TÜV SÜD China Slide 22017TÜV PV Quality Certification Research Report3/18/2018
----PV Chief Editor Wang Chao
Led by leaders of the program, PERC, double-sided, half piece, laminated tile and other technologies gradually
enter into large-scale production. China's photovoltaic batteries and module products have a blossoming trend. Study
of the product performance will also move up to a new step. Different types of products have their own advantages
under different conditions. No matter how innovative products are, quality dominates the first place. How to instruct
electric power design institute and power plant investment enterprise to carry out equipment selection? TÜV has
played an exemplary role by formulating this research report.
TÜV took the lead in China to open an outdoor empirical base of product testing, accumulated a lot of data and
experience. Their testing results of more than 30GW at downstream photovoltaic power plants also give them a
stronger say in the status of use of products. Finding problems is to solve and avoid problems. We believe that TÜV
can make a huge contribution to promoting the wholesome development of the industry.
1 Market Analysis
2 Quality Status
3 Certification Status
4 Failure Cases Sharing
5 Solutions
TÜV SÜD China Slide 33/18/2018 2017TÜV PV Quality Certification Research Report
TÜV SÜD Slide 4
Explosive Growth in 2017 Gradation Stability in 2018
3/18/2018 2017TÜV PV Quality Certification Research Report
Data Source: Public Data Collation IRENA
Shenwan Hongyuan Research
Global PV New Installation Forecast(Unit:GW)
Year-on-Year
Growth%
New Installed
Capacity
-10%
0%
10%
20%
30%
40%
50%
60%
0
20
40
60
80
100
120
140
2012 2013 2014 2015 2016 2017 2018E 2019E 2020E 2021E 2022E
100 GW+ 30%+
TÜV SÜD Slide 5
Rapid Growth of Global PV Application Market
China
Japan
USA• New installed capacity about
14.76GW
• Market accounted for 20%
• The market tends to stabilize.
India • Emerging potential
markets
• New installed about 8.8
GW
• Market accounted for
12%
• Newly installed capacity about 6.9 GW
• Market accounted for 7%
• The market tends to stabilize.
• Newly installed capacity more
than 53GW
• Market accounted for 46%
• Ranked first in the world
• New installed capacity about
8.6 GW
• Market accounted for 11%
• The market tends to stabilize.
Europe
3/18/2018 2017TÜV PV Quality Certification Research Report
China46%
USA20%
India12%
Japan11%
欧洲7%
其它4%
China, USA, Japan and India become the main demand force of PV market in
the world,
Global PV Market Access
TÜV SÜD Slide 62017TÜV PV Quality Certification Research Report3/18/2018
China CQC
China CGC Japa
n JET
美国 CEC
Australia
CEC
IsraelS
II
Brazil
INMETR
O
Canada
CSA
Dubai
DEWA
Italy
UNI 9177
Russia GOST
Saudi
SASO
USA UL
India BIS
TÜV SÜD Slide 7
China’s new installed capacity in 2017 is far exceeding
expectations.
3/18/2018 2017TÜV PV Quality Certification Research Report
Data Source: Public Materials Collation
China PV Installed Capacity Comparison(Unit:GW)
Accumulated
Installation
Capacity
New
Installation
Capacity
0.52 2.6
3.5
12.9
2
10.6 15
.13
34.5
4
53.9
8
0.89 3.5 7
19.4
2 28.0
5
43.1
8
77.4
2
137.
62
2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 2 0 1 5 2 0 1 6 2 0 1 7
53 GW+ 53.6%+ 405%
Domestic New PV Installed Capacity Exceeding 50GW in 2017
TÜV SÜD China Slide 82017TÜV PV Quality Certification Research Report3/18/2018
Item Data Sources/Assumptions 2017 2018E 2019E 2020E
Planning of Centralized Power
Station
General Centralized Power StationPV Power Station New Construction Scale Program 2017-
202014.02 8 8 6
Centralized PV Poverty-Alleviation Power
Station2.98 7 5 4
Total Planning of Centralized Power
Stations17 15 13 10
Planning Leader SchemePV Power Station New Installation Scale Program 2017-
20208 8 8 8
Plan Totals(Excluding
Distribution)25 23 21 18
Self-Managed Regional Centralized
Power Station
Beijing, Tianjin, Shanghai, Fujian,
Chongqing, Tibet, HainanEstimate according to the size of the area declaration 1.2 1.2 1.2 1.2
Distribution
Village-level PV Poverty-Alleviation Power
Station(including household)Circular of the State Council on Issuing “Thirteen-Five”
Planning for Poverty Alleviation2.18 5 4 3
Self-Contained Ground Centralization <6MW 10 0 0 0
Household distributed power plant +
Industrial and Commercial Distributed
Power Plan (excluding poverty alleviation)10 20 25 30
Distribution Totals 22.18 25 29 33
Additional Indicator Additional Indicator Bases on historical experience 5.6 0 0 0
Totals 53.98 49.2 51.2 52.2
Data Source: National Energy Administration, Shenwan Hongyan Research, Public Data Census
Table:PV New Installed Capacity Estimated in China 2017-2020(Unit:GW)
TÜV SÜD Slide 9
China's Domestic Application Market: Dual Conversion of Layout Structure
Outside the Northwest
• 24.80GW outside the northwest
• Accounted for 72% of the
whole country
• Central region of China has become a major growth area,
accounting for 89% of the country’s new installation.
• Shangong、Henan、Anhui
• Hebei、Jiangxi、Shanxi
• Zhejiang、Hubei、Jiangsu
Others
• New Installation of Distributed
dominates in the coastal
provinces of Zhejiang,
Shandong, Jiangsu,
Guangdong
• Ningxia and Shanxi etc. rely
on poverty-alleviation power
plants. The new installation
scale is also larger.
Northwest of China
9.74GW in the northwest region
Accounted for 28% of the whole
country
Central Part of China
Big shift in market structure: From ground power station to distributed type
Market Structure: Shifting from the northwest to the central and eastern
regions.
3/18/2018 2017TÜV PV Quality Certification Research Report
Frequently Certified New Products Flourishing Technical Innovation
TÜV SÜD Slide 102017TÜV PV Quality Certification Research Report
Single Multi-Crystal
Contests
• More mono crystal
certification projects
• Black Silicon
Products
Silicon Wafer
• Silicon Wafer
Thinner
• Cutting Technology
Diamond Wire Cutting
Cell
• Multigrid Line
• Black Silicon +
PERC
• N-Type、double-
sided
• HIT
• WMT
modules
• Half Piece
• Double Glass
• Laminated Tile
• Double-Sided
• Intelligent
• Reflective Sticker
• Double Glass Assembly
of Back White
3/18/2018
Increased Pressure on Enterprises’ Costing Down
module Risk Increasing Gradually
TÜV SÜD China Slide 112017TÜV PV Quality Certification Research Report3/18/2018
Improving
Efficiency
Costing
Down
Structure
Innovation
Cell
Innovation
Material
Innovation
Thinner
Silicon
Wafer
Thin Glass
Frame
▪ Half Piece
▪ Laminated
Tile
▪ Double
Glass
• N Type
• Single
Silicon
• HIT
• WMT
• Double-
Sided
• Black
Silicon +
PERC
• Multi-Grid
Line
▪ Reflective
Foil White
EVA
▪ backplane
Glass
backplane
EVA
Increased
Risk
1.New Materials: Long-Term stability needs to be assessed (Resistance
to humidity, UV, wet freezing, mechanical impact)
2.High-Efficiency Cable: Power Generation Performance Assurance
(Anti-PID, hot spot, temperature rise, power attenuation)
1 Market Analysis
2 Quality Status
3 Certification Status
4 Failure Cases Sharing
5 Solutions
TÜV SÜD China Slide 123/18/2018 2017TÜV PV Quality Certification Research Report
2017 TÜV SUD PV Enterprise Market Research – BASIC Data
TÜV SÜD Slide 132017TÜV PV Quality Certification Research Report3/18/2018
65%
9%
12%
5%
3%
4%
3%
0% 20% 40% 60% 80%
生产方
采购方
EPC
金融机构
分销商
第三方检测机构
其他
Customer type
modules, 38%
Inverter, 9%Power Staion,
21%
Stent, 4%Tracker, 2%
Junction Box, 8%
Other, 18%
Product Types
37% 23% 6%
9%
14%
24%
53%
0% 10% 20% 30% 40% 50% 60%
≤50人
50-200人
200-500人
≥500人
Company Scale
• Respondents
China enterprises related to PV industry
• Statistical Data
136 Valid Questionnaires
2017 TÜV SUD PV Enterprise Market Research----BASIC Data
TÜV SÜD Slide 142017TÜV PV Quality Certification Research Report3/18/2018
24%
56%
19%
0%
10%
20%
30%
40%
50%
60%
基层 中层 高层
Interviewee Position
37% 23%
16% 12%
6%
48%
9%
17%
2% 1% 4% 2% 5% 5% 3% 4%0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
江苏浙江上海安徽东北山东河北河南江西北京广东海外其它
Area of the Respondent
37%
23%
16%
12%
6%3%
Quality Status of PV Products
TÜV SÜD Slide 152017TÜV PV Quality Certification Research Report3/18/2018
45%
41%
9%
5%
0%
满意
一般
很满意
比较满意
很不满意
1 .SATISFACTION OF RESPONDENTS TO THE PV PRODUCTS
27%
18%
16%
14%
13%
9%
2%
0%
可靠性
寿命
安全性
电性能
内在质量
经济性
外观质量
其他
2 . THE MAIN PROBLEMS OF PV PRODUCTS QUALITY
40%
27%
13%
12%
8%
行标
GB
SEMI
IEC
其他
3 .FORMULATED STANDARDS INVOLVED IN RESPONDENTS’ COMPANIES
35%
33%
21%
9%
3%
较高
中等
非常高
偏低
不清楚
4 .CONTRIBUTION LEVEL OF RESPONDENTS’ COMPANIES TO
QUALITY CONTROL
Quality Status of PV Products
TÜV SÜD Slide 162017TÜV PV Quality Certification Research Report3/18/2018
16%
33%32%
12%
7%
13%
22%
48%
16%
2%6%
18%
60%
14%
3%
7%
19%
52%
15%
5%
低 较低 中等 较高 很高
QUALITY ENGINEERS’ INCOME LEVEL IN COMPANY COMPARED WITH SALES,
PURCHASING, TECHNOLOGY, MARKET
Technology
Purchasing
Market
Sales
41%
31%
28%
0%
1-3次 /年
5次以上/年
3-5次/年
不参与
5 .RELEVANT STANDARD ANNUAL MEETING ATTENDING FREQUENCY OF
RESPONDENTS’ COMPANIES IN PVQUALITY/CERTIF ICATION
60%
21%
13%
4%
2%
中等
较高
较低
低
很高
6 .QUALITY ENGINEER’S INCOME LEVEL IN YOUR COMPANY
Quality Status of PV Products
TÜV SÜD Slide 172017TÜV PV Quality Certification Research Report3/18/2018
For recent 1 or 2 years, TUV has issued nearly 400 effective monocrystalline and polycrystalline certificates for PV
enterprises, of which more than 90% focus on producing coated-glass. Customers of the backplane enterprise of PV
material with the fluorine backplane accounts for 80%.
Regarding to the most important link in improving quality management, 26% of the respondents thinks quality material
control and production process quality management level is in the first place, followed by the standard improvement and the
overall quality performance improvement, as well as the testing means, certification management and quality inspection
before delivery in the third-party supervision.
7.TÜV SUD PV Material Customer Valid Certificate Ratio of Recent 1-2
Years
90%
10%
镀膜玻璃 普通玻璃
80%
20%
含氟背板 不含氟背板
26%
26%
13%
12%
9%
8%
6%
质量材料控制
生产环节质量管理水平
标准完善
提升整体质量表现
第三方验货监造测试手段
认证管理
出厂前质检
THE MOST IMPORTANT L INK IN IMPROVING QUALITY
MANAGEMENT
Quality Status of PV Products
TÜV SÜD Slide 182017TÜV PV Quality Certification Research Report3/18/2018
8.Frequent Quality Problems of PV Products
20%
17%
14%
13%
11%
10%
8%
7%
1%
隐裂
衰减过多
接线盒/二极管/连接器问题
质量一致性较差
热斑
PID
蚯蚓纹
安全隐患
其他
M O D U L E S
47%
21%
19%
12%
0% 10% 20% 30% 40% 50%
故障率高
过热
效率低
炸机风险
I N V E R T E R
21%
13%
13%
11%
10%
9%
8%
7%
5%
3%
0% 5% 10% 15% 20% 25%
安装不规范
设计缺陷
运维不规范
基建问题
设备质量
PR效率
线路链接问题
衰减过多
监控
箱变
P O W E R S TAT I O N
28%
28%
20%
15%
8%
0% 5% 10% 15% 20% 25% 30%
接线盒
背板
连接器
EVA
线缆
M AT E R I A L
Quality Status of PV Products
TÜV SÜD Slide 192017TÜV PV Quality Certification Research Report3/18/2018
9.Regarding to the Non-Standard Test Project, 13% of respondents are concerned about
outdoor power generation demonstration and long-term aging. Secondly, 11% of respondents
care about IEC new standard. 10% cares about PID.
0% 2% 4% 6% 8% 10% 12% 14%
长期老化
户外发电量实证
IEC新标
PID
寿命测试
动态载荷
1500V
新兴市场认证测试项目
沙尘
盐雾氨气
蜗牛纹
防眩光
不均匀雪载
PANFILE文档建立
NON-STANDARD TESTING PROJECT OBSESSING THE RESPONDENTS
8%
13%
13%
11%
10%
9%
8%
8%
4%
4%
4%
3%
3%
2%
1 Market Analysis
2 Quality Status
3 Certification Status
4 Failure Cases Sharing
5 Solutions
TÜV SÜD China Slide 203/18/2018 2017TÜV PV Quality Certification Research Report
Certification Status of PV Products
TÜV SÜD Slide 212017TÜV PV Quality Certification Research Report3/18/2018
1. 51 of the respondents have their own quality
testing laboratories, of which 71% is the CNAS lab.
71%
29%
有
无
S T A T U S O F Q U A L I T Y T E S T I N G L A B S O W N E D B Y T H E R E S P O N D E N T S
18%
17%
16%
16%
13%
11%
8%
>500万
200-500万
不清楚
100-200万
50-100万
0-50万
>1K 万
2 . E S T I M AT E D A n n u a l e x p e n d i t u r e o n a c c r e d i t a t i o n o f r e s p o n d e n t s ’ C o m p a n i e s .
15%
15%
13%
13%
12%
11%
8%
6%
5%
1%
1%
认证机构资质
价格
测试周期
技术沟通
品牌知名度
配合度
一站式资源整合
销售服务
创新能力
其他
关系
3 . F a c t o r s t o b e c o n s i d e r e d b y e n t e r p r i s e s i n s e l e c t i n g c e r t i f i c a t i o n o r g a n i z a t i o n
32%
26%
12%
10%
7%
6%
5%
2%
1%
TÜV SÜD
TÜV Rheinland
CQC
UL
CSA
Intertek
SGS
其它
BV
4 . C e r t i f i c a t i o n o r g a n i z a t i o n c o m m o n l y u s e d b y t h e r e s p o n d e n t s ’ c o m p a n i e s
Certification Status of PV Products
TÜV SÜD Slide 222017TÜV PV Quality Certification Research Report3/18/2018
64%
32%
3%
1%
非常重要
重要
一般
不重要
5 . T h e i m p o r t a n c e o f c e r t i f i c a t i o n t o r e s p o n d e n t s ' c o m p a n i e s
24%
22%
20%
13%
8%
8%
4%
0%
加快测试周期
加强对标准理解的培训课程
降低报价
加强项目前期沟通
改进工程师沟通服务
帮助准备材料文件
工厂规范
其他
6 . I m p r o v e m e n t s u g g e s t i o n g i v e n b y r e s p o n d e n t s t o o r g a n i z a t i o n
25%
15%
14%
10%
10%
10%
8%
8%
1%
测试周期过长
公司内部协调流程
标准不熟悉
样品准备
材料文件准备
对认证了解程度较低
预算不足
销售/项目工程师沟通
其他
7 . K e y f a c t o r s a f f e c t i n g c e r t i f i c a t i o n p r o g r e s s
19%
19%
18%
13%
11%
9%
6%
5%
差异化认证
买家定制服务
光伏系统安全
长期老化
智能关断
法规强制
拉弧检测
市场宣传
8 . F u t u r e P V C e r t i f i c a t i o n Tr e n d
1 Market Analysis
2 Quality Status
3 Certificate Status
4 Failure Cases Sharing
5 Solutions
TÜV SÜD China Slide 233/18/2018 2017TÜV PV Quality Certification Research Report
Failure Cases Analysis
TÜV SÜD China Slide 242017TÜV PV Quality Certification Research Report3/18/2018
3.8%41%
Due Diligence, Power Station Assessment
Project Failure Ratio with sampling(PID, EL,
Attenuation)
VS
Pure TÜV Certification
Testing Failure Project
Ratio
Testing Failure Cases Sharing of PV Products
TÜV SÜD Slide 252017TÜV PV Quality Certification Research Report3/18/2018
Wet Freeze Test
Mechanical Load Test (ML)5400
Thermal Cycling Test(TC)200
Hot Spot Test
Damp Heat Test (DH)1000 h
Accessibility Testing(ACC)
Temperature Test(TT)
Impulse Voltage Test(IV)
Module Breakage Test(MB)
Reverse Current Overload Test (RC)
IEC 61215:2005 IEC 61730-2:2004
2. Failure Ratio of Testing Project Ranking
Top5
1.组件在电站应用中最常见的失败因素
接线盒故障
电池破片/隐裂
主栅线虚焊
蜗牛纹
灰尘/阴影导…
EVA黄变或脱落
背板开裂
玻璃面板破碎
连接器故障
其他
12%
10%
19%
13%
11%
11%
8%
1%
4%
11%
Testing Failure Cases Sharing of PV Products
TÜV SÜD Slide 262017TÜV PV Quality Certification Research Report3/18/2018
3. IEC 61215-2:2016,IEC 61730-2:2016 New Standard Testing Failure Project Distribution
29%
19%
19%
10%
7%
6%
3%
3%
3%
序列B
可接触性测试
静态机械负载测试
湿热1000 h
热斑测试
材料蠕变试验
耐久性标记
湿冻测试
冰雹冲击试验
Testing Failure Cases Sharing of PV Products
TÜV SÜD Slide 272017TÜV PV Quality Certification Research Report3/18/2018
4. IEC 61215:2005 Testing Failure
Project Distribution
5. IEC 61730-2:2004 Testing Failure
Project Distribution
54%
21%
9%
7%
7%
3%
可接触性测试
模块破坏测试
温度测试
冲击电压试验
反向电流过载试验
接地连续性测试
40%
21%
13%
11%
9%
3%
2%
1%
0%
湿冻测试
热循环测试200
湿热测试1000 h
热斑测试
机械载荷试验5400 pa
机械载荷试验2400 pa
热循环测试50
引出端端子强度测试
冰雹冲击试验
1 Market Analysis
2 Quality Status
3 Certification Status
4 Failure Cases Sharing
5 Solutions
TÜV SÜD China Slide 283/18/2018 2017TÜV PV Quality Certification Research Report
TÜV SÜD 2017TÜV PV Quality Certification Research Report3/18/2018
Legacy: Successful Experience of over 150 Years
1866 1906 1938 1964 1991 2006On 6th January, 22
industrialists jointly
established Steam
Boiler Inspection
Association in
Manheim.
The first periodic
technical inspection of
vehicles is conducted.
After the national
standardization system
was officially launched,
14 regional inspection
associations, known
as TÜV, were born.
Since the inspection of
the cable car accident
in Cape Town of South
Africa, business
development has
expanded to other
countries and regions
outside Europe。
Asian division has
been established in
Hong Kong, Japan,
Taiwan and Shanghai,
while creating a North
American division.
Singapore PSB Group
was acquired and
TÜVTÜRK mark was
launched in the
following year.
1881 1921 1951 1989 1996 NowThe negotiation and
determination of the first
binding standards related to
the safety of boilers is
conducted to set a
foundation for the
development of a unified
technical inspection work
pad.
A report on dust
pollution was issued to
advocate the
protection of the
environment.
TÜV organization
authorized regular
testing of all motor
vehicles.
TÜV products service
company was founded
and TÜV take the lead
in launching the
concept of global
Certification.
TÜV South Deutsche
Group was jointly
formed by TÜV
organizations from
each states of the
South of Germany
Over the past
150+years, TÜVSouth
Deutsche Group has
been building and
sharing reliance to
shape the future of
business and society.
TÜV SÜD 3/18/2018
TÜV South Deutsche Group is growing stronger gradually.
1-stop solution
provider
1,000Worldwide Distribution
2016 sales hit new
highs.
24,000 employees worldwide
Oversea sales in Germany
accounted for 43%.
574,000 pieces of certification
were issued. 100% Independent
and Impartial
150+Experience in quality,
safety and sustainable
development
2017TÜV PV Quality Certification Research Report
€2.3b
24,000 43%
574,000 100% 1
TÜV SUD PV Technical Service
TÜV SÜD Slide 312017TÜV PV Quality Certification Research Report3/18/2018
• PV modules
• PV Cables
• PV Materials
• PV Bracket
• PV Electronic
System
Equipment
• PV Power
Station
• Chargeable Pile
TÜV PV Technical Service
TÜV SÜD Slide 322017TÜV PV Quality Certification Research Report3/18/2018
Manufacturer/O
peration PartyService Overview Test
Cer
tific
ate
Multin
ational
Certifi
cation
Asse
ssm
ent
Trai
nin
g
PV modules
• IEC 61215 & IEC 61730 new standard certification
• Thresher long-term anti-aging Test
• PV∙Discovery (Outdoor Power Generation
Demonstration)
• IEC TS 62941:2016 Ground modules
• Transport Testing and Certification
• Power Measurement System Evaluation
• Uncertainty assessment
• PANFILE
• Dynamic Load Testing/Certification
• Potential Induced Attenuation
Test/Certification
• Snail Pattern Test/Evaluation
• Dust Test/Certification
• Salt Spray Test/Certification
• Ammonia Test
• Light-induced Attenuation
Test/Evaluation
• Intelligent module Certification
• Double-Sided module Test Certification
√ √ √ √ √
PV Cables
• PV Cable: VDE 2283-4,EN 50618:2014
• Chargeable Pile Cable: EN 50620:2016
(TÜV SUD Enterprise Standard)• Electric Vehicle Cable : ISO 6722-1:2011,ISO
14572:2011
• Robot Cable
(TÜV SUD Enterprise Standard)• Rail Locomotive Cable
EN 50264,EN50306,EN 50382
• Low Smoke halogen-free flame
retardant cable, with hot wire etc.
√ √ √ √
PV Materials
• backplane material
• Packaging Materials of EVA
• Sealant and Potting Glue
• Application Environment of Backplane Material
• Differentiation
• Glass
• Mounting Bracket√ √ √ √
PV Electronic
System
Equipment
• Energy Storage System
• Large Energy Storage System
• PV Grid-Connected Inverter
• PV Combiner Box
• Intelligent PV Module√ √ √ √ √
PV Power Station
• Site Evaluation
• Power Generation Forecast Assessment
• Design Evaluation
• evaluation of Critical contracts and tender
documents
• Quality control of key equipment
• Construction Control
• Acceptance inspection and testing
• Performance evaluation
• Operation and Maintenance Evaluation
√ √