-92-
4.調査日程表
No.
Date Day Activities Place
1 July 12 Mon (Consultant: NRT–BKK) BKK 2 13 Tue BKK - KTM
Internal meeting at JICA Nepal 16:00 Meeting with Mr. Ram Prasad BHANDARI 18:00 Meeting with Ms. Miwa HIASA
KTM
3 14 Wed Review of Baseline Survey Findings Finalize Check list for Interview with Ministries/Districts 11:00 am Meeting with M&E section, NPCS Mr. Tamang 12:30 Meeting with Agriculture section / Rural Development section, NPCS (Mr. Shrestha and Mr. Bhandari) 15:00 Meeting with Education section, NPCS (Mr. Khanal)
4 15 Thu 10:30 Meeting at ADB (Mr. Parwez and Ms. Shrestha) 12:00 Meeting at M&E Section, MoLD (Mr. Shrestha) 12:45 pm Meeting with M&E Specialist of LGCDP (Dr. Shrestha)
KTM
5 16 Fri 11:00 Meeting at MoE (Mr. Bhattarai, M&E Section, Mr. Dhungel SMES Core Trainer) 12:20 Meeting at MoAC (Mr. Adhikari) 14:30 Meeting at UNDP Project Office, NPC (Dr. Pradhan)
KTM
6 17 Sat Internal discussion KTM
7 18 Sun 09:00 Travel to Sindhupalchowk District 14:00 Meeting at DEO (Mr. Dahal) 15:30 Meeting at DFO (Mr. Bamjan) 16:40 Meeting at DADO (Mr. Tiwary)
Chautara
8 19 Mon 10:00 Meeting at DDC (Mr. Khadka) 12:00 Meeting at DSCO (Mr. Shrestha) 13:20 Travel back to Kathmandu (Mr. Takeda, Kimata NRT-BKK)
KTM
9 20
Tue (Mr. Takeda, Kimata BKK- KTM) 11:00 Meeting with JS, Economic Management Division, NPCS 14:00 Meeting with Mr. Vaidhya, UNICEF 14:30- CC to CR of JICA Nepal Meeting with JICA, Ms. Ishida (Chief of SMES)
KTM
10 21 Wed 11:00 CC to Secretary of NPCS (Mr. Pandey) 14:00 Meeting with MoF (JS Mr. Regmi, US Mr. Tripathi) 15:00 Meeting with JS of Poverty Monitoring Division, NPCS (Mr. Dahal) Meeting with M&E Section Chief, MoFSC (time to be confirmed)
KTM
11 22 Thu Internal discussion 15:10 Fly to Janakpur (PM)
Janakapur
12 23 Fri 07:00 Travel to Sindhuli (Morning) 09:30 Round table meeting with LDO/DDC and other line agencies 13:00 Travel back to Janakpur 16:05 Return back to KTM
KTM
13 24 Sat Internal Meeting Preparation for the Action Plan Workshop
KTM
14 25 Sun Internal Meeting 13:00 Planning workshop @ NPCS
KTM
-93-
15 26 Mon 14:00 M/M discussion with NPCS KTM
16 27 Tue Internal Discussion 16:00- M/M discussion
KTM
17 28 Wed 12:00- M/M Discussion KTM 18 29
Thu 9:00- Report to JICA
10:30- M/M Discussion with NPCS KTM-BKK
KTM
19 30 Fri BKK-NRT
-94-
Name Position NPCS Mr. Yuba Raj Pandey Secretary, NPCS Mr. Dhruba P. Dahal JS/Chief, PMD, NPCS Mr. Puspa Lal Shakya JS, Economic Management Division, NPCS Mr. Rabi Shankar Sainju Program Director, Macro Economic Section, NPCS Mr. Rudra Singh Tamang Program Director, M&E Section, NPCS Mr. Biju Kumar Shrestha Program Director, Agriculture and Forests Section, NPCS Ms. Rudra Devi Sharma Planning Officer, Agriculture and Forests Section, NPCS Ms. Nita Pokharel Planning Officer, Agriculture and Forests Section, NPCS Mr. Narayan P. Bhandari Planning Officer, Local Development Section
Mr. Sanjaya Kumar Khanal Program Director, Education and Human Resources Section, NPCS
Mr. Tej Prasad Panthi Planning Officer (Core Trainer), NPCS Mr. Subash Dhakal Computer Officer, NPCS Mr. Radha Krishna Pradhan Program Director, Infrastructure Section, NPCS Mr. Dhruba Bandhu Aryal Under Secretary (Core Trainer), Local Development Section,
NPCS Mr. Lava K.C. Program Director, NPCS Mr. Pashupati P Bhandari Under Secretary, M&E Section, NPCS Central Level Line Agencies
Mr. Lokdarshan Regmi JS/Chief, M&E Division, MoF Mr. Janardan P. Tripathi US, M&E Division, MoF Mr. Raj Kumar Malla JS, Planning and M&E Division, MoPPW Mr. Rajiv Ghimire SDE, PME Division, MoPPW Mr. Jivan K.C. SDE, PME Division, MoPPW Mr. Bikash Kafle Engineer, PME Divison, MoPPW Mr. Gobinda P. Adhikari Section Officer, PME Division, MoPPW Mr. Diwakar Dhungel Jt. Secretary, Education Review Office, MoE (Core Trainer) Mr. Gopal Prasad Bhattarai Under Secretary, M&E Section, MoE Mr. Dhan Bahadur Shrestha Under Secretary, M&E Section, MoLD Dr. Raghu Shrestha M&E Specialist, LGCDP Mr. Ram Babu Adhikari Senior Agriculture Economist, M&E Division, MoAC Mr. Buddhi Nath Bhattarai Agriculture Economist, M&E Division, MoAC Mr. Chevan P. Guragain US/ Chief M&E Section, MoFSC
Ms. Manju Adhikari Section Officer, MoE
Mr. Subas Chandra Shiwakoti US, DTCO Sankhuwasabaha (Core Trainer)
Mr. Ramesh Aryal Section Officer, M&E Section, MoLD (National Trainer)
Mr. Ram Krishna Shrestha Senior Extension Officer, MoAC
Mr. Bishnu G. C. Deputy Director, DoE (Core Trainer)
District Level Mr. Ganesh Gyawali LDO, DDC, Sindhuli Mr. Keshav Dahal DEO, DEO, Sindhupalchowk Mr. Badri Paudel School Administration Chief, DEO, Sindhupalchowk
5.主要面談者リスト
-95-
Name Position Mr. Bharat Subedi School Supervisor, DEO, Sindhupalchowk Mr. Sukman Bamjan Asst. DFO, DFO, Sindhupalchowk Mr. Dinesh Tiwary Sr. Agriculture Development Officer (Office-in-charge), DADO,
Sindhupalchowk Mr. Lokendra Bohora Plant Protection Officer, DADO, Sindhupalchowk Mr. Deepak Pyakurel Agriculture Extension Officer, DADO, Sindhupalchowk Mr. Bhattarai Act. Horticulture Development Officer, DADO,
Sindhupalchowk Mr. Dhruba Khadka Planning, Monitoring and Administrative Officer, DDC,
Sindhupalchowk Mr. Rajendra Pyakurel Information Officer, DDC, Sindhupalchowk Ms. Geeta Kharel Assistant, Planning Section, DDC, Sindhupalchowk Mr. Chandika Shrestha Assistant, Planning Section, DDC, Sindhupalchowk Mr. Niranjan Shrestha Chief, DSCO, Sindhupalchowk Mr. Keshav Raj Subedi Planning, Monitoring and Administrative Officer, DDC,
Sindhuli Mr. Sagar K. Dhakal Program Officer, DDC, Sindhuli
Mr. Dinesh K. Shah District Facilitator, LGCDP, DDC, Sindhuli
Mr. Dip Narayan Chaudhary Sub-Engineer, WSSDO, Sindhuli
Mr. Dilli P Paudel District Project Officer, JICA/COMCAP, Sindhuli
Mr. Kapil P Aryal Account Officer, DDC, Sindhuli
Mr. Gopal S Lamichhane Agriculture Extension Officer, DADO, Sindhuli
Mr. Upendra K Singh Planning Officer, DADO, Sindhuli
Mr. Rajendra P Sah Veterinary Officer, DLSO, Sindhuli
Mr. Shree Lal Chaudhary JTA (Planning Sector), DSCO, Sindhuli
Mr. Prabhansh Mandal Sub-Engineer, DSCO, Sindhuli
Mr. Rup Narayan Jha Officiating DFO, DFO, Sindhuli
Mr. Ram P Gajurel Sub-Engineer, DRSP, Sindhuli
Ms. Chandrakala Shrestha WDO, WDO, Sindhuli
Mr. Manoj K Dhakal US, DEO, Sindhuli
Mr. Shyam Sundar Shrestha Chief, DSCO, Sindhuli (Core Trainer)
Donor Organization Mr. Shahid Parwez Project/Program Implementation Officer, ADB Ms. Rachana Shrestha Governance and Capacity Building Officer, ADB Mr. Ashok Vaidhya Programme Specialist, Planning, M&E Section, UNICEF
Dr. Hari Pradhan Program Manager, Strengthening Planning and Monitoring Capacity of NPC (UNDP Project at NPC)
-96-
6.Plan of Operation(PO)案ネパ
ール
国モニタリング評
価システム強
化プロジェクト
As o
f 28
July
201
0
作業
工程
・人
月表
(案
)
現地
国内
現地
国内
現地
国内
現地
国内
現地
国内
12
34
56
89
#11
121
23
45
68
910
1112
12
34
56
89
1011
12I
23
Nep
ali F
isca
l Yea
r総括/有償案件評価
1総括/有償案件評価
0.90
0.10
6.50
0.10
7.00
0.00
5.00
0.20
19.4
00.
40政策・プログラムレベル評価
2政策・プ
ログラムレベル評価
0.30
0.10
2.70
0.10
3.00
0.00
1.50
0.20
7.50
0.40
訓練計画管理
3訓練計画管理
1.30
0.00
6.00
0.00
6.00
0.00
4.50
0.00
17.8
00.
00セミナー講師1
4セミナー講師1
0.00
0.00
0.50
0.00
0.50
0.00
0.50
0.00
1.50
0.00
セミナー講師2
5セミナー講師2
0.00
0.00
0.50
0.00
0.50
0.00
0.50
0.00
1.50
0.00
セミナ
ー講師3
6セミナー講師3
12
34
56
0.00
0.00
0.50
0.00
0.50
0.00
0.50
0.00
1.50
0.00
◎○
(1)基本方針の検討・確定
2.50
0.20
16.7
00.
2017
.50
0.00
12.5
00.
4049
.20
0.80
◎○
(2)基本方針の見直し
◎○
(3)最終報告書のとりまとめ
成果
1: 成果重視型
M&E
ガイドラインの普及に基づき、
NPC
Sの成果重視型
M&E
報告書の作成能力が強化される。
成果
2: N
PCが策定した成果重視型
M&E
ガイドラインに従って、パートナー省の
M&E
メカニズムが
改良
され
る。
成果
3: パ
イロット郡からパートナー省、
NPC
Sへの
M&E
結果の報告体制が強化される。
成果
4: M
&E結果を計画策定プロセスに反映するための
NPC
S内関係部局間及び
NPC
S-関係省庁間の調整メカニズムが強化される。
○
国 内 作 業 現 地 作 業
○○○
◎○
○○
○○
◎◎○
○
◎◎○
○
◎○
○
◎○
○
◎○
○
◎○
○
◎○
○
◎○
○
◎○
○
◎○
○
◎
第3年次
第4年次
合計
50.0
0
◎○
○
2-2
NPC
Sとパートナー省の行政官からなるセクター
調整タスクフォースを設置する。
○
◎○
○
○
2011
/12年
度20
12/1
3年度
2013
/14年
度第
2年
次第
3年
次
NPC
Sとパートナー省の行政官からなる
NPC
S調整タスクフォースを設置する。
1-2ナショナルレベルのM&E計画を作成する。
2010
/11
第1年次
第2年次
77
7
第4年
次
1-5成果重視型
M&E
の実施手法を策定する。
1-6パイロット郡
におけるパートナー省の
P1プロジェク
ト/プ
ログラムの
M&E
の進捗をモニタリングする。
第1年次
NPC
Sの能力をレビューする。
1-1
1-4
NPC
S行政官に対し、
M&E
結果分析に関する研
修を実施する。
1-3
2-1パートナー省の
M&E
能力、計画策定へのフィー
ドバック能力をレビューする。
1-7パートナー省から提出された
M&E
報告書を分析
する
1-8
M&E
報告書を毎年及び
4ヵ月毎に作成する。
2-6
M&E
実施手続をパイロット郡に指導する。
2-7パ
イロット郡
のプロジェクト/プログラムの
M&E
の進捗をモニタリングする。
2-4省行政官に対し、
M&E
研修を実施する。
2-5プロジェクト/プログラムM&Eの指標、報告書
式、手続きを修正/設定する。
◎○
○
◎○
◎○
○○
DD
Cとセクター郡事務所の
M&E
関連行政官から
なる郡調整タスクフォースを設置する。
M&E結果を踏まえた計画レビュー会合を開催す
る。
3-5
M&E
結果を計画レビュー会合で情報共有する。
パイロット郡における
M&E
、計画策定へのフィー
ドバック能力をレビューする。
3-1
2-8
3-4パイロット郡において、
M&E
実施手続に基づい
てプロジェクト/プログラムをモニタリングし、そ
3-3パイロット郡の行政官に対しM&E研修を実施す
る。
3-2
◎○
○
◎○
○ ○
◎○
○
◎○
○
◎○
◎○
○
4-2
M&E
結果を国家中期計画に反映するための
M&E
局と経済調整局の調整手続きを策定する。
4-3関係者間で成果・経
験共有セミナーを開催す
る。
4-1プロジェクト/
プログラムの
M&E結果を承認プロ
セスに反映するためのM&E局とセクター局の調
整手続きを策定する。
4-4
M&E
の実践からの経験・教訓に基づき政策決定
者への認識・理解を強化するための政策フォー
ラムを開催する。
2-3省
・セクター
M&E
計画を作成する。
2068
/69
2069
/70
2070
/71
2067
/68
-97-
Stre
ngth
enin
g M
onito
ring
and
Eval
uatio
n Sy
stem
in N
epal
Pro
ject
Pha
se 2
Tent
ativ
e Pl
an o
f Ope
ratio
n (P
O)
As o
f 28
July
201
0
Nep
ali F
isca
l Yea
rJa
pane
se F
isca
l Yea
rW
este
rn C
ar e
nder
12
34
56
89
##
121
23
45
68
9#
##
12
34
56
89
##
#I
23
45
68
Out
put 1
: N
PCS
capa
city
of f
orm
ulat
ing
resu
lt-ba
sed
M&E
repo
rt is
enh
ance
d ba
sed
on th
e ex
tens
ion
of R
esul
t-bas
ed M
&E G
uide
lines
Out
put2
: M&E
mec
hani
sm o
f Par
tner
Min
istri
es a
ccor
ding
to R
esul
t-bas
ed M
&E G
uide
lines
pre
pare
d by
NPC
is im
prov
ed
Out
put 3
: Rep
ortin
g an
d fe
edba
ck o
f M&E
resu
lts fr
om P
ilot D
istri
cts
to P
artn
er M
inis
tries
, and
NPC
S, a
re e
nhan
ced
Out
put 4
: Coo
rdin
atio
n m
echa
nism
s am
ong
divi
sion
s of
NPC
S an
d be
twee
n N
PCS
and
Partn
er M
inis
tries
are
enh
ance
d fo
r ref
lect
ing
M&E
resu
lts to
pla
nnin
g pr
oces
s
4-2
Form
ulat
e op
erat
iona
l pro
cedu
re to
coo
rdin
ate
betw
een
MED
and
EM
D fo
r ref
lect
ing
M&E
resu
lt to
revi
ew o
f nat
iona
l per
iodi
c pl
an
4-3
Org
aniz
e se
nsiti
zatio
n w
orks
hop
with
rele
vant
stak
ehol
ders
for s
harin
g M
&E re
sults
4-4
Org
aniz
e po
licy
foru
m fo
r enh
anci
ng a
war
enes
s an
dun
ders
tand
ing
of d
ecis
ion
mak
ers
base
d on
less
ons
lear
ned
from
M&E
pra
ctic
es
4-1
Form
ulat
e op
erat
iona
l pro
cedu
re to
coo
rdin
ate
betw
een
MED
and
Sec
tora
l Div
isio
ns fo
r ref
lect
ing
Dis
trict
Coo
rdin
atio
n TF
Dis
trict
Coo
rdin
atio
n TF
DD
Cs,
Line
Age
ncie
sD
DC
s,Li
ne A
genc
ies
Dis
trict
Coo
rdin
atio
n TF
DD
C, L
ine
Agen
cy
Dis
trict
Coo
rdin
atio
n TF
Task
forc
e Le
ader
s
Task
forc
e Le
ader
s
Sect
or C
oord
inat
ion
TFs
Sect
or C
oord
inat
ion
TFs
Sect
or C
oord
inat
ion
TFs
Sect
or C
oord
inat
ion
TFs
Sect
or C
oord
inat
ion
TFs
Sect
or C
oord
inat
ion
TFs
Sect
or C
oord
inat
ion
TFs
MED
and
Sec
tora
lD
ivis
ions
of N
PCS
NPC
S C
oord
inat
ion
TF
JS o
f MED
and
Sect
oral
Div
isio
nsJS
of M
ED a
ndSe
ctor
al D
ivis
ions
Task
forc
e Le
ader
Dis
trict
TF
Lead
ers
Sect
or T
F Le
ader
sSe
ctor
Coo
rdin
atio
n TF
s
Task
forc
e Le
ader
s
Task
forc
e Le
ader
s
Sect
or C
oord
inat
ion
TFs
3-5
Shar
e th
e M
&E re
sults
at r
evie
w m
eetin
g at
Pilo
tD
istri
cts
Rev
iew
of c
apac
ity o
f M&E
and
its
feed
back
to th
epl
anni
ng p
roce
ss in
Pilo
t Dis
trict
s
Task
forc
e Le
ader
s
Task
forc
e Le
ader
s
Task
forc
e Le
ader
s
3-1
3-4
Mon
itor P
roje
ct/P
rogr
am a
nd re
port
its re
sult
acco
rdin
gto
the
M&E
pro
cedu
re in
Pilo
t Dis
trict
s
Dis
trict
TF
Lead
ers
3-2
Esta
blis
h D
istri
ct C
oord
inat
ion
Com
mitt
ee c
onsi
st o
fof
ficer
s/st
aff m
embe
rs o
f DID
and
Par
tner
Lin
e
3-3
Con
duct
M&E
trai
ning
to s
taff
of P
ilot D
istri
cts
Task
forc
e Le
ader
NPC
S C
oord
inat
ion
Task
forc
e (T
F)N
PCS
Coo
rdin
atio
nTa
skfo
rce
Task
forc
e Le
ader
2-7
Org
aniz
e pl
anni
ng re
view
mee
ting
base
d on
the
M&E
resu
lt
Dis
trict
TF
Lead
ers
2-6
Mon
itor p
rogr
ess
of p
roje
cts/
prog
ram
s’ M
&E o
f Pilo
tD
istri
cts
Task
forc
e Le
ader
NPC
S C
oord
inat
ion
TF
NPC
S C
oord
inat
ion
TF
MED
and
Sec
tora
lD
ivis
ions
of N
PCS
Task
forc
e Le
ader
JS o
f MED
and
Sect
oral
Div
isio
ns
Task
forc
e Le
ader
s
MED
and
Sec
tora
lD
ivis
ions
of N
PCS
2-3
Con
duct
M&E
trai
ning
/WS
to P
artn
er M
inis
tries
'of
ficer
s
2-4
Rev
ise/
Set u
p in
dica
tor,
form
ant,
and
proc
edur
e fo
rpr
ojec
t/pro
gram
M&E
2-5
Inst
ruct
/Con
sult
M&E
pro
cedu
re to
Pilo
t Dis
trict
s
1-7
Prep
are
M&E
repo
rts a
nnua
lly/tr
imes
ter
1-8
Impr
ove
Res
ult-b
ased
M&E
Gui
delin
es b
ased
on
prac
tices
2-1
Rev
iew
of c
apac
ity o
f M&E
and
its
feed
back
to th
epl
anni
ng p
roce
ss in
Par
tner
Min
istri
es
1-4
Form
ulat
e op
erat
iona
l pro
cedu
re o
f Res
ult-b
ased
M&E
1-5
Mon
itor p
rogr
ess
of P
1 Pr
ojec
ts/P
rogr
ams’
M&E
of
Partn
er M
inis
tries
in P
ilot D
istri
cts
1-6
Anal
yze
M&E
repo
rts s
ubm
itted
by
Partn
er M
inis
tries
Rev
iew
of r
ole/
func
tion
of N
PCS
and
its c
apac
ity1-
1
1-3
Con
duct
trai
ning
/WS
of M
&E re
sults
ana
lysi
s to
NPC
S's
offic
ers
1-2
Esta
blis
h N
PCS
Coo
rdin
atio
n Ta
skfo
rce
cons
ist o
fdi
visi
on o
ffice
rs o
f NPC
S
2067
/68
77
7
2068
/69
2069
/70
2070
/71
2010
/11
Plan
ned
Activ
ities
Pers
on in
Cha
rge
Rem
arks
2011
2012
2013
Org
aniz
atio
n(C
entra
l)O
rgan
izat
ion
(Loc
al)
NPC
S C
oord
inat
ion
TF
NPC
S C
oord
inat
ion
TF
NPC
S C
oord
inat
ion
TF
NPC
S C
oord
inat
ion
TF
Task
forc
e Le
ader
Task
forc
e Le
ader
Task
forc
e Le
ader
Task
forc
e Le
ader
DD
C, L
ine
Agen
cy
DD
C, L
ine
Agen
cy
2-2
Esta
blis
h Se
ctor
Coo
rdin
atio
n Ta
skfo
rce
cons
ist o
fN
PCS
and
Partn
er M
inis
tries
Task
forc
e Le
ader
sSe
ctor
Coo
rdin
atio
n TF
s
2011
/12
2012
/13
2013
/14
2014
/15
2014
7
-98-
7
ND
AC▲
▲▲
▲▲
MD
AC▲
▲▲
▲▲
(Bim
onth
ly)
MD
AC▲
▲▲
▲
(Trim
este
r)
56
2067
/68
2011
71
23
4
Cha
itra
Bais
hakh
Jest
haAs
had
Man
sir
Pous
hM
agh
Farg
un
56
Farg
unC
haitr
aBa
isha
khJe
stha
2068
/69
Nep
ali F
Y
Wes
tern
Cal
enda
r12
1
Pous
hM
agh
23
48
910
1112
Asha
dSr
awan
Bhad
raAs
hoKa
rtic
-99-
7.ワークショップ結果
THE PROJECT on STRENGTHENING MONITORING AND EVALUATION SYSTEM in NEPAL (SMES) Phase 2
Participatory Workshop on SMES Phase 2 1 Background
Nepal is standing in political and social transition period with the dream of entering the New Nepal. Good Governance including strengthening M&E is one of the prioritized issues for the Government of Nepal (GoN).
GoN has committed to strengthen the M&E system to enhance their governance and to improve their socio-economic growth by effective and efficient use of the development resources. In order to support the GoN efforts, JICA has provided the technical assistance “the Strengthening the Monitoring and Evaluation System in Nepal (SMES) Project”. The counterpart agency of the SMES Project is National Planning Commission Secretariat (NPCS) with the key line ministries as partner ministries.
Through the SMES Project the key M&E human resources, core trainers and national trainers were trained and the monitoring reporting formats and the M&T training modules were updated and produced. However, further capacity development would be needed in order to institutionalize the more effective M&E system and to make the GoN agencies take action. The improvement in the monitoring system at the district level is also given high priority, for smooth promotion of the GoN decentralization and devaluation policy,
To cope with these challenges, the GoN requested JICA to conduct the SMES Phase 2 for providing further technical assistance to develop capacity in M&E.
JICA is conducting the preparatory survey for SMES Phase 2. Participatory Workshop will be conducted with concerned persons as one of the activities of the survey.
2 Objective
The objectives of the Participatory Workshop are:
(1) to provide a platform to discuss M&E issues for the government officers in Planning and M&E field;
(2) to review the achievement of improvement of M&E through the efforts of GoN, SMES Phase 1 and the other project supported by development partners; and
(3) to prepare and agree on the action plan to develop the individual and institutional M&E capacity to i) conduct project, program and policy evaluation and ii) to use the M&E results effectively.
3 Expected participants (The total number is around 20.)
Core Trainer and National Trainer of SMES Phase 1 Government officers in Planning and M&E Section/Division
4 Schedule and Venue (Tentative)
Date: 25 July 2010 Venue: Meeting Room at NPCS
-100-
Biju
Kum
ar S
hres
tha
SMES
Cor
e Tr
aine
r/ P
rogr
am D
irect
or o
f N
PCS
July
25,
201
0
Par
tici
pato
ry W
orks
hop
Stre
ngth
enin
g M
onit
orin
g &
Ev
alua
tion
Sys
tem
in N
epal
P
hase
2
-101-
Obj
ectiv
es a
nd S
trat
egie
s
SM
ES P
roje
ct a
imed
to
stre
ngth
en t
he
M&
E sy
stem
in N
epal
thr
ough
the
thr
ee
spec
ific
str
ateg
ies:
To
str
engt
hen
the
M&
E hu
man
res
ourc
es o
f N
PCS
and
the
key
min
istr
ies
To
mak
e M
&E
proc
ess/
outp
uts
mor
e ef
ficie
nt b
y up
datin
g M
&E
form
ats,
man
uals
and
gui
delin
es
To im
prov
e th
e aw
aren
ess
and
supp
ort
of t
he
polic
y m
aker
s an
d th
e pl
anni
ng o
ffic
ers
and
to
stre
ngth
en t
he li
nkag
e be
twee
n th
em a
nd M
&E
-102-
Goa
ls a
nd O
utpu
tsRe
sults
of M
&E
are
refle
cted
in t
he p
roce
ssof
pol
icy
form
ulat
ion,
pro
ject
pla
nnin
g an
d im
plem
enta
tion
M&
E ca
pabi
litie
s ar
e st
reng
then
ed
Per
son
nel
Trai
ned
M&
ETo
ols
Imp
rove
d
Man
agem
ent
Su
pp
ort
Im
pro
ved
-103-
Targ
et G
roup
Targ
etar
eaB
ased
in K
athm
andu
, the
Pro
ject
will
cov
er th
e na
tion
wid
e ar
ea o
f Nep
al a
s its
targ
et a
rea
(SM
ES P
ilot D
istr
icts
: Par
bat,
Mor
ang
and
Jum
la
Ind
irec
t ta
rget
gro
up
Offi
cial
s of
the
cent
ral a
nd th
e di
stric
t go
vern
men
t age
ncie
s, w
ho w
ill b
e tr
aine
d by
the
offic
ials
trai
ned
by th
e Pr
ojec
t
Dir
ect
targ
etg
rou
pO
ffici
als
of th
e M
&E
units
of t
he
rele
vant
gov
ernm
ent a
genc
ies
at th
e ce
ntra
l and
the
loca
l lev
els
Par
tner
gro
up
Offi
cial
s of
PM
D, N
PCJC
C M
embe
rs
-104-
Capa
city
Dev
elop
men
t in
M&
E Le
ads
to…
.B
ette
r Res
ourc
e A
lloca
tion
and
Impr
oved
Acc
ount
abili
ty a
nd T
rans
pare
ncy
Effic
ient
and
Pr
actic
al M
&E
Tool
s/Pr
oces
s
Tim
ely
and
Qua
lity
Out
puts
of M
&E
Out
puts
of M
&E
Ref
lect
ed to
Po
licy
and
Proj
ect F
orm
ulat
ion
and
Impl
emen
tatio
n
M&
E H
uman
R
esou
rces
D
evel
oped
Link
age
with
Pl
anne
rs a
nd
Dec
isio
n M
aker
s
-105-
Less
ons
Lear
nt
Co
mm
itmen
t –
Polit
ical
Lea
ders
Co
-ord
inat
ion
–Ce
ntra
l Eco
nom
ic
Agen
cies
Ev
alua
tion
Soci
ety
M
ando
tory
Sys
tem
–Le
sson
Lea
rnin
g
Eval
uatio
n Ac
t
-106-
Prog
ress
rev
iew
of
Prob
lem
s to
hav
e be
en s
olve
d in
M&
E
Wha
t w
ere
mai
n is
sues
?
Cor
e pr
oble
m:
M&
E R
esul
ts a
re n
ot r
efle
cted
pr
oper
ly t
o pl
anni
ng p
roce
ss,
impr
ovin
g im
plem
enta
tion
, and
ac
coun
tabi
lity.
-107-
Prog
ress
rev
iew
of
Prob
lem
s to
hav
e be
en s
olve
d in
M&
EW
hat
wer
e m
ain
caus
es o
f co
re
prob
lem
?
1. L
uck
of H
uman
Res
ourc
es in
M&
E2.
Ine
ffic
ient
, unc
lear
M&
E Sy
stem
, P
roce
ss, a
nd T
ools
3. L
uck
of li
nkag
e be
twee
n M
&E
offi
cers
an
d P
lann
ers
/Dec
isio
n M
aker
s4.
Luc
k of
aw
aren
ess
of M
&E
impo
rtan
ce
-108-
Cons
eque
nces
of
the
Prob
lem
In
crea
sed
risk
of f
orm
ulat
ing
unre
alis
tic
proj
ects
;
Serio
us c
onse
quen
ces
and
gaps
in p
olic
y fo
rmul
atio
n an
d im
plem
enta
tion;
Lo
w L
evel
of
inst
itutio
naliz
atio
n of
info
rmat
ion;
In
com
plet
ion
of d
evel
opm
ent
proj
ect
in
stip
ulat
ed p
erio
d;
N
ot t
o m
aint
ain
an a
ppro
pria
te s
tand
ard
of
proj
ects
; an
d
Lack
of
inco
rpor
atio
n of
exp
erie
nces
gai
ned
from
com
plet
ed p
roje
cts
in t
he f
orm
ulat
ion
proc
ess
of n
ew p
roje
cts
-110-
Prog
ress
rev
iew
of
Prob
lem
s to
hav
e be
en s
olve
d in
M&
E
2. M
&E
Syst
em, T
ools
, and
Pro
cess
-111-
Prog
ress
rev
iew
of
Prob
lem
s to
hav
e be
en s
olve
d in
M&
E
3. L
inka
ge b
etw
een
M&
E of
fice
rs a
nd
Pla
nner
s /D
ecis
ion
Mak
ers
-112-
Prog
ress
rev
iew
of
Prob
lem
s to
hav
e be
en s
olve
d in
M&
E
Wha
t ar
e co
ntin
uous
issu
es t
o be
ta
ckle
d ? in
Nex
t se
ssio
n
-113-
Dev
elop
men
t Re
sults
Pra
ctic
es in
Nep
al
Leve
l P
lann
ing
Bud
geti
ng
Mon
itor
ing
Res
ults
Nat
iona
l PR
SPLo
g fr
ame
base
dM
TEF
PMAS
PRSP
pr
ogre
ss r
epor
ts
Sect
oral
Busi
ness
pla
nAs
sec
tora
l PRS
MTE
FPM
ASSe
ctor
al
mat
rices
Proj
ect
Log
fram
eM
anda
tory
Perf
orm
ance
ba
sed
budg
etPe
rfor
man
ce
indi
cato
rs
Loca
l D
PPs
D-M
TEF
DPM
AS
-114-
Alig
nmen
t Mod
el
Sect
oral
con
trib
utio
n to
pov
erty
redu
ctio
n
Goa
ls,
Targ
ets
+ In
dica
tors
Peri
odic
Pla
n
Sect
or C
hapt
ers
+ M
IS In
dica
tors
Com
mon
Indi
cato
rs
Sect
oral
M
aste
r Pla
ns,
Sect
oral
Po
licie
s, e
tc.
Prog
ram
/ Pr
ojec
tsM
DG
sPR
SP /
Peri
odic
Pla
nSe
ctor
Pla
ns/
Stra
tegi
es
-115-
16
AD
B T
A 4
765
MfD
R -I
Hel
p m
ains
trea
m M
fDR
in N
PC
, MLD
&
MP
PW
G
uide
lines
/res
ult
mat
rixes
PM
AS/M
&E/
Perf
orm
ance
indi
cato
rs
Inte
r-m
inis
teria
l roa
d se
ctor
pla
n
H
elp
Jhap
a, D
ang
and
Jum
la D
DC
s op
erat
iona
lize
MfD
R-
Stre
ngth
enin
g D
IDC
-D
PMAS
/M&
E/Pe
rfor
man
ce in
dica
tors
-H
ouse
hold
sur
vey
in o
ne d
istr
ict
re-g
over
nanc
e se
rvic
es/b
enef
its
-116-
17
TA
476
5 P
roje
ct O
bjec
tive
s co
ntd.
C
apac
ity
build
ing
-Tr
aini
ng (
exte
rnal
/dom
estic
)-
Info
rmat
ion
netw
orki
ng a
nd e
quip
men
ts
R
ETA -An
othe
r AD
B TA
hel
ping
to
asse
ss a
nd c
arry
out
M
fDR
at D
hanu
sha
Dis
tric
t D
evel
opm
ent
Co
mm
ittee
, Min
istr
y of
Edu
catio
n an
d Sp
orts
an
d D
epar
tmen
t of
Wat
er S
uppl
y an
d Se
wer
age,
MPP
W
-117-
Lear
ning
St
rong
Lea
ders
hip,
pol
itica
l com
mitm
ent
and
min
dset
sup
port
ing
orga
niza
tiona
l ob
ject
ive
In
stitu
tiona
l mem
ory
and
rete
ntio
n of
st
aff
Li
nkin
g m
onito
ring
with
ince
ntiv
es (
both
in
divi
dual
and
org
aniz
atio
n) a
nd
acco
unta
bilit
y st
ruct
ures
Av
aila
bilit
y of
Bas
elin
e da
ta f
or
indi
cato
rs
-118-
Lear
ning
Con
td.
Co
ntin
uous
mon
itorin
g an
d su
ppor
t fr
om h
ighe
r au
thor
ities
Cont
inui
ty o
f M
TEF
Co
ntin
uous
han
ds-o
n su
ppor
t pa
rtic
ular
ly in
the
dis
tric
ts
Incr
ease
d m
otiv
atio
n at
ag
ency
/per
sona
l lev
el
-120-
Modality
Ensure implementation transparency Improved M&E related guidelines etc in an integrated way with practical level improvements
(uniform to all)
Points discussed to consider while formulating II Phase:
M&E project should come under SWAp modality M&E system needs to be diagnosed to find out the real gap
What sort of interface between the planning and M&E functions well
How to make the tools… developed operational Can we refine tools at the sectoral level We need to focus HR development as like in the first phase M&E tools should be developed on sectoral b asis Focus on RB M&E Guidelines Evaluation system (as like in Vietnam), third party evaluation system needs to be introduced
Design of the project needs to be flexible so that during the implementation we can switch over to some activities to some other felt important
Logistics support should also be included Is not the scale of the project too small, if it will be considering only the Sindhuli corridor. How the linkage will be developed at the NPC level with this level of intervention?
-121-
Priority needs to be given to those areas felt necessary and /or left during the implementation of Phase I
Gaps/needs/issues of the sectoral ministries needs to be addressed (Database, M&E tools, etc.)
Skill needs to be developed in the area of policy analysis Difference between the monitoring to be done by Ministry, Department and District needs to be delineated (district – implementation; ministry – policy; deparment – program ). How can we link the district level monitoring to the higher level?
Focus on accountability might strengthen M&E system Clear linkage has not been established in our design, therefore, the project needs to focus on establishing clear linkages among activities, outputs and so on so that clear indicators can be set out for monitoring. (Health, Education have good indicators; but agriculture is vauge).
More investment is necessary for database management To address the above problems, sectoral MIS might be helpful
Capacity building system needs to be continuous Orientation is necessary on Pink Book (still we find some inconsistencies and unclear)
Present reporting is quantitative (eg. 67 % refers for what qualitative value: necessity …… number of teachers received training)
-122-
Such kind of project needs to be internalized in our own system. Should be need based, not supply based.
Maximum utilization of resources. More funds needs to be spend for program and not for consultancies.
Flexibility should be there for the targeted areas. Instead of giving high money for consultant, project itself can do the need assessment.
Develop implementation modality of all the existing systems/tools
Operationalization of RB M&E guidelines even at the ministry level might be a challenge
How to ensure good flow of information between ministry and the districts
Reflection of M&E results after analysis (at the ministry level and NPCS) – necessary to improve the performance
Discussion will be continued to discuss with NPCS and line ministries while formulating the II phase.
NPC – RB M&E guidelines. Most of the issues raised in this workshop will be solved after the implementation of the guidelines for ex. Indicators, linkages among offices
Capacity building support IT system support (DPMAS‐already finished, PMAS, PPIS) rigorous training might be necessary
-123-
Need to internalize these systems – MfDR: running, UNDP: still running, Australian: thinking to support, JICA is planning) ‐
-124-
THE PROJECT on STRENGTHENING MONITORING AND EVALUATION SYSTEM in NEPAL (SMES) Phase 2
Participatory Workshop on SMES Phase 2 1 Background
Nepal is standing in political and social transition period with the dream of entering the New Nepal. Good Governance including strengthening M&E is one of the prioritized issues for the Government of Nepal (GoN).
GoN has committed to strengthen the M&E system to enhance their governance and to improve their socio-economic growth by effective and efficient use of the development resources. In order to support the GoN efforts, JICA has provided the technical assistance “the Strengthening the Monitoring and Evaluation System in Nepal (SMES) Project”. The counterpart agency of the SMES Project is National Planning Commission Secretariat (NPCS) with the key line ministries as partner ministries.
Through the SMES Project the key M&E human resources, core trainers and national trainers were trained and the monitoring reporting formats and the M&T training modules were updated and produced. However, further capacity development would be needed in order to institutionalize the more effective M&E system and to make the GoN agencies take action. The improvement in the monitoring system at the district level is also given high priority, for smooth promotion of the GoN decentralization and devaluation policy,
To cope with these challenges, the GoN requested JICA to conduct the SMES Phase 2 for providing further technical assistance to develop capacity in M&E.
JICA is conducting the Detailed Planning Survey for SMES Phase 2. Participatory Workshop will be conducted with concerned persons as one of the activities of the Survey.
2 Objective
The objectives of the Participatory Workshop are:
(1) to provide a platform to discuss M&E issues for the government officers and other concerned persons in planning and M&E field in the district;
(2) to discuss improvement area related to M&E in the district; and (3) to prepare the action plan to develop the individual and institutional M&E capacity
to i) implement project, ii) monitor project, and iii) use the M&E results effectively.
3 Expected participants (The total number is around 25.)
LDO, Planning Officers, Social Development Officers, and other officers related to planning and M&E at DDC
Planning Officers and Officers in charge of M&E of line agencies Other concerned persons in charge of planning and/or M&E
4 Schedule and Venue (Tentative)
Date: 23 July 2010 Time: to be considered Venue: Meeting Room at DDC (tentative)
-125-
Polic
ies
/ G
uid
elin
es
/Form
ats
Org
aniz
atio
n S
tructu
re /
Fin
ancia
l / H
um
anR
eso
urc
es
Pra
ctices
of
M&E
Utiliz
atio
n o
f M
&E
Resu
lts
Oth
er
Unst
able
indi
cat
ors
to b
em
onitore
dLac
k of
eff
ective
ness
of
the m
onitoring
mechan
ism
Inad
equ
acy
in im
pact
asse
ssm
ent
Monitoring
bein
gdo
ne f
or
the s
ake o
fm
onitoring
Difficulty
in f
ield
monitoring
due t
oge
ogr
aphic
alN
o d
irective
s fr
om
DW
SS
rega
rdin
g filli
ng
of
the
form
ats;
ask
ing
only
for
sendi
ng
progr
ess
repo
rt
Ineff
ective
M&E b
eac
ause
of
hav
ing
monitoring
from
the im
plem
enta
tion u
nit
Eye
witness
typ
e o
f m
onitoring,
not
base
d on s
om
e indi
cat
ors
Sugg
est
ions
from
monitoring
are n
ot
impl
em
ente
d
Less
motiva
tion f
or
monitoring
as t
he
probl
em
s ra
ised
are n
ot
addr
ess
ed
Repo
rtin
g fo
rms
are v
ery
com
plex
for
impl
em
enta
tion
Lac
k of
prope
r kn
ow
ledg
e o
n m
onitoring
Monitoring
is n
ot
condu
cte
d at
diff
ere
nt
leve
l of
impl
em
enta
tion
Fin
dings
of
the
monitoring
are n
ot
disc
uss
ed
and
utiliz
ed
in f
urt
her
Monitoring
should
be
on-go
ing
activi
ty
Com
mitte
e led
by D
DC
exi
sts
with T
oR
, bu
t th
ispr
ocess
is
not
eff
ective
Lac
k of
qual
ifie
d a
nd
cap
able
sta
ff o
nm
onitoring;
thus
hav
ing
poor
monitoring
Monitoring
is n
ot
tied
up
with
obj
ective
/qu
antita
tive
/qu
alitat
ive
Pro
blem
s re
port
ed
to t
he c
ente
r ar
enot
addr
ess
ed
Not
syst
em
led,
but
indi
vidu
al b
ased
gove
rnan
ce
Not
cle
ar o
n m
onitoring
and
eva
luat
ion
repo
rt w
riting
Mis
mat
ch o
f im
plem
enta
tion
tim
ing
and
monitoring
tim
ing
Futu
re p
lan s
hould
be b
ased
on M
&E
Monitoring
agency
isnot
functional
Difficult t
o m
anag
e t
he t
ime o
f th
e p
ers
on
resp
onsi
ble f
or
monitoring
No f
eedb
ack
is p
rovi
ded
from
the a
uth
orities
on t
he r
esu
lt o
fm
onitoring
and
repo
rtin
gLac
k of
reso
urc
es
Monitoring
is n
ot
eff
ective
; no
monitoring
culture
Lac
k of
staf
fR
evi
ew
is
just
in q
uan
tity
Lac
k of
trai
nin
g to
monitoring
staf
fN
o e
valu
atio
nN
o v
ehic
le f
or
field
vis
itN
o b
udg
et
as p
er
the n
eeds
No s
epa
rate
budg
et
for
M&E
M&E R
ela
ted
Pro
blem
s - O
utp
ut
of Sin
dhuli
Work
shop