इस सॊस्थान से सॊबजन्धत उक्त अवचध...
Transcript of इस सॊस्थान से सॊबजन्धत उक्त अवचध...
-
Page 1 of 12
SRFMTTI,ANANTAPUR No. 22-2/2015-Admn.Coord. Dated: 07.07.2015
भारत सरकार Government of India
कृषष मॊत्राऱय, (कृषष एवॊ सहकाररता षवभाग) Ministry of Agriculture, (Department of Agriculture and Cooperation)
दक्षऺणी ऺेत्र कृषष मशीनरी प्रशशऺण एवॊ ऩरीऺण सॊस्थान Southern Region Farm Machinery Training and Testing Institute
टै्रक्टर नगर, गाऱलददन्ने – 515 731, जिऱा: अनॊतऩुर (आॊ. प्र.) Tractor Nagar, Garladinne- 515 731, District: Anantapur (A.P.)
[ISO 9001:2008 COMPLIANT INSTITUTION] फ़ाइऱ सॊख्या\File No. 22-2/2015-प्रशासन-समन्वय- ददनाॊक/Dated: 7th July, 2015 प्रतत:
1. श्री बी. बी. भगत,, अवर सॊचिव (एम.एण्ड.टी), भारत सरकार, कृषष मॊत्राऱय, (कृषष एवॊ सहकाररता षवभाग) कृषष भवन, नई ददल्ऱी – 110 001.
2. श्री ए. एन. मेश्राम, उऩ आयुक्त (एम.एण्ड.टी), भारत सरकार, कृषष मॊत्राऱय, (कृषष एवॊ सहकाररता षवभाग) कृषष भवन, नई ददल्ऱी – 110 001.
षवषय:- माह जून, वषल 2015 का माशसक प्रगतत प्रततवेदन (मॊथऱी प्रोगे्रस ररऩोटल)। महोदय, इस सॊस्थान से सॊबजन्धत उक्त अवचध का माशसक प्रगतत प्रततवेदन (मॊथऱी प्रोगे्रस ररऩोटल) सॊप्रेषषत ककया िा रहा है। गत माह तक की माशसक प्रगतत प्रततवेदन (मॊथऱी प्रोगे्रस ररऩोटल) सॊस्थान के वेब- साइट ऩर उऩऱब्ध करा दी गई है। सदा की भाॉतत , प्रस्तुत प्रततवेदन भी अतत- शीघ्र वेब- साइट ऩर उऩऱब्ध करा ददया िाएगा।
2. आऩको ऩुनः स्मरण कराना है कक गत कई वषों से इस सॊस्थान के शऱए RFD में तनधालररत TARGET, इस सॊस्थान को उऩऱब्ध नहीॊ कराया गया है।
भवदीय, सॊऱग्न: यथोक्त
(ऩी. के. ऩाण्डये) तनदेशक
प्रततशऱषऩ: तनदेशक के तनज़ी सहायक
(ऩी. के. ऩाण्डये) तनदेशक
AO\E:\Admn Files\MPR\MPR 2015-16\MPR June, 2015\ MPR.
Website: http://srfmtti.dacnet.nic.in/
E-mail: [email protected] Tele./FAX: 08551-286441
REGISTERED POST/E-MAIL
-
Page 2 of 12
SRFMTTI,ANANTAPUR No. 22-2/2015-Admn.Coord. Dated: 07.07.2015
Financial Progress for the month of June, 2015.
NON-PLAN
UNIT: (`)
Sl.No. Sub-Head Exp.during
previous year 2014-15
Budget estimate current
year 2015-16
Revised estimate
current year 2015-16
Proportionate allocation up to the month of June, 2015
Amount spent
during the month of
June, 2015
Progressive Total
(+)Excess/ (-)Saving
Likely exp. During the
year
Detailed reasons for excess / savings
1 2 3 4 5 6 7 8 9 10 11
Demand No.1, Agriculture, Major Head '2401'Demand No.113, Agricultural Engineering, 01 Tractor Training & Testing Station, NON-PLAN
1 010001- Salary
13567498 13609000
Not applicable
at this stage
4536333 940150 3975480 -560853 13609000 The saving is due to a number of posts lying vacant.
2 010002- Wages
183158 487000 121750 35194 76994 -44756 487000 Payment of wages for a particular month is made only in next month.
3 010006- Med.treatment
446884 500000 125000 80360 100826 -24174 500000 Medical claims are under process.
4 010011- Dom.Tra.Exp.
185212 350000 87500 8625 8625 -78875 350000 The saving is due to economy in tours.
5 010013- Office Exp.
789284 2000000 500000 62796 327369 -172631 2000000 Purchase proposals are under process.
6 010016- Publication
34104 48000 12000 0 0 -12000 48000 Proposals are under process.
7 010027- Minor Works
375000 2200000 550000 0 0 -550000 2200000 Details as per Annexure-I.
8 010050- Other Charges
510247 1000000 250000 2642 124167 -125833 1000000 Purchase proposals are under process.
TOTAL 16091387 20194000 - 6182583 1129767 4613461 (-)1569122 20194000
-
Page 3 of 12
SRFMTTI,ANANTAPUR No. 22-2/2015-Admn.Coord. Dated: 07.07.2015
PLAN
UNIT: (`)
Sl.No. Sub-Head Exp.during
previous year 2014-15
Budget estimate current
year 2015-16
Revised estimate current
year 2015-16
Proportionate allocation up to the month of June, 2015
Amount spent
during the month of
June, 2015
Progressive Total
(+)Excess/ (-)Saving
Likely exp. During the
year Detailed reasons for excess / savings
1 2 3 4 5 6 7 8 9 10 11
Demand No.1, Agriculture, Major Head '2401'Demand No.113, Agricultural Engineering, 01 Tractor Training & Testing Station, PLAN
1 250101- Salary
13337581 15000000
Not applicable
at this stage
5000000 1207366 4487612 (-)512388 15000000 The saving is due to a number of posts lying vacant.
2
250102- Wages
1114812 2000000 500000 92412 185844 (-)314156 2000000 Payment of wages for a particular month (except March) is made only in next month.
3 250103 - OTA
25176 50000 12500 0 0 (-)12500 50000 The saving is due to non-receipt of claims.
4 250106- Med.treatment
797756 800000 200000 42298 199346 (-)654 800000 The saving is negligible.
5 250111- Dom.Tra.Exp.
421601 600000 150000 35120 91711 (-)58289 600000 The saving is due to economy in tours.
6 250112- Fore. Tra. Exp.
0 200000 50000 0 0 (-)50000 200000 FTA claim is under process.
7 250113- Office Exp.
3600481 8000000 2000000 205799 281999 (-)1718001 8000000 Purchase proposals are under process.
8
250116- Publication
46770 50000 12500 0 0 (-)12500 50000 Purchase proposals are under process.
9 250126- Advt. & Pub.
474981 1000000 250000 0 3288 (-)246712 1000000 Proposal is under process.
10 250127- Minor Works
6578934 1100000 275000 0 0 (-)275000 1100000 --
11 250128- Prof. Serv.
0 200000 50000 0 0 (-)50000 200000 Bills received from Advocate are under process.
12 250150- Other Charges
1589111 2400000 600000 0 95375 (-)504625 2400000 Purchase proposals are under process.
TOTAL 27987203 31400000 - 9100000 1582995 5345175 (-)3754825 31400000
Capital Section Major "Head 4401" - Capital Works and Machinery & Equipment-
1 150151- Motor Vehicle
0 1500000 Not applicable
at this stage
375000 0 0 (-)375000 1500000 --
2 150152- My & Eqptt.
165000 4500000 1125000 0 0 (-)1125000 4500000 --
3 150153- Major works
6637889 5500000 1375000 0 0 (-)1375000 5500000 Details are given in the enclosed Annexure - II.
TOTAL 6802889 11500000 - 2875000 0 0 (-)2875000 11500000
-
Page 4 of 12
SRFMTTI,ANANTAPUR No. 22-2/2015-Admn.Coord. Dated: 07.07.2015
ANNEXURE-I
PROGRESS REPORT ON REVENUE SECTION MAJOR HEAD "2401" MINOR WORKS (NON-PLAN) for the month of June, 2015.
Sl. No.
Name of the Work Sanction number &
date
Amount (₹)
Amount already spent by
the end of the
previous year(s) (₹)
Amount authorized to CPWD with date
during 2015-16
(₹)
Amount spent during
the month
(₹)
Amount spent
during the year
2015-16 (₹)
Likely expenditure during the year 2015-
16 (₹)
Remarks
1 2 3 4 5 6 7 8 9 10
REVENUE SECTION, MAJOR HEAD '2401', MINOR WORKS, NON-PLAN: B.E.2015-16 ₹ 22.00 LAKH;
I WORKS ALREADY SANCTIONED BY THE DEPARTMENT:
1
Special Repairs & maintenance of Hostel Building (Boys) at a P.E. Cost of Rs.26.81 lakh
Not Applicable
Not Applicable
375000 (2014-15)
Not Applicable
Not Applicable
Not Applicable
23,06,000
The proposal has been sent to Ministry for expenditure sanction of balance amount of Rs. 22,00,000/- only, vide this Institute’s letter No. 12-02/2012–Bldg. (Vol.II)/321 dated 07.05.2015, followed by letter of even no.dated 07.06.2015.
II WORKS SANCTIONED UNDER THE POWERS OF THE INSTITUTE:
1 --------N I L -----------
III WORKS FOR WHICH PROPOSAL SENT TO THE DEPARTMENT BUT SANCTION AWAITED:
1 --------N I L -----------
IV PROPOSALS AT THE FORMULATION STAGE WHERE PART OF EXPENDITURE IS LIKELY TO BE BOOKED IN THE CURRENT YEAR:
--------N I L -----------
TOTAL 0 3,75,000 - 0 0 23,06,000
-
Page 5 of 12
SRFMTTI,ANANTAPUR No. 22-2/2015-Admn.Coord. Dated: 07.07.2015
ANNEXURE-II
PROGRESS REPORT ON CAPITAL SECTION, MAJOR HEAD "4401" MAJOR WORKS (PLAN), for the month of June, 2015.
Sl. No.
Name of the Work Sanction number &
date
Amount (₹)
Amount already spent by
the end of the
previous year(s) (₹)
Amount authorized to CPWD with date
during 2015-16
(₹)
Amount spent
during the month (₹)
Amount spent during
the year 2015-16
(₹)
Likely expenditure during the year 2015-16
(₹)
Remarks
1 2 3 4 5 6 7 8 9 11
CAPITAL SECTION, MAJOR HEAD ''4401'' MAJOR WORKS, PLAN: B.E.2015-16 ₹ 55.00 LAKH;
I. WORKS ALREADY SANCTIONED BY THE DEPARTMENT:
1
Ladies Hostel-and-Guest-House at a P.E. cost of ₹99.22 lakh ( Revised Cost : Rs.1.16.58.855/-)
Not Applicable
Not Applicable
200000 (2011-12)
Nil (2012-13) 2928601 (2013-14) 6637889 (2014-15)
Not Applicable
Not Applicable
Not Applicable
1892395
The proposal has been sent to Ministry for expenditure sanction of balance amount of Rs. 18,92,395/- only, vide this Institute’s letter No. 12-03/2009-Bldg./317 dated 07.05.2015.
II. WORKS SANCTIONED UNDER THE POWERS OF THE INSTITUTE:
--------N I L -----------
III. WORKS FOR WHICH PROPOSAL SENT TO THE DEPARTMENT BUT SANCTION IS AWAITED: --------N I L -----------
IV. PROPOSALS AT THE FORMULATION STAGE WHERE PART OF EXPENDITUTE IS LIKELY TO BE BOOKED IN THE CURRENT YEAR:
--------N I L -----------
TOTAL - 0 9766490 - 0 0 1892395
-
Page 6 of 12
SRFMTTI,ANANTAPUR No. 22-2/2015-Admn.Coord. Dated: 07.07.2015
TRAINING WING
1. Training Activities
Sl. No
Particulars
U
T A NB TT M1 Total In-Campus
Off-Campus
1 Target Like previous years, this year too, the Target as per RFD is not
received.
2 No. of Applications carried forward from the previous year
03 - 31 375 224 - - 633
3 No. of applications received during the month
66 - 05 28 08 - - 107
4 Total No. of applications received up to the reporting month
78 87 51 735 486 - - 1437
5 Number of trainees carried forward from previous year
- - 22 - - - - 22
6 Number of trainees carried forward from previous month
- - - - - - - -
7 No. of trainees joined during the month.
19 - - 80 50 - - 149
8 Total of 6+7 above 19 - - 80 50 - - 149
9 Trainees trained during the month
- - - 80 - - - 80
10 Trainees trained up to reporting month
- 86 22 80 379 - - 567
11 No. of Trainees under training
19 - - - 50 - - 69
12 Break up of trainees trained during the month – Category-wise
i a) General - - - 26 - - - 26
ii b) SC - - - 09 - - - 09
iii c) ST - - - 12 - - - 12
iv d) OBC - - - 33 - - - 33
13 Break up of trainees trained up to the month – Category-wise
i a) General - 04 04 26 113 - - 147
ii b) SC - 11 02 09 65 - - 87
iii c) ST - 01 - 12 13 - - 26
iv d) OBC - 70 16 33 188 - - 307
14 Break up of trainees trained during the month - Land holding- wise
i LANDLESS - - - - - - - - ii MARGINAL - - - 15 - - - -
iii SMALL - - - 17 - - - -
iv SEMI MEDIUM - - - 10 - - - -
v MEDIUM - - - 04 - - - -
vi LARGE - - - 02 - - - -
-
Page 7 of 12
SRFMTTI,ANANTAPUR No. 22-2/2015-Admn.Coord. Dated: 07.07.2015
15 Break up of trainees trained up to the month - Land holding- wise
i LANDLESS - - - - - - - -
ii MARGINAL - 24 06 15 38 - - 83
iii SMALL - 37 01 17 38 - - 93
iv SEMI MEDIUM - 11 02 10 57 - - 80
v MEDIUM - 13 - 04 38 - - 55
vi LARGE - 01 - 02 17 - - 20
16 Apprentice Under Training (Graduate/ITI Trade/Vocational)
--- 8
17 Women/Women farmers trained during the month
- - - 24 - - - 24
18 Women/Women farmers trained up to the month
- 86 - 24 50 - - 160
19 Total Farmers trained during the month
- - - 48 - - - 48
20 Total Farmers trained up to the month
- 86 09 48 188 - - 331
21 Total trainees trained since inception
--- 26745
2. Demonstration Activities
2.1 Demonstration programmes under Saansad Adarsh Gram Yojana (SAGY).
Sl.
No. Date
Village/Sub-Distt./
Distt./ State
Name of the Hon’ble
M.P. (S/Shri)
Machines
demonstrated No. of beneficiaries
1 12.06.2015
Sanarapatti/
Nangavalli/ Salem/
(T.N.)
V.Panneer Selvam Groundnut
Decorticator
MEN WOMEN TOTAL
SC - - -
ST - - -
OBC 28 37 65
General - - -
G.Total 28 37 65
2 15.06.2015 Chettikulam/ Madurai
west/ Madurai/ (T.N.) R.Gopalakrishnan
- Groundnut
Decorticator
- Chaff Cutter
- Rotavator
MEN WOMEN TOTAL
SC - - -
ST 5 - 5
OBC 33 - 33
General 8 - 8
G.Total 46 - 46
3 16.06.2015
Pariyur/
Gobichettipalayam/
Erode/ (T.N.)
Smt. V.Sathyabama
- Groundnut
Decorticator
- Chaff Cutter
- Rotavator
MEN WOMEN TOTAL
SC - - -
ST - - -
OBC 34 - 34
General 20 - 20
G.Total 54 - 54
4 18.06.2015
ThinnanurNadu/
KolliHills/ Namakkal/
(T.N.)
P.R.Sundaram Chaff Cutter
MEN WOMEN TOTAL
SC - - -
ST 26 5 31
OBC - - -
General - - -
G.Total 26 5 31
2.2 Participants:
Total Farmers: 196
-
Page 8 of 12
SRFMTTI,ANANTAPUR No. 22-2/2015-Admn.Coord. Dated: 07.07.2015
3. AWARENESS COURSES on Safety in Agricultural Machines (AW Series)
conducted at the Institute up to June, 2015.
S.
No.
Name of the Institute/farmers
group/Sponsorer
Date of
Visit
Number. of
Visitors/
Candidates
Remarks
I F.T.C, Nandyal Kurnool (Dt), Andhra Pradesh 06.04.2015 23 Farmers
II K.V.K, Banavasi, Emmiganur, Kurnool (Dt.),
Andhra Pradesh
09.04.2015 22 Farmers
III K.V.K., Kalikiri, Chittore (Dt.), Andhra
Pradesh
10.04.2015 27 Farmers
IV D.W.M.A., Mydukur, Porumamilla, Kadapa,
Andhra Pradesh
16.04.2015 65 Farmers
V A.D.A. (FTC) Kadapa, Andhra Pradesh 27.04.2015 22 Farmers
VI R.D.T Anantapur (Korrapadu, Danduvari palli
villages)
08.05.2015 32 Farmers
VII Dr.M.Johnson, Principal Scientist and
Coordinator, DAATTC, Kadapa.
02.06.2015 19 Farmers
Note: Although this was earlier treated as regular programme but now in SMAM, this
programme is discontinued hence this is not reckoned for indicating Achievement.
-
Page 9 of 12
SRFMTTI,ANANTAPUR No. 22-2/2015-Admn.Coord. Dated: 07.07.2015
TESTING WING
A.1. TESTING PROGRESS FOR THE MONTH OF JUNE, 2015
Target and Achievement
I Like previous years, this year too, the Target as per RFD is not received.
II No. of Applications carried forward from the
previous year
44
III No. of Applications received during the month 08
IV No. of Applications received during the year 13
V Machines carried forward from the previous year 44
VI No. of Machines received for test during the month 08
VII No. of Machines received for test during the year 13
VIII No. of Machines taken up for test during the month 08
IX No. of Machines yet to be received 0
X No. of Draft Test Reports released during the month 06
XI No. of Draft Test Reports released during the year 16
XII No. of Final Test Reports released during the month 05
XIII No. of Final Test Reports released during the year 15
XIV Machines under test 41
XV No. of Applications (advised to contact with SAU's) During the month 0
During the year 0
XVI Monthly Progress Report on CMVR/Emission/Type Approval Not Applicable
XVII Machines tested since inception 510
XVIII PHYSICAL TARGET OF TESTING (QUARTER-WISE) Yet to be
received from
Ministry
A.2. Activities as the Nodal Agency for various Approved Testing Institutions.
Sl.
No. Particular Total
1 No. of Draft Test Reports received, for comments, from various approved
Test Agencies during the month 04
2 No. of Draft Test Reports received, for comments, from various approved
Test Agencies upto this month. 17
3 No. of Draft Test Reports regarding which comment of this Institute
forwarded during the month 00
4 No. of Draft Test Reports regarding which comment of this Institute
forwarded upto this month. 06
5 No. of Draft Test Reports regarding which comment of this Institute is yet to
be forwarded 11
As many as 130 addresses of applicants/manufacturers/traders have been uploaded in
the FARMERS PORTAL, exclusively by this Institute.
-
Page 10 of 12
SRFMTTI,ANANTAPUR No. 22-2/2015-Admn.Coord. Dated: 07.07.2015
FARM SECTION
Sl.
No. FARM ACTIVITY DURING THE MONTH OF JUNE, 2015
1 Red Gram seed (Total 20 kg) sowing had completed in a 5 acre area at plots near
Type-II quarters and plot near haulage test track towards kharif crop. Seed had been
sown @ 4kg/acr at a spacing of 2.1 mtr B/W row-row with the help of Farmak
automatic seed drill. Weedicide Atrazine had been sprayed against as an initial weed
control. Chlorophyriphos @2 ml/ltr had sprayed against leaf eating insect-pest.
2 RAINFALL
Total rainfall received during the previous year of 2014-15 is: 165.4 mm.
Total rainfall received upto the month May, 2015: 47.75 mm.
Total rainfall received during the month of June, 2015: 36.75 mm.
Total rainfall received during the year 2015-16: 84.50 mm.
-
Page 11 of 12
SRFMTTI,ANANTAPUR No. 22-2/2015-Admn.Coord. Dated: 07.07.2015
STAFF POSITION AS ON 30th
JUNE, 2015
Sl.
No.
Group Sanctioned
strength
Filled Vacant
1 A 3 3 0
2 B 5 2 3
3 B (N.G.) 7 3 4
4 C 59 54 5
Total 74 62 12
In pursuance of Ministry’s letter No.12-6/2015-M&T (Admn.) dated 11.5.2015,
vacancy position of Group-B (NG) and C posts at this Institute has been informed as
under vide this Office letter No.1-9/2015 dt.13.05.2015 and 14.05.2015
1 Name of the post Number of vacancy Date of vacancy
1.1 Farm
Superintendent
01 No. (Ministry is Appointing Authority) 25.07.2014
1.2 Agricultural
Engineer
02 Nos. (Ministry is Appointing
Authority)
11.11.2014- 1 No.
20.05.2015- 1 No.
1.3 Office
Superintendent
02 Nos. (refer –Ministry’s letter No.13-4/2012-M&T(Admn.) dated 19.02.2014
regarding common nomenclature for various
non-technical posts at SRFMTTI, Anantapur.
First vacancy occurred in the
year on 01.05.2012 and
second one on 08.07.2014
1.4 Senior
Technical
Assistant
01 No. 01.05.2012
1.5 Stenographer
Grade-I
01 No. 07.04.2014
1.6 Training
Assistant (now
re-designated as
Technical
Assistant)
02 Nos. As per Ministry's advice vide letter No.9-35/2006
- M & T (Admn) dated 03-07.2013 a suitable
proposal has been submitted to the Ministry vide
our letter No.1-4/2008-Estt. dated 08.08.2013.
Reminder sent on 07.11.2013. Further
clarification sought vide Ministry's letter No.9-
35/2006-M&T(Admn.) dated 06.05.2014 has
been furnished vide our letter No.1-4/2008-
Estt./507 dated 28.05.2014. Last letter issued on
15.12.2014. Ministry vide their letter No.9-
35/2006-M&T(Admn.) dated 03.06.2015 have
informed that DOPT has advised to identify and
intimate a vacant post for the period 07.03.2008
to 24.01.2012 which has similar grade pay with
Training Assistant and submit details for seeking
revival of the abolished post.
25.01.2012- 1 No.
01.06.2015- 1 No.
1.7 Lower Division
Clerk
01 No. 14.12.2010
1.8 Stenographer
Grade-II
01 No. 23.09.2012
1.9 Chowkidar-
cum-Farm Mate (now re-
designated as
MTS(NT))
01 No. 01.05.2014
-
Page 12 of 12
SRFMTTI,ANANTAPUR No. 22-2/2015-Admn.Coord. Dated: 07.07.2015
REVENUE RECEIPT DURING 2014-15 UPTO JUNE, 2015.
Sl. No. During previous
Year Revenue
(Rs.)
During
previous
year
June,
2015
Revenue
(Rs.)
Progressive
up to
06/2015
1 Training 170341 16,240 1,12,121
2 Testing 8185792 7,25,013 7,25,013
3 Farm Orchard 247895 0 8,740
4 Farm Misc. 75506 0 9,899
5 Farm Produce 82390 0 0
6 Office Misc. 262158 53,520 1,00,245
Total 9024082 7,94,773 9,56,018