Projecten Stad Kortrijk
KortrijkIN18 november 2016
![Page 2: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/2.jpg)
OVERLEIE2012
Stadsvernieuwingsprojecten
![Page 3: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/3.jpg)
Stadsvernieuwingsproject Overleie
![Page 4: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/4.jpg)
CAMPUS KORTRIJK WEIDE
STATIONSOMGEVING
![Page 5: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/5.jpg)
![Page 6: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/6.jpg)
Situering (2/2)
6
CVO’s
Evenementenplein / parking
Zwembad
Stadspark
Incubator
Tranzit
fuifzaal
![Page 7: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/7.jpg)
CVO’s
![Page 8: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/8.jpg)
CVO Miras : opening jan 2017
Campus Kortrijk Weide
![Page 9: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/9.jpg)
Fuifzaal
![Page 10: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/10.jpg)
Fuifzaal
Campus Kortrijk Weide
![Page 11: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/11.jpg)
Fuifzaal: opening juni 2017
Campus Kortrijk Weide
![Page 12: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/12.jpg)
Loods
![Page 13: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/13.jpg)
economische invulling
incubator + ruimte voor
trekkersbedrijven
urban sports jongerencentrum tranzit fuifzaal
13
Campus Kortrijk Weide Loods
![Page 14: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/14.jpg)
14
Campus Kortrijk Weide Loods: Incubator +
• Behoud open ruimtegevoel
• Binnenstraat: onthaal – koffie – horeca - flexplekken
• Functietrein met vergaderlokalen, sanitair, …
• Flexibele indeling met box-in-box, akoestische gordijnen, …
![Page 15: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/15.jpg)
Incubator +
• Dakwerken in uitvoering• Aanbesteding december• Opening: najaar 2017
![Page 16: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/16.jpg)
Urban Sports
Campus Kortrijk Weide
![Page 17: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/17.jpg)
Zwembad
![Page 18: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/18.jpg)
NIVEAU PARK
Campus Kortrijk Weide Zwembad
![Page 19: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/19.jpg)
BUITENBAD en LIGWEIDE
• Milieu- en bouwvergunning ingediend
• Geplande start werken feb/maart 2017
• Opening half december 2018
![Page 20: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/20.jpg)
![Page 21: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/21.jpg)
![Page 22: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/22.jpg)
Evenementenplein / parking
Stedelijke bevédère: afgewerkt juni 2017Parking: december 2017
![Page 23: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/23.jpg)
![Page 24: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/24.jpg)
Ecologisch park
![Page 25: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/25.jpg)
watertuin
![Page 26: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/26.jpg)
vuurplaats
![Page 27: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/27.jpg)
Fasering van de werken
Campus Kortrijk Weide
fase 2
fase 2
fase 1: opening voorjaar 2018
fase 2: • werfzone rond zwembad: na afronden
ruwbouwwerken zwembad• spoorwegtuin en buurtparking• afwerking: najaar 2018fase 3:• notenbos en vlonder aan de Leie• na werken Leie
fase 3
![Page 28: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/28.jpg)
Spoorwegbrug Drie Duikers
Campus Kortrijk Weide
Huidige situatie: - Overspanning van ca. 45 m- ca. 4 à 5 m ruimte
Toekomstige situatie: - Overspanning van ca. 70 m- 11 tot 11,80 m ruimte + min 6m vrije hoogte
>>> uitvoering 2019/2020
![Page 29: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/29.jpg)
Brug Bissegem - Marke Werken: 2018 – 2019
![Page 30: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/30.jpg)
Leieboorden
![Page 31: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/31.jpg)
Leieboorden
![Page 32: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/32.jpg)
![Page 33: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/33.jpg)
![Page 34: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/34.jpg)
• Voorbereidende werken gestart.• Fase 1: Guido Gezellestraat – Conventstraat – zone Broelhotel• Fase 2: pleinen van gevel tot gevel• Einde: Pasen 2018
![Page 35: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/35.jpg)
Globaal concept heraanleg Oude Leie-arm Kortrijk
Studieopdracht voor de heraanleg van de boorden van de Oude Leie-arm te Kortrijk / Deelopdracht 01 / 11.2005
![Page 36: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/36.jpg)
Parking Texture
![Page 37: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/37.jpg)
Parking Texture
![Page 38: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/38.jpg)
• Overeenkomst begin 2017• Start werken 2018• Opening parking 2019• Project en
omgevingsaanleg 2020
Parking Texture
![Page 39: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/39.jpg)
Reepbrug
![Page 40: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/40.jpg)
STATIONSOMGEVING
![Page 41: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/41.jpg)
Masterplan Stationsomgeving
![Page 42: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/42.jpg)
Masterplan Stationsomgeving
• Fase 1a: bus en fietstunnel + ondergrondse parking• Fase 1b: wegtunnel en bovengrondse aanleg van fase 1
![Page 43: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/43.jpg)
![Page 44: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/44.jpg)
Houtmarkt
![Page 45: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/45.jpg)
Overbekeplein
![Page 46: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/46.jpg)
• Versterken dakplaat: maart –juli 2017
• Heraanleg plein: augustus –december 2017
![Page 47: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/47.jpg)
Heule Centrum
• Opgesplitst in 5 fasen• Lagaeplein steeds
bereikbaar• aanbesteding: begin 2017• Start werken: maart 2017• Einde: oktober 2018
![Page 48: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/48.jpg)
![Page 49: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/49.jpg)
Heule Park
![Page 50: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/50.jpg)
Click to edit Master title style
21 september 2015
Opwaardering Kanaal Bossuit-Kortrijk
Seine-Schelde
Volwaardige Va(+) – verbinding tussen de Leie en de Schelde:
- Een nieuwe klasse Va(+) – sluis- Verdieping van het kanaal
– Kortrijk – Zwevegem: Verdieping tot 4,5 m (Cfr. Seine-Schelde profiel); diepgang 3,5 m (volledig geladen Va-schepen: 3000 ton)
– Zwevegem – Bossuit: Verdieping tot 4 m diepgang tot 3,1 m
Schets inplanting sluis
![Page 51: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/51.jpg)
Click to edit Master title style
21 september 2015
Opwaardering Kanaal Bossuit-Kortrijk
Seine-Schelde
Rechtdoor- versus bypassalternatief
Rechtdoorvariant (a) met subvarianten aan sluis 11
Bypassvariant (b): langs R8 variant
Voorbereidende studies
Ontwikkeling ROCEr wordt beoogd om een regionaal overslagcentrum (ROC) te ontwikkelen langs het Kanaal Bossuit-Kortrijk
![Page 52: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/52.jpg)
Click to edit Master title style
21 september 2015
Opwaardering Kanaal Bossuit-Kortrijk
Seine-Schelde
Vervolgtraject:
Studiebureau aangesteld
Zelfde twee alternatieven (a: rechtdoor en b: bypass) worden verder uitgewerkt :• Op Infrastructureel - technisch vlak (verdieping en
waterpeildaling t.g.v. sluis: impact op bruggen, kaaimuren, oeververdedigingen, …; ontwikkeling ROC)
• Op nautisch vlak (scheepvaart)• Op economisch vlak (financiële business case)• Effectenonderzoeken: o.a. ruimtelijke, milieu- en
erfgoed gerelateerde effecten
![Page 53: 20161118 stadsprojecten](https://reader031.fdocument.pub/reader031/viewer/2022030305/5873d4b21a28ab9d168b6efd/html5/thumbnails/53.jpg)
Click to edit Master title style
21 september 2015
Opwaardering Kanaal Bossuit-Kortrijk
Seine-Schelde
Piloot decreet Complexe Projecten
• Verkenningsfase StartbeslissingBedoeling tegen maart 2017
• Onderzoeksfase: Alternatievenonderzoeksnota voorkeursbesluit
• Uitwerkingsfase: Projectonderzoeksnota projectbesluit. Hierin is het ruimtelijk uitvoeringsplan geïntegreerd.
• Uitvoeringsfase