2 Kuldeep singh CV

7
KULDEEP SINGH CURRICULUM-VITAE (Senior Site Manager) Worley Parsons Education City Tram project, Doha-QATAR E-Mail: [email protected] [email protected] Contact No: +974- 50747172 (Doha-Qatar) TOTAL PROFESSIONAL EXPERIENCE 20 YEARS Presently working (Jan-2014 till date) with Worley Parsons at PMS Education City Tram Project Doha QATAR as Senior Site Manager and looking after Depot and one km viaduct(including two over ground stations) Structural and finishing works. Period Organization Position Project Location Jan-2014 TO Till Date Worley Parsons Sr.Site Manager PMS Education City Tram project Doha -QATAR Dec-2011 To Jan- 2014. Parsons Aecom JV Abu Dhabi(U.A.E Asst.Resident Engineer Etihad Rail Project Abu Dhabi (UAE) April- 2007 To Nov-2011 Systra Parsons JV Dubai ( U. A. E ) Str. Engineer Dubai Metro Rail Project, Dubai DUBAI (U A E) Nov- 2000 To Feb-2007 Gammon India Ltd. (Delhi-India) Project Engineer Delhi Metro Rail project Delhi (India) Oct- 1997 To Sept-2000 Triveni Eng & Industries Sr.Civil Engineer Water Treatment Plant NTPC -U.P(India) India Aug -1995 To Sept- 1997 Triveni Eng & Industries Civil Engineer Sewage treatment plant-Delhi India July 1993 To July-1995 Triveni Eng & Industries CIVIL ENGINEER W.T.P Gujarat India

Transcript of 2 Kuldeep singh CV

Page 1: 2 Kuldeep singh CV

KULDEEP SINGH CURRICULUM-VITAE

(Senior Site Manager)

Worley Parsons

Education City Tram project,

Doha-QATAR

E-Mail: [email protected]

[email protected]

Contact No: +974- 50747172 (Doha-Qatar)

TOTAL PROFESSIONAL EXPERIENCE 20 YEARS

Presently working (Jan-2014 till date) with Worley Parsons at PMS Education City Tram Project Doha

QATAR as Senior Site Manager and looking after Depot and one km viaduct(including two over ground

stations) Structural and finishing works.

Period

Organization

Position

Project

Location

Jan-2014 TO

Till Date

Worley Parsons

Sr.Site Manager

PMS Education City

Tram project

Doha -QATAR

Dec-2011 To

Jan- 2014.

Parsons Aecom

JV Abu Dhabi(U.A.E

Asst.Resident Engineer

Etihad Rail Project Abu Dhabi (UAE)

April- 2007 To

Nov-2011

Systra Parsons

JV Dubai ( U. A. E )

Str. Engineer

Dubai Metro Rail Project, Dubai

DUBAI (U A E)

Nov- 2000 To Feb-2007

Gammon India

Ltd. (Delhi-India)

Project Engineer

Delhi Metro Rail project

Delhi (India)

Oct- 1997 To Sept-2000

Triveni Eng &

Industries

Sr.Civil Engineer

Water Treatment Plant

NTPC -U.P(India)

India

Aug -1995 To Sept- 1997

Triveni Eng &

Industries

Civil

Engineer

Sewage treatment

plant-Delhi India

July 1993 To

July-1995

Triveni Eng &

Industries

CIVIL ENGINEER

W.T.P

Gujarat India

Page 2: 2 Kuldeep singh CV

Assignments completed in Metro Rail/Rail Projects/Tram Project (DUBAI METRO, DELHI METRO, ETIHAD

RAIL, and Education City Doha Tram Project): –

Sub &Super Structural Works-Piling, Pile cap, Pier, Pier cap, Cast Insitu Viaduct, Earth works excavation,

Sheet pile shoring, Three spans, Portals, Segment Launching.

Over Ground Station building works - Concourse &platform slab, Spine beam, Structural Steel erection

works.

Station finishing works - Inside station floor tiles, Wall cladding, Roof cladding, Painting, Fire rated painting ,

Glazing, False ceiling, public and rest areas finishing’s.

OGS Utility diversion, Reinstatement works. Snag list preparation for Civil works for viaduct and station

areas.

Rail/Tram Depot- Earth works, Industrial shed (Sleeper Factory), Civil &Structural steel works, Equipment

Foundations, Architectural finishing works, Depot utility works.

Completed:-

� Three Metro projects (Viaduct) worked with Gammon India(Main Contractor) in DMRC- Delhi (INDIA)

(2000-2007),

� Metro project including Over ground Station and Viaduct with Systra -Parsons JV (The Engineer) in

DUBAI Metro(Green Line) (UAE) (2007-2011),

� Rail Project-Depot with Aecom- Parsons JV in ETIHAD RAIL Abu Dhabi (UAE) (2012-2014)

Received Special Performance award in 2009 and Certificate of appreciation in 2011 for successful

completion of Dubai Green line Metro, Appreciation Letter from CD- Parsons while working at Etihad Rail.

� A dynamic professional with 20+ years of rich experience in civil construction & Management.

� Demonstrative excellence in executing large scale Metro/ Rail/Tram Infrastructure projects.

� A strategic planner with expertise in planning, executing and managing civil construction of high value projects

involving planning, budgeting and resource administration, with a flair for adopting modern methodologies in

compliance with the quality standards.

� Resourceful in supervising all construction activities including provisioning of technical inputs for

methodologies of construction & coordinating with the site management activities while ensuring compliance

for various construction activities as per the norms and regulations.

� Strong relationship management, communication skills with the ability to network with project members,

architects / external agencies / consultants / clients / sub-contractors with consummate ease.

Professional Synopsis

Page 3: 2 Kuldeep singh CV

� Excellent analytical, troubleshooting & inter-personal skills with skills in driving numerous quality

enhancement, process improvement & cost savings initiatives during career span.

Key Skills

Managing of Execution, Supervision, Monitoring and controlling Progress, Quality, Quantity, Time and Safety issues in

large scale various projects such as Metro/ Rail /Tram Projects, Industrial building works.

Current Status: Bachelor of Engineering in Civil (1992) with first class.

Training courses/seminar (provided by company)

: Occupational Safety & Health for the construction industry.

: Administration for the construction industry.

: First Aid training from first security group.

: Training for work hazards at site.

Driving License for GCC countries

: UAE and Qatar Driving License up to 2019

� Punctual & Hard worker

� Self Motivated

� Good in time management

Organizational Experiences

Parsons Aecom JV Etihad Rail Project Abu Dhabi (UAE) - (PMC) January 2012 to till date

Assistant resident engineer

Projects Undertaken

� Program management consultancy of 265 km rail corridor including Depot from Shah habsan To

Ruwais Port with the project cost of 22 billion AED.

My Job involves construction supervision of Depot buildings like Wheel lathe bldg,Provisioning,wagon

wash bldg, General maintenance bldg,Admin block, Yellow plant etc.Construction of sleeper factory and

sleeper production supervision, Development of Rail head, welding/rail stack plant.

Key Deliverables

Qualification

Key Strengths

Page 4: 2 Kuldeep singh CV

� Supervision of Rail Depot civil works and sleeper production factory.

� Responsible for coordination for various issues with clients & contractor/subcontractor pertaining to Progress,

Quality and Safety.

� Conducting site inspections with contractor& issuing NCR’s, NNC if necessary.

� Maintaining records for Progress, Quality and Safety.

� Responsible for providing support to the Construction Manager/R.E on all Civil, Structural, Architectural,

Traffic Management Plan and Utility diversion Plan.

� Supervise the daily work activities to ensure that work is completed on time with all quality and

safety requirements met as per procedure. Undertakes tasks, requiring a check on the basic

parameters which are clearly established to see the successful completion of work and attend to any

problems that may need to be attended to.

� Project site coordination on all technical clarification/matters encountered..

� Coordinate with Client, Consultant, Design department on all technical clarification.

� Responsible for reviewing and checking all Civil/Structural Drawings and Specifications.

� Coordination with the planning/scheduling engineer for other related activities.

� Responsible for reviewing and approval of Method statements ITP’s, FCR’s regarding civil works.

� Monitoring of Daily work report, Quantity tracking report, Weekly and Monthly progress report.

� Conduct project supervision and construction project management.

Systra Parsons JV, Dubai Metro Rail Project-(The Engineer) April-2007 to November-2011

Str. Engineer

Projects Undertaken

� World’s Largest Automated Metro Rail Project in Dubai: This involved Project management& construction

Supervision of Dubai Metro Green Line which comprises viaduct substructures, Superstructures, over/under

ground stations, depot as well as foot-over bridges works having project cost of 30 billion AED.

In Dubai Metro Rail Project Responsibilities as a STR. Engineer. (April 2007 – November 2011)

Jobs involved the construction supervision of two Over Ground Stations and three viaducts including sub/super str. of

viaduct & structural & architectural works of Station building. Piling diameter was in OGS, 900mm, 1200mm, 2600mm

and length of pile was 30 to 33m.Aproximately the concrete used in Spine beams & Concourse/Platform slab including

piling 2000 cubic meter & steel 250 ton. The steel structure was also major parts of OGS. The total quantity of steel

structure was used in one OGS 900 ton including primary ribs, secondary ribs & longitudinal ribs. The erection of steel

structure was completed within two months with 2 cranes capacity of 200 ton & 4 man lift. The all steel structures

member was Two Hours Fire rated paint. The floor tiles was used reconstituted tiles with four theme, Water, Fire, Air

& Earth. The floor tiles was used as a pattern for beauty and Tack tiles was used to help the blind people. The all

external wall was constructed by Glass Cladding & Aluminum cladding and ceiling was protected by inner lining and

outside by golden panels. All the glass and aluminum cladding was hold by spider bracket and joint was sealed by

aesthetic sealant. Escalator , Elevator are used for vertical approach.

Key Deliverables

� Monitoring the civil & steel structural, architectural as well as the utility works.

� Preparing and reporting to RE/ARE for daily, weekly and monthly report.

� Responsible for coordination for various issues with clients, contractor pertaining to Progress, Quality and Safety.

� Conducting safety inspection for daily and weekly.

� Conducting site inspections with Contractor and sub-contractor.

Page 5: 2 Kuldeep singh CV

� Maintaining records for Progress, Quality, Quantity and Safety.

� Liaising with local agencies as well as the client (RTA).

� Monitoring and reporting on contractor baseline as well as the 3 months rolling program.

� Supervising the construction works for the compliance of approved Method Statements, ITP’s, Local Standards,

Codes, Shop Drawings, etc.

� Reviewing of as built drawings.

� Certification of contractor’s invoice.

� Preparing the snag list documents prior to handing over of station works.

� To keep all records and verify contractors extra claim.

� Assisting our Engineering Manager on all technical function in support for Civil and Electro Mechanical works

� Ensuring that all punch-list items are resolved, client handover is satisfactorily concluded and that there is no

prolongation of project.

� Performed the Site weekly meeting and monthly meeting and prepare all the necessary documents required to

be submitted to the Client.

� To ensure that contractor HSE practices are acceptable and that adequate, Measures and procedures are being

implemented by everyone concerned.

� To check the availability and fitness of Construction equipment and to check the personnel mobilization and

demobilization.

� Investigate damage, accident or delay at construction site, to ensure that project proper procedure is being

carried out.

Gammon India Ltd (Contactor) Delhi Metro Rail project (India). November 2000 to Feb 2007

Project Engineer

Project under taken

Construction of over ground metro which involved construction of sub/super structure pile, pile cap, pier, pier

cap, segmental launching, portal, Three span. Completed three projects of Delhi Metro rail within a period

from Nov.2000-Feb 2007

Key Deliverables

� Responsible for the implementation of Construction plan and to organize the work at site according to plan and

schedule.

� Checking phase of activities comprising the quality management system requirements

� To work and check the construction activities as per Drawings, Specification and Method statement

� To develop and follow accurate project incorporating all significant variables

� Prepare daily progress reports for review by the Site In charge.

� Ensures that the subcontractor works to the approved method statements and schedules. Instruct

subcontractors on day to day matters, check with all standard which is approved by company, Signing and

authorizing day work sheets from subcontractors.

� Ensuring that all punch-list items are resolved, client handover is satisfactorily concluded and that there is no

prolongation of project.

� Manage the all coordination between COMPANY and Subcontractor, establish and maintain the overall

organization and resources for effective and in time project Execution.

� Performed the Site weekly meeting and monthly meeting and prepare all the

Necessary documents required to be submitted to the Client.

� To check that Sub-contractors compile and maintain updated construction documents, procedures, plans

and pertinent information related to site work. To check the preparation, issue and implementation by sub-

contractor of Construction Engineering Documents including details procedure, method statement,

drawings, list of construction equipments and planning, back-up by the Sub-contractor procedure.

Page 6: 2 Kuldeep singh CV

� To ensure that contractor HSE practices are acceptable and that adequate, Measures and procedures are being

implemented by everyone concerned.

Triveni Eng&Industries Ltd- (Contractor) July-1993 to Sept-2000

Sr.Civil engineer

Completed three projects within a period of seven years projects under taken Water treatment plant, Effluent

treatment plant.

� Involved in construction of filter house, Chemical House, Clarifiers, pump house,reservoir,Admin block

� Preparation of bills, BBS, BOQ Subcontractor bills.

� Responsible for setting up site lab facilities and conducted various field and lab test at site

� Prepare daily progress reports for review by the Site In charge.

� Development of underground utilities, Roads and Footpath inside the plant.

� Ensure work is done according to Safety standard, with the needed quality, on schedule and budget.

� Ensures that the subcontractor works to the approved method statements and schedules. Instruct subcontractors

on day to day matters, check with all standard which is approved by company, Signing and authorizing day work

sheets from subcontractors.

� Manage the all coordination between COMPANY and Subcontractor, establish and maintain the overall

organization and resources for effective and in time project Execution.

� Assisting our Engineering Manager on all technical function in support for Civil and Electro Mechanical works

Passport No : H-6659894

Date of issue : 21-July-2009

Date of Expiry : 20-July-2019

Place of issue : DUBAI

Date of Birth : 26-02-1969

Father’s Name : Mr. Ram Sewak Singh

Marital Status : Married

Nationality : Indian

Language Known : English, Hindi, & Urdu.

Flat No. 29 Plot no. 112

Vidyut Nikunj Apartments

Patparganj I.P.Extension

DELHI- INDIA 110092

Place: DOHA (QATAR)

Date: (Kuldeep Singh)

Personal Information

Permanent Address

Passport Details

Page 7: 2 Kuldeep singh CV