UNCLASSIFIED DEPARTMENT OF THE AIR FORCE
PROCUREMENT PROGRAM FISCAL YEAR (FY) 2008/2009 BUDGET ESTIMATES
PROCUREMENT OF AMMUNITIONFEBRUARY 2007
UNCLASSIFIED
i
DEPARTMENT OF THE AIR FORCE PROCUREMENT OF AMMUNITION ESTIMATES
FOR FISCAL YEARS 2008/2009
Table of Contents
Table of Contents..……………………………………………… i Identification Codes and Glossary……………………………… ii Appropriation Language.……………………………………….. vii Program Exhibit P-1……………………………………………. viii
PROCUREMENT OF AMMUNITION, AF
P-1 Line No. Item Page No.
1 Rockets.……………………………………………………... 1 2 Cartridges.…………………………………………………... 11 3 Practice Bombs.……………………………………………... 36 4 General Purpose Bombs.……………………………………. 43 6 Joint Direct Attack Munition.………………………………. 73 8 CAD/PAD…………………………………………………... 78 9 Explosives Ordnance Disposal (EOD)……………………... 80
10 Spares & Repair Parts.……………………………………… 84 11 Modifications.………………………………………………. 86 12 Items Less Than $5 Million.………………………………... 87 13 Flares..………………………………………………………. 90 14 Fuzes.……………………………………………………….. 128 15 Small Arms.…………………………………………………. 138
ii
IDENTIFICATION CODES Code “A” - Line items of material which have been approved for Air Force service use. Code “B” - Line items of material that have not been approved for Service use GLOSSARY Contract Method ALLOT - Allotment C - Competitive DO - Delivery Order FCA - Fund Cite Authorization MIPR - Military Interdepartmental Purchase Request OA - Obligation Authority OPT - Option OTH - Other PO - Project Order REQN - Requisition SS - Sole Source WP - Work Project MIPR-OPT - Military Interdepartmental Purchase Request - Option MIPR-C - Military Interdepartmental Purchase Request - Competitive MIPR-SS - Military Interdepartmental Purchase Request - Sole Source MIPR-OTH - Military Interdepartmental Purchase Request - Other
iii
Contract Type FP - Fixed Price FFP - Firm Fixed Price FPIS - Fixed Price Incentive with Successive Targets FPAF - Fixed Price Award Fee FPE - Fixed Price with Escalation FPIF - Fixed Price Incentive Fee CPAF - Cost Plus Award Fee CPFF - Cost Plus Fixed Fee CPIF - Cost Plus Incentive Fee ID/IQ - Indefinite Delivery/Indefinite Quantity M-5 (Yr 1) - Multiyear, 5 years (Yr 1) M-5 (Yr 2) - Multiyear, 5 years (Yr 2) M-5 (Yr 3) - Multiyear, 5 years (Yr 3) M-5 (Yr 4) - Multiyear, 5 years (Yr 4) M-5 (Yr 5) - Multiyear 5 years (Yr 5) OTH - Other Contracted By 11 WING - 11th Support Wing, Washington, DC ACC - Air Combat Command, Langley AFB, VA AEDC - Arnold Engineering Development Center, Arnold AFB, TN AAC – Air Armament Center, Eglin AFB, FL AEDC – Arnold Engineering Development Center, Arnold AFB, TN AETC - Air Education and Training Command, Randolph AFB, TX AFCIC - Air Force Communications and Information Center, Washington, DC AFCESA - Air Force Civil Engineering Support Agency, Tyndall AFB, FL
iv
AFFTC - Air Force Flight Test Center, Edwards AFB, CA AFMC - Air Force Materiel Command, Wright-Patterson AFB, OH
AFMETCAL - Air Force Metrology and Calibration Office, Heath, Ohio AFMLO - Air Force Medical Logistics Office, Ft Detrick, MD AIA - Air Intelligence Agency, Kelly AFB, TX AMC - Air Mobility Command, Scott AFB, IL ASC - Aeronautical Systems Center, Wright-Patterson AFB, OH & Eglin AFB, FL AFWA - Air Force Weather Agency, Offutt AFB, NE DGSC - Defense General Support Center, Richmond, VA DPSC - Defense Personnel Support Center, Philadelphia, PA ER - Eastern Range, Patrick AFB, FL ESC - Electronic Systems Center, Hanscom AFB, MA HSC - Human Services Center, Brook AFB, TX OC-ALC - Oklahoma City Air Logistics Center, Tinker AFB, OK OO-ALC - Ogden Air Logistics Center, Hill AFB, UT SMC - Space & Missile Systems Center, Los Angeles AFB, CA US STRATCOM - US Strategic Command, Offutt AFB, NE WACC - Washington Area Contracting Center, Washington DC WR - Western Range, Vandenberg AFB, CA WR-ALC - Warner-Robins Air Logistics Center, Robins AFB, GA AFSPC - Air Force Space Command, Peterson AFB, CO HQ ANG - Headquarters, Air National Guard, Washington, DC USAFE - United States Air Force Europe, Ramstein AB, GE USAFA - United States Air Force Academy, Colorado Springs, CO SSG - Standard Systems Group, Maxwell AFB-Gunter Annex, AL
Bases/Organizations 11 WING - 11th Support Wing ACC - Air Combat Command
v
AETC - Air Education & Training Command AFCAO - Air Force Computer Acquisition Office AFCESA - Air Force Civil Engineering Support Agency AFCIC - AF Communications & Information Center AFCSC - Air Force Cryptologic Service Center AFESC - Air Force Engineering Services Center AFGWC - Air Force Global Weather Central AFIT - Air Force Institute of Technology AFMC - Air Force Materiel Command AFMETCAL - Air Force Metrology and Calibration Office AFMLO - Air Force Medical Logistics Office AFNEWS - Air Force Information & News Service Center AFOSI - Air Force Office of Special Investigation AFOTEC - Air Force Operational Test & Evaluation Center AFPC - Air Force Personnel Center AFPSL - AF Primary Standards Lab AFR - Air Force Reserve AFSOC - AF Special Operations Command
AFSPC - Air Force Space Command AIA - Air Intelligence Agency AMC - Air Mobility Command ANG - Air National Guard AU - Air University AWS - Air Weather Service CIA - Central Intelligence Agency DGSC - Defense General Support Center DLA - Defense Logistics Center DOE - Department of Energy DSCC - Defense Supply Center, Columbus DPSC - Defense Personnel Support Center
vi
ER - Eastern Range ESC - Electronic Systems Center FAA - Federal Aviation Agency FBI - Federal Bureau of Investigation GSA - General Services Administration JCS - Joint Chiefs of Staff JCS - Johnson Space Center NATO - North Atlantic Treaty Organization NBS - National Bureau of Standards PACAF - Pacific Air Forces USAF - United States Air Force USAFA - United States Air Force Academy USAFE - United States Air Force Europe USCENTCOM - United States Central Command USEUCOM - United States European Command USMC - United States Marine Corps
USSTRATCOM - United States Strategic Command WPAFB - Wright-Patterson AFB, OH WR - Western Range
vii
APPROPRIATION LANGUAGE
PROCUREMENT OF AMMUNITION, AIR FORCE
For construction, procurement, production, and modification of ammunition, and accessories therefor; specialized equipment and training devices; expansion of public and private plants, including ammunition facilities authorized by section 2854 of title 10, United States Code, and the land necessary therefor, for the foregoing purposes, and such lands and interests therein, for the foregoing purposes, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and Government and contractor-owned equipment layaway; and other expenses necessary for the foregoing purposes, $868,917,000 to remain available for obligation until September 30, 2010.
UNCLASSIFIED DEPARTMENT OF THE AIR FORCE FY 2008 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 3011F PROCUREMENT OF AMMUNITION, AIR FORCE DATE: 25 JAN 2007 MILLIONS OF DOLLARS S LINE IDENT FY 2006 FY 2007 FY 2008 E NO ITEM NOMENCLATURE CODE QUANTITY COST QUANTITY COST QUANTITY COST C ---- ----------------- ----- -------- ------- -------- ------- -------- ------- - BUDGET ACTIVITY 01: PROCUREMENT OF AMMO, AIR FORCE ------------------- ROCKETS 1 ROCKETS A 35.8 51.2 18.2 U CARTRIDGES 2 CARTRIDGES A 144.1 160.7 165.3 U BOMBS 3 PRACTICE BOMBS A 14.1 15.0 26.1 U 4 GENERAL PURPOSE BOMBS A 249.3 250.5 150.2 U 5 SENSOR FUZED WEAPON A 332 118.8 305 118.4 U 6 JOINT DIRECT ATTACK MUNITION A 8205 224.6 7261 174.3 3817 112.8 U 7 WIND CORRECTED MUNITIONS DISPENSER A 70 15.5 14.6 U FLARE, IR MJU-7B 8 CAD/PAD A 21.3 29.8 33.9 U 9 EXPLOSIVE ORDINANCE DISPOSAL (EOD) A 9.4 3.1 3.2 U 10 SPARES AND REPAIR PARTS A 4.3 4.7 4.7 U 11 MODIFICATIONS A .9 .9 .9 U 12 ITEMS LESS THAN $5,000,000 A 3.9 4.1 4.2 U FUZES 13 FLARES A 140.0 161.3 274.9 U 14 FUZES A 44.5 56.5 70.8 U ------- ------- ------- TOTAL PROCUREMENT OF AMMO, AIR FORCE 1,026.3 1,045.1 865.3 PAGE F-11 UNCLASSIFIED viii
UNCLASSIFIED DEPARTMENT OF THE AIR FORCE FY 2008 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 3011F PROCUREMENT OF AMMUNITION, AIR FORCE DATE: 25 JAN 2007 MILLIONS OF DOLLARS S LINE IDENT FY 2006 FY 2007 FY 2008 E NO ITEM NOMENCLATURE CODE QUANTITY COST QUANTITY COST QUANTITY COST C ---- ----------------- ----- -------- ------- -------- ------- -------- ------- - BUDGET ACTIVITY 02: WEAPONS ------------------- SMALL ARMS 15 SMALL ARMS A 6.0 4.9 3.7 U ------- ------- ------- TOTAL WEAPONS 6.0 4.9 3.7 ------- ------- ------- TOTAL PROCUREMENT OF AMMUNITION, AIR FORCE 1,032.3 1,050.1 868.9 PAGE F-12 UNCLASSIFIED ix
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ROCKETS (OVERVIEW)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$35,817 $51,183 $18,188 $34,432 $30,706 $38,589 $46,043 $46,287COST(in Thousands)
Description:
1. The Air Force primarily uses rockets to mark target locations for other aircraft during combat and training operations. Rockets constitute the primary target marking munition used by forward air control aircraft, which launch this munition from reusable pods carried on aircraft pylons. The 2.75-inch diameter rocket with folding fins utilizes high explosive, white phosphorous, or target practice warheads, and is fired from either high or low speed aircraft. Three versions of the 2.75-inch rocket motor are in use: MK 4, MK 40, and MK 66.
2. Funding decrease in FY08 and beyond is due to unit cost decrease for rockets.
3. In FY06, Rockets received $2.0M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
4. Items procured in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
1PAGE NO:
1
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ROCKETS (OVERVIEW)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
ROCKET MOTOR GTR-18 (YW33) A 51,648 $7,896 77,507 $12,426 60,515 $9,763 53,851 $8,872
2.75 INCH ROCKET FLARE (HA06) A 10,313 $10,821 15,464 $17,729 5,173 $6,925 6,012 $8,167
ITEMS LESS THAN 5 MILLION A $17,100 $21,028 $1,500 $17,393
TOTALS: $35,817 $51,183 $18,188 $34,432
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO1
PAGE NO:2
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ROCKETS (ROCKET MOTOR GTR-18 - YW33)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$7,896 $12,426 $9,763 $8,872 $7,433 $9,093 $9,000 $9,000COST(in Thousands)
Description:
1. This rocket provides realistic training for pilots to practice evasive maneuvers against Surface-to-Air Missile (SAM) threats. It provides pilots a visual reference simulating an actual SAM launch, while maintaining a safe and realistic environment to hone combat skills.
2. This item is procured through the U.S Army Missile Command, Joint Attack Munitions Systems (JAMS), PEO Missiles and Space at Redstone Arsenal Alabama.
3. Items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
1PAGE NO:
3
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ROCKETS (ROCKET MOTOR GTR-18 - YW33)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
ROCKETS (RKT MTR, GTR-18 (SMOKEY SAM, YW33)
RKT MTR, GTR-18 (SMOKEY SAM, YW33) A 51,648 $7,896 77,507 $12,426 60,515 $9,759 53,851 $8,868$153 $160 $161 $165
QUALITY ASSURANCE $4 $4
TOTALS: $7,896 $12,426 $9,763 $8,872
Remarks:Total Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
1
PAGE NO:
4
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ROCKETS (ROCKET MOTOR GTR-18 - YW33)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
RKT MTR, GTR-18 (SMOKEY SAM,YW33)
FY2006 51,648 $153 AFMC/OO-ALC MIPR/SS/FP Apr-06 May-07
NAVY/ NAVSEA SURFACEWARFARE CENTER/INDIAN HEAD, MD
FY2007 77,507 $160 AFMC/OO-ALC MIPR/SS/FP Mar-07 Apr-08 Yes
NAVY/ NAVSEA SURFACEWARFARE CENTER/INDIAN HEAD, MD
FY2008 60,515 $161 AFMC/OO-ALC MIPR/SS/FP Mar-08 Mar-09 Yes
NAVY/ NAVSEA SURFACEWARFARE CENTER/INDIAN HEAD, MD
FY2009 53,851 $165 AFMC/OO-ALC MIPR/SS/FP Mar-09 Mar-10 Yes
NAVY/ NAVSEA SURFACEWARFARE CENTER/INDIAN HEAD, MD
ROCKETS (RKT MTR, GTR-18(SMOKEY SAM, YW33)
Remarks:
Cost information is in actual dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
1PAGE NO:
5
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ROCKETS (2.75 INCH ROCKET FLARE - HA06)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$10,821 $17,729 $6,925 $8,167 $6,494 $7,344 $9,209 $9,241COST(in Thousands)
Description:
1. The 2.75 inch Rocket Flare (HA06), used with the 2.75 inch Rocket Motor (HA07), provides forward air control aircraft with target illumination capability from a standoff distance in a hostile environment. The 2.75 inch Rocket Flare (HA06) consists of an ignition system, flare main parachute, drogue parachute assembly, and an integral fuze/delay assembly. Enclosed in an aluminum case, the fuze and candle igniter are armed by rocket motor acceleration. The candle, when actuated, is suspended from the main chute.
2. This item is procured through the Army by the Joint Attack Munitions Systems (JAMS), PEO Missiles and Space, Redstone Arsenal AL.
3. Items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
1PAGE NO:
6
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ROCKETS (2.75 INCH ROCKET FLARE - HA06)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
2.75 ROCKET FLARE IR A 10,313 $10,603 15,464 $17,529 5,173 $6,757 6,012 $8,132$1,028 $1,134 $1,306 $1,353
PRODUCTION SUPPORT {$218} {$199} {$168} {$35}
PRODUCTION ENGINEERING (1) $218 $199 $168 $35
TOTALS: 10,313 $10,821 15,464 $17,729 5,173 $6,925 6,012 $8,167
Remarks:Total Cost information is in thousands of dollars. (1) Production Engineering funding is used to develop and review engineering change proposals to improve design, maintainability, reliability andperformance. It is also used to provide technical assistance to the prime contractor and subcontractors.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
1
PAGE NO:
7
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ROCKETS (2.75 INCH ROCKET FLARE - HA06)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
2.75 ROCKET FLARE IR
FY2006(1) 10,313 $1,028 AFMC/OO-ALC MIPR/OPT/FFP Mar-06 Sep-07
ARMY/ GDATP/BURLINGTON, VT
FY2007(1) 15,464 $1,134 AFMC/OO-ALC MIPR/OPT/FFP Mar-07 Sep-08 Yes
ARMY/ GDATP/BURLINGTON, VT
FY2008(1) 5,173 $1,306 AFMC/OO-ALC MIPR/OPT/FFP Mar-08 Sep-09 Yes
ARMY/ GDATP/BURLINGTON, VT
FY2009(1) 6,012 $1,353 AFMC/OO-ALC MIPR/OPT/FFP Mar-09 Sep-10 Yes
ARMY/ GDATP/BURLINGTON, VT
Remarks:
Cost information is in actual dollars. (1) Contract has an FY05 base year with four option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
1PAGE NO:
8
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ROCKETS (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$17,100 $21,028 $1,500 $17,393 $16,779 $22,152 $27,834 $28,046COST(in Thousands)
Description:
1. All items have an annual procurement value of less than $5,000,000 and are Code A.
2. In FY06, Rockets Items Less Than $5 Million received $2.0M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. These items are procured through the U.S Army Missile Command, Joint Attack Munitions Systems (JAMS), PEO Missiles and Space at Redstone Arsenal Alabama.
4. Items requested in FY08 are identified on the following P-40A-IL and are representative of items to be procured. Items procured during execution may change based on critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
1PAGE NO:
9
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ROCKETS (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
LAUNCHER, LAU-131A F/2.75 RKT (H149) 164 $996 162 $994
ROCKET HIGH EXPLOSIVE 66MM M72A3 (H557) 3,352 $2,000
2.75 INCH ILLUM (H812) 3,697 $5,576
WHD 2.75 RKT SMK M156 PD M427 (H855) 3,606 $3,746
2.75 INCH SIGNATURE (H872) 2,725 $504 12,630 $2,051
2.75 INCH ROCKET MOTOR (HA07) 5,826 $3,027
TOTALS: $1,500 $17,393
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
1PAGE NO:
10
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (OVERVIEW)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$144,077 $160,685 $165,343 $159,026 $172,422 $182,791 $183,108 $187,343COST(in Thousands)
Description:
1. The items within this category include various bullets, expulsion devices (impulse cartridges) and airborne counter measures used to support training qualification and war reserve requirements. Impulse cartridges are used to expel an asset from its mating system (an adapter rack or casing).
2. In FY06, Cartridges received $1.189M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
2. Representative items requested in FY08 are identified on the following P-40A. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2PAGE NO:
11
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (OVERVIEW)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
CARTRIDGES (OVERVIEW)
20MM TP PGU-27 (AA24) A 1,159,760 $6,130 3,218,875 $19,000 3,519,445 $20,250 3,177,744 $19,434
RR-196 F-22 CHAFF (CY94) A 130,214 $4,995 102,721 $5,398 138,646 $7,365 130,334 $7,000
20MM M56 PELE (AA83) A 165,304 $7,398 351,922 $16,603 328,746 $15,837
30MM PGU-15/B (B116) A 3,814,088 $53,726 3,777,156 $52,321 3,852,795 $57,435 3,489,380 $55,035
30MM HEI PGU-13/B (B104) A 204,410 $9,611 104,788 $5,128 183,089 $9,342 202,656 $10,556
ITEMS LESS THAN 5 MILLION DOLLARS A $69,615 $71,440 $54,348 $51,164
TOTALS: $144,077 $160,685 $165,343 $159,026
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO2
PAGE NO:12
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (20 MM TP PGU-27A/B - AA24)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$6,130 $19,000 $20,250 $19,434 $19,681 $19,543 $18,671 $18,253COST(in Thousands)
Description:
1. The 20 MM target practice (TP) round is used for air-to-air and air-to-ground training in the M61 aircraft gun on F-15 and F-16 aircraft. The Air Force procures various links, linking methods, and mixtures of target practice and target practice tracer ammunition depending on the specific requirement of the system and the training program. The cartridge is electrically primed and has no fuze. The 20MM projectile is a solid slug sized to match the ballistics of the 20MM combat round. The 20MM cartridge is the primary ammunition used in aircraft gun systems by the Air Force and Navy. The Air Force procures the PGU-27 TP round to provide a training capability to complement the PGU-28 high explosive incendiary combat round and ensure training is consistent with combat operations.
2. In FY06, 20MM TP PGU-27A/B received $.489M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. This item is procured through the Army Single Manager for Conventional Ammunition (SMCA) and Engineering Support Costs are provided to the Navy.
4. Representative items requested in FY08 are identified on the following P-5. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2PAGE NO:
13
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (20 MM TP PGU-27A/B - AA24)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
20MM TP (1) A 635,604 {$3,201}$5
LOAD, ASSEMBLE, PACK 635,604 $3,103$5
BOX METAL M548 2,680 $76$29
PALLET MK3-0 133 $22$166
20MM TP (2) A 524,156 {$2,638}$5
LOAD, ASSEMBLE, PACK 524,156 $2,559$5
BOX METAL M548 2,149 $61$29
PALLET MK3-0 107 $18$166
20MM TP A 3,218,875 {$18,963} 3,519,445 {$20,202} 3,177,744 {$18,632}$6 $6 $6
LOAD, ASSEMBLE, PACK 3,218,875 $18,474 3,519,445 $19,639 3,177,744 $18,113$6 $6 $6
BOX METAL M548 13,212 $386 14,428 $431 13,028 $397$29 $30 $30
PALLET MK3-0 645 $104 704 $133 632 $122$162 $189 $193
PC&H FOR MK83 PALLETS (NONRECURRING) $1
CONTINGENCY (NONRECURRING) $259
UNCLASSIFIED
Page 1 of 2P-1 ITEM NO
2
PAGE NO:
14
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (20 MM TP PGU-27A/B - AA24)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
QUALITY ASSURANCE $6 $11 $19 $18
NAVY ENGINEERING SUPPORT $25 $25 $25 $25
ACCEPTANCE TESTING $4 $759
TOTALS: 1,159,760 $6,130 3,218,875 $19,000 3,519,445 $20,250 3,177,744 $19,434
Remarks:Total Cost information is in thousands of dollars. (1) GD-OTS portion of the FY'06 procurement (55%)(2) ATK portion of the FY'06 procurement (45%)
UNCLASSIFIED
Page 2 of 2P-1 ITEM NO
2
PAGE NO:
15
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (20 MM TP PGU-27A/B - AA24)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
20MM TP
FY2006(1) 635,604 $5 AFMC/OO-ALC MIPR/OPT/FP Jun-06 Oct-07
ARMY/ GD-OTS/ MARION,IL
FY2006(1) 524,156 $5 AFMC/OO-ALC MIPR/OPT/FP Jun-06 Jul-07ARMY/ ALLIANT TECH, MN
FY2007(2) 3,218,875 $6 AFMC/OO-ALC MIPR/C/FP W/OPT Mar-07 Mar-08 YesARMY/ UNKNOWN
FY2008(2) 3,519,445 $6 AFMC/OO-ALC MIPR/OPT/FP Mar-08 Mar-09 YesARMY/ UNKNOWN
FY2009(2) 3,177,744 $6 AFMC/OO-ALC MIPR/OPT/FP Mar-09 Mar-10 YesARMY/ UNKNOWN
Remarks:
Cost information is in actual dollars. (1) Contract has an FY05 base year with a percentage option.(2) Contract will have an FY07 base year with 4 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2PAGE NO:
16
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (RR-196 A/L CHAFF - CY94)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$4,995 $5,398 $7,365 $7,000 $6,000 $6,000 $3,000 $3,000COST(in Thousands)
Description:
1. The RR-196 chaff cartridge consists of a two-chamber square plastic tube case which contains two separate chaff payloads that are dispensed during flight to disrupt RADAR, and RADAR guided weapons. Each of the two separate chaff payloads are wrapped into three different bundles to delay chaff separation during ejection from the F-22 aircraft. It is currently only used on the F-22 aircraft.
2. This item is procured through the Ogden Air Logistics Center.
3. Items requested in FY08 are identified on the following P40A and are representative of items to be procured. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2PAGE NO:
17
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (RR-196 A/L CHAFF - CY94)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
RR-196 A/L CHAFF - CY94 A 130,214 $4,995 102,721 $5,398 138,646 $7,365 130,334 $7,000
TOTALS: 130,214 $4,995 102,721 $5,398 138,646 $7,365 130,334 $7,000
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO2
PAGE NO:18
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (RR-196 A/L CHAFF - CY94)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
RR-196 A/L CHAFF - CY94
FY2006 130,214 $38 AFMC/OO-ALC SS/FFP Jan-06 Apr-06ARMTEC/ COACHELLA, CA
FY2007 102,721 $53 AFMC/OO-ALC SS/FFP Apr-07 Oct-07 YesARMTEC/ COACHELLA, CA
FY2008(1) 138,646 $53 AFMC/OO-ALC SS/FFP W/OPT Apr-08 Oct-08 YesARMTEC/ COACHELLA, CA
FY2009(1) 130,334 $54 AFMC/OO-ALC OPT/FFP Apr-09 Oct-09 YesARMTEC/ COACHELLA, CA
Remarks:
Cost information is in actual dollars. ARMTEC owns the design of the RR-196 and is the Sole Source for procurement at this time. (1) Contract will have an FY08 base year with 1 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2PAGE NO:
19
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (20MM PELE-AA83)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$0 $7,398 $16,603 $15,837 $20,365 $25,619 $22,635 $31,429COST(in Thousands)
Description:
1. The 20MM Penetrator with Enhanced Lateral Efficiency (PELE) is a cartridge with a steel walled projectile, containing a plastic core. Upon impact with the target, the plastic core is compressed causing the steel case to burst into fragments. It is designed for use in F-15 and F-16 aircraft M61 gun systems against aircraft and light material targets. The round's ballistics are compatible with current fighter computer systems.
2. This item is procured through the Single Manager for Conventional Ammunition (SMCA).
3. Representative items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2PAGE NO:
20
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (20MM PELE-AA83)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
20MM PELE - AA83 A 165,304 {$7,398} 351,922 {$16,603} 328,746 {$15,837}$45 $47 $48
LOAD, ASSEMBLE, PACK (LAP) 165,304 $7,373 351,922 $16,468 328,746 $15,707$45 $47 $48
BOX METAL M548 661 $19 1,521 $45 1,421 $43$29 $30 $30
PALLET MK3-0 33 $6 447 $84 418 $81$185 $189 $193
QUALITY ASSURANCE $6 $6
TOTALS: 165,304 $7,398 351,922 $16,603 328,746 $15,837
Remarks:Total Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2
PAGE NO:
21
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (20MM PELE-AA83)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
20MM PELE - AA83
FY2007(1) 165,304 $45 AFMC/OO-ALC
MIPR/SS/FFPW/OPT
Apr-07 Apr-08 YesAIR FORCE/ ALLIANT
TECH/ MN
FY2008(1) 351,922 $47 AFMC/OO-ALC MIPR/OPT/FFP Apr-08 Apr-09 Yes
AIR FORCE/ ALLIANTTECH/ MN
FY2009(1) 328,746 $48 AFMC/OO-ALC MIPR/OPT/FFP Apr-09 Apr-10 Yes
AIR FORCE/ ALLIANTTECH/ MN
Remarks:
Cost information is in actual dollars. (1) Contract will have an FY07 base year with 4 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2PAGE NO:
22
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (30 MM TP PGU-15/B - B116)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$53,726 $52,321 $57,435 $55,035 $58,426 $59,693 $59,269 $60,000COST(in Thousands)
Description:
1. The 30MM Target Practice (TP) cartridge is a solid, inert projectile used to train aircrew in the use of the GAU-8/A cannon on the A-10 aircraft and the PGU-5/A 30MM gun pod on the F-16 aircraft. The cartridge is mechanically primed and has no fuze, while the projectile is a solid slug designed to match the ballistics of high explosive incendiary and armor piercing incendiary cartridges.
2. This item is procured through the Single Manager for Conventional Ammunition (SMCA).
3. Representative items requested in FY08 are identified on the following P-5. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2PAGE NO:
23
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (30 MM TP PGU-15/B - B116)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
30MM TP A 1,465,488 {$20,538}$14.01
LOAD,ASSEMBLE,PACK 1,465,488 $18,480$12.61
CONTAINER CNU-332E 141 $18$129.83
TUBE AND STRAP ASSEMBLY 6,120 $2,039$333.25
30MM TP A 2,365,999 {$33,148}$14.01
LOAD,ASSEMBLE,PACK 2,365,999 $32,355$13.68
CONTAINER CNU-332E 1,023 $131$127.99
TUBE AND STRAP ASSEMBLY 1,988 $662$332.99
30MM TP A 3,777,156 {$51,899} 3,852,795 {$57,190} 3,489,380 {$53,789}$13.74 $14.84 $15.42
LOAD,ASSEMBLE,PACK 3,777,156 $48,045 3,852,795 $53,438 3,489,380 $49,423$12.72 $13.87 $14.16
CONTAINER CNU-332E 7,581 $1,237 7,508 $1,051 8,556 $1,223$163.22 $139.99 $142.95
TUBE AND STRAP ASSEMBLY 7,581 $2,616 7,510 $2,700 8,558 $3,142$345.06 $359.58 $367.18
PRODUCTION SUPPORT {$40} {$422} {$245} {$1,246}
QUALITY ASSURANCE $40 $22 $45 $46
UNCLASSIFIED
Page 1 of 2P-1 ITEM NO
2
PAGE NO:
24
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (30 MM TP PGU-15/B - B116)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
ACCEPTANCE TESTING $400 $200 $1,200
TOTALS: 3,831,487 $53,726 3,777,156 $52,321 3,852,795 $57,435 3,489,380 $55,035
Remarks:Total Cost information is in thousands of dollars.
UNCLASSIFIED
Page 2 of 2P-1 ITEM NO
2
PAGE NO:
25
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (30 MM TP PGU-15/B - B116)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
30MM TP
FY2006(1) 2,365,999 $14.01 AFMC/OO-ALC
MIPR/C/FFPW/OPT
Sep-06 May-07ARMY/ ALLIANT TECH
SYS, INC/ PLYMOUTH,, MN
FY2006(1) 1,465,488 $14.01 AFMC/OO-ALC
MIPR/C/FFPW/OPT
Sep-06 May-07ARMY/ GD-OTS/ MARION,
IL
FY2007(2) 3,777,156 $13.74 AFMC/OO-ALC
MIPR/C/FFPW/OPT
Mar-07 Mar-08 YesARMY/ UNKNOWN
FY2008(2) 3,852,795 $14.84 AFMC/OO-ALC MIPR/OPT/FFP Mar-08 Jan-09 YesARMY/ UNKNOWN
FY2009(2) 3,489,380 $15.42 AFMC/OO-ALC MIPR/OPT/FFP Mar-09 Jan-10 YesARMY/ UNKNOWN
Remarks:
Cost information is in actual dollars. (1) FY06 contract has a single technical data package, and will be awarded as a base year contract with 40% option. (2) Contract will have an FY07 base year with 4 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2PAGE NO:
26
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (30MM HEI PGU-13/B - B104)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$9,611 $5,128 $9,342 $10,556 $10,690 $10,694 $9,684 $2,969COST(in Thousands)
Description:
1. The 30MM HEI PGU-13/B is a High Explosive Incendiary (HEI) round that is used with the GAU-8/A cannon on the A-10 aircraft and the PGU-5/A 30MM gun pod on F-16 aircraft. This round contains an explosive material that is used against light armor and personnel.
2. This item is procured through the Ogden Air Logistics Center.
3. Representative items requested in FY08 are identified on the following P-5. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2PAGE NO:
27
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (30MM HEI PGU-13/B - B104)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
30MM HEI PGU-13/B A 204,410 {$9,611} 104,788 {$5,128} 183,089 {$9,342} 202,656 {$10,556}$47 $49 $51 $52
LOAD, ASSEMBLE, PACK (LAP) 204,410 $9,436 104,788 $5,032 183,089 $9,151 202,656 $10,343$46 $48 $50 $51
CONTAINER CNU-332E 368 $49 189 $31 330 $46 365 $52$134 $163 $140 $143
TUBE AND STRAP ASSEMBLY F/30MM 368 $126 189 $65 330 $119 365 $134$343 $345 $360 $367
QUALITY ASSURANCE $26 $26
TOTALS: 204,410 $9,611 104,788 $5,128 183,089 $9,342 202,656 $10,556
Remarks:Total Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2
PAGE NO:
28
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (30MM HEI PGU-13/B - B104)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
30MM HEI PGU-13/B
FY2006(1-2) 204,410 $47 AFMC/OO-ALC C/FFP W/OPT Apr-07 Mar-08 YesUNKNOWN
FY2007(2) 104,788 $49 AFMC/OO-ALC OPT/FFP Apr-07 Mar-08 YesUNKNOWN
FY2008(2) 183,089 $51 AFMC/OO-ALC OPT/FFP Mar-08 Mar-09 YesUNKNOWN
FY2009(2) 202,656 $52 AFMC/OO-ALC OPT/FFP Mar-09 Mar-10 YesUNKNOWN
Remarks:
Cost information is in actual dollars. (1) FY06 and FY07 will be awarded together.(2) Contract has an FY06 base year with four option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2PAGE NO:
29
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$69,615 $71,440 $54,348 $51,164 $57,280 $61,242 $69,849 $71,692COST(in Thousands)
Description:
1. All items have an annual procurement of less than $5,000,000 and are Code A.
2. In FY06, Cartridges received $1.189M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. Items requested in FY08 are identified on the following P-40A-IL and are representative of items to be procured. Items procured during execution may change based on critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
2PAGE NO:
30
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
CARTRIDGES (ITEMS LESS THAN $5 MILLION)
.45 CAL BALL M1911 (A475) 133,083 $40 184,178 $50
7.62MM BALL DIM TRACER (A257) 889,947 $500
RR-188 CHAFF (3W37) 433,854 $1,443 439,000 $1,476
RR-180 CHAFF (SY16) 61,181 $500 54,460 $450
BBU-48 IMPULSE CARTRIDGE (SS27) 60,827 $500 60,168 $500
5.56MM LINKED FRANGIBLE (AA85) 5,030,009 $2,179 4,458,656 $1,952
.50 CAL LINKED 4 API/1 API TRACER (A576) 990,923 $2,477 404,907 $1,016
12 GAUGE N-LETH PT-CONT M1012 (AA51) 5,979 $40 5,174 $40
12 GAUGE N-LETHAL CROWD M1013 (AA52) 15,384 $100 6,944 $50
BBU-35 IMP CART (MG62) 647,800 $1,121 674,500 $1,180
5.56MM NATO BALL CLIPPED (A059) 11,167,768 $3,000 9,293,286 $2,323
5.56MM SAW (A062) 595,396 $232
UNCLASSIFIED
Page 1 of 5P-1 ITEM NO
2PAGE NO:
31
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
5.56MM 4-1 TRACER (SAW) (A064) 2,032,808 $1,000 2,253,028 $1,000
5.56MM SAW BLANK (A075) 1,046,963 $300
5.56MM BLANK (A080) 7,054,474 $1,199 5,747,126 $1,000
5.56MM FRANG (AA40) 9,276,437 $3,000 7,649,938 $2,500
5.56MM AP LINKED M995 (AA01) 103,565 $140 57,337 $80
5.56MM AP/TR M995/M856 4-1 (AA02) 335,829 $400 159,148 $358
7.62MM ARMOR PIERCING M993 (AA04) 578,856 $1,000 284,800 $500
7.62MM SP BALL M118 (AA11) 1,676,307 $1,000 1,142,099 $700
7.62MM 4/1 (A131) 4,057,255 $2,400 3,113,711 $1,900
PGU-30A/B (WAS A679) (AA28) 215,611 $3,000 143,741 $2,000
7.62 CARTRIDGE M80 4-1 (A165) 1,401,878 $750 1,336,640 $750
SIGNAL MK-4 MOD 3 (F562) 409,403 $1,900 358,725 $1,700
.50 CAL BALL LINK (A555) 888,480 $1,999 868,323 $1,997
UNCLASSIFIED
Page 2 of 5P-1 ITEM NO
2PAGE NO:
32
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
.50 CAL BALL/TCR LKD M2/M9 (A557) 1,453,950 $3,418 1,332,706 $3,212
.50 CAL BALL BLANK (A598) 87,986 $100 86,078 $100
.45 CAL BALL WAD (A482) 1,105,349 $300 740,231 $200
.45 CAL BALL (MATCH GRADE) (A483) 584,385 $275 399,019 $193
12 GAUGE FRANGIBLE (AA82) 218,250 $100 215,750 $100
9MM BALL (A363) 3,104,770 $495 3,087,472 $494
9MM BALL FRANGIBLE (AA16) 4,642,000 $1,300 1,724,000 $500
BBU-36 IMPULSE CARTRIDGE (MG11) 617,000 $978 561,000 $899
7.62MM BALL TRACER 9/1 (A168) 1,845,714 $1,000 1,857,772 $1,000
7.62MM BALL M80 LINKED/M13 (A143) 838,446 $500 838,995 $500
5.56MM SPECIAL BALL MK262 (AA53) 923,531 $500 913,408 $500
12 GAUGE #00 BUCKSHOT (A011) 118,394 $50 187,147 $80
12 GAUGE BIRDSCARE (AY04) 14,000 $12 48,667 $42
UNCLASSIFIED
Page 3 of 5P-1 ITEM NO
2PAGE NO:
33
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
CCU-41 IMPULSE CARTRIDGE (MF60) 11,280 $70 7,974 $50
CART IMP ARD 863-1 3000# (M189) 737,000 $3,049 792,000 $3,313
CART IMP ARD 446 1B (WB33) 79,500 $497
7.62MM BLANK M82 (A111) 1,292,134 $500 499,749 $200
.50 CAL DIM TRACER (AA50) 220,235 $2,060 104,418 $999
22. CAL BALL LONG MATCHGRADE (A091) 309,347 $49 241,788 $48
7.62 BLANK SINGLE (A112) 498,791 $227 388,745 $181
CART, IMPULSE BBU-59/B (WD01) 629 $125 971 $195
CTG, 40MM PRACTICE M781 (B519) 72,078 $400
40MM WHITE STAR M58 (B535) 1,606 $70 1,135 $50
40MM CTG HEDP M430 (B542) 104,982 $3,700 101,205 $3,699
CTG, 40MM TARGET PRACTICE (B576) 79,443 $1,534 187,269 $4,207
CTG 40MM TP M918 LINKED F/MK19 (B584) 179,344 $4,500 177,407 $4,500
UNCLASSIFIED
Page 4 of 5P-1 ITEM NO
2PAGE NO:
34
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CARTRIDGES (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
XM1006 (40MMNL) (BA06) 4,610 $100
40MM CROWD DISPERSAL GRENADE (BA13) 5,695 $100
BBU-63 (SS44) 1,048 $250 1,036 $250
TOTALS: $54,348 $51,164
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 5 of 5P-1 ITEM NO
2PAGE NO:
35
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
PRACTICE BOMBS (OVERVIEW)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$14,086 $14,976 $26,080 $24,792 $28,220 $25,533 $25,951 $28,452COST(in Thousands)
Description:
1. Items in this category consist of non-explosive training shapes used to provide combat air forces with aircrew weapons delivery training. They simulate the drop trajectory of explosives loaded bombs without the explosives.
2. Representative items requested in FY08 are identified on the following P-40A. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
3PAGE NO:
36
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
PRACTICE BOMBS (OVERVIEW)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
MK82 INERT/BDU-50C/B (EB71) A 15,420 $13,939 14,382 $13,334 16,530 $15,636 16,259 $15,696
ITEMS LESS THAN $5M A $147 $1,642 $10,444 $9,096
TOTALS: $14,086 $14,976 $26,080 $24,792
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO3
PAGE NO:37
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
PRACTICE BOMBS (BDU-50C/B INERT - EB71)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$13,939 $13,334 $15,636 $15,696 $15,822 $13,910 $15,372 $14,906COST(in Thousands)
Description:
1. The BDU-50C/B is a 500 pound thick-wall cast ductile iron, non-explosive training shape used to provide combat air forces with aircrew weapons delivery training. The BDU-50 simulates the drop trajectory of a live MK-82.
2. Items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
3. This item is procured through the Single Manager for Conventional Ammunition (SMCA)
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
3PAGE NO:
38
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
PRACTICE BOMBS (BDU-50C/B INERT - EB71)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
BDU-50C/B INERT - EB71 A 15,420 {$13,929} 14,382 {$13,324} 16,530 {$15,626} 16,259 {$15,686}$903 $926 $945 $965
BDU-50 PRACTICE BOMB 15,420 $12,750 14,382 $12,204 16,530 $14,324 16,259 $14,387$827 $849 $867 $885
SUSP LUG MS3314 31,171 $569 29,077 $545 33,391 $639 32,855 $642$18 $19 $19 $20
PALLET MHU-149/E 2,620 $409 2,447 $382 2,810 $438 2,765 $431$156 $156 $156 $156
PALLET INSPECTION, MHU149/E 2,623 $192 2,447 $183 2,810 $215 2,765 $216$73 $75 $77 $78
QUALITY ASSURANCE $10 $10 $10 $10
TOTALS: 15,420 $13,939 14,382 $13,334 16,530 $15,636 16,259 $15,696
Remarks:Total Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
3
PAGE NO:
39
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
PRACTICE BOMBS (BDU-50C/B INERT - EB71)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
BDU-50C/B INERT - EB71
FY2006(1) 15,420 $903 AFMC/OO-ALC MIPR/OPT/FFP Mar-06 Nov-06
ARMY/ ALLIEDMECHANICAL/ APPLETON,
WI
FY2007(1) 14,382 $926 AFMC/OO-ALC MIPR/OPT/FFP Mar-07 Nov-07 Yes
ARMY/ ALLIEDMECHANICAL/ APPLETON,
WI
FY2008(2) 16,530 $945 AFMC/OO-ALC MIPR/C/FFP Mar-08 Nov-08 YesARMY/ UNKNOWN
FY2009(3) 16,259 $965 AFMC/OO-ALC MIPR/C/FFP Mar-09 Nov-09 YesARMY/ UNKNOWN
Remarks:
Cost information is in actual dollars. (1) FY06 and FY07 procurements are the last options of the FY03 basic contract. (2) FY08 procurement strategy is single-year, buying just the Cast Ductile Iron (CDI) version.(3) Competition between producers of both the forged and CDI versions of the BDU-50 is planned for FY09.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
3PAGE NO:
40
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
PRACTICE BOMBS (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$147 $1,642 $10,444 $9,096 $12,398 $11,623 $10,579 $13,546COST(in Thousands)
Description:
1. All items have an annual procurement of less than $5,000,000 and are Code A. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
2. Increased funding necessary to maintain stockpile at the inventory objective level.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
3PAGE NO:
41
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
PRACTICE BOMBS (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
BDU-56 2000LB PRACTICE BOMB (E756) 339 $1,016 333 $1,012
BDU-56 CDI $2,000
MK-83-4 INERT (EC37) 221 $884 212 $877
BLU-109 (D-1)/B (F034) 311 $4,904 106 $1,709
MK-84 INERT (F262) 1,067 $3,639 1,009 $3,499
TOTALS: $10,444 $9,096
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
3PAGE NO:
42
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (OVERVIEW)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$249,324 $250,523 $150,247 $150,924 $157,674 $152,171 $154,860 $160,505COST(in Thousands)
Description:
1. The General Purpose (GP) Bombs category includes all high explosive air delivered bombs and associated fins and guidance kits. The warfighter delivers these munitions via fighter or bomber aircraft in support of both training and wartime contingency taskings. GP Bombs can be used as either unguided weapons or as guided munitions after the installation of a guidance and control kit.
2. Funding reprogrammed from General Purpose Bombs to Flares beginning in FY08 due to increased expenditures of Flares.
3. In FY07 General Purpose Bombs received a $16.0M Congressional Add in the FY07 Appropriations Conference Report 109-676 (dated 25 September 2006).
4. In FY06, General Purpose Bombs received $8.073M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
5. Items requested in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
43
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (OVERVIEW)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
MK-84 2000 LB GP BOMB (F275) A 8,831 $71,663 5,868 $41,859 1,334 $14,993 1,878 $21,490
BLU-110 1000 LB GP BOMB (EB28) A 928 $5,756 1,681 $11,327 793 $4,877 877 $5,505
BLU-109/B PENETRATOR (EC72) A 3,465 $42,536 3,354 $52,926 1,997 $38,806 2,254 $44,689
BLU-122 BOMB A $1,370 140 $12,767 139 $14,750
GBU-10/12 COMPUTER CONTROL GROUP A 5,378 $50,307 5,839 $50,714 4,175 $37,029 5,227 $46,357
MXU-650 FIN ASSEMBLY A 4,381 $16,515 4,610 $18,628 3,806 $13,605 3,949 $14,273
MXU-651 FIN ASSEMBLY A 984 $3,010 2,856 $13,855 2,574 $12,617 1,493 $7,400
BLU-121A/B GP BOMB (EC64) A 96 $9,250 73 $5,750
ITEMS LESS THAN 5 MILLION GP BOMBS A $58,167 $48,447 $4,320 $5,460
TOTALS: $249,324 $250,523 $150,247 $150,924
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO4
PAGE NO:44
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (MK-84 2000 LB GP BOMB - F275)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$71,663 $41,859 $14,993 $21,490 $20,479 $22,643 $27,096 $31,262COST(in Thousands)
Description:
1. The MK-84 is a 2,000-pound class general purpose bomb. The bomb produces blast and fragmentation effects and can be used as either an unguided high or low drag weapon. When used with a guidance kit, it can be employed as a precision guided bomb. The warhead is used on the Paveway II, Paveway III, GBU-15, and Joint Direct Attack Munition weapon systems. The MK-84 can also be fuzed with proximity, instantaneous, or delayed fuzes to provide a variety of military effects.
2. In FY06, MK-84 2000 LB GP Bomb received $2.73M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. This item is procured through the Single Manager for Conventional Ammunition (SMCA).
4. Items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
45
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (MK-84 2000 LB GP BOMB - F275)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
MK-84 2000 LB GP BOMB A 8,831 {$70,805} 5,868 {$41,655} 1,334 {$14,786} 1,878 {$21,194}$8,018 $7,099 $11,084 $11,285
LOAD ASSEMBLE & PACK 5,038 $5,396 5,038 $5,538$1,071 $1,099
RECEIPT OF GFM MATERIAL 9,008 $111 5,139 $65 1,380 $18 1,943 $26$12 $13 $13 $13
BOMB BODY MK84-4 (1) 5,139 $12,775 5,139 $13,110$2,486 $2,551
LUG SUSP MK3 (1) 17,839 $835 11,854 $569 2,732 $134 3,847 $193$47 $48 $49 $50
TNT TYPE 1 FLAKE (LB) 4,000,172 $9,283 4,000,172 $9,527$2 $2
ALUMINUM POWDER 947,144 $1,851 947,144 $1,899$2 $2
CXM-AF7 (LB) 2,469,648 $21,011 536,524 $4,684 872,713 $7,781 1,228,700 $11,187$9 $9 $9 $9
BOMB BODY MK84-4 (IM) 3,873 $8,753 1,177 $2,730 1,380 $3,269 1,943 $4,699$2,260 $2,319 $2,369 $2,419
LOAD ASSEMBLE & PACK/CXM-AF7 3,793 $7,510 830 $1,687 1,352 $2,806 1,904 $4,034$1,980 $2,032 $2,075 $2,119
PALLET MK79 6,338 $3,280 3,375 $1,846 1,352 $778 1,904 $1,055$518 $547 $576 $554
PRODUCTION SUPPORT
QUALITY ASSURANCE (2) $176 $102 $37 $53
ACCEPTANCE TESTING $453 $102 $170 $244
UNCLASSIFIED
Page 1 of 2P-1 ITEM NO
4
PAGE NO:
46
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (MK-84 2000 LB GP BOMB - F275)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
NAVY ENGINEERING SUPPORT $228
TOTALS: $71,663 $41,859 $14,993 $21,490
Remarks:Total Cost information is in thousands of dollars. In accordance with the Air Force Insensitive Munitions (IM) Strategic Plan, some of the bombs procured in FY06 and FY07 will be loaded assembledand packed with a new more expensive explosive fill, AFX-795, instead of TNT. The bomb bodies which will have the new explosive fill are alsomodified to be more insensitive to unplanned stimuli. In 2006 and 2007, The quantities/prices for the lugs, pallets, quality assurance and acceptance testing are combined TNT filled and CXM-AF7. Allother component are seperate. (1) Three percent more bomb bodies and lugs are procured to account for defects.(2) Quality assurance consists of funding for Army personnel to travel to production facilities.
UNCLASSIFIED
Page 2 of 2P-1 ITEM NO
4
PAGE NO:
47
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (MK-84 2000 LB GP BOMB - F275)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
MK-84 2000 LB GP BOMB
FY2006(1)
8,831 $8,018 AFMC/OO-ALC MIPR/SS/FFPW/OPT
Aug-06 Jan-08
ARMY/ ARMY/ OSC,MCALESTER ARMY
AMMUNITION PLANT/MCALESTER, OK
FY2007(1)
5,868 $7,099 AFMC/OO-ALC MIPR/OPT/FFP Mar-07 Sep-08 Yes
ARMY/ ARMY/ OSC,MCALESTER ARMY
AMMUNITION PLANT/MCALESTER, OK
FY2008(1)
1,334 $11,084 AFMC/OO-ALC MIPR/OPT/FFP Mar-08 Sep-09 Yes
ARMY/ ARMY/ OSC,MCALESTER ARMY
AMMUNITION PLANT/MCALESTER, OK
FY2009(1)
1,878 $11,285 AFMC/OO-ALC MIPR/OPT/FFP Mar-09 Sep-10 Yes
ARMY/ ARMY/ OSC,MCALESTER ARMY
AMMUNITION PLANT/MCALESTER, OK
Remarks:
Cost information is in actual dollars. General Dynamics Ordnance and Tactical Systems, Garland, TX, produces the bomb bodies. McAlester Army Ammunition Plant Loads, Assembles, andPacks (LAP) the bombs. (1) Contract will have a FY06 base year with 4 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
48
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (BLU-110B/B 1000 LB GP BOMB - EB28)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$5,756 $11,327 $4,877 $5,505 $3,000 $3,000 $3,000 $3,000COST(in Thousands)
Description:
1. The BLU-110B/B is a 1,000-pound class general purpose bomb. It has a relatively thin bomb case that is streamlined to reduce aerodynamic drag. The bomb produces blast and fragmentation effects and can be used as either an unguided, high or low drag weapon. When used with a guidance kit, it can be employed as a precision guided bomb. The warhead will be used with the Joint Direct Attack Munition weapon system. The BLU-110B/B can also be fuzed with proximity, instantaneous or delayed fuzes to provide a variety of military effects.
2. In FY06, BLU-110B/B 1000 LB GP Bomb received $2.0M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for Defense, the Global War on Terror, and Hurricane Recovery, 2006.
3. This item is procured through the Single Manager for Conventional Ammunition (SMCA).
4. Items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
49
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (BLU-110B/B 1000 LB GP BOMB - EB28)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
BLU-110B/B A 928 {$5,756} 1,681 {$11,327} 793 {$4,877} 877 {$5,505}$6,203 $6,738 $6,151 $6,277
LOAD ASSEMBLE & PACK 928 $745 1,680 $2,169 793 $876 877 $990$803 $1,291 $1,105 $1,129
RECEIPT OF GFM 1,715 $18 830 $13 900 $14$11 $15 $15
BOMB BODY BLU-110B/B (1) 957 $1,588 1,715 $2,448 815 $1,857 900 $2,094$1,659 $1,427 $2,278 $2,327
LUG SUSPENSION MS3314 1,980 $35 3,520 $67 1,705 $38 1,893 $43$18 $19 $22 $22
CXM-7 (LB) 502,434 $3,246 911,102 $6,379 209,800 $1,955 233,200 $2,219$6 $7 $9 $10
CABLE ASSEMBLY M73
PALLET MHU-187 316 $134 572 $225 268 $129 295 $137$423 $394 $483 $465
NAVY ENGINEERING SUPPORT $9 $14 $6 $5
QUALITY ASSURANCE $7 $3 $3
TOTALS: $5,756 $11,327 $4,877 $5,505
Remarks:Total Cost information is in thousands of dollars. (1) Three percent more bomb bodies are procured to account for defects.(2) Quality assurance consists of funding for Army personnel to travel to production facilities.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4
PAGE NO:
50
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (BLU-110B/B 1000 LB GP BOMB - EB28)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
BLU-110B/B
FY2006(1)
928 $6,203 AFMC/OO-ALC MIPR/SS/FFPW/OPT
Mar-06 Dec-07ARMY/ JMC, MCALESTER
ARMY AMMUNITIONPLANT/ MCALESTER, OK
FY2007(1) 1,681 $6,738 AFMC/OO-ALC MIPR/OPT/FFP Mar-07 Jun-08 Yes
ARMY/ JMC, MCALESTERARMY AMMUNITION
PLANT/ MCALESTER, OK
FY2008(1) 793 $6,151 AFMC/OO-ALC MIPR/OPT/FFP Mar-08 Sep-09 Yes
ARMY/ JMC, MCALESTERARMY AMMUNITION
PLANT/ MCALESTER, OK
FY2009(1) 877 $6,277 AFMC/OO-ALC MIPR/OPT/FFP Mar-09 Sep-10 Yes
ARMY/ JMC, MCALESTERARMY AMMUNITION
PLANT/ MCALESTER, OK
Remarks:
Cost information is in actual dollars. General Dynamics Ordnance and Tactical Systems, Garland, TX, produces the bomb bodies. McAlester Army Ammunition Plant Loads, Assembles, andPacks (LAP) the bombs. (1) Contract has an FY06 base year with 4 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
51
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (BLU-109 2000 LB HARD TARGET BOMB - (EC72)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$42,536 $52,926 $38,806 $44,689 $53,300 $57,394 $42,032 $44,421COST(in Thousands)
Description:
1. The BLU-109 warhead is a 2000-pound hard target penetrator bomb. It is a penetration weapon used against bunkers, aircraft shelters, and reinforced concrete structures. The warhead is used on the GBU-10, 24, and 27 as well as Joint Direct Attack Munition (JDAM) weapon systems.
2. In FY06, BLU-109 2000LB Hard Target bomb received $2.0M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. This item is procured through the Single Manager for Conventional Ammunition (SMCA).
4. Items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
52
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (BLU-109 2000 LB HARD TARGET BOMB - (EC72)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
BLU-109 A 3,465 {$42,494} 3,354 {$52,877} 1,997 {$38,761} 2,254 {$44,644}$12,264 $15,765 $19,410 $19,807
LOAD ASSEMBLE & PACK 3,465 $7,138 3,354 $9,001 1,997 $5,399 2,254 $6,223$2,060 $2,684 $2,704 $2,761
BOMB BODY BLU-109 3,465 $29,870 3,354 $38,472 1,997 $24,338 2,254 $28,051$8,621 $11,470 $12,187 $12,445
CNU 417 CONTAINER 1,733 $1,746 1,677 $3,266 1,010 $2,090 1,141 $2,411$1,008 $1,948 $2,069 $2,113
ALUMINUM POWDER (LB) 381,000 $389 640,051 $806$1 $1
TNT TYPE I FLAKE (LB) 1,525,000 $3,309 528,823 $1,264$2 $2
CXM-7 737,650 $6,874 831,545 $7,913$9 $10
RECEIPT OF GFM MATERIAL 2,520 $19 1,999 $15 235 $2$7 $8 $8
PRODUCTION ENGINEERING $36 $42 $40 $40
QUALITY ASSURANCE (1) $6 $7 $5 $5
TOTALS: $42,536 $52,926 $38,806 $44,689
Remarks:Total Cost information is in thousands of dollars. (1) Quality assurance consists of funding for Army personnel to travel to production facilities.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4
PAGE NO:
53
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (BLU-109 2000 LB HARD TARGET BOMB - (EC72)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
BLU-109
FY2006(1) 3,465 $12,264 AFMC/OO-ALC MIPR/FP W/OPT Mar-06 Sep-07
ARMY/ JMC/ MCALESTERARMY AMMUNITION
PLANT/ MCALESTER, OK
FY2007(1) 3,354 $15,765 AFMC/OO-ALC MIPR/OPT/FP Mar-07 Sep-08 Yes
ARMY/ JMC/ MCALESTERARMY AMMUNITION
PLANT/ MCALESTER, OK
FY2008(1) 1,997 $19,410 AFMC/OO-ALC MIPR/OPT/FP Mar-08 Oct-09 Yes
ARMY/ JMC/ MCALESTERARMY AMMUNITION
PLANT/ MCALESTER, OK
FY2009(1) 2,254 $19,807 AFMC/OO-ALC MIPR/OPT/FP Mar-09 Oct-10 Yes
ARMY/ JMC/ MCALESTERARMY AMMUNITION
PLANT/ MCALESTER, OK
Remarks:
Cost information is in actual dollars. Ellwood National Forge Company, Irvine, PA, produces the bomb bodies. McAlester Army Ammunition Plant Loads, Assembles, and Packs, (LAP) thebombs. (1) Contract has an FY06 base year with three option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
54
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (BLU-122 BOMB)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$1,370 $12,767 $14,750 $0 $0 $0 $0 $0COST(in Thousands)
Description:
1. The BLU-122 Bomb is used on the GBU-28 C/B Precision Guided Air-to-Surface weapon to form an improved 5000 lb BLU-113 penetrating warhead, with a new designator of BLU-122. The bomb is an end item, and is stock listed and stored as such. It is used on the B-2 and F-15E aircraft weapon system platforms. The warhead provides deeper target penetration, increased lethality, and survivability with improved insensitive munitions characteristics. The new BLU-122 significantly enhances the Air Force's capability to destroy hardened targets.
2. Items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
3. This item is procured through the Air Armament Center, Eglin AFB, FL.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
55
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (BLU-122 BOMB)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
BLU-122 (1) A 140 {$11,642} 139 {$12,739}$83,157 $91,645
PALLET 140 $560 139 $560$4,000 $4,029
BLU-122 LOAD TRAINER
BLU-122 LIVE WPN 140 $11,082 139 $12,179$79,157 $87,616
ENGINEERING CHANGE ORDERS $41 $693 $329
PROGRAM SUPPORT $329 $433 $682
PRODUCTION ASSET TEST & EVAL (PAT&E) $1,000
ECONOMIC PRICE ADJUSTMENT $1,000
TOTALS: $1,370 $12,767 $14,750
Remarks:Total Cost information is in thousands of dollars. (1) No hardware was procured in FY06, due to steel hardness issues with the foundry subcontractor.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4
PAGE NO:
56
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (BLU-122 BOMB)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
BLU-122
FY2007(1-2) 140 $83,157 AFMC/AAC OPT/FFP Mar-07 Aug-07 YesGD-OTS/ NICEVILLE, FL
FY2008(1) 139 $91,645 AFMC/AAC OPT/FFP Nov-07 Feb-08 YesGD-OTS/ NICEVILLE, FL
Remarks:
Cost information is in actual dollars. (1) Contract awarded in FY03 for System Design and Development (SDD) has 3 option years for production. (2) Due to problems with the sub-contracted foundry the award of contract option orignally scheduled for FY06 was slipped to FY07, and will use FY07funding.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
57
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (GBU-10/12 COMPUTER CONTROL GROUP)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$50,307 $50,714 $37,029 $46,357 $45,385 $38,997 $49,371 $50,273COST(in Thousands)
Description:
1. The GBU-10/12 Computer Control Group is a laser homing guidance unit used on the GBU-10 (MK-84 Warhead, 2000lb class) or GBU-12 (MK-82 Warhead, 500lb class) PAVEWAY II Laser Guided Bomb (LGB). The PAVEWAY II system has folding wings which open upon release for maneuverability and increased aircraft payload. These weapons are primarily used for precision bombing against hardened and non-hardened targets.
2. Items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
3. This item is procured through the Ogden Air Logistics Center.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
58
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (GBU-10/12 COMPUTER CONTROL GROUP)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
GBU-10/12 COMPUTER CONTROL GROUP A 3,161 {$27,691}$8,760
GBU-10/12 COMPUTER CONTROL GROUP KIT 3,161 $26,916$8,515
PALLET 370 $1$3
CONTAINER CNU-317 3,161 $774$245
GBU-10/12 COMPUTER CONTROL GROUP A 2,217 {$22,616}$10,201
GBU-10/12 COMPUTER CONTROL GROUP KIT 2,217 $22,072$9,956
PALLET 220 $1$3
CONTAINER CNU-317 2,217 $542$245
GBU-10/12 COMPUTER CONTROL GROUP A 5,839 {$50,714} 4,175 {$37,029} 5,227 {$46,357}$8,685 $8,869 $8,869
GBU-10/12 COMPUTER CONTROL GROUP KIT 5,839 $49,212 4,175 $35,936 5,227 $44,991$8,428 $8,607 $8,608
PALLET 590 $2 461 $1 535 $2$3 $3 $3
CONTAINER CNU-317 5,839 $1,501 4,175 $1,091 5,227 $1,364$257 $261 $261
TOTALS: 5,378 $50,307 5,839 $50,714 4,175 $37,029 5,227 $46,357
Remarks:Total Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4
PAGE NO:
59
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (GBU-10/12 COMPUTER CONTROL GROUP)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
GBU-10/12 COMPUTER CONTROLGROUP
FY2006(1) 2,217 $10,201 AFMC/OO-ALC OPT/FFP Apr-06 Dec-06
LOCKHEED MARTIN/ARCHBALD, PA
FY2006(1) 3,161 $8,760 AFMC/OO-ALC OPT/FFP Apr-06 Oct-06RAYTHEON/ TUCSON, AZ
FY2007(1) 5,839 $8,685 AFMC/OO-ALC OPT/FFP Apr-07 Apr-08 YesUNKNOWN
FY2008(1) 4,175 $8,869 AFMC/OO-ALC OPT/FFP Apr-08 Aug-09 YesUNKNOWN
FY2009(1) 5,227 $8,869 AFMC/OO-ALC OPT/FFP Apr-09 Aug-10 YesUNKNOWN
Remarks:
Cost information is in actual dollars. (1) Contract has an FY03 base year with 6 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
60
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (MXU-650 FIN ASSEMBLY)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$16,515 $18,628 $13,605 $14,273 $14,391 $11,540 $12,015 $10,940COST(in Thousands)
Description:
1. The MXU-650 Fin Assembly consists of a tail fin and forward canards used on the GBU-12 (MK-82 Warhead, 500lb class) PAVEWAY II Laser Guided Bomb (LGB). The PAVEWAY II system has folding wings which open upon release for increased maneuverability. These weapons are primarily used for precision bombing against non-hardened targets.
2. This item is procured through the Ogden Air Logistics Center.
3. Items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
61
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (MXU-650 FIN ASSEMBLY)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
GENERAL PURPOSE BOMBS (MXU-650 GBU-12 (EC32, EC29))
MXU-650 GBU-12 A 1,955 {$8,006}$4,095
MXU-650/B KIT 1,955 $7,525$3,849
PALLET 1,109 $3$3
DRUM CONTAINER (YY52) 1,955 $477$244
MXU-650 GBU-12 A 2,426 {$8,509}$3,507
MXU-650/B KIT 2,426 $7,913$3,262
PALLET 1,265 $4$3
DRUM CONTAINER (YY52) 2,426 $592$244
MXU-650 GBU-12 A 4,610 {$18,628} 3,806 {$13,605} 3,949 {$14,273}$4,041 $3,574 $3,614
MXU-650/B KIT 4,610 $17,464 3,806 $12,647 3,949 $13,265$3,788 $3,323 $3,359
PALLET 2,305 $7 3,200 $10 2,980 $9$3 $3 $3
DRUM CONTAINER (YY52) 4,610 $1,157 3,806 $948 3,949 $999$251 $249 $253
TOTALS: 4,381 $16,515 4,610 $18,628 3,806 $13,605 3,949 $14,273
Remarks:
UNCLASSIFIED
Page 1 of 2P-1 ITEM NO
4
PAGE NO:
62
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (MXU-650 FIN ASSEMBLY)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
Total Cost information is in thousands of dollars.
UNCLASSIFIED
Page 2 of 2P-1 ITEM NO
4
PAGE NO:
63
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (MXU-650 FIN ASSEMBLY)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
MXU-650 GBU-12
FY2006(1) 2,426 $3,507 AFMC/OO-ALC OPT/FFP Apr-06 Oct-06
LOCKHEED MARTIN/ARCHBALD, PA
FY2006(2) 1,955 $4,095 AFMC/OO-ALC OPT/FFP Apr-06 Apr-07RAYTHEON/ TUCSON, AZ
FY2007(3) 4,610 $4,041 AFMC/OO-ALC OPT/FFP Apr-07 Apr-08 YesUNKNOWN
FY2008(3) 3,806 $3,574 AFMC/OO-ALC OPT/FFP Apr-08 Apr-09 YesUNKNOWN
FY2009(3) 3,949 $3,614 AFMC/OO-ALC OPT/FFP Apr-09 Apr-10 YesUNKNOWN
Remarks:
Cost information is in actual dollars. (1) Contract with Lockheed Martin has an FY03 base with six option years. (2) Contract with Raytheon has an FY03 base with six option years.(3) FY07 through FY09 are options of the FY03 basic contract. Contracts will be split between Raytheon and Lockheed when procurement quantities alloweconomy of scale. Otherwise, the full procurement will be awarded to the lowest bidder.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
64
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (MXU-651 GBU-10 FIN ASSEMBLY)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$3,010 $13,855 $12,617 $7,400 $7,084 $3,000 $4,000 $2,935COST(in Thousands)
Description:
1. The MXU-651/B is an airfoil group consisting of an aft wing assembly, forward canards and attaching hardware to assemble a GBU-10 (MK-84 Warhead, 2000lb class, or BLU-109 2000lb Hard Target Penetrator Bomb) PAVEWAY II Laser Guided Bomb (LGB). The PAVEWAY II system has folding wings which open upon release for increased maneuverability.
2. In FY06, MXU-651 GBU-10 Fin Assembly received $2.0M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. This item is procured through the Ogden Air Logistics Center.
4. Items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
65
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (MXU-651 GBU-10 FIN ASSEMBLY)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
GENERAL PURPOSE BOMBS (MXU-651 GBU-10 FINASSEMBLY)
MXU-651 A 984 {$3,010} 2,856 {$13,855} 2,574 {$12,617} 1,493 {$7,400}$3,059 $4,851 $4,902 $4,956
MXU-651 KIT 984 $2,759 2,856 $13,103 2,574 $11,929 1,493 $6,994$2,804 $4,588 $4,634 $4,685
PALLET 470 $1 1,400 $4 932 $3 750 $2$3 $3 $3 $3
DRUM CONTAINER (YY51) 984 $250 2,856 $748 2,574 $685 1,493 $403$254 $262 $266 $270
TOTALS: 984 $3,010 2,856 $13,855 2,574 $12,617 1,493 $7,400
Remarks:Total Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4
PAGE NO:
66
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (MXU-651 GBU-10 FIN ASSEMBLY)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
MXU-651
FY2006(1-2) 984 $3,059 AFMC/OO-ALC OPT/FFP Apr-06 Apr-07
LOCKHEED MARTIN/ARCHIBALD, PA
FY2007(3) 2,856 $4,851 AFMC/OO-ALC C/FFP W/OPT Apr-07 Apr-08 YesUNKNOWN
FY2008(3) 2,574 $4,902 AFMC/OO-ALC OPT/FFP Apr-08 Apr-09 YesUNKNOWN
FY2009(3) 1,493 $4,956 AFMC/OO-ALC OPT/FFP Apr-09 Apr-10 YesUNKNOWN
Remarks:
Cost information is in actual dollars. (1) Contract has an FY03 base year with 6 option years. (2) The FY06 option was awarded soley to Lockheed Martin. (3) The contract will be a split buy between Raytheon and Lockheed Martin with an FY07 base year and 3 option years. The amounts of the split are notknown.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
67
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (BLU-121A/B GP BOMB (EC64))
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$0 $0 $9,250 $5,750 $6,125 $7,589 $8,346 $9,674COST(in Thousands)
Description:
1. The BLU-121 Bomb is used on the GBU-15 and AGM-130 Precision Guided Air-to-Surface weapons to form an improved 2000 lb penetrating warhead, with a new designator of BLU-121. It is used on the F-15E aircraft weapon system platform. The warhead provides tunnel target penetration, increased lethality, and survivability. The new BLU-121 significantly enhances the Air Force's capability to destroy tunnel targets.
2. The engineering effort for the program was funded FY02-FY07 by the Defense Threat Reduction Agency (DTRA) with 97X0400 (R&D) funds.
3. This item is procured through the Air Armament Center, Eglin AFB, FL.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
68
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (BLU-121A/B GP BOMB (EC64))
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
HARDWARE 96 {$8,370} 73 {$4,814}
BLU 121 A/B A 96 $8,370 73 $4,814$87,188 $65,949
PRODUCTION AND SUPPORT COST {$880} {$936}
PROGRAM MANAGEMENT AUTHORITY (PMA) $828 $880
ENGINEERING CHANGE ORDERS $52 $55
TOTALS: 96 $9,250 73 $5,750
Remarks:Total Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4
PAGE NO:
69
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (BLU-121A/B GP BOMB (EC64))
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
HARDWARE
BLU 121 A/B
FY2008(1) 96 $87,188 AFMC/AAC OTH/OTH Dec-07 Jun-08 YesUNKNOWN
FY2009(1) 73 $65,949 AFMC/AAC OTH/OTH Dec-08 Jun-09 YesUNKNOWN
Remarks:
Cost information is in actual dollars. (1) Contract type will be determined after acquisition strategy is finalized.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
70
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$58,395 $48,447 $4,320 $5,460 $7,910 $8,008 $9,000 $8,000COST(in Thousands)
Description:
1. All items have a procurement value of less than $5,000,000. Representative items requested in FY08 are identified on the following P-40A-IL. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
71
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
GENERAL PURPOSE BOMBS (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
DTU-31 TAFF (G240) 5,882 $1,000
KEVLAR LANYARD (EA99) 22,927 $322
BSU-33 FIN, MK82 GP BOMB (F782) 25,045 $2,460
MK82 WARHEAD (E485) 1325004601305 1,248 $2,998 1,223 $3,000
TOTALS: $4,320 $5,460
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
4PAGE NO:
72
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
JOINT DIRECT ATTACK MUNITION
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40M)
TOTAL2006 2007 201020092008PRIORYEARS
20122011 2013
Quantity 105,340 8,205 7,261 3,817 3,826 3,750 3,734 3,509 3,447 142,889
Gross Cost ($M) $2,250.874 $224.550 $174.310 $112.783 $106.587 $107.024 $110.240 $107.806 $109.661 $3,303.835
Initial Spares ($M) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total ($M) $2,250.874 $224.550 $174.310 $112.783 $106.587 $107.024 $110.240 $107.806 $109.661 $3,303.835
Flyaway Unit Cost ($M) $0.020 $0.025 $0.023 $0.026 $0.024 $0.025 $0.026 $0.027 $0.028 $0.022
Wpn Sys Proc Unit Cost ($M) $0.021 $0.027 $0.024 $0.030 $0.028 $0.029 $0.030 $0.031 $0.032 $0.023
Description:
1. The Joint Direct Attack Munition (JDAM) program is a joint Air Force/Navy program with the Air Force as the lead service. Designated ACAT 1C, this program upgrades the existing inventory of general purpose bombs (MK-84, BLU-109/B, MK-82 and MK-83) by integrating the bombs with a field installed guidance kit using a global positioning system aided inertial navigation system (GPS/INS). JDAM provides an accurate, adverse weather capability. JDAM is integrated with the B-52H, B-2A, B-1B, F-16C/D, F-117, F/A-18A+/C/D/E/F, F-15E, AV-8B and F-22A aircraft. Follow-on integrations with the A/OA-10, MQ-9 and F-35 are in progress.
2. FY08 budget includes funding to procure Lot 12 Baseline Production and 500 AMSTE (Affordable Moving Target Engagement) modifications to Lot 9 baseline JDAM guidance kits.
3. Total Funding includes Seek Eagle.
Page 1 of 1P-1 ITEM NO6
PAGE NO:73
UNCLASSIFIED
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
JOINT DIRECT ATTACK MUNITION
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
JOINT DIRECT ATTACK MUNITION 8,205 {$202,746} 7,261 {$165,270} 3,817 {$98,209} 3,826 {$91,870}
AIRFRAME A 8,205 $200,781 7,261 $163,673 3,817 $95,234 3,826 $88,815$24,471 $22,541 $24,950 $23,214
ENGINEERING CHANGE ORDERS $2,129 $2,174
CONTRACTOR INCENTIVE $1,965 $1,597 $846 $881
SUPPORT COSTS 157 {$21,804} {$8,933} 100 {$14,574} 100 {$14,717}
AIRBORNE TEST EQUIPMENT A 157 $4,499 100 $3,193 100 $3,260$28,656 $31,930 $32,600
PROGRAM MANAGEMENT ADMINISTRATION & MISSIONSUPPORT
$3,217 $4,183 $4,355 $4,446
ALTERNATE DISPUTE RESOLUTION $50 $50 $53 $54
PRODUCTION SUSTAINING ENGINEERING $14,038 $4,700 $6,973 $6,957
SEEK EAGLE $107
TOTALS: 8,362 $224,550 7,261 $174,310 3,917 $112,783 3,926 $106,587
Remarks:Total Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
6
PAGE NO:
74
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
JOINT DIRECT ATTACK MUNITION
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
JOINT DIRECT ATTACK MUNITION
AIRFRAME
FY2006 8,205 $24,471 AFMC/AAC SS/FFP Mar-06 Mar-07BOEING/ ST CHARLES, MO
FY2007 7,261 $22,541 AFMC/AAC SS/FFP Nov-06 Mar-08BOEING/ ST CHARLES, MO
FY2008 3,817 $24,950 AFMC/AAC SS/FFP Jan-08 Mar-09 YesBOEING/ ST CHARLES, MO
FY2009 3,826 $23,214 AFMC/AAC SS/FFP Jan-09 Mar-10 YesBOEING/ ST CHARLES, MO
FY2010 3,750 $24,149 AFMC/AAC SS/FFP Jan-10 Mar-11 YesBOEING/ ST CHARLES, MO
FY2011 3,734 $25,027 AFMC/AAC SS/FFP Jan-11 Mar-12 YesBOEING/ ST CHARLES, MO
FY2012 3,509 $25,957 AFMC/AAC SS/FFP Jan-12 Mar-13 YesBOEING/ ST CHARLES, MO
FY2013 3,447 $26,943 AFMC/AAC SS/FFP Jan-13 Mar-14 YesBOEING/ ST CHARLES, MO
SUPPORT COSTS
AIRBORNE TEST EQUIPMENT
FY2006 157 $28,656 AFMC/AAC SS/FFP Sep-06 Nov-07BOEING/ ST CHARLES, MO
FY2008 100 $31,930 AFMC/AAC SS/FFP Jul-08 Mar-09 YesUNKNOWN
UNCLASSIFIED
Page 1 of 2P-1 ITEM NO
6PAGE NO:
75
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
JOINT DIRECT ATTACK MUNITION
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
FY2009 100 $32,600 AFMC/AAC SS/FFP Jul-09 Mar-10 YesUNKNOWN
Remarks:
Cost information is in actual dollars.
UNCLASSIFIED
Page 2 of 2P-1 ITEM NO
6PAGE NO:
76
UNCLASSIFIEDAF FORM 1537(THEN YEAR DOLLARS)
WEAPON SYSTEM BUDGET ESTIMATE(DOLLARS IN MILLIONS)
CATEGORY TY$
WEAPON SYSTEM: CONTRACTOR: AS OF DATE: APPN: 3011
EQUIP: REPORT CONTROL SYMBOL: PREPARED BY:FY08PB
PE: 27583F BPAC: 356010
MUNITIONS ACC/YU
JDAM BOEING FEBRUARY 2007
PRIORYEARS
TOTAL2006 2007 20122011201020092008DESCRIPTION 2013
QUANTITY OF AURs 105,340 8,205 7,261 3,817 3,826 3,750 3,734 3,509 142,8893,447
RECURRING HARDWARE $2,132.868 $200.781 $163.673 $95.234 $88.815 $90.349 $93.379 $91.089 $3,049.067$92.879
ECO $0 $0 $0 $2.129 $2.174 $2.220 $2.267 $2.239 $13.110$2.081
CONTRACTOR INCENTIVE $22.352 $1.965 $1.597 $.846 $.881 $.896 $.926 $.903 $31.287$.921
FLYAWAY COST $2,155.220 $202.746 $165.270 $98.209 $91.870 $93.465 $96.572 $94.231 $3,093.464$95.881
TEST EQUIPMENT (CMBRE) $7.538 $0 $0 $0 $0 $0 $0 $0 $7.538$0
AIRBORNE TEST EQUIPMENT $23.317 $4.499 $0 $3.193 $3.260 $3.329 $3.402 $3.476 $48.028$3.552
DATA $.059 $0 $0 $0 $0 $0 $0 $0 $.059$0
PROGRAM MGMT./ADMIN REQ $19.615 $3.217 $4.183 $4.355 $4.446 $4.540 $4.637 $4.740 $54.577$4.844
SYSTEM TEST & EVALUATION $.222 $0 $0 $0 $0 $0 $0 $0 $.222$0
TRAINING $3.791 $0 $0 $0 $0 $0 $0 $0 $3.791$0
PROD. SUSTAINING ENGINEERING $36.901 $14.038 $4.700 $6.973 $6.957 $5.635 $5.572 $5.301 $91.402$5.325
SEEK EAGLE $.868 $0 $.107 $0 $0 $0 $0 $0 $.975$0
ALT. DISPUTE RESOLUTION $.590 $.050 $.050 $.053 $.054 $.055 $.057 $.058 $1.026$.059
DELIVERY ACCELERATION $2.753 $0 $0 $0 $0 $0 $0 $0 $2.753$0
WEAPON SYSTEM COST $2,250.874 $224.550 $174.310 $112.783 $106.587 $107.024 $110.240 $107.806 $3,303.835$109.661
INITIAL SPARES $0 $0 $0 $0 $0 $0 $0 $0 $0$0
PROCUREMENT COST $2,250.874 $224.550 $174.310 $112.783 $106.587 $107.024 $110.240 $107.806 $3,303.835$109.661
TOTAL PROGRAM (TY$) $2,250.874 $224.550 $174.310 $112.783 $106.587 $107.024 $110.240 $107.806 $3,303.835$109.661
APPROVED PROGRAM (TY$) $2,250.874 $224.550 $174.310 $112.783 $106.587 $107.024 $110.240 $107.806 $3,303.835$109.661
DELTA (TY$) $0 $0 $0 $0 $0 $0 $0 $0 $0$0
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO6
PAGE NO:77
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CAD/PAD
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$21,278 $29,789 $33,867 $36,323 $38,315 $36,398 $39,983 $42,627COST(in Thousands)
Description:
1. Cartridge Actuated Devices/Propellant Actuated Devices (CAD/PAD), such as gas generators, initiators, time-delay cartridges, Shield Mild-Detonating Cord (SMDC), rocket motors, rocket catapults, etc are used on aircraft fire-suppression, emergency-release and aircrew-escape/ejection systems. These explosive devices have finite lives and are replaced during scheduled aircraft maintenance. Life-support devices such as the Universal Water Activated Release System (UWARS) and parachute-release cartridges are essential to aircrew survival after ejection, and are included in the CAD/PAD category. Aircraft operational availability is directly impacted if replacement CAD/PAD assets are not available to meet specific "time-change" requirements as based on life-expiration of the installed devices.
2. Items requested in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
8PAGE NO:
78
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
CAD/PAD
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
BOMBER AIRCRAFT A $6,027 $7,174 $7,607 $7,928
CARGO AIRCRAFT A $3,906 $4,183 $4,264 $4,344
FIGHTER AIRCRAFT A $5,150 $5,259 $6,039 $6,259
TRAINING AIRCRAFT A $450 $8,098 $10,552 $12,203
COMMON EGRESS ITEMS A $2,607 $2,089 $1,924 $1,835
COMMON LIFE SUPPORT ITEMS A $2,471 $2,089 $1,924 $1,835
COMMON MISC ITEMS A $667 $897 $1,557 $1,919
TOTALS: $21,278 $29,789 $33,867 $36,323
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO8
PAGE NO:79
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
EXPLOSIVES ORDNANCE DISPOSAL (EOD)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$9,439 $3,079 $3,198 $3,273 $3,390 $3,482 $3,552 $3,623COST(in Thousands)
Description:
1. Explosive Ordnance Disposal (EOD)/Civil Engineering Demolition Material, Tools and Equipment includes all explosives, explosive tools and related equipment to render unexploded ordnance safe. EOD items are used in deployment packages, base response assets and range clearance resources in support of peacetime and contingency operations. These items are certified for use by the Air Force Non-Nuclear Munitions Safety Board (NNMSB) and the Department of Defense Explosives Safety Board (DDESB).
2. In FY06, Explosive Ordnance Disposal received $6.521M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. Items requested in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on the most critical equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
9PAGE NO:
80
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
EXPLOSIVES ORDNANCE DISPOSAL (EOD)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
CHARGE, DEMOLITION C4-M112 (M023) A 66,930 $1,140 31,071 $665 33,511 $717 34,125 $730
DEMOLITION TOOLS A 106 $545 117 $615 94 $497 95 $498
EXPLOSIVE CUTTING TAPE (MM53) A 34,939 $498
EXPLOSIVE CUTTING TAPE (MM54) A 5,063 $500 5,033 $545 2,006 $199 1,977 $200
EOD TRAINING AIDS A 1 1 $400 1 $446 1 $447
DISRUPTOR, LIGHT WEIGHT (YY32) A 440 $53 203 $25 198 $25 196 $25
CHARGE, DEMO SHAPED MK88 (M997) A 719 $59 412 $37 408 $37 169 $17
RE70 FSS SLUG (NY11) A 447 $27
SEMTEX A (MN82) A 1,450 $25 2,023 $35 2,024 $35 2,040 $35
IGNITER TIME BLASTING (MN08) A 6,024 $25 5,813 $25 5,760 $25 5,963 $26
DISRUPTOR, MAIN CHARGE (DWDF) A 452 $20 446 $20 446 $20 440 $20
MK275 AVON (AA63) A 795 $5 793 $5 788 $5
ALUMINUM SLUG, MK 280 (DWEE) A 2,745 $14 588 $3 585 $3 584 $3
STEEL SLUG, MK 279 (DWED) A 2,745 $14 588 $3 587 $3 583 $3
SHOCK TUBE (YY34) A 166,666 $10 333,333 $20 333,333 $20 333,333 $20
UNCLASSIFIED
Page 1 of 3P-1 ITEM NO9
PAGE NO:81
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
EXPLOSIVES ORDNANCE DISPOSAL (EOD)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
ENHANCED BLANK, MK 277 (DWEC) A 3,448 $10 2,985 $10 1,779 $6 1,760 $6
DYNAMITE, 75% AMMON NITRATE (MN85) A 3,067 $7 2,103 $5 1,673 $4 1,673 $4
SQUIB (WB29) A 1,234 $5
MK276 POPPER (AA64) A 1,142 $2 1,117 $2 1,058 $2 1,036 $2
EXPLOSIVE WATER GEL (MY77) A 2,597 $2 2,564 $2 1,785 $2 1,666 $2
MEDIUM VELOCITY BLANK (AA66) A 486 $2 480 $2 476 $2 472 $2
RELOADER (ML66) A 75 $1 74 $1 73 $1 73 $1
DYNAMITE, NITRO GLYCERIN (MN30) A 620 $1 613 $1 606 $1 595 $1
MK32 MOD 4 X-RAY PROCESSOR A 7 $49 7 $49 7 $49
DEMINING FLARE (LA37) A 384 $100 6,075 $96 6,075 $96
50 CAL API (A606) A 1,440 $15 1,201 $10 1,201 $10 1,201 $10
MINI REMOTE FIRING DEVICE A 202 $6,464 12 $384 13 $416
DHARGE DEMO M112-1LB (MN53) A 17,539 $250
CORD ASBLY DETONATING (M456) A 86,281 $10 85,324 $10
FUZE BLASTING TIME (M670) A 92,592 $100 92,592 $100
UNCLASSIFIED
Page 2 of 3P-1 ITEM NO9
PAGE NO:82
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
EXPLOSIVES ORDNANCE DISPOSAL (EOD)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
CHARGE ASBLY DEMO M183 COMP 4 (M757) A 426 $250 482 $300 480 $300
SHOCK TUBE W/BLASTING CAP 500 (MN88) A 4,551 $100 4,551 $100
RT 4 N/L A 3 $46
DYNAMITE, AMONIA NITRATE 60% (MN32) A 71,336 $100 69,861 $100
TOTALS: 303,038 $9,439 409,916 $3,079 649,733 $3,198 647,676 $3,273
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 3 of 3P-1 ITEM NO9
PAGE NO:83
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
SPARES AND REPAIR PARTS
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$4,295 $4,686 $4,726 $5,079 $5,137 $5,266 $5,371 $5,477COST(in Thousands)
Description:
1. This P-1 line funds spares and repair parts for Procurement of Ammunition, Air Force (PAAF) items. Initial spares consist of reparable components, assemblies and subassemblies, as well as consumable items required in support of newly fielded end items. Requirements are based on historical failure/demand data on similar items. Replenishment spares consist of reparable components, assemblies and subassemblies required for follow-on sustainment of end items. Munitions replenishment spare levels are based on item-specific failure/demand driven computations.
2. Items requested in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force Mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
10PAGE NO:
84
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
SPARES AND REPAIR PARTS
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
INITIAL SPARES {$397} {$413} {$421} {$423}
MISC. LOW COST INITIAL SPARES A $397 $413 $421 $423
REPLENISHMENT SPARES {$3,898} {$4,273} {$4,305} {$4,656}
GP BOMBS A $3,898 $4,273 $4,305 $4,656
TOTALS: $4,295 $4,686 $4,726 $5,079
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO10
PAGE NO:85
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
MODIFICATIONS
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$881 $915 $935 $1,245 $1,324 $1,350 $1,376 $1,404COST(in Thousands)
Description:
1. This budget line encompasses both new and on-going modification efforts for guided bomb and munitions systems. Permanent modifications consist of configuration changes to in-service systems and equipment which correct material/other deficiencies or add/delete capability. Safety modifications correct deficiencies which may create personnel, system or equipment hazards.
2. The FY08 funding request reflects estimated costs based on historical funding requirements and projected future requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
11PAGE NO:
86
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ITEMS LESS THAN $5 MILLION
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$3,896 $4,066 $4,169 $4,046 $1,774 $1,786 $1,822 $1,858COST(in Thousands)
Description:
1. This category includes various munitions items to support air base ground defense, air rescue, and aircrew/ground training. All items have an annual procurement value of less than $5 million and are code A.
2. Items requested in FY08 are identified on the following P-40A-IL and are representative of items to be procured. Items procured during execution may change based on critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
12PAGE NO:
87
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ITEMS LESS THAN $5 MILLION
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
GRENADE HAND, GREEN SMOKE (G940) 1,318 $100 1,191 $100
NUCLEAR TRAINER 2 $890 1 $490
GRENADE HAND, MK84 STUN (GG09) 782 $100
GRENADE HAND, RED SMOKE (G950) 23,920 $1,391 19,088 $1,428
GRENADE HAND, VIOLET SMOKE (G955) 5,129 $300 5,849 $500
GRENADE HAND, PRACTICE (L601) 24,422 $350 26,745 $423
GRENADE HAND, FRAG DELAY (G881) 12,119 $500 7,936 $500
SIMULATOR, AIR BURST (L366) 8,223 $200 1 $10
GRENADE HAND, YELLOW SMOKE (G945) 1,747 $100 3,124 $200
PEPPER SPRAY (KM01) 3,486 $72 3,352 $70
PEPPER SPRAY POCKET (KM02) 1,452 $28 1,282 $25
SIMULATOR, GROUND BURST (L594) 13,229 $238 9,694 $200
TOTALS: $4,169 $4,046
UNCLASSIFIED
Page 1 of 2P-1 ITEM NO
12PAGE NO:
88
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
ITEMS LESS THAN $5 MILLION
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 2 of 2P-1 ITEM NO
12PAGE NO:
89
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (OVERVIEW)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$139,955 $161,307 $274,921 $306,656 $286,424 $287,704 $292,267 $294,784COST(in Thousands)
Description:
1. Flares are dispensed from a variety of aircraft to either protect the aircraft by decoying enemy heat-seeking missiles or as an illumination source for reconnaissance, target marking, emergency night landings, or search and rescue.
2. In FY06, Flares received $8.478M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. Funding for FY08 increases due to increased flares expenditures.
4. Items requested in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
90
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (OVERVIEW)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
MJU-7B IR FLARE (L463) A 763,113 $27,066 758,126 $28,360 1,280,232 $45,300 1,245,884 $45,000
M206 FLARE (L410) A 1,446,132 $29,425 1,269,510 $28,968 1,963,379 $45,688 2,352,304 $55,790
M-211 (LA14) A 241,194 $20,598 195,321 $21,124 88,874 $9,450 87,942 $9,555
M-212 (LA15) A 32,738 $4,087 51,419 $8,368 110,523 $17,056 120,599 $19,004
MJU-10/B FLARE (L461) A 157,348 $16,476 354,516 $14,520 360,776 $43,030 336,749 $41,000
MJU-39/40 FLARE A 3,172 $11,183 3,118 $11,110 3,515 $12,659 3,563 $12,973
MJU-50/B FLARE (LA19) A 139,871 $8,300 368,567 $22,103 791,932 $48,006 1,008,353 $61,801
MJU-51/B (LA20) A 10,244 $1,800 46,091 $8,190 53,709 $9,649
MJU-52 (DWCO) A 66,785 $1,500 49,118 $1,115 272,449 $6,250 219,482 $5,092
MJU-62 (LA36) A 23,719 $4,317 16,310 $3,000 38,080 $7,080 51,990 $9,773
ALA-17B FLARE CARTRIDGE (LY12) A 11,294 $5,000 11,171 $5,000
ITEMS LESS THAN $5 MILLION A $17,003 $20,839 $27,212 $32,019
TOTALS: $139,955 $161,307 $274,921 $306,656
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO13
PAGE NO:91
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-7A/B IR FLARE - L463)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$27,066 $28,360 $45,300 $45,000 $40,000 $39,773 $45,234 $45,906COST(in Thousands)
Description:
1. The MJU-7A/B is an infrared countermeasures flare used by F-15 and F-16 aircraft against heat seeking missiles. It is dispensed from ALE-40 countermeasure dispensers. The MJU-7A/B flare is a pyrotechnic candle that creates an infrared signature, acting as a decoy against heat seeking missiles. The flare candle is ejected from the dispenser by a small explosive cartridge (BBU-36/B Impulse Cartridge) contained in the flare case.
2. Items requested in FY08 are identified on the following P-5, and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
3. This item is procured through the Single Manager for Conventional Ammunition (SMCA).
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
92
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-7A/B IR FLARE - L463)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
MJU-7A/B IR FLARE A 457,800 $16,234$35
MJU-7A/B IR FLARE A 305,313 $10,826$35
MJU-7A/B IR FLARE A 758,126 $28,354 1,280,232 $45,282 1,245,884 $44,989$37 $35 $36
QUALITY ASSURANCE $6 $6 $18 $11
TOTALS: 763,113 $27,066 758,126 $28,360 1,280,232 $45,300 1,245,884 $45,000
Remarks:Total Cost information is in thousands of dollars. (1) Quality Assurance consists of funding for Army personnel to travel to production facilities.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13
PAGE NO:
93
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-7A/B IR FLARE - L463)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
MJU-7A/B IR FLARE
FY2006(1) 305,313 $35 AFMC/OO-ALC MIPR/OPT/FP Mar-06 Mar-07
ARMY/ KILGORE/ TOONE,TN
FY2006(1) 457,800 $35 AFMC/OO-ALC MIPR/OPT/FP Mar-06 Mar-07
ARMY/ ARMTEC/ CAMDEN,AR
FY2007(1) 758,126 $37 AFMC/OO-ALC MIPR/OPT/FP Mar-07 Mar-08 YesARMY/ UNKNOWN
FY2008(1) 1,280,232 $35 AFMC/OO-ALC MIPR/OPT/FP Mar-08 Mar-09 YesARMY/ UNKNOWN
FY2009(2) 1,245,884 $36 AFMC/OO-ALC MIPR/FP W/OPT Apr-09 Oct-10 YesARMY/ UNKNOWN
Remarks:
Cost information is in actual dollars. (1) Contract is a split award with an FY04 base year and 4 option years. The actual split for FY07 thru FY09 is unknown at this time.(2) Contract will be a split award with optiions.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
94
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (M206 FLARE - L410)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$29,425 $28,968 $45,688 $55,790 $56,188 $59,285 $59,409 $59,308COST(in Thousands)
Description:
1. The M206 is an infrared countermeasures flare used by A-10, F-16, C-17, and AC-130 aircraft against heat seeking missiles.
2. Increased funding in FY08 is required due to increased expenditures.
2. Items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on critical munitions/equipment needed to support current Air Force mission requirements.
3. This item is procured through the Single Manager for Conventional Ammunition (SMCA).
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
95
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (M206 FLARE - L410)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
FLARES (M206 FLARE - L410)
M206 FLARE (1) A 731,367 $16,090$22.00
M206 FLARE (1) A 598,391 $13,165$22.00
M206 FLARE A 1,269,510 $28,693 1,963,379 $45,332 2,352,304 $55,460$22.60 $23.09 $23.58
PRODUCTION ENGINEERING $170 $263 $343 $318
QUALITY ASSURANCE (2) $12 $13 $12
TOTALS: 1,329,758 $29,425 1,269,510 $28,968 1,963,379 $45,688 2,352,304 $55,790
Remarks:Total Cost information is in thousands of dollars. (1) Contracts are split between ARMTEC and KILGORE at 55% and 45% respectively.(2) Quality assurance consists of funding for Army personnel to travel to production facilities.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13
PAGE NO:
96
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (M206 FLARE - L410)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
FLARES (M206 FLARE - L410)
M206 FLARE
FY2006(1-2) 731,367 $22.00 AFMC/OO-ALC MIPR/OPT/FP Mar-06 Oct-07
ARMY/ ARMTEC/ CAMDEN,AR
FY2006(1-2) 598,391 $22.00 AFMC/OO-ALC MIPR/OPT/FP Mar-06 Oct-07
ARMY/ KILGORE/ TOONE,TN
FY2007(2) 1,269,510 $22.60 AFMC/OO-ALC MIPR/OPT/FP Mar-07 May-08 YesARMY/ UNKNOWN
FY2008(2) 1,963,379 $23.09 AFMC/OO-ALC MIPR/OPT/FP Mar-08 May-09 YesARMY/ UNKNOWN
FY2009(2) 2,352,304 $23.58 AFMC/OO-ALC MIPR/OPT/FP Mar-09 Nov-10 YesARMY/ UNKNOWN
Remarks:
Cost information is in actual dollars. (1) The FY06 contract split between ARMTEC and KILGORE at 55% and 45% respectively.(2) Contract has an FY04 base year with 5 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
97
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (M211 ACFT FLARE - LA14)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$20,598 $21,124 $9,450 $9,555 $9,040 $8,561 $10,936 $12,860COST(in Thousands)
Description:
1. The M211 is a hermetically sealed aluminum case purged with nitrogen containing a payload of stacked special material elements which react to air. When deployed into the air stream, the special material reacts to emit an infrared signal to decoy infrared seeking missiles. This flare is required to provide the C-130 and A-10 aircraft and HH-53 and HH-60 helicopters protection against advanced air-to-air and surface-to-air infrared weapon systems.
2. In FY06, M211 Aircraft Flares received $2.5M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. Items requested in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on critical munitions/equipment needed to support current Air Force mission requirements.
4. This item is procured through the Armament Research Development and Engineering Center (ARDEC) at Picatinny Arsenal, NJ.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
98
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (M211 ACFT FLARE - LA14)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
M211 FLARE A 245,214 $20,598 203,115 $21,124 90,000 $9,450 89,299 $9,555
TOTALS: $20,598 $21,124 $9,450 $9,555
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO13
PAGE NO:99
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (M211 ACFT FLARE - LA14)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
M211 FLARE
FY2006(1) 245,214 $84 AFMC/OO-ALC MIPR/OPT/FP Nov-05 Apr-08
ARMY/ ALLOY SURFACES/CHESTER TOWNSHIP, PA
FY2007(2) 203,115 $104 AFMC/OO-ALC
MIPR/SS/FPW/OPT
May-07 Jun-08 YesARMY/ ALLOY SURFACES/CHESTER TOWNSHIP, PA
FY2008(2) 90,000 $105 AFMC/OO-ALC MIPR/OPT/FP Mar-08 Nov-09 Yes
ARMY/ ALLOY SURFACES/CHESTER TOWNSHIP, PA
FY2009(2) 89,299 $107 AFMC/OO-ALC MIPR/OPT/FP Mar-09 Dec-10 Yes
ARMY/ ALLOY SURFACES/CHESTER TOWNSHIP, PA
Remarks:
Cost information is in actual dollars. (1) Contract has an FY04 base year with two option years.(2) Contract will have an FY07 base year and 4 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
100
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (M212 INFRA RED CM FLARE - LA15)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$4,087 $8,368 $17,056 $19,004 $16,096 $12,797 $10,630 $9,916COST(in Thousands)
Description:
1. The M212 Multi-color Infrared Countermeasure Flare consists of an 8" x 1" x 1" aluminum case that possesses a receptacle for installation of an impulse cartridge. The M212 is then loaded into a MJU-11 multiple countermeasure magazine and installed into an AN-ALE-40 series countermeasure dispenser. The M212 countermeasure flare is deployed into the aircraft air stream and ignited by the hot gases and flame produced by the BBU-35 impulse cartridge. This flare is primarily used on C-130 aircraft. The M212 flare is designed to provide multi-spectrum infrared output and is used with M211 decoys and M206 flares as a cocktail mix to decoy advanced missile threats against the aircraft.
2. Funding increase in FY08 is due to the programmed production ramp up for this item.
3. Items requested in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
4. This item is procured through the Armament Research Development and Engineering Center (ARDEC) at Picatinny Arsenal, NJ.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
101
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (M212 INFRA RED CM FLARE - LA15)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
M212 (LA15) A 34,931 $4,087 55,417 $8,368 111,477 $17,056 121,820 $19,004
TOTALS: 34,931 $4,087 55,417 $8,368 111,477 $17,056 121,820 $19,004
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO13
PAGE NO:102
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (M212 INFRA RED CM FLARE - LA15)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
M212 (LA15)(1)
FY2006(1) 34,931 $117 AFMC/OO-ALC MIPR/OPT/FFP Nov-05 Aug-06
ARMY/ ATK-THIOKOLPROPULSION CO/
BRIGHAM CITY, UT
FY2007(2)
55,417 $151 AFMC/OO-ALC MIPR/C/FFPW/OPT
May-07 Nov-08 YesARMY/ ATK-THIOKOL
PROPULSION CO/BRIGHAM CITY, UT
FY2008(2) 111,477 $153 AFMC/OO-ALC MIPR/OPT/FFP Mar-08 Mar-09 Yes
ARMY/ ATK-THIOKOLPROPULSION CO/
BRIGHAM CITY, UT
FY2009(2) 121,820 $156 AFMC/OO-ALC MIPR/OPT/FFP Mar-09 Mar-10 Yes
ARMY/ ATK-THIOKOLPROPULSION CO/
BRIGHAM CITY, UT
Remarks:
Cost information is in actual dollars. (1) Contract has an FY04 base year with two option years. (2) Contract will have an FY07 base year with 4 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
103
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-10/B IR CM FLARE - L461)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$16,476 $14,520 $43,030 $41,000 $41,000 $40,948 $40,916 $42,561COST(in Thousands)
Description:
1. The MJU-10/B is an infrared countermeasure flare used by A-10, F-15 and F-16 aircraft against heat seeking missiles. It is dispensed from the AN/ALE-45. This flare is approximately twice the size of the MJU-7/B Flare, which is used on F-15 and F-16 aircraft.
2. MJU-10/B Flare is used in a preemptive mode. As a result of the Global War on Terror, training and combat usage have increased dramatically over the last three years and drove a critical need for increased procurements.
3. Items requested in FY08 are identified on the following P-5 and are representative of items to be procured. Items procured during execution may change based on critical munitions/equipment needed to support current Air Force mission requirements.
4. This item is procured through the Single Manager for Conventional Ammunition (SMCA).
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
104
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-10/B IR CM FLARE - L461)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
MJU-10/B A 62,939 $6,590$105
MJU-10/B A 94,409 $9,886$105
MJU-10/B A 354,516 $14,514 360,776 $43,008 336,749 $40,992$41 $119 $122
QUALITY ASSURANCE $6 $22 $7
TOTALS: 157,348 $16,476 354,516 $14,520 360,776 $43,030 336,749 $41,000
Remarks:Total Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13
PAGE NO:
105
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-10/B IR CM FLARE - L461)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
MJU-10/B
FY2006(1-2) 94,409 $105 AFMC/OO-ALC MIPR/FP W/OPT Apr-06 Oct-07
ARMY/ ARMTEC/ CAMDEN,AR
FY2006(1-2) 62,939 $105 AFMC/OO-ALC MIPR/FP W/OPT Apr-06 Oct-07
ARMY/ KILGORE/ TOONE,TN
FY2007(2) 354,516 $41 AFMC/OO-ALC MIPR/OPT/FP Mar-07 Mar-08 YesARMY/ UNKNOWN
FY2008(2) 360,776 $119 AFMC/OO-ALC MIPR/OPT/FP Mar-08 Mar-09 YesARMY/ UNKNOWN
FY2009(3) 336,749 $122 AFMC/OO-ALC MIPR/C/FP W/OPT Apr-09 Oct-10 YesARMY/ UNKNOWN
Remarks:
Cost information is in actual dollars. Procurement strategy maintains no more than two option years on any contract. This enables the Air Force to obtain the latest technology with least risk tofunds execution. (1) Contract is a split buy with a 60/40 split between Armtec and Kilgore. (2) Contract has an FY06 base year with 2 option years.(3) Contract will have an FY09 base year with 2 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
106
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-39/40-ACFT FLARE - LA32/LA33)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$11,183 $11,110 $12,659 $12,973 $16,355 $13,046 $13,307 $13,573COST(in Thousands)
Description:
1. The MJU-39/B and MJU-40/Bare magnesium based kinematic IR counter-measure flares. They consists of an aluminum case, crimped on aluminum end cap, plastic piston, sequencer device, flare body with nozzle and shroud. The MJU-39/B is dispensed by the ALE-52 and ignited in flight by a BBU-59/B impulse cartridge. The MJU-40/B is also dispensed by the ALE-52, but ignited in flight by a BBU-36/B impulse cartridge. These flares are designed to meet F-22 unique requirements.
2. This item is procured through the Ogden Air Logistics Center.
3. Items requested in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
107
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-39/40-ACFT FLARE - LA32/LA33)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
MJU-39/40 A 3,172 $11,183 3,118 $11,110 3,515 $12,659 3,563 $12,973
TOTALS: 3,172 $11,183 3,118 $11,110 3,515 $12,659 3,563 $12,973
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO13
PAGE NO:108
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-39/40-ACFT FLARE - LA32/LA33)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
MJU-39/40
FY2006(1) 3,172 $3,525 AFMC/OO-ALC SS/FFP W/OPT Nov-06 Nov-07KILGORE/ TOONE, TN
FY2007(1) 3,118 $3,563 AFMC/OO-ALC OPT/FFP Mar-07 Mar-08 YesKILGORE/ TOONE, TN
FY2008(2) 3,515 $3,601 AFMC/OO-ALC C/FFP W/OPT Mar-08 Mar-09 YesUNKNOWN
FY2009(2) 3,563 $3,641 AFMC/OO-ALC OPT/FFP Mar-09 Mar-10 YesUNKNOWN
Remarks:
Cost information is in actual dollars. (1) Contract has an FY06 base year with 1 option year.(2) Contract has an FY08 base year with 1 option year.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
109
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-50 - LA19)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$8,300 $22,103 $48,006 $61,801 $51,152 $56,444 $38,102 $27,207COST(in Thousands)
Description:
1. The MJU-50/B is a pyrophoric decoy developed as an advanced infrared countermeasure to defeat advanced-technology missile threats. The MJU-50 is termed a "covert" decoy because of the low-level of visible light it emits during ignition and burn. This flare's light intensity minimizes aircraft exposure to enemy ground monitoring and attack, and does not blind a pilot wearing night vision goggles. The MJU-50 flare was developed for the C-130 and is used on A-10 aircraft and HH-53 and HH-60 helicopters.
2. This flare is used extensively in current combat operations to provide essential aircraft/aircrew protection. Operational usage increased dramatically over the last three years driving a critical need for increased procurement.
3. In FY06, MJU-50/B Decoy received $2.0M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
4. This item is currently procured through the Ogden Air Logistics Center.
5. Items requested in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
110
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-50 - LA19)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
MJU-50/B DECOY A 139,871 $8,300 368,567 $22,103 791,932 $48,006 1,008,353 $61,801
TOTALS: $8,300 $22,103 $48,006 $61,801
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO13
PAGE NO:111
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-50 - LA19)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
MJU-50/B DECOY
FY2006 139,871 $59 AFMC/OO-ALC SS/FFP Jun-06 Jul-06
ALLOY SURFACES/ASTON, PA
FY2007(1) 368,567 $60 AFMC/OO-ALC SS/FFP W/OPT May-07 May-08 Yes
ALLOY SURFACES/ASTON, PA
FY2008(1) 791,932 $61 AFMC/OO-ALC OPT/FFP Mar-08 Mar-09 Yes
ALLOY SURFACES/ASTON, PA
FY2009(1) 1,008,353 $61 AFMC/OO-ALC OPT/FFP Mar-09 Mar-10 Yes
ALLOY SURFACES/ASTON, PA
Remarks:
Cost information is in actual dollars. (1) Contract has an FY07 base year with 4 optiion years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
112
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-51 FLARE - LA20)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$0 $1,800 $8,190 $9,649 $6,030 $7,000 $7,000 $7,000COST(in Thousands)
Description:
1. The MJU-51A/B infrared countermeasure decoy consists of an aluminum cartridge case purged with nitrogen and containing a payload of stacked special material elements which react with air. Each aluminum cartridge case contains a sealed receptacle cup with an O-ring for an impulse cartridge, a lexan piston, crimped and sealed, and metal end cap. When the impulse cartridge is initiated by the firing pulse, the impulse cartridge receptacle cup frangible membrane ruptures. Pressure inside the canister increases pushing on the piston and breaking the end cap seal deploying the special material payload in the air stream. The special material payload reacts with air in generating infrared energy to decoy surface-to-air and air-to-air missiles.
2. Funding increase in FY08 is due to the programmed production ramp up for this item.
3. This item is procured through the Ogden Air Logistics Center.
4. Items requested in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
113
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-51 FLARE - LA20)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
(MJU-51 FLARE - LA20) A 10,244 $1,801 46,091 $8,190 53,709 $9,649
TOTALS: 10,244 $1,801 46,091 $8,190 53,709 $9,649
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO13
PAGE NO:114
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-51 FLARE - LA20)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
(MJU-51 FLARE - LA20)
FY2007(1) 10,244 $176 AFMC/OO-ALC SS/FFP W/OPT Apr-07 Jul-08 Yes
ALLOY SURFACES/CHESTER TOWNSHIP, PA
FY2008(1) 46,091 $178 AFMC/OO-ALC OPT/FFP Mar-08 Jun-09 Yes
ALLOY SURFACES/CHESTER TOWNSHIP, PA
FY2009(1) 53,709 $180 AFMC/OO-ALC OPT/FFP Mar-09 Jun-10 Yes
ALLOY SURFACES/CHESTER TOWNSHIP, PA
Remarks:
Cost information is in actual dollars. (1) Contract will have a FY07 base year with 4 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
115
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-52 - DWCO)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$1,500 $1,115 $6,250 $5,092 $5,172 $4,298 $7,591 $7,626COST(in Thousands)
Description:
1. The MJU-52/B decoy consists of individual sealed packets of activated metal foils in a plastic frame. 80 frames and packets make up the 80 QUP configuration. The MJU-52/B decoy is dispensed from the F-15 aircraft to protect it from infrared seeking missile threats. The MJU-52/B packets are loaded into a mechanical dispenser attached to the aircraft and dispensed during flight as needed.
2. In FY06, MJU-52 Flares received $1.3M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. This item is procured through the Ogden Air Logistics Center.
4. Items requested in FY08 are identified on the following P40A and are representative of items to be procured. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
116
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-52 - DWCO)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
MJU-52 - DWCO A 66,785 $1,500 49,118 $1,115 272,449 $6,250 219,482 $5,092
TOTALS: 66,785 $1,500 49,118 $1,115 272,449 $6,250 219,482 $5,092
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO13
PAGE NO:117
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-52 - DWCO)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
MJU-52 - DWCO
FY2006 66,785 $22 AFMC/OO-ALC SS/FFP Apr-06 Mar-07
ALLOY SURFACES/PHILADELPHIA, PA
FY2007(1) 49,118 $23 AFMC/OO-ALC SS/FFP W/OPT Apr-07 Mar-08 Yes
ALLOY SURFACES/PHILADELPHIA, PA
FY2008(1) 272,449 $23 AFMC/OO-ALC OPT/FFP Apr-08 Mar-09 Yes
ALLOY SURFACES/PHILADELPHIA, PA
FY2009(1) 219,482 $23 AFMC/OO-ALC OPT/FFP Apr-09 Mar-10 Yes
ALLOY SURFACES/PHILADELPHIA, PA
Remarks:
Cost information is in actual dollars. Alloy Surfaces is the only known source for procurement and will remain the sole source until other vendor(s) prove qualification. (1) FY2007 contract will have two option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
118
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-62 - LA36)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$4,317 $3,000 $7,080 $9,773 $8,255 $7,000 $7,000 $8,000COST(in Thousands)
Description:
1. The MJU-62/B flare is a boron based IR countermeasure. It consists of an aluminum case, plastic end cap, felt spacer, safe & initiation device, plastic piston, and the flare pellet. It is dispensed and ignited in flight by a BBU-36/B impulse cartridge.
2. This item is procured through the Ogden Air Logistics Center.
3. Items requested in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
119
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-62 - LA36)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
MJU-62 FLARE - LA36 A 23,719 $4,317 16,310 $3,000 38,080 $7,080 51,990 $9,773
TOTALS: 23,719 $4,317 16,310 $3,000 38,080 $7,080 51,990 $9,773
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO13
PAGE NO:120
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (MJU-62 - LA36)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
MJU-62 FLARE - LA36
FY2006 23,719 $182 AFMC/OO-ALC SS/FFP Feb-07 Sep-07 Yes
ATK THIOKOL/ BRIGHAMCITY, UT
FY2007(1) 16,310 $184 AFMC/OO-ALC SS/FFP W/OPT Apr-07 Nov-07 Yes
ATK THIOKOL/ BRIGHAMCITY, UT
FY2008(1) 38,080 $186 AFMC/OO-ALC OPT/FFP Mar-08 Oct-08 Yes
ATK THIOKOL/ BRIGHAMCITY, UT
FY2009(1) 51,990 $188 AFMC/OO-ALC OPT/FFP Mar-09 Oct-09 Yes
ATK THIOKOL/ BRIGHAMCITY, UT
Remarks:
Cost information is in actual dollars. (1) Contract will have an FY07 base year with 4 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
121
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (ALA-17B FLARE - LY12)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$0 $0 $5,000 $5,000 $5,530 $7,000 $11,000 $13,000COST(in Thousands)
Description:
1. The ALA-17C IR countermeasure flare is a two cartridge flare consisting of an upper and lower pellet contained in an 11 and ¼ inch by 2 and ¾ inch diameter aluminum housing (cartridge case). This flare is used to defeat missile threats on the B-52 bomber aircraft. Eight double pellet flare cartridges are installed in an ALA-17 flare rack that is loaded on the B-52 bomber in an AN/ALE-20 ejector set or dispenser. The bottom flare pellet is deployed first and then the upper flare pellet. Both pellets are ignited and deployed into the B-52 air stream by the use of two internal individual squibs.
2. This flare is used extensively in current combat operations to provide essential aircraft/aircrew protection. Operational usage increased dramatically over the last two years and drove a critical need for increased procurement.
3. This item is currently procured through the Ogden Air Logistics Center.
4. Items requested in FY08 are identified on the following P-40A and are representative of items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
122
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (ALA-17B FLARE - LY12)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
ALA-17C FLARE - LY12 A 11,294 $5,000 11,171 $5,000
TOTALS: 11,294 $5,000 11,171 $5,000
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO13
PAGE NO:123
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (ALA-17B FLARE - LY12)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
ALA-17C FLARE - LY12
FY2008(1-2) 11,294 $443 AFMC/OO-ALC SS/FFP W/OPT Mar-08 Sep-08 Yes
KILGORE CORP/ TOONE,TN
FY2009(2) 11,171 $448 AFMC/OO-ALC OPT/FFP Mar-09 Sep-09 Yes
KILGORE CORP/ TOONE,TN
Remarks:
Cost information is in actual dollars. (1) Kilgore Corp is working with the Air Force to redesign this item and to develop updated specifications. Kilgore is currently the only known source.(2) Contract will have an FY08 base year with 3 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
124
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$17,003 $20,839 $27,212 $32,019 $31,606 $31,552 $41,142 $47,827COST(in Thousands)
Description:
1. All listed items on the following P-40A-IL have an FY08 procurement value of less than $5,000,000 and are Code A.
2. In FY06, Flares Items Less Than $5 Million received $2.678M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. Items requested in FY08 are representative of items to be procured. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
13PAGE NO:
125
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
DISPENSER, FLARE SUU-25 F/A (L127) 153 $3,459 74 $2,339
MJU-23 FLARE (L462) 2,506 $1,425 3,027 $1,740
FLARE SIM M206 (T-3)/B (L448 (LY85)) 145,573 $2,125 212,957 $3,143
LUU-2C/B AC PARACHUTE FLARE (L440) 1,294 $999 1,120 $1,000
LUU-4/B (L443) 2,300 $1,000 2,276 $1,000
SIG IL GRND GRN STR CLS M125A1 (L314) 8,080 $400 6,372 $324
MJU-47/B FLARE (LA30) 4,837 $2,000 4,784 $2,000
MJU-48/B FLARE (LA31) 6,617 $2,000 6,544 $2,000
MJU-53/B FLARE (LA21) 93,427 $4,709
SIG KIT PRSNL DISTRESS (L119) 9,984 $1,000 18,759 $1,915
SIGNL,SMOKE&ILLUM MK124 MOD 0 (L283) 87,390 $4,989 59,520 $3,510
COMBAT RESCUE AND RECOVERY 1 $2,538 1 $2,593
SIGNL,ILL GRN RED STR M158 (L306) 6,495 $320 3,602 $200
UNCLASSIFIED
Page 1 of 2P-1 ITEM NO
13PAGE NO:
126
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FLARES (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
MARKER LOC MARINE MK25-3 (L554) 18,043 $4,958 12,769 $3,547
MJU-52 (T-1)/B INT 80-PK (LA41) 90,909 $2,000
TOTALS: $27,212 $32,019
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 2 of 2P-1 ITEM NO
13PAGE NO:
127
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FUZES (OVERVIEW)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$44,481 $56,549 $70,808 $72,725 $73,991 $78,422 $78,740 $79,177COST(in Thousands)
Description:
1. A bomb fuze initiates the explosive train of a bomb at the appropriate time to fulfill mission requirements. Normally, fuzes are placed in both the nose and tail of the bomb to increase functional reliability. The Fuze category includes the DSU-33 Proximity Sensor Fuze and the FMU-152/B Joint Programmable Fuze.
2. In FY06, Fuzes received $.523M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. Items requested in FY08 are identified on the following P-40A, and are representative of items to be procured. Items procured during execution may change based on critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
14PAGE NO:
128
UNCLASSIFIEDDATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FUZES (OVERVIEW)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMSID
CODE QTY. COST QTY. COST QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A)
FY2006 FY2007 FY2008 FY2009
FUZES (OVERVIEW)
DSU-33C/B PROXIMITY SENSOR (BY30) A 5,460 $6,205 7,748 $8,504 25,903 $24,396 18,430 $17,161
FMU-152/B JOINT PROGRAMMABLE FUZE A 9,712 $35,739 18,500 $45,771 20,679 $44,662 18,632 $55,264
ITEMS LESS THAN 5 MILLION DOLLARS A $2,537 $2,274 $1,750 $300
TOTALS: $44,481 $56,549 $70,808 $72,725
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO14
PAGE NO:129
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FUZES (DSU-33D/B PROXIMITY SENSOR)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$6,205 $8,504 $24,396 $17,161 $15,466 $14,750 $13,330 $5,183COST(in Thousands)
Description:
1. The DSU-33D/B is a joint service Doppler radar proximity sensor designed to provide airburst capability to the Joint Direct Attack Munitions and general purpose bombs using the FMU-139 and FMU-152 fuzes. Airburst yields a significant increase in effectiveness for unitary warheads against surface targets such as surface-to air missiles and anti-aircraft artillery. The DSU-33D/B variant has the same form, fit and function of the DSU-33C/B. Like the DSU-33C/B, it incorporates surface mount technology, an improved Frequency Modulated Continuous Wave (FMCW) Doppler radar, and improved electronics while minimizing parts obsolescence issues. The DSU-33D/B variant is expected to begin production in FY08. It improves and corrects a set screw clearance issue between the bomb body set screw and the sensor housing. It has essentially the same fit, form and function as the DSU-33C/B.
2. Items requested in FY08 are identified on the following P-5, and are representative of items to be procured. Items procured during execution may change based on critical munitions/equipment needed to support current Air Force mission requirements.
3. This item is procured through the Air Armament Center, Eglin AFB, Florida.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
14PAGE NO:
130
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FUZES (DSU-33D/B PROXIMITY SENSOR)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
DSU-33 D/B A 5,460 $5,666 7,748 $7,583 25,903 $24,120 18,430 $17,161$1,038 $979 $931 $931
PRODUCTION SUPPORT
ECO/ECP $19 $232
PROGRAM SUPPORT (1) $239 $260 $7
CONTRACTOR SUPPORT (1) $281 $429 $269
TOTALS: $6,205 $8,504 $24,396 $17,161
Remarks:Total Cost information is in thousands of dollars. (1) The DSU-33 D/B program fully transitions to the Ogden Air Logistics Center Mar 08. Program Support and Contractor Support will be funded for6 months with Program funds. Once the program transitions to Ogden Air Logistics Center Operation and Maintenance funding will pay for Programand Contractor Support..
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
14
PAGE NO:
131
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FUZES (DSU-33D/B PROXIMITY SENSOR)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
DSU-33 D/B
FY2006(1) 5,460 $1,038 AFMC/AAC C/FFP W/OPT Apr-06 Nov-07
ALLIANT/ ROCKET CITY,WV
FY2007(1) 7,748 $979 AFMC/AAC OPT/FFP Jan-07 Jun-08
ALLIANT/ ROCKET CITY,WV
FY2008(1) 25,903 $931 AFMC/OO-ALC OPT/FFP Jan-08 Nov-09 Yes
ALLIANT/ ROCKET CITY,WV
FY2009(1) 18,430 $931 AFMC/OO-ALC OPT/FFP Jan-09 Oct-10 Yes
ALLIANT/ ROCKET CITY,WV
Remarks:
Cost information is in actual dollars. (1) Contract has an FY06 base year with 5 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
14PAGE NO:
132
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FUZES (FMU-152/B JOINT PROGRAMABLE FUZE)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$35,739 $45,771 $44,662 $55,264 $56,769 $62,129 $54,160 $62,744COST(in Thousands)
Description:
1. The FMU-152/B Joint Programmable Fuze (JPF) is a Joint AF/Navy multi-function unitary fuze developed and procured for the Joint Direct Attack Munition and other conventional inventory weapons. The Air Force is the lead service for procurement of the JPF. The FMU-152/B provides a highly reliable bomb fuze with multiple arm times, instantaneous and multiple short and long delay detonation times, hard target survivability, cockpit programmability, and increased service/shelf life. The JPF is compatible with MK-80 series guided and unguided bombs. It will replace or supplement FMU-139, FMU-143, FMU-124, and M904/M905 fuzes, and provide the next generation of fuzing capability for hard target, general purpose, and guided bombs.
2. In FY06, FMU-152/B Joint Programmable Fuze received $.523M in additional funding under P.L. 109-234, the Emergency Supplemental Appropriations Act for 2006.
3. Items requested in FY08 are identified on the following P-5, and are representative of items to be procured. Items procured during execution may change based on critical munitions/equipment needed to support current Air Force mission requirements.
4. This item is procured through the Air Armament Center, Eglin AFB, Florida.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
14PAGE NO:
133
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FUZES (FMU-152/B JOINT PROGRAMABLE FUZE)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5)
WEAPON SYSTEMCOST ELEMENTS
IDCODE
QTYTOTALCOST
FY2006 FY2007 FY2008 FY2009
UnitCost QTY
UnitCost QTY
UnitCost QTY
UnitCost
TOTALCOST
TOTALCOST
TOTALCOST
HARDWARE 9,712 {$22,865} 18,500 {$42,492} 20,679 {$39,832} 18,632 {$36,910}
FMU-152/B FUZE A 9,712 $22,865 18,500 $42,492 20,679 $39,832 18,632 $36,910$2,354 $2,297 $1,926 $1,981
PRODUCTION SUPPORT
PROGRAM SUPPORT $854 $962 $1,017 $1,028
RELIABILITY INCENTIVE $308 $308 $308 $308
ECO/ECP $124 $681 $3,237 $17,019
FACILITIZATION (1) $7,783
PBXN-7 LINE QUALIFICATION (2) $650
TESTING $2,360 $1,327 $269
TOOLING/TEST EQUIPMENT $795
TOTALS: $35,739 $45,771 $44,662 $55,264
Remarks:Total Cost information is in thousands of dollars. (1) Includes funding for new manufacturing equipment in FY06 and FY07. A new facility is needed to meet required production rates.(2) PBXN-7 line qualification funding required to qualify the line at BAE OSI. Qualification completion is estimated for 3Qtr FY07.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
14
PAGE NO:
134
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FUZES (FMU-152/B JOINT PROGRAMABLE FUZE)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET PROCUREMENT HISTORY PLANNING (EXHIBIT P-5A)
ITEM NAME/ FISCAL YEAR
QTY.UNITCOST
LOCATION OF PCOCONTRACT METHOD &
TYPE
CONTRACTORAND LOCATION
AWD.DATE
DATEFIRSTDEL.
SPECSAVAILNOW
DATEREV.
AVAIL
HARDWARE
FMU-152/B FUZE
FY2006(1) 9,712 $2,354 AFMC/AAC OPT/FFP Mar-06 May-07
KAMAN/ DAYRON/ORLANDO, FL
FY2007(1) 18,500 $2,297 AFMC/AAC OPT/FFP Feb-07 Jan-08 Yes
KAMAN/ DAYRON/ORLANDO, FL
FY2008(1) 20,679 $1,926 AFMC/AAC OPT/FFP Feb-08 Jan-09 Yes
KAMAN/ DAYRON/ORLANDO, FL
FY2009(1) 18,632 $1,981 AFMC/AAC OPT/FFP Feb-09 Jan-10 Yes
KAMAN/ DAYRON/ORLANDO, FL
Remarks:
Cost information is in actual dollars. (1) Contract has an FY98 base year with 9 option years.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
14PAGE NO:
135
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FUZES (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$2,537 $2,274 $1,750 $300 $1,756 $1,543 $11,250 $11,250COST(in Thousands)
Description:
1. This category includes various fuzes to include inert training items that have an annual procurement value of less than $5 million and are code A.
2. Items requested in FY08 are representative of items to be procured. Items procured during execution may change based on the most critical munitions/equipment needed to support Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
14PAGE NO:
136
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
FUZES (ITEMS LESS THAN $5 MILLION)
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
FUZES (LESS THAN $5M)
FMU-143G/B 60 MILSEC (F800) 306 $750
DSU-33A D-2 PROX INERT (FY88) 159 $100 154 $100
FMU-152/B D-2 (EB93) 701 $900 151 $200
TOTALS: $1,750 $300
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
14PAGE NO:
137
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
SMALL ARMS
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
QUANTITY
$5,961 $4,944 $3,652 $7,493 $7,637 $7,628 $7,780 $7,936COST(in Thousands)
Description:
1. This Small Arms line encompasses small caliber, hand fired weapons (pistols and rifles) used to support air base ground defense, aircrew protection, Office of Special Investigations, security functions, and other activities requiring small, portable firearms. This line also procures various accessories needed to improve or maintain existing weapons.
2. Items requested in FY08 are identified on the following P-40A-IL and are representative of items to be procured. Items procured during execution may change based on the most critical munitions/equipment needed to support current Air Force mission requirements.
UNCLASSIFIED
Page 1 of 1P-1 ITEM NO
15PAGE NO:
138
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
SMALL ARMS
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
9MM COMPACT PISTOL 128 $100 126 $100
9MM GENERAL OFFICER PISTOL 102 $61 285 $174
M-24 SNIPER RIFLE 23 $197 92 $771
M249 MACHINE GUN 6 $29 6 $30
M240B MACHINE GUN 3 $31 47 $502
M203 GRENADE LAUNCHER 5 $10 5 $10
TRIPOD MOUNT 79 $100 79 $102
M1 INERT FACSIMILE 1,077 $302 1,075 $307
MODULAR COMBAT SHOTGUN 372 $300 365 $300
M-4A1 CARBINE 22 $30 21 $30
X4 TELESCOPE 21 $20 21 $20
VIPER II BINOC LASER RG FIND 19 $296 19 $303
M145 OPTICS 51 $50 50 $51
UNCLASSIFIED
Page 1 of 2P-1 ITEM NO
15PAGE NO:
139
UNCLASSIFIED
DATE: FEBRUARY 2007
P-1 NOMENCLATURE:
SMALL ARMS
APPROP CODE/BA:
PAAF/MUNITIONS & RELATED EQUIPMENT
PROCUREMENT ITEMS NSN QTY. COST QTY. COST
BUDGET ITEM JUSTIFICATION FOR AGGREGATED ITEMS (EXHIBIT P-40A-IL)
FY2009FY2008
.50 CAL BARRETT RIFLE 48 $722 19 $292
5.56MM RIFLE REPLACEMENTS 1,200 $1,999
HANDGUN REPLACEMENT 2,869 $1,403 5,014 $2,502
TOTALS: $3,652 $7,493
Remarks:
Cost information is in thousands of dollars.
UNCLASSIFIED