LAPORAN KEMAJUAN PROJEK NO.18
‘FEBUARY 2009’
PROJEK ADTEC TAIPING
KEMENTERIAN SUMBER MANUSIA
JABATAN KERJA RAYA MALAYSIA
KAMALBINA SDN. BHD
PEMILIK
PEGARAH PROJEK
KONTRAKTOR R&B
![Page 2: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/2.jpg)
ADTEC TAIPING
LOKASI PROJEK
![Page 3: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/3.jpg)
BANGUNAN PENTADBIRAN
BENGKEL TEK. MAKLUMAT& JAMIN KUALITI
DEWAN BESAR
PUSAT SUMBER
DEWAN KULIAH
LOBI UTAMA
KAFETERIA
MIKRO ELEKTRONIK
KOMPOSIT PLASTIK
M&E PLANT ROOM
1
TNB SUB
STATION
SERAMIK
M&E PLANT ROOM
2
GARAJ KENDERAAN
ASRAMA LELAKIASRAMA PEREMPUAN
DEWANMAKAN
SURAU
KELAS F
KELAS G
KUARTERSB, C, C&D
PELAN TAPAK ADTEC TAIPING
![Page 4: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/4.jpg)
KEMAJUAN KERJA FIZIKAL
JADUAL : 70.88%SEBENAR : 67.03%KESELURUHAN : -3.85%
TARIKH LAPORAN : 12 FEB 2009
![Page 5: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/5.jpg)
KEMAJUAN KERJA KEWANGAN
JADUAL : 74.78%SEBENAR : 68.50%KESELURUHAN : -6.28% @ 45 HARI
(LEWAT )
TARIKH LAPORAN : 12 FEB 2009
![Page 6: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/6.jpg)
![Page 7: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/7.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 98.98% 65.52% - 33.46%
FEB 09’ 99.12% 67.42% - 31.70%
MECHANICAL PLANNED
ACTUAL
AIR COND 100.00% 50.00%
FIRE FIGHTING 100.00% 26.74%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL - DEWAN BESAR
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 65.00%
SUBMAIN CABLE 100.00% 71.00%
DB 100.00% 0.00%
LUMINAIRE 100.00% 0.00%
MAIN S/BOARD 100.00% 0.00%
LPS NA NA
PA 100.00% 2.12%
SMATV 100.00% 21.25%
CCTV NA NA
ICT 100.00% 12.65%
![Page 8: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/8.jpg)
DEWAN BESAR
![Page 9: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/9.jpg)
DEWAN BESAR
![Page 10: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/10.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 93.25% 78.68% -14.57%
FEB 09’ 95.00% 90.85% -4.15%
MECHANICAL PLANNED
ACTUAL
AIR COND NA NA
FIRE FIGHTING NA NA
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – LOBI
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 75.00%
SUBMAIN CABLE 100.00% 90.00%
DB 100.00% 0.00%
LUMINAIRE 100.00% 0.00%
MAIN S/BOARD NA NA
LPS NA NA
PA 100.00% 65.37%
SMATV NA NA
CCTV 100.00% 0.00%
ICT NA NA
![Page 11: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/11.jpg)
LOBI UTAMA
![Page 12: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/12.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 73.49% 66.39% -7.10%
FEB 09’ 83.03% 70.04% -12.99%
MECHANICAL PLANNED
ACTUAL
AIR COND 50.00% 74.50%
FIRE FIGHTING 41.70% 49.64%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – DEWAN KULIAH UTAMABANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 65.00%
SUBMAIN CABLE 56.25% 88.00%
DB 100.00% 0.00%
LUMINAIRE 0.00% 0.00%
MAIN S/BOARD 100.00% 0.00%
LPS 91.09% 0.00%
PA 100.00% 19.31%
SMATV NA NA
CCTV NA NA
ICT 97.21% 0.00%
![Page 13: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/13.jpg)
DEWAN KULIAH UTAMA
![Page 14: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/14.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 84.29% 84.41% 0.12%
FEB 09’ 93.37% 89.98% -3.39%
MECHANICAL PLANNED
ACTUAL
AIR COND 87.60% 80.18%
FIRE FIGHTING 33.90% 90.24%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – PUSAT SUMBER/PERPUSTAKAAN
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 90.00%
SUBMAIN CABLE 100.00% 88.00%
DB 100.00% 0.00%
LUMINAIRE 100.00% 25.00%
MAIN S/BOARD 100.00% 0.00%
LPS 100.00% 73.47%
PA 100.00% 34.79%
SMATV 100.00% 57.16%
CCTV NA NA
ICT 29.27% 0.00%
![Page 15: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/15.jpg)
PUSAT SUMBER / PERPUSTAKAAN
![Page 16: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/16.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 82.12% 77.52% -4.60%
FEB 09’ 91.35% 84.29% -7.06%
MECHANICAL PLANNED
ACTUAL
AIR COND 71.21% 63.09%
FIRE FIGHTING 45.46% 38.79%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – PENTADBIRAN & PENGURUSAN SUMBERBANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 82.50%
SUBMAIN CABLE 100.00% 78.00%
DB 100.00% 0.00%
LUMINAIRE 78.57% 25.00%
MAIN S/BOARD 100.00% 0.00%
LPS 93.03% 69.22%
PA 100.00% 15.96%
SMATV 100.00% 52.05%
CCTV 62.56% 2.13%
ICT 72.81% 0.00%
![Page 17: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/17.jpg)
BANGUNAN PENTADBIRAN & PENGURUSAN SUMBER
![Page 18: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/18.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 72.24% 89.11% 16.88%
FEB 09’ 84.36% 94.85% 10.49%
MECHANICAL PLANNED
ACTUAL
AIR COND 0.00% 43.00%
FIRE FIGHTING 12.65% 29.54%
KITCHEN EQUIP. 0.00% 6.51%
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL - KAFETARIA
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 90.00%
SUBMAIN CABLE 100.00% 90.00%
DB 83.33% 0.00%
LUMINAIRE 0.00% 25.00%
MAIN S/BOARD NA NA
LPS 64.46% 56.58%
PA 98.14% 22.79%
SMATV 81.61% 50.29%
CCTV NA NA
ICT 100.00% 0.00%
![Page 19: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/19.jpg)
KAFETERIA
![Page 20: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/20.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 79.02% 84.02% 5.01%
FEB 09’ 85.84% 89.53% 3.69%
MECHANICAL PLANNED
ACTUAL
AIR COND 23.57% 66.78%
FIRE FIGHTING 27.70% 33.67%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – BENGKEL TEKNOLOGI MAKLUMATBANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 90.00%
SUBMAIN CABLE 100.00% 50.00%
DB 100.00% 25.00%
LUMINAIRE 0.00% 45.00%
MAIN S/BOARD 86.67% 0.00%
LPS 99.49% 74.62%
PA 100.00% 42.43%
SMATV 99.68% 59.11%
CCTV 54.53% 33.71%
ICT 20.74% 0.00%
![Page 21: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/21.jpg)
BENGKEL TEKNOLOGI MAKLUMAT
![Page 22: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/22.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 68.69% 86.03% 17.33%
FEB 09’ 78.05% 93.28% 15.23%
MECHANICAL PLANNED
ACTUAL
AIR COND 30.27% 80.11%
FIRE FIGHTING 24.65% 53.54%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR 14.29% 75.00%
DUST CONTROL NA NA
PROCESS COOLING
7.60% 0.00%
KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 53.57% 90.00%
SUBMAIN CABLE 0.00% 80.00%
DB 0.00% 0.00%
LUMINAIRE 0.00% 45.00%
MAIN S/BOARD 0.00% 0.00%
LPS 69.14% 74.65%
PA 22.31% 46.85%
SMATV NA NA
CCTV 37.46% 49.69%
ICT 4.96% 0.00%
![Page 23: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/23.jpg)
BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)
![Page 24: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/24.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 71.23% 83.64% 12.41%
FEB 09’ 79.39% 93.66% 14.27%
MECHANICAL PLANNED
ACTUAL
AIR COND 31.60% 79.74%
FIRE FIGHTING 31.64% 59.65%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR 20.00% 75.00%
DUST CONTROL 17.20% 23.77%
PROCESS COOLING
12.06% 0.00%
KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 60.71% 90.00%
SUBMAIN CABLE 0.00% 75.00%
DB 0.00% 0.00%
LUMINAIRE 0.00% 45.00%
MAIN S/BOARD 0.00% 0.00%
LPS 64.14% 67.88%
PA 25.13% 40.39%
SMATV NA NA
CCTV 54.68% 50.54%
ICT 13.80% 0.00%
![Page 25: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/25.jpg)
BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)
![Page 26: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/26.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 71.02% 79.96% 8.84%
FEB 09’ 76.14% 93.08% 16.93%
MECHANICAL PLANNED
ACTUAL
AIR COND 15.58% 78.29%
FIRE FIGHTING 27.33% 55.87%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR 28.57% 75.00%
DUST CONTROL 3.37% 28.75%
PROCESS COOLING
15.20% 0.00%
KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 71.43% 90.00%
SUBMAIN CABLE 0.00% 85.00%
DB 0.00% 0.00%
LUMINAIRE 0.00% 45.00%
MAIN S/BOARD 0.00% 0.00%
LPS 56.92% 73.14%
PA 39.65% 41.63%
SMATV NA NA
CCTV 43.10% 57.16%
ICT 11.76% 0.00%
![Page 27: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/27.jpg)
BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)
![Page 28: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/28.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 77.16% 77.74% 0.58%
FEB 09’ 80.11% 87.32% 7.21%
MECHANICAL PLANNED
ACTUAL
AIR COND 25.39% 55.00%
FIRE FIGHTING 37.17% 37.23%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR 88.57% 75.00%
DUST CONTROL 33.88% 27.27%
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – BENGKEL KEJ. JAMINAN KUALITIBANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 82.50%
SUBMAIN CABLE 94.44% 50.00%
DB 0.00% 0.00%
LUMINAIRE 0.00% 0.00%
MAIN S/BOARD 0.00% 0.00%
LPS 70.85% 71.76%
PA 97.59% 22.19%
SMATV 68.57% 34.14%
CCTV 44.98% 40.48%
ICT 16.57% 0.00%
![Page 29: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/29.jpg)
BENGKEL KEJ. JAMINAN KUALITI
![Page 30: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/30.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 72.73% 78.27% 5.54%
FEB 09’ 79.37% 86.86% 7.49%
MECHANICAL PLANNED
ACTUAL
AIR COND 24.09% 75.00%
FIRE FIGHTING 16.09% 39.65%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR 45.71% 75.00%
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – BENGKEL MIKRO ELEKTRONIKBANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 92.86% 82.50%
SUBMAIN CABLE 9.52% 50.00%
DB 0.00% 0.00%
LUMINAIRE 0.00% 0.00%
MAIN S/BOARD 0.00% 0.00%
LPS 65.33% 72.28%
PA 56.33% 26.46%
SMATV 63.35% 46.25%
CCTV 58.47% 52.62%
ICT 18.14% 0.00%
![Page 31: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/31.jpg)
BENGKEL MIKRO ELEKTRONIK
![Page 32: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/32.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 80.19% 96.63% 16.44%
FEB 09’ 90.43% 96.63% 6.20%
MECHANICAL PLANNED
ACTUAL
AIR COND 100.00% 90.00%
FIRE FIGHTING NA NA
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘B’
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 90.00%
SUBMAIN CABLE 100.00% 90.00%
DB 100.00% 75.00%
LUMINAIRE 0.00% 65.00%
MAIN S/BOARD 100.00% 0.00%
LPS 97.60% 0.00%
PA NA NA
SMATV 100.00% 32.27%
CCTV 99.75% 34.02%
ICT 100.00% 75.00%
![Page 33: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/33.jpg)
KUARTERS KELAS ‘B’
![Page 34: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/34.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 81.59% 96.76% 15.16%
FEB 09’ 88.42% 96.76% 8.33%
MECHANICAL PLANNED
ACTUAL
AIR COND 100.00% 90.00%
FIRE FIGHTING NA NA
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C’
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 90.48% 90.00%
SUBMAIN CABLE 0.00% 90.00%
DB 100.00% 90.00%
LUMINAIRE 8.33% 90.00%
MAIN S/BOARD 100.00% 0.00%
LPS 83.45% 0.00%
PA NA NA
SMATV 89.67% 24.75%
CCTV NA NA
ICT 98.54% 51.68%
![Page 35: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/35.jpg)
KUARTERS KELAS ‘C’
![Page 36: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/36.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 69.32% 96.38% 27.06%
FEB 09’ 84.31% 96.38% 12.07%
MECHANICAL PLANNED
ACTUAL
AIR COND 100.00% 90.00%
FIRE FIGHTING NA NA
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – KUATERS KELAS ‘C+D’BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 90.00%
SUBMAIN CABLE 100.00% 90.00%
DB 100.00% 90.00%
LUMINAIRE 85.71% 90.00%
MAIN S/BOARD 100.00% 0.00%
LPS 96.87% 0.00%
PA NA NA
SMATV 100.00% 32.27%
CCTV NA NA
ICT 100.00% 75.00%
![Page 37: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/37.jpg)
KUARTERS KELAS ‘C’ + ‘D’
![Page 38: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/38.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 73.69% 91.08% 17.39%
FEB 09’ 77.45% 93.57% 16.12%
MECHANICAL PLANNED
ACTUAL
AIR COND NA NA
FIRE FIGHTING NA NA
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – KUATERS KELAS F ( 1 BLOK 4 TINGKAT & I BLOK 5 TINGKAT)BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 90.48% 90.00%
SUBMAIN CABLE 0.00% 90.00%
DB 0.00% 75.00%
LUMINAIRE 0.00% 90.00%
MAIN S/BOARD 0.00% 0.00%
LPS 100.00% 83.97%
PA NA NA
SMATV 100.00% 73.58%
CCTV NA NA
ICT 100.00% 54.65%
![Page 39: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/39.jpg)
KUARTERS KELAS ‘F’ ( 4 TINGKAT )
![Page 40: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/40.jpg)
KUARTERS KELAS ‘F’ ( 5 TINGKAT )
![Page 41: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/41.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 73.24% 92.63% 19.39%
FEB 09’ 77.88% 93.41% 15.53%
MECHANICAL PLANNED
ACTUAL
AIR COND NA NA
FIRE FIGHTING NA NA
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – KUATERS KELAS G
(1 BLOK 4 TINGKAT & 1 BLOK 5 TINGKAT)BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 90.00%
SUBMAIN CABLE 38.10% 90.00%
DB 0.00% 75.00%
LUMINAIRE 0.00% 90.00%
MAIN S/BOARD 0.00% 0.00%
LPS 100.00% 83.97%
PA NA NA
SMATV 100.00% 73.58%
CCTV NA NA
ICT 100.00% 58.20%
![Page 42: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/42.jpg)
KUARTERS KELAS ‘G’ ( 5 TINGKAT )
![Page 43: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/43.jpg)
KUARTERS KELAS ‘G’ ( 4 TINGKAT )
![Page 44: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/44.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 96.42% 94.87% -1.55%
FEB 09’ 98.16% 97.32% -0.84%
MECHANICAL PLANNED
ACTUAL
AIR COND 100.00% 90.00%
FIRE FIGHTING 100.00% 45.63%
KITCHEN EQUIP. 0.00% 5.66%
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – DEWAN MAKAN
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 90.00%
SUBMAIN CABLE 100.00% 75.00%
DB 100.00% 0.00%
LUMINAIRE 100.00% 90.00%
MAIN S/BOARD 100.00% 0.00%
LPS 100.00% 84.63%
PA 100.00% 42.65%
SMATV 100.00% 60.35%
CCTV NA NA
ICT 100.00% 0.00%
![Page 45: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/45.jpg)
DEWAN MAKAN
![Page 46: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/46.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 81.74% 91.05% 9.30%
FEB 09’ 86.42% 97.01% 10.59%
MECHANICAL PLANNED
ACTUAL
AIR COND 100.00% 25.53%
FIRE FIGHTING 91.54% 69.93%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – ASRAMA LELAKI A & BBANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 64.29% 90.00%
SUBMAIN CABLE 0.00% 75.00%
DB 0.00% 0.00%
LUMINAIRE 0.00% 75.00%
MAIN S/BOARD 0.00% 0.00%
LPS 85.58% 80.71%
PA 99.21% 32.10%
SMATV 72.16% 54.88%
CCTV 37.44% 33.69%
ICT 99.85% 0.00%
![Page 47: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/47.jpg)
ASRAMA LELAKI A & B
![Page 48: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/48.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 72.72% 93.81% 21.09%
FEB 09’ 81.04% 97.63% 16.58%
MECHANICAL PLANNED
ACTUAL
AIR COND 0.00% 10.00%
FIRE FIGHTING 24.94% 71.32%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – ASRAMA PEREMPUAN C & DBANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 80.95% 90.00%
SUBMAIN CABLE 15.79% 75.00%
DB 0.00% 0.00%
LUMINAIRE 0.00% 90.00%
MAIN S/BOARD 0.00% 0.00%
LPS 79.12% 81.33%
PA 6.35% 30.15%
SMATV 5.81% 54.88%
CCTV 88.52% 0.00%
ICT 0.08% 16.54%
![Page 49: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/49.jpg)
ASRAMA PEREMPUAN C & D
![Page 50: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/50.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 74.66% 78.73% 4.07%
FEB 09’ 77.94% 88.08% 10.14%
MECHANICAL PLANNED
ACTUAL
AIR COND NA NA
FIRE FIGHTING 0.00% 0.00%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL - SURAU
BANGUNAN
ELECTRICAL PLANNED ACTUAL
WIRING 23.81% 75.00%
SUBMAIN CABLE 0.00% 50.00%
DB NA NA
LUMINAIRE 0.00% 0.00%
MAIN S/BOARD 0.00% 0.00%
LPS 43.92% 58.38%
PA 18.31% 4.58%
SMATV NA NA
CCTV NA NA
ICT NA NA
![Page 51: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/51.jpg)
SURAU
![Page 52: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/52.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
JAN 09’ 79.98% 87.62% 7.64%
FEB 09’ 91.60% 98.95% 7.35%
MECHANICAL PLANNED
ACTUAL
AIR COND NA NA
FIRE FIGHTING 0.00% 0.00%
KITCHEN EQUIP. NA NA
LPG INSTALL. NA NA
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL - ASTAKA
BANGUNAN SOKONGAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 90.00%
SUBMAIN CABLE 100.00% 90.00%
DB 100.00% 0.00%
LUMINAIRE 100.00% 50.00%
MAIN S/BOARD 100.00% 0.00%
LPS 59.67% 58.21%
PA 100.00% 5.72%
SMATV NA NA
CCTV NA NA
ICT NA NA
![Page 53: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/53.jpg)
BANGUNAN SOKONGAN
ASTAKA
![Page 54: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/54.jpg)
MONTH PLANNED ACTUAL AHEAD / DELAY
FEB 09’ 87.44% 97.52% 10.08%
MECHANICAL PLANNED
ACTUAL
AIR COND 91.70% 88.10%
FIRE FIGHTING 70.07% 0.00%
KITCHEN EQUIP. NA NA
LPG INSTALL. 0.00% 0.00%
COMPRES. AIR NA NA
DUST CONTROL NA NA
PROCESS COOLING
NA NA
KEMAJUAN KERJA FIZIKAL – M&E PLANT ROOM
BANGUNAN SOKONGAN
ELECTRICAL PLANNED ACTUAL
WIRING 100.00% 90.00%
SUBMAIN CABLE 100.00% 20.00%
DB 100.00% 0.00%
LUMINAIRE 100.00% 50.00%
MAIN S/BOARD 100.00% 0.00%
LPS NA NA
PA NA NA
SMATV NA NA
CCTV NA NA
ICT NA NA
![Page 55: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/55.jpg)
BANGUNAN SOKONGAN
M&E PLANT ROOM – PUSAT SUMBER
![Page 56: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/56.jpg)
BANGUNAN SOKONGAN
M&E PLANT ROOM - BENGKEL
![Page 57: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/57.jpg)
DECORATIVE FENCE
![Page 58: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/58.jpg)
BANGUNAN SOKONGAN
GARAJ KENDERAAN
![Page 59: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/59.jpg)
ELEVATED WATER TANK, PUMP HOUSE & SUCTION TANK
![Page 60: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/60.jpg)
WAKAF
![Page 61: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/61.jpg)
LALUAN BERBUMBUNG
![Page 62: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/62.jpg)
OPEN PLAZA
![Page 63: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/63.jpg)
KERJA INFRA – JALAN UTAMA
![Page 64: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/64.jpg)
GELANGGANG PERMAINAN - TENIS
![Page 65: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/65.jpg)
M&E INSTALLATION
![Page 66: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/66.jpg)
M&E INSTALLATION
![Page 67: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/67.jpg)
M&E INSTALLATION
![Page 68: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/68.jpg)
M&E INSTALLATION
![Page 69: Adtec Pre No.18 Feb 09](https://reader035.fdocument.pub/reader035/viewer/2022081508/5589b49bd8b42a0d598b4656/html5/thumbnails/69.jpg)
• SEKIAN TERIMA KASIH