PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ADICIONALES
Fecha: 03/03/2016
PRESUPUESTO: RESUMEN
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM DESCRIPCION UND
1.00 ADICIONALES
1.01 RAMPA UND
1.02 REFUERZO DE VIGA DE FACHADA UND 1.03 BAÑO 1ER PISO UND 1.04 DRYWALL UND
1.05 BARANDA 5 PISO UND
1.06 PUERTA MELAMINE VIDRIOS UND
1.07 ENCHAPES UND
1.08 PINTURA UND
1.09 ESCALERA DE GATO Y ESCOTILLA UND
1.10 IIEE UND
1.11 CLARABOYA UND
1.12 GRANITO UND
3.01.03
PRESUPUESTO: RESUMEN
Fecha: 03/03/2016
METRADO PARCIAL
1.00 S/. 5,209.65
1.00 S/. 5,562.50
1.00 S/. 5,167.50
1.00 S/. 43,932.00
1.00 S/. 375.00
1.00 S/. 8,835.00
1.00 S/. 9,790.88
1.00 S/. 6,771.75
1.00 S/. 1,320.00
1.00 S/. 17,650.00
1.00 S/. 30,025.96
1.00 S/. 2,090.00
COSTO DIRECTO S/. 136,730.24
UTILIDADES 10,254.77
SUB TOTAL S/. 146,985.00
IGV 18% 26,457.30
TOTAL S/. 173,442.30
PRESUPUESTO: ADICIONAL RAMPA 1 PISO
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM DESCRIPCION UND
ESTRUCTURA (ADICIONAL)
1.00 MOVIMIENTO DE TIERRAS
1.01 GLB
2.00 OBRAS PRELIMINARES 2.01 DEMOLICION DE CONCRETO SIMPLE GLB
2.02 DEMOLICION CONCRETO ARMADO (CIMIENTOS) GLB
3.00 OBRAS DE CONCRETO ARMADO
3.01 RAMPA DISCAPACITADOS 1 PISO
3.01.03 ENCOFRADO Y DESENCOFRADO DE RAMPA FONDO M2
3.01.04 ACERO FY=4200 KG/CM2 KG
4.00 VARIOS 4.01 TARRAJEO DE BORDES DE RAMPA ML
4.02 BARANDA ML
4.03 BRUÑADO DE RAMPA ML
4.04 CORTE DE PISO ML
4.05 ENCHAPE CERAMICO ESCALERA MAS ZOCALO GLB
4.06 CANTONERA ML
ELIMINACION DE MATERIAL EXCEDENTE PROCEDENTE DE LAS EXCAVACIONES
PRESUPUESTO: ADICIONAL RAMPA 1 PISO
Fecha: 03/03/2016
METRADO P.U. PARCIAL
1.00 S/. 220.00 S/. 220.00
1.00 S/. 300.00 S/. 300.00
1.00 S/. 450.00 S/. 450.00
3.00 S/. 95.00 S/. 285.00
50.00 S/. 6.50 S/. 325.00
8.00 S/. 25.00 S/. 200.00
9.50 S/. 250.00 S/. 2,375.00
37.00 S/. 8.00 S/. 296.00
10.70 S/. 7.00 S/. 74.90
1.00 S/. 500.00 S/. 500.00
7.35 S/. 25.00 S/. 183.75
COSTO DIRECTO S/. 5,209.65
UTILIDADES 7.50% 390.72
SUB TOTAL S/. 5,600.37
IGV 18% 1,008.07
TOTAL S/. 6,608.44
PRESUPUESTO: REFUERZO VIGA FACHADA
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM DESCRIPCION UND
ESTRUCTURA (METALICA)
1.00 COLUMNA DE ACERO
1.01 COLUMNA DE ACERO 4"X4" KG
2.00 VIGAS DE ACERO
2.01 VIGAS DE ACERO 4"X4" KG
PRESUPUESTO: REFUERZO VIGA FACHADA
Fecha: 03/03/2016
METRADO P.U. PARCIAL
130.00 S/. 12.50 S/. 1,625.00
315.00 S/. 12.50 S/. 3,937.50
COSTO DIRECTO S/. 5,562.50
UTILIDADES (7.5%) 417.19
SUB TOTAL S/. 5,979.69
IGV 18% 1,076.34
TOTAL S/. 7,056.03
PRESUPUESTO: ADICIONAL BAÑO 1 PISO
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM DESCRIPCION UND
ESTRUCTURA (ADICIONAL)
1.00 MOVIMIENTO DE TIERRAS
1.01 EXCAVACION MANUAL GLB
1.02 GLB
2.00 OBRAS PRELIMINARES
2.01 DEMOLICION DE CONCRETO SIMPLE (PISO) M2
2.02 DEMOLICION CONCRETO ARMADO (PASE EN PLACA) GLB
3.00 OBRAS DE CONCRETO SIMPLE
3.01 PISO BAÑO
3.01.01 CONCRETO 210 KG/CM2, SIN BOMBA, DOSIF. EN OBRA M3
3.01.02 ENCOFRADO Y DESENCOFRADO DE PISO M2
4.00 VARIOS
4.01 SUMINISTRO E INSTALACION DE LAVADERO UND
4.04 SUMINISTRO E INSTALACION DE URINARIO UND
4.05 SUMINISTRO E INSTALACION DE INODORO UND
ELIMINACION DE MATERIAL EXCEDENTE PROCEDENTE DE LAS EXCAVACIONES
PRESUPUESTO: ADICIONAL BAÑO 1 PISO
Fecha: 03/03/2016
METRADO P.U. PARCIAL
1.00 S/. 200.00 S/. 200.00
1.00 S/. 250.00 S/. 250.00
9.75 S/. 40.00 S/. 390.00
1.00 S/. 150.00 S/. 150.00
1.50 S/. 415.00 S/. 622.50
3.00 S/. 75.00 S/. 225.00
1.00 S/. 250.00 S/. 250.00
4.00 S/. 320.00 S/. 1,280.00
4.00 S/. 450.00 S/. 1,800.00
COSTO DIRECTO S/. 5,167.50
UTILIDADES 387.56
SUB TOTAL S/. 5,555.06
IGV 18% 999.91
TOTAL S/. 6,554.97
PRESUPUESTO: DRYWALL
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM
1.00
1.01
1.02
1.03
2.00
2.01
2.02
2.03
2.04
2.05
2.06
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
4.00
4.01
4.02
4.03
4.04
4.05
4.06
5.00
5.01
5.02
5.03
5.04
5.05
5.06
6.00
6.01
6.02
6.03
6.04
6.05
6.06
6.07
6.08
7.00
7.01
PRESUPUESTO: DRYWALL
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
DESCRIPCION
ARQUITECTURA
DRYWALL
DRYWALL CAJA (CAFETERIA)
MUROS DE TABIQUE DE DRYWALL
INSTALACION DE PUERTA, VENTANAS, ETC.
TECHO
PISO 5
DINTEL FACHADA MAMPARA DE 60CM
DINTEL PASADIZO PARA CLARABOYA
DINTEL ESCALERA PARA CLARABOYA
RECUBRIMIENTO CON DRYWALL COLUMNAS DE ACERO
MURO CON PLANCHA SUPER BOAR FACHADA
DETALLE DRYWALL INGRESO ESCALERA DE GATO
PISO 4
INSTALACION BALDOSA AULA 407
INSTALACION BALDOSA BAÑOS
INSTALACION DE TABIQUE DE DRYWALL BAÑO
INSTALACION DE FIBRA DE VIDRIO BAÑO
ABERTURA DE PUERTA Y RESANE BAÑO DISCAPACITADOS VARIOS
CERRAR CON DRYWALL PUERTA EXISTENTE BAÑO DAMAS
INSTALACION DE FIBRA DE VIDRIO BAÑO DAMAS
FORRADO DE VIGAS DE ACERO CON DRYWALL
DINTEL DESNIVEL DE BALDOSA AULA 407
REUBICAION DE VENTANA AULA 401
PISO 3
INSTALACION BALDOSA BAÑOS
INSTALACION DE TABIQUE DE DRYWALL BAÑO
INSTALACION DE FIBRA DE VIDRIO BAÑO
ABERTURA DE PUERTA Y RESANE BAÑO DISCAPACITADOS VARIOS
CERRAR CON DRYWALL PUERTA EXISTENTE BAÑO DAMAS
INSTALACION DE FIBRA DE VIDRIO BAÑO DAMAS
PISO 2
INSTALACION BALDOSA BAÑOS
INSTALACION DE TABIQUE DE DRYWALL BAÑO
INSTALACION DE FIBRA DE VIDRIO BAÑO
ABERTURA DE PUERTA Y RESANE BAÑO DISCAPACITADOS
CERRAR CON DRYWALL PUERTA EXISTENTE BAÑO DAMAS
INSTALACION DE FIBRA DE VIDRIO BAÑO DAMAS
PISO 1
INSTALACION BALDOSA BAÑOS
INSTALACION DE TABIQUE DE DRYWALL BAÑO
INSTALACION DE FIBRA DE VIDRIO BAÑO
ABERTURA DE PUERTA Y RESANE BAÑO DISCAPACITADOS
CERRAR CON DRYWALL PUERTA EXISTENTE BAÑO DAMAS
INSTALACION DE FIBRA DE VIDRIO BAÑO DAMAS
MODIFICACION DE PUERTA LABORATORIO
MURO ALINEACION CON PLACA
AZOTEA
PARAPETO ESTRUCTURA DE ACERO Y PLANCHA SUPER BOAR
PRESUPUESTO: DRYWALL
UND METRADO P.U. PARCIAL
M2 16.00 S/. 75.00 S/. 1,200.00
GLB 1.00 S/. 350.00 S/. 350.00
GLB 1.00 S/. 300.00 S/. 300.00
ML 18.00 S/. 72.00 S/. 1,296.00
ML 40.00 S/. 72.00 S/. 2,880.00
ML 20.00 S/. 72.00 S/. 1,440.00
ML 31.00 S/. 64.00 S/. 1,984.00
M2 6.00 S/. 90.00 S/. 540.00
M2 4.50 S/. 72.00 S/. 324.00
M2 52.00 S/. 65.00 S/. 3,380.00
M2 20.00 S/. 65.00 S/. 1,300.00
M2 7.00 S/. 78.00 S/. 546.00
M2 7.00 S/. 15.00 S/. 105.00
GLB 1.00 S/. 365.00 S/. 365.00
M2 2.00 S/. 85.00 S/. 170.00
M2 2.00 S/. 15.00 S/. 30.00
ML 20.00 S/. 72.00 S/. 1,440.00
ML 4.00 S/. 72.00 S/. 288.00
GLB 1.00 S/. 365.00 S/. 365.00
M2 20.00 S/. 65.00 S/. 1,300.00
M2 7.00 S/. 78.00 S/. 546.00
M2 7.00 S/. 15.00 S/. 105.00
GLB 1.00 S/. 365.00 S/. 365.00
M2 2.00 S/. 85.00 S/. 170.00
M2 2.00 S/. 15.00 S/. 30.00
M2 20.00 S/. 65.00 S/. 1,300.00
M2 7.00 S/. 78.00 S/. 546.00
M2 7.00 S/. 15.00 S/. 105.00
GLB 1.00 S/. 365.00 S/. 365.00
M2 2.00 S/. 85.00 S/. 170.00
M2 2.00 S/. 15.00 S/. 30.00
M2 20.00 S/. 65.00 S/. 1,300.00
M2 7.00 S/. 78.00 S/. 546.00
M2 7.00 S/. 15.00 S/. 105.00
GLB 1.00 S/. 365.00 S/. 365.00
M2 2.00 S/. 85.00 S/. 170.00
M2 2.00 S/. 15.00 S/. 30.00
GLB 1.00 S/. 500.00 S/. 500.00
M2 3.00 S/. 52.00 S/. 156.00
ML 85.00 S/. 205.00 S/. 17,425.00
COSTO DIRECTO S/. 43,932.00
UTILIDADES (7.5%) 3,294.90
SUB TOTAL S/. 47,226.90
IGV 18% 8,500.84
TOTAL S/. 55,727.74
PRESUPUESTO: DRYWALL
Fecha: 04/03/2016
PRESUPUESTO: BARAMDA 5 PISO
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM DESCRIPCION UND
ESTRUCTURA (METALICA)
1.00 BARANDA DE ACERO
1.01 BARANDA DE ACERO H=90CM ML
PRESUPUESTO: BARAMDA 5 PISO
Fecha: 03/03/2016
METRADO P.U. PARCIAL
2.50 S/. 150.00 S/. 375.00
COSTO DIRECTO S/. 375.00
UTILIDADES (7.5%) 28.13
SUB TOTAL S/. 403.13
IGV 18% 72.56
TOTAL S/. 475.69
PRESUPUESTO: PUERTA, MELAMINE Y VIDRIOS
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM
1.00
1.01
1.02
1.03
1.04
PRESUPUESTO: PUERTA, MELAMINE Y VIDRIOS
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
DESCRIPCION
ARQUITECTURA
PUERTA, MELAMINE Y VIDRIO
PUERTA DE MADERA BAÑO DISCAPACITADOS 1 AL 4 PISO
DIVISOR DE MELAMINE INODOROS BAÑO 1 PISO
DIVISOR DE VIDRIO URINARIO BAÑO 1 PISO
ESPEJO BAÑO DE VARONES 1 PISO
PRESUPUESTO: PUERTA, MELAMINE Y VIDRIOS
UND METRADO P.U. PARCIAL
UND 4.00 S/. 1,050.00 S/. 4,200.00
ML 7.00 S/. 480.00 S/. 3,360.00
UND 5.00 S/. 175.00 S/. 875.00
UND 1.00 S/. 400.00 S/. 400.00
COSTO DIRECTO S/. 8,835.00
UTILIDADES (7.5%) 662.63
SUB TOTAL S/. 9,497.63
IGV 18% 1,709.57
TOTAL S/. 11,207.20
PRESUPUESTO: PUERTA, MELAMINE Y VIDRIOS
Fecha: 03/03/2016
PRESUPUESTO: CERAMICO
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM DESCRIPCION UND
ARQUITECTURA
1.00 CERAMICO
1.01 BAÑO VARONES 1 PISO M2
1.02 BAÑO DISCAPACITADOS 1 AL 4 PISO M2
1.03 BAÑO VARONES 2 AL 4 PISO M2
1.04 DEMOLICION CERAMICO BAÑO 1 PISO M2
1.05 DESMONTAJE MELAMINE GLB
1.06
PRESUPUESTO: CERAMICO
Fecha: 03/03/2016
METRADO P.U. PARCIAL
49.7 S/. 66.00 S/. 3,280.20
77.3 S/. 66.00 S/. 5,100.48
13.5 S/. 66.00 S/. 891.00
7.6 S/. 42.00 S/. 319.20
1.0 S/. 200.00 S/. 200.00
S/. 0.00
COSTO DIRECTO S/. 9,790.88
UTILIDADES (7.5%) 734.32
SUB TOTAL S/. 10,525.20
IGV 18% 1,894.54
TOTAL S/. 12,419.73
PRESUPUESTO: PINTURA
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM DESCRIPCION UND
1.00 ARQUITECTURA
1.01 DINTELES DRYWALL 5 PISO M2
1.02 BAÑOS VARONES MURO INTER 1 AL 4 PISO M2
1.03 FACHADA BAÑOS VARONES 1 AL 4 PISO M2
1.04 AULA 401 TECHO Y MUROS M2
1.05 AULA 407 PINTADO DE MUROS M2
1.06 PARAPETO 6 PISO SUPER WOOL M2
1.07 INGRESO AL INSTITUTO M2
PRESUPUESTO: PINTURA
Fecha: 03/03/2016
METRADO P.U. PARCIAL
40.0 12.50 S/. 500.00
60.0 12.50 S/. 750.00
98.0 12.50 S/. 1,225.50
132.2 12.50 S/. 1,652.50
85.5 12.50 S/. 1,068.75
106.0 12.50 S/. 1,325.00
20.0 12.50 S/. 250.00
COSTO DIRECTO S/. 6,771.75
UTILIDADES (7.5%) 507.88
SUB TOTAL S/. 7,279.63
IGV 18% 1,310.33
TOTAL S/. 8,589.96
PRESUPUESTO: ESCALERA DE GATO MAS ESCOTILLA
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM DESCRIPCION UND
1.00 ESTRUCTURA METALICA
1.01 ESCALERA DE GATO GLB
1.02 ESCOTILLA GLB
PRESUPUESTO: ESCALERA DE GATO MAS ESCOTILLA
Fecha: 15/02/2016
METRADO P.U. PARCIAL
1.0 870.00 S/. 870.00
1.0 450.00 S/. 450.00
COSTO DIRECTO S/. 1,320.00
UTILIDADES (7.5%) 99.00
SUB TOTAL S/. 1,419.00
IGV 18% 255.42
TOTAL S/. 1,674.42
PRESUPUESTO: II EE
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM DESCRIPCION UND
1.00 IIEE
1.01 SUMINISTRO E INSTALACION DE EXTRACTORES MIRAY Y/O SIMILARUND
1.02 SUMINISTRO E INSTALACION DE LUMINARIAS 2X36 O 4X18 UND1.03 SALIDA PARA EXTRACTOR UND1.04 SALIDA DE INTERRUPTOR SIMPLE PARA EXTRACTORES UND
AULA 407
1.05 DESMONTAJE DE LUMINARIAS DE 2X36 UND1.06 DESMONTAJE DE VENTILADORES DE TECHO UND1.07 SUMINISTRO E INSTALACION DE LUMINARIAS 2X36 O 4X18 UND1.08 INSTALACION DE VENTILADORES DE TECHO UND
BAÑOS
1.09 UND
1.10 UND
AULA 401
1.11 DESMONTAJE DE EXTRACTORES UND1.12 DESMONTAJE DE VENTILADORES DE PARED UND
BAÑOS DE 1 AL 4 (DESMONTAJE DE LUMINARIAS, INDEPENDIZACION DE CIRCUITOS, ENTUBADOS, COLOCACION DE CAJAS RETANGULARES, CABLEADOS PARA LUMINARIAS E LUMINARIAS E INTERRUPTORES, Y COLOCACION DE MANGA FLEXIBLE A DUCTO DE VENTILACION
BAÑOS DE 1 AL 4 DISCAPACITADOS (DESMONTAJE DE LUMINARIAS, INDEPENDIZACION DE CIRCUITOS, ENTUBADOS, COLOCACION DE CAJAS RETANGULARES, CABLEADOS PARA LUMINARIAS E LUMINARIAS E INTERRUPTORES, Y COLOCACION DE MANGA FLEXIBLE A DUCTO DE VENTILACION
1.13 DESMONTAJE DE VENTILADORES DE TECHO UND
ENTUBADO DE RED
1.14ML
INSTALACION DE CAJA PASE DE 10 X 10 ENTUBADO CON TUBERIA DE 2"DESDE EL 5TO AL 2DO PISO
PRESUPUESTO: II EE
Fecha: 03/03/2016
METRADO P.U. PARCIAL
3.0 240.00 S/. 720.00
26.0 210.00 S/. 5,460.005.0 80.00 S/. 400.003.0 90.00 S/. 270.00
10.0 30.00 S/. 300.002.0 35.00 S/. 70.0011.0 210.00 S/. 2,310.002.0 50.00 S/. 100.00
4.0 650.00 S/. 2,600.00
4.0 850.00 S/. 3,400.00
2.0 35.00 S/. 70.002.0 35.00 S/. 70.00
2.0 65.00 S/. 130.00
50.0 35.00 S/. 1,750.00
COSTO DIRECTO S/. 17,650.00
UTILIDADES (7.5%) 1,323.75
SUB TOTAL S/. 18,973.75
IGV 18% 3,415.28
TOTAL S/. 22,389.03
PRESUPUESTO: CLARABOYA
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM DESCRIPCION UND
1.00 Tragaluz Pasadizo 1.01 Estructura Metálica Kg.
1.02 Canaleta de drenaje ML.
1.03 Cobertura de Policarbonato m2
1.04 Accesorio en T ML.
1.05 Accesorio en U ML.
1.06 Instalacion de policarbonato y accesorios m2
1.07 Puntos de drenaje pluvial unidad
1.08 Ventanas m2
Tragaluz Escalera 1.09 Estructura Metálica Kg.
1.10 Canaleta de drenaje ML.
1.11 Cobertura de Policarbonato m2
1.12 Accesorio en T ML.
1.13 Accesorio en U ML.
1.14 Instalacion de policarbonato y accesorios m2
1.15 Puntos de drenaje pluvial unidad
1.16 Ventanas m2
PRESUPUESTO: CLARABOYA
Fecha: 03/03/2016
METRADO P.U. PARCIAL
460.8 11.50 S/. 5,299.20
14.5 60.00 S/. 870.00
15.2 83.72 S/. 1,274.22
2.1 19.80 S/. 41.58
30.6 20.68 S/. 632.81
15.2 102.30 S/. 1,557.01
3.0 185.00 S/. 555.00
24.5 320.00 S/. 7,833.60
405.8 11.50 S/. 4,666.70
3.9 60.00 S/. 235.20
17.8 83.72 S/. 1,493.56
10.5 19.80 S/. 207.90
14.8 20.68 S/. 306.06
15.2 102.30 S/. 1,552.91
1.0 185.00 S/. 185.00
10.4 320.00 S/. 3,315.20
COSTO DIRECTO S/. 30,025.96
UTILIDADES (7.5%) 2,251.95
SUB TOTAL S/. 32,277.90
IGV 18% 5,810.02
TOTAL S/. 38,087.92
PRESUPUESTO: DRYWALL
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
ITEM
1.00
1.01
2.00
2.10
3.00
3.01
4.00
4.01
2.04
PRESUPUESTO: DRYWALL
PROPIETARIO: INSTITUTO SISE ATE
PROYECTO: AMPLIACION 5 PISO INSTITUTO SISE ATE
DESCRIPCION
ARQUITECTURA
DRYWALL
PISO 4
GRANITO EN MESA DE BAÑO DE 4TO PISO
PISO 3
GRANITO EN MESA DE BAÑO DE 3TO PISO
PISO 2
GRANITO EN MESA DE BAÑO DE 2TO PISO
PISO 1
GRANITO EN MESA DE BAÑO DE 1ER PISO
PRESUPUESTO: DRYWALL
UND METRADO P.U. PARCIAL
GBL 1.00 S/. 230.00 S/. 230.00
GBL 1.00 S/. 230.00 S/. 230.00
GBL 1.00 S/. 230.00 S/. 230.00
GBL 1.00 S/. 1,400.00 S/. 1,400.00
S/. 0.00
COSTO DIRECTO S/. 2,090.00
UTILIDADES (7.5%) 156.75
SUB TOTAL S/. 2,246.75
IGV 18% 404.42
TOTAL S/. 2,651.17
PRESUPUESTO: DRYWALL
Fecha: 03/03/2016