PRE- QUALIFICATION DOCUMENTS INDEX
ANNEXURE - I : SCOPE OF ACTIVITES
ANNEXURE - II : ABOUT THE COMPANY
ANNEXURE - III : ORGANIZATION STRUCTURE
ANNEXURE - IV : KEY PERSONNEL
ANNEXURE - V : COMPLETED PROJECTS
ANNEXURE - VI : ISO CERTIFICATION
ANNEXURE - VII : SAFETY CERTIFICATIONS
ANNEXURE - VIII : APPRAISAL CERTIFICATES
ANNEXURE - IX : HIGH TECH. CNC MACHINES
ANNEXURE - X : VIEW ON SOME OF OUR PROJECTS
ANNEXURE - XI : CONTACT INFORMATION
ISO CERTIFIED9001-2000 SCOPE OF ACTIVITIES
SOFTWARE USED
ANNEXURE I
DESIGN, FABRICATION & ERECTION OF CARBON STEEL, STAINLESS STEEL FOR PROCESS AND STORAGETANKS
DESIGN, FABRICATION & SUPPLY OF CARBON STEEL, STAINLESS STEEL, AIR & GAS DUCTING,DUSTCOLLECTOR, BOILER AND REFORMER CASING.
AS PER API 650 STANDARDS WITH TANK VER: 2.2
www.akphi.com.sa
ISO CERTIFIED9001-2000 ABOUT THE COMPANY
Continue…
www.akphi.com.saANNEXURE II
The Steel Fabrication Division of ABDULLA B. AL- KHALIFA & SONS CO. was formed in 1980. Since that time it has grown till the formation of the FACTORY ABDULLA B. AL- KHALIFA & PARTNERS CO., HEAVY INDUSTRIES LTD. in 1996, and independently operating as a company specialized and licensed by the Ministry of Industries to Design, Fabricate and Install 7,000 ton per year of Plate work (Ducts and Stacks in Carbon and Stainless Steel).
AK & PARTNERS CO., LTD. is also specialized in Design, Fabrication and Installation of a fixed roof Storage Tanks as per API 650 Standard up to 50MTR DIA.
To Gain the edge to our competitors and to increase the speed and the reliability of our Engineering Dept. we have installed X-Steel software Ver.12 which is now operated by numerous professional Engineers/ Draftsman.
AK & PARTNERS CO., HEAVY INDUSTRIES LTD. has an extended arm of Design and Detail Engineering Company based in Egypt (G4 Engineering) where it can provide 2,500 ton per month of high quality Engineering works, and to react swiftly to accommodate any fast necessity from the client
ISO CERTIFIED9001-2000
ABOUT THE COMPANY
www.akphi.com.sa
AK & PARTNERS CO., HEAVY INDUSTRIES LTD. believe that good Management and a high ratio of efficient and experienced supervisory staff is the key to successful project completion.
The Fabrication Shop is seated on an area of 96,000 sq. meters. And has a Total covered area of 30,000 sq. meters. and served with several Computer Numerical Machines (CNC Machines) that guarantees precise and high quality product for massive production. Possessing overhead cranes and all necessary fabrication equipments. These equipments include Plate rolling, Plate bending, Pipe bending, Guillotines and Heavy 300-ton break press. The shop has semi automatic and Mig/Tig welding capability.
All supervisory staffs are screened not only for experience and ability but also for motivation and attitude.
All welders are carefully vetted and tested prior to employment
High supervisory ratio and care in recruitment ensure our clients of the best possible service and AK & PARTNERS CO., HEAVY INDUSTRIES LTD. of the best reputation.
ISO CERTIFIED9001-2000
www.akphi.com.saANNEXURE III
Organizational Chart
Quality Control
Purchasing Manager
CM Procurement
Consumable Materials Store
Mechanical Maintenance
Housing and Civil
Painting Inspection
Galvanizing Inspection
Production and Material Planning
Safety and Health
Design and Shop
Drawing
Raw Materials Store
Coating Process
Electrical Maintenance
Welding Process
Fabrication Process
Material Preparation and Cutting Process
Production
Deputy General Manager
Engineering and Planning
Paint Store
QA/QC Manager QMR
Accountants
Quality Assurance
ISO Matters and Quality Planning
Supplier Evaluation
Calibration
Fabrication Inspection
Welding Inspection
Coating Inspection
Govt. Relations
Packing and Shipping Recruiting and Training
General Manager
Administration Manager
General Services
Information Technology
Projects and Manufacturing Manager
Sales and Contract
ISO CERTIFIED9001-2000
KEY PERSONNELS
Mr. ABDULLAH OMAR LABBADGeneral Manager
Mr. BASSAM OMAR LABBADDeputy General Manager
Mr. ABDALLA AHMED FAHMYProjects and Manufacturing Manager
Mr. MOHAMMED ASIMQA/QC Manager/ QMR
Mr. SAEEDEDDIN AL- HALLAQPurchasing Manager
www.akphi.com.saANNEXURE IV
ISO CERTIFIED9001-2000
COMPLETED PROJECTS
Continue…
8 MONTHSDAMASCUS,SYRIA
3.300MILLION
DESIGN AND CONSTRUCTED OF 4 STEEL TANK ACCORDING TO API 650 STD.
04 Nos.GENERAL COMPANY FORBUILDING
06
4 MONTHSDAMASCUS,SYRIA
1.300MILLION
DESIGN OF TANK 7,200 CUBIC METER IN DESIGN OF TANK 7,200 CUBIC METER IN 8.75 MTRS HIGH ACCORDING TO API 650 STD.
01 No.THE GENERAL SYRIAN GLASS& CERAMIC INDUSTRIES CO.THE GEN. CHEMICAL IND. CORP
05
4 MONTHSJUBAIL, KSA0.600 MILLION
DESIGN, FABRICATION, INSULATION & TESTING AS PER API 650 OF CARBON STEEL
05 Nos.UNITED LUBE OIL04
4 MONTHSJUBAIL,KSA0.700 MILLION
DESIGN, FABRICATION, INSULATION & TESTING OF CARBON STEEL TANKS AS PER API 650 STD.
07 Nos.SAUDI SHINWHA CO. LTD.
03
4 MONTHSJUBAIL, KSA1.500MILLION
DESIGN, FABRICATION, INSULATION & TESTING 304L STAINLESS STEEL TANKS AS PER API 650 STD.
01 No.GULF STABILIZER INDUSTRIESSAUDI SHINWHA CO. LTD.GULF STABILIZER INDUSTRIES
02A02B
4 MONTHSJUBAIL, KSA1.400MILLION
DESIGN, FABRICATION & INSTALLATION OF 7500M3 FIXED ROOF POTABLE WATER STORAGE TANK AS PER API 650 STD.
01 No.P & C OF UPGRADE OF R.O. UNITS AND SUPPORT FACILITIESSAUDI CONDRECO & AL- MABANI GENERAL CONTRACTORS CO.
01
PROJECTDURATION
LOCATION /VALUE(SR)PROJECT DESCRIPTIONQUANTITYNAME OF PROJECTS & CLIENTS
SL
www.akphi.com.saANNEXURE V
ISO CERTIFIED9001-2000
Continue…
3 MONTHSYANBU, KSA1.07MILLION
FABRICATION & SUPPLY OF BOILER INLET AND TURBINE BYPASS ASSEMBLY DUCTSOF 30M2 CROSS SECTION FOR IBN RUSHD PROJECT
300 TONSIBN RUSHD (MYAS POWER STATION EXTENSION)MECANICA DE LA PENA, SPAIN
11
6 MONTHSKUWAIT5 MILLIONDEBOTTLENECKING AND GRANULATION PROJECT MDP 3. PETROCHEMICAL IND. KUWAIT. CARBON STEEL & STAINLESS STEEL DUCTS AND STACKS
600 TONSUREA PLANT - ITECNIMONT ITALY
10
2 MONTHSJUBAIL,KSA0.500MILLION
DESIGN, FABRICATION AND ERECTION OF 8 STORAGE TANK WITH DISHED ENDS AS PER API 650 & DESIGN, FABRICATION AND ERECTION OF 3 STORAGE TANKS 50M3 CAPACITY
11 KHONAINI PETROLEUM SERVICES
09
2 MONTHSJUBAIL,KSA0.200MILLION
DESIGN, FABRICATION & INSTALLATION OF 2 SWEET WATER TANK, EACH CAPACITY OF 120 CUBIC METER & 4.0MX15.0M DIMENSION
02AL- YUSR TOWNSEND & BOTTUM CO. LTD.
08
3 MONTHSJUBAIL,KSA0.450MILLION
FABRICATION AND ERECTION OF 575M3 CAPACITY WATER STORAGE TANK
01SHARQ PE EXPANSION PROJ. SAUDI SHINWHA CO., LTD.
07
PROJECTDURATION
LOCATION VALUE(SR)PROJECT DESCRIPTIONQUATITYNAME OF PROJECTS & CLIENTS
SL#
www.akphi.com.sa
ISO CERTIFIED9001-2000
www.akphi.com.sa
6 MonthsJubail-K.S.A.GAS SABIC
7 MILLIONFabrication, Supply And Erection of Cold BoxStructure
650 TONSAIR SEPERATION UNIT GAS V PROJECT Linde.
17
4 MONTHSJUBAIL,KSA6.6 MILLIONSTRUCTURE STEEL OF COLD BOX SHELL
650 TONSAL JUBAIL GAS-V SEPERATIONSABICLINDE AG ENGINEERING DIV.
16
6 MONTHSJUBAIL,KSA5.6 MILLIONCOMPLETE STEEL STRUCTURE FORREFORMER
1300 TONSSAUDI INT'L PETROCHEM. COSMJ REFORMER STR.CHIYODA PETROSTAR LTD
15
4 MONTHSJUBAIL,KSA0.8 MILLIONFABRICATION AND SUPPLY OF MANIFOLDS AND DUCTS FOR AIR FAN COOLER SYSTEM
120 TONSSPC PDH / PP PROJECT FBM HUDSON
14
4 MONTHSJUBAIL,KSA3.03 MILLION
FABRICATION AND SUPPLY OF CARBON STEEL/ STAINLESS STEEL, DUCTS, STACKS, STRUCTURAL SUPPORTS AND PLATFORMSTAIRCASES ETC.
700 TONSSAUDI ARABIAN FERTILIZER CO.SAFCOCHIYODA PETROSTAR LTD.
13
4 MONTHSJUBAIL, KSA3 MILLIONPROCUREMENT, FABRICATION AND SUPPLY OF STAINLESS STEEL , DUCTS AND HOPPERS
500 TONSSAUDI ARABIAN FERTILIZER CO.SACFO TECNIMONT ARABIA LTD.
12
PROJECTDURATION
LOCATION VALUE(SR)PROJECT DESCRIPTIONQUANTITYNAME OF PROJECTS & CLIENTS
SL
4 MONTHSABU DHABI UAE
0.6 MILLIONFABRICATION OF MANIFOLDS AND CONDENSATE TANKS FOR AIR COOLED CONDENSER
34 TONSABU DHABI GAS IND,. LTD GASCO ONSHORE GAS DEV. PHASE III
23
6 MONTHSQATAR13.5 MILLION
FABRICATION OF STEAM DUCTS, MANIFOLDS CONDENSATE TANKS FOR AIR COOLED CONDENSER
916 TONSBTT – SHELL Pearl GTL Project.
24
6 MONTHSRAS LAFFAN QATAR
2 MILLIONFABRICATION OF STEAM DUCTS OF AIR COOLED CONDENSER
174 TONSQATAR LIQUIFIED GAS CO.(QATAR GAS 3&4 ONSHORE )
22
5 MONTHSRABIGH, KSA1.8 MILLIONFABRICATION OF STEAM DUCTS, MANIFOLDS CONDENSATE TANKS FOR AIR COOLED CONDENSER
82 TONSRABIGH REFINING & PETRO CHEMICAL CO. GEA-BTT COMPANY
21
6 MONTHSRAS LAFFAN QATAR
1.5 MILLIONFABRICATION OF STEAM DUCTS OF AIR COOLED CONDENSER
138 TONSQATAR LIQUIFIED GAS CO. (QATAR GAS II DEVELOPMENT) GEA-BTT COMPANY JOB NO. 22683
20
IN PROGRESSJUBAIL, KSA6.3 MILLIONFABRICATION AND SUPPLY OF CARBON STEEL/ STAINLESS STEEL TANKS
3 Nos.TECNIMONT ITALYTECNIMONT ARABIA LTD
19
IN PROGRESSJUBAIL, KSA2.5 MILLIONFABRICATION AND SUPPLY OF CARBON STEEL/ STAINLESS STEEL TANKS
4 Nos.DAELIM INDUSTRIAL CO., LTD Al Waha PDH PP Project
18
PROJECTDURATION
LOCATION VALUE(SR)PROJECT DESCRIPTIONQUANTITYNAME OF PROJECTS & CLIENTS
SL
www.akphi.com.sa
ANNEXURE VII
ANNEXURE VIII
ANNEXURE IX
ANNEXURE X
ISO CERTIFIED9001-2000 CONTACT INFORMATION
Factory Abdulla B. Al-Khalifa & Partners Co., Heavy Industries Limited.
Post Box No. 768 – Jubail 31951Kingdom of Saudi Arabia
Phone: +966 3 362 3307 (Six Lines)Fax: +966 3 362 4229
Email: [email protected]
Web Site: www.akphi.com.sa