Aberdeen-Stavanger Gateway
description
Transcript of Aberdeen-Stavanger Gateway
![Page 1: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/1.jpg)
Aberdeen-Stavanger Gateway
![Page 2: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/2.jpg)
DOF Subsea
DOF Subsea 2
• Welcome
• Giovanni Corbetta, Managing Director
• DOF Subsea, part of the DOF Group
![Page 3: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/3.jpg)
DOF Subsea 3
![Page 4: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/4.jpg)
4DOF Subsea
“To be a world class integrated offshore company, delivering marine services and subsea solutions responsibly, without risk, together, every day”
![Page 5: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/5.jpg)
5
• Steady business• Time charter/ROV contracts• Long-term contracts
DOF Subsea
DOF Subsea business model
![Page 6: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/6.jpg)
Company Capabilities• Integrated Subsea Construction
• Engineering
• Flexible & Umbilical Installation
• Subsea Structure Installation
• Mooring & Riser Installation
• Inspection Maintenance & Repair
• Tie-in & Diverless Intervention Capabilities
• Field Abandonment & Decommissioning
• Seabed Mapping
• Positioning Services
DOF Subsea
![Page 7: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/7.jpg)
DOF Subsea Atlantic fleet
DOF Subsea 7
Skandi Skolten Skandi SkansenNormand Reach
Geosund Skandi InspectorGeoholm
![Page 8: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/8.jpg)
DOF Subsea in Aberdeen
• Moved into Aberdeen in 2006
• Opportunities in subsea / marine construction
• Success to date
• Followed by a trend of vessel owners moving towards a more projects-based approach
DOF Subsea 8
![Page 9: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/9.jpg)
Aberdeen – Norway
• Working together as a region
• 350 staff working in Atlantic operations
• People synergies
• Skills transfer and maximising knowledge
• Lessons learned
DOF Subsea 9
![Page 10: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/10.jpg)
Challenges
• Cultural differences- office culture- business
relationships
• Communication- language barriers- physical distance
DOF Subsea 10
![Page 11: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/11.jpg)
DOF Subsea
Focus regionsGlobal Locations
![Page 12: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/12.jpg)
Current projects
DOF Subsea
![Page 13: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/13.jpg)
Gina Krog FSO Field Development
Scope:
•Installation of TM Buoy
•Installation of Riser and Riser Base
•Design, Fabrication and Installation of Spool and Covers
•Offshore installation May and June 2016
Vessels:
•Skandi Skolten
•Normand Reach
DOF Subsea 13
![Page 14: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/14.jpg)
Maersk Riser Replacement, North Sea
Scope:
•Removal of existing flexible riser system on the Dunbarton field
•Installation of new riser system
•Associated surveys
Offshore installation will commence July 2014
Vessel:
•Normand Reach
DOF Subsea 14
![Page 15: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/15.jpg)
Shell – Corrib Natural Gass Field, Ireland
Scope:
•Disconnecting of the redundant flexible flowlines
•Install two flexible flowlines
•Tie-ins of the new flowlines to the wellhead and subsea manifold using the GE Icarus tie-in tool
Offshore Installation August 2014
Vessel:
•Normand Reach
DOF Subsea 15
![Page 16: Aberdeen-Stavanger Gateway](https://reader036.fdocument.pub/reader036/viewer/2022062410/568159f3550346895dc73cc2/html5/thumbnails/16.jpg)
Thank you!