Rp. 9,280.00 Biaya umum dan keuntungan Rp. 928.00
= Rp. 10,208.00
C. PEKERJAAN PINTU1 M3 PEK.KOSEN PINTU
15.000 Tukang @ Rp. 50,000 = Rp. 750,000.00 2.000 Kepala tukang @ Rp. 60,000 = Rp. 120,000.00 4.500 Pekerja @ Rp. 40,000 = Rp. 180,000.00
0.240 Mandor @ Rp. 45,000 = Rp. 10,800.00 = Rp. 1,060,800.00
1.100 M3 Balok kayu @ Rp. ### = Rp. 1,485,000.00 ( A + B1 ) = Rp. 2,545,800.00
Biaya umum dan keuntungan = Rp. 254,580.00 Rp. 2,800,380.00
1 M2 PEK. PINTU TRIPLEKS
1.000 Tukang @ Rp. 50,000 = Rp. 50,000.00 0.010 Kepala tukang @ Rp. 60,000 = Rp. 600.00 0.400 Pekerja @ Rp. 40,000 = Rp. 16,000.00
0.020 Mandor @ Rp. 45,000 = Rp. 900.00 0.150 KG Paku biasa @ Rp. 9,800 = Rp. 1,470.00 0.300 Ltr Lem aibon @ Rp. 22,500 = Rp. 6,750.00
= Rp. 75,720.00 0.020 M3 Balok kayu @ Rp. ### = Rp. 26,460.00 2.000 Lbr Tripleks @ Rp. 37,500 = Rp. 75,000.00
(A+B+B2+= Rp. 177,180.00 Biaya umum dan keuntungan = Rp. 17,718.00
Rp. 194,898.00
1 BH PAS.KUNCI TANAM 2 SLAG
0.500 Tukang @ Rp. 50,000 = Rp. 25,000.00 0.050 Kepala tukang @ Rp. 60,000 = Rp. 3,000.00 1.000 BH Kunci tanam @ Rp. 84,000 = Rp. 84,000.00
Rp. 112,000.00 Biaya umum dan keuntungan = Rp. 11,200.00
Rp. 123,200.00
1 BH PAS.ENGSEL
0.120 Tukang @ Rp. 50,000 = Rp. 6,000.00 0.012 Kepala tukang @ Rp. 60,000 = Rp. 720.00 1.000 BH Kunci tanam @ Rp. 7,000 = Rp. 7,000.00
Rp. 13,720.00 Biaya umum dan keuntungan = Rp. 1,372.00
Rp. 15,092.00
D. PEKERJAAN PEMELIHARAAN LANTAI1 M2 Pas. Kramik lantai
7.500 BH Tegel @ Rp. 1,100 = Rp. 8,250.00 1.000 M2 Spesi @ Rp. 17,500 = Rp. 17,500.00 0.210 Tukang @ Rp. 50,000 = Rp. 10,500.00 0.028 Kepala tukang @ Rp. 60,000 = Rp. 1,680.00 0.260 Pekerja @ Rp. 40,000 = Rp. 10,400.00 0.032 Mandor @ Rp. 45,000 = Rp. 1,440.00
= Rp. 49,770.00 Biaya umum dan keuntungan Rp. 4,977.00
= Rp. 54,747.00 PEKERJAAN REHAB RUANG WAKADIS
A. PEKERJAAN PLAFON
1 M2 PASANG RANGKA PLAFOND
0.220 Tukang @ Rp. 50,000 = Rp. 11,000.00 0.022 Kepala tukang @ Rp. 60,000 = Rp. 1,320.00 0.120 Pekerja @ Rp. 40,000 = Rp. 4,800.00
0.085 Mandor @ Rp. 45,000 = Rp. 3,825.00 0.180 KG Paku biasa @ Rp. 9,800 = Rp. 1,764.00
= Rp. 22,709.00 0.018 M3 Balok kayu 5/10 @ Rp. ### = Rp. 24,300.00
( A + B1 ) Rp. 47,009.00 Biaya umum dan keuntungan = Rp. 4,700.90
Rp. 51,709.90
1 M2 PASANG PLAFOND TEAKWOOD
0.100 Tukang @ Rp. 50,000 = Rp. 5,000.00 0.010 Kepala tukang @ Rp. 60,000 = Rp. 600.00 0.070 Pekerja @ Rp. 40,000 = Rp. 2,800.00
0.004 Mandor @ Rp. 45,000 = Rp. 157.50 0.030 KG Paku tripleks @ Rp. 10,500 = Rp. 315.00
= Rp. 8,872.50 0.375 Lbr Teakwood @ Rp. 88,500 = Rp. 33,187.50
( A + B1 ) Rp. 42,060.00 Biaya umum dan keuntungan = Rp. 4,206.00
Rp. 46,266.00
1 M2 PASANG PLAFOND LAMBERSERING
0.100 Tukang @ Rp. 50,000 = Rp. 5,000.00 0.010 Kepala tukang @ Rp. 60,000 = Rp. 600.00 0.070 Pekerja @ Rp. 40,000 = Rp. 2,800.00
0.004 Mandor @ Rp. 45,000 = Rp. 157.50 0.030 KG Paku tripleks @ Rp. 10,500 = Rp. 315.00
= Rp. 8,872.50 3.125 Lbr Lambersering @ Rp. 32,500 = Rp. 101,562.50
( A + B1 ) Rp. 110,435.00 Biaya umum dan keuntungan = Rp. 11,043.50
Rp. 121,478.50 1 M' PAS. LIST PLAFOND Sp 3
0.020 Tukang @ Rp. 50,000 = Rp. 1,000.00 0.002 Kepala tukang @ Rp. 60,000 = Rp. 120.00 0.020 Pekerja @ Rp. 40,000 = Rp. 800.00
0.001 Mandor @ Rp. 45,000 = Rp. 45.00 1.050 M' List profil Sp3 @ Rp. 7,000 = Rp. 7,350.00 0.050 KG Paku biasa @ Rp. 9,800 = Rp. 490.00
= Rp. 9,805.00 Biaya umum dan keuntungan Rp. 980.50
= Rp. 10,785.50
PEKERJAAN PENGECATANRUANG KADIS, WAKADIS, dan KaTU
1 M2 MENGECAT TEMBOK / PLAFOND 3X
0.050 Tukang @ Rp. 50,000 = Rp. 2,500.00 0.005 Kepala tukang @ Rp. 60,000 = Rp. 300.00 0.070 Pekerja @ Rp. 40,000 = Rp. 2,800.00 0.380 KG Cat tembok @ Rp. 17,000 = Rp. 6,460.00
Rp. 12,060.00 Biaya umum dan keuntungan = Rp. 1,206.00
Rp. 13,266.00 1 M2 MEMENIE 1X SAMPAI MENGECAT 2X
0.200 Tukang @ Rp. 50,000 = Rp. 10,000.00 0.020 Kepala tukang @ Rp. 60,000 = Rp. 1,200.00 0.200 Pekerja @ Rp. 40,000 = Rp. 8,000.00
0.012 Mandor @ Rp. 45,000 = Rp. 540.00 0.180 KG Cat menie @ Rp. 25,000 = Rp. 4,500.00 0.290 KG Cat warna @ Rp. 26,000 = Rp. 7,540.00 0.510 Ltr Minyak cat @ Rp. 9,000 = Rp. 4,590.00 0.150 KG Dumpul kayu @ Rp. 15,000 = Rp. 2,250.00 0.090 KG Plamur kayu @ Rp. 8,000 = Rp. 720.00
Rp. 39,340.00 Biaya umum dan keuntungan = Rp. 3,934.00
Rp. 43,274.00
1 M2 MEMENIE 1X SAMPAI MENGECAT 2X
0.200 Tukang @ Rp. 50,000 = Rp. 10,000.00 0.020 Kepala tukang @ Rp. 60,000 = Rp. 1,200.00 0.200 Pekerja @ Rp. 40,000 = Rp. 8,000.00
0.010 Mandor @ Rp. 45,000 = Rp. 450.00 0.230 KG Politur Fernis @ Rp. 15,500 = Rp. 3,565.00
Rp. 23,215.00 Biaya umum dan keuntungan = Rp. 2,321.50
Rp. 25,536.50 PEKERJAAN INSTALASI LISTRIK
1 TTK INSTALASI LISTRIK
0.300 Tukang @ Rp. 50,000 = Rp. 15,000.00 0.030 Kepala tukang @ Rp. 60,000 = Rp. 1,800.00 0.300 Pekerja @ Rp. 40,000 = Rp. 12,000.00
0.030 Mandor @ Rp. 45,000 = Rp. 1,350.00 1.000 TTK Instalasi Listrik @ Rp. 37,500 = Rp. 37,500.00
Rp. 67,650.00 Biaya umum dan keuntungan = Rp. 6,765.00
Rp. 74,415.00
1 BH LAMPU
0.300 Tukang @ Rp. 50,000 = Rp. 15,000.00 0.030 Kepala tukang @ Rp. 60,000 = Rp. 1,800.00 0.300 Pekerja @ Rp. 40,000 = Rp. 12,000.00
0.030 Mandor @ Rp. 45,000 = Rp. 1,350.00 1.000 BH Lampu @ Rp. 18,500 = Rp. 18,500.00
Rp. 48,650.00 Biaya umum dan keuntungan = Rp. 4,865.00
Rp. 53,515.00
PEKERJAAN INSTALASI AIR dan PEMELIHARAAN KM/WC1 TTK INSTALASI AIR
0.300 Tukang @ Rp. 50,000 = Rp. 15,000.00 0.030 Kepala tukang @ Rp. 60,000 = Rp. 1,800.00 0.300 Pekerja @ Rp. 40,000 = Rp. 12,000.00
0.030 Mandor @ Rp. 45,000 = Rp. 1,350.00 1.000 TTK Instalasi Air @ Rp. 155,000 = Rp. 155,000.00
Rp. 185,150.00 Biaya umum dan keuntungan = Rp. 18,515.00
Rp. 203,665.00
D A F T A R H A R G A S A T U A N J A D I
No Jenis Pekerjaan Volume / Satuan
A B C
I PEKERJAAN PERSIAPAN1 Pas. Papan Proyek - ls 2 Pembersihan Lokasi - ls 3 Los kerja / Direksikeet 1 Unit
II PEKERJAAN REHAB RUANG KADISA. PEKERJAAN PARTISI
1 Bongkaran partisi lama - 2 Pas rangka partisi 1.00 3 Pas.partisi teakwood 1.00
B. PEKERJAAN PLAFON1 Bongkaran plafon lama - 2 Pas. Rangka plafon 1.00 3 Pas. Plafon teakwood 1.00 4 Pas. Plafon lambersering 1.00 5 Pas. Listprofil 1.00
C. PEKERJAAN PINTU1 Kosen 1.00 2 Pas. Daun pintu 1.00 3 Kunci 1.00 bh4 Engsel 1.00 bh
D. PEKERJAAN PEMELIHARAAN LANTAI1 Bongkaran lantai lama - 2 Pas.Tegel lantai 1.00
III PEKERJAAN REHAB RUANG WAKADISPEKERJAAN PLAFON
1 Bongkaran plafon lama - 2 Pas. Rangka plafon 1.00 3 Pas. Plafon teakwood 1.00 4 Pas. Plafon lambersering 1.00 5 Pas. Listprofil 1.00
No Jenis Pekerjaan Volume / Satuan
A B CIV PEKERJAAN PENGECATAN
RUANG KADIS, WAKADIS, dan Ka.TU1 Cat dinding 1.00 2 Cat plafond 1.00 3 Cat Kosen 1.00 4 Cat daun pintu 1.00
M2
M2
M2
M2
M2
M'
M3
M2
M2
M2
M2
M2
M'
M2
M2
M2
M2
7 Cat list profil 1.00
V PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik 1.00 ttk2 Pas. Lampu 1.00 bh
VI PEKERJAAN INSTALASI AIR dan PEMELIHARAAN WC/KM
1 Pas.Instalasi air 1.00 Titik2 Pemeliharaan Km/Wc 1.00 Unit
VII PEKERJAAN AKHIR1 Pembersihan Akhir -
M'
D A F T A R H A R G A S A T U A N J A D I
D
- -
500,000.00
ls 51,709.90 46,216.50
ls 51,709.90 46,216.50 121,487.50 10,208.00
2,800,380.00 194,898.00 127,050.00 15,092.00
ls 54,747.00
ls 51,709.90 46,216.50 121,050.00 10,208.00
D
13,266.00 13,266.00 43,274.00 43,274.00
Harga satuan (Rp)
Harga satuan (Rp)
25,536.50
74,415.0053,515.00
203,665.00ls
ls
RENCANA ANGGARAN BIAYAProyek : Perbaikan Ruang Kadis, Wakadis,Ka TU
Lokasi : Dinas Kesehatan Provinsi Sulawesi Utara
Tahun Anggaran: 2006
No Jenis Pekerjaan Jumlah (Rp)
A B C D E
I PEKERJAAN PERSIAPAN1 Pas. Papan Proyek - ls - 250,000.00 2 Pembersihan Lokasi - ls - 700,000.00 3 Los kerja / Direksikeet 1 Unit 500,000.00 650,000.00
1,600,000.00 II PEKERJAAN REHAB RUANG KADISA. PEKERJAAN PARTISI
1 Bongkaran partisi lama - ls 950,000.00 2 Pas rangka partisi 166.70 51,709.90 8,620,040.33 3 Pas.partisi teakwood 166.70 46,216.50 7,704,290.55
17,274,330.88 B. PEKERJAAN PLAFON
1 Bongkaran plafon lama - ls 1,050,000.00 2 Pas. Rangka plafon 208.80 51,709.90 10,797,027.12 3 Pas. Plafon teakwood 129.60 46,216.50 5,989,658.40 4 Pas. Plafon lambersering 79.20 121,487.50 9,621,810.00 5 Pas. Listprofil 83.50 10,208.00 852,368.00
28,310,863.52 C. PEKERJAAN PINTU
1 Kosen 0.18 2,800,380.00 504,068.40 2 Pas. Daun pintu 6.72 194,898.00 1,309,714.56 3 Kunci 2.00 bh 127,050.00 254,100.00 4 Engsel 6.00 bh 15,092.00 90,552.00
2,158,434.96 D. PEKERJAAN PEMELIHARAAN LANTAI
1 Bongkaran lantai lama - ls 250,000.00 2 Pas.Tegel lantai 3.50 54,747.00 191,614.50
441,614.50 III PEKERJAAN REHAB RUANG WAKADIS
PEKERJAAN PLAFON1 Bongkaran plafon lama - ls 950,000.00 2 Pas. Rangka plafon 151.00 51,709.90 7,808,194.90 3 Pas. Plafon teakwood 98.40 46,216.50 4,547,703.60 4 Pas. Plafon lambersering 52.60 121,050.00 6,367,230.00 5 Pas. Listprofil 96.30 10,208.00 983,030.40
20,656,158.90
IV PEKERJAAN PENGECATANRUANG KADIS, WAKADIS, dan Ka.TU
1 Cat dinding 212.80 13,266.00 2,823,004.80 2 Cat plafond 359.80 13,266.00 4,773,106.80 3 Cat Kosen 4.40 43,274.00 190,405.60 4 Cat daun pintu 6.72 43,274.00 290,801.28 5 Cat list profil 180.00 25,536.50 4,596,570.00
12,673,888.48
Volume / Satuan
Harga satuan (Rp)
M2
M2
M2
M2
M2
M'
M3
M2
M2
M2
M2
M2
M'
M2
M2
M2
M2
M'
V PEKERJAAN INSTALASI LISTRIK1 Instalasi Listrik 14.00 ttk 74,415.00 1,041,810.00 2 Pas. Lampu 12.00 bh 53,515.00 642,180.00
1,683,990.00 VI PEKERJAAN INSTALASI AIR dan
PEMELIHARAAN WC/KM1 Pas.Instalasi air 4.00 Titik 203,665.00 814,660.00 2 Pemeliharaan Km/Wc 2.00 Unit ls 750,000.00
1,564,660.00 VII PEKERJAAN AKHIR
1 Pembersihan Akhir - ls 1,650,000.00 1,650,000.00
REKAPITULASI
No Jenis Pekerjaan Jumlah Harga ( Rp )
I PEKERJAAN PERSIAPAN 1,600,000.00 II PEKERJAAN REHAB RUANG KADISA. PEKERJAAN PARTISI 17,274,330.88 B. PEKERJAAN PLAFON 28,310,863.52 C. PEKERJAAN PINTU 2,158,434.96 D. PEKERJAAN PEMELIHARAAN LANTAI 441,614.50 III PEKERJAAN REHAB RUANG WAKADIS
PEKERJAAN PLAFON 20,656,158.90 IV PEKERJAAN PENGECATAN
RUANG KADIS, WAKADIS, dan Ka.TU 12,673,888.48 V PEKERJAAN INSTALASI LISTRIK 1,683,990.00 VI PEKERJAAN INSTALASI AIR dan PEMEL. KM/WC 1,564,660.00 VII PEKERJAAN AKHIR 1,650,000.00
JUMLAH 88,013,941.24 PPN + JAB 11,881,882.07 13.5
TOTAL 99,895,823.31 100 DIBULATKAN 99,800,000.00
SEMBILAN PULUH SEMBILAN JUTA DELAPAN RATUS RIBU RUPIAH
CV. ARKASIH ABADI PIMPINAN TEKNIK
THAMBRIN WAGIUDIREKTRIS
Mengetahui, Manado, 20 September 2006
ERNA A. TANAWALO
129
79
208
208.80 151.00
359.8
1,600,000.00
17,274,330.88 28,301,863.52
2,158,434.96 441,614.50
20,656,158.90
12,673,888.48 1,638,990.00 1,564,660.00 1,650,000.00
87,959,941.24
100,000,000.00 (0.20)