1 00 - GROUND FLOORagarchitects.co.uk/perch/resources/ygb-aga-xx-00... · wc/hygiene facilities...
Transcript of 1 00 - GROUND FLOORagarchitects.co.uk/perch/resources/ygb-aga-xx-00... · wc/hygiene facilities...
UP
By Department Legend
Adnoddau Dysgu - Learning Resources
Neuadd - Hall
Dysgu Sylfaenol - Basic Teaching
Storfa Dysgu - Teaching Storage
Dysgu Sylfaenol (meithrin) - Basic Teaching
Storfa Arall - Other Storage
Atodol - Supplementary
Ardal Di-net - Non-net Area
Cylchrediad - Ardal Di-net - Circulation - Non-net Area
Staff a Gweinyddiaeth - Staff and Admin
8.5 m²KITCHEN
N-G024
CEGIN
60.7 m²ALN CLASSROOM (3-6)
N-G040
DOSBARTH ADY (3-6)
60.1 m²ALN CLASSROOM (6-10)
N-G046
DOSBARTH ADY (6-10)
12.1 m²PRACTICAL TEACHING AREA
N-G043
ARDAL ADDYSG YMARFEROL
4.4 m²WC
N-G042
TOILED
4.2 m²WC
N-G049
TOILED
12.1 m²HYGEINE FACILITIES 2
N-G045
CYFLEUSTERAU HYLENDID 2
5.0 m²EXTERNAL STORE
N-G094
STORFA ALLANOL
65.4 m²CYLCH MEITHRIN CLASSROOM
N-G054
DOSBARTH CYLCH MEITHRIN
10.0 m²WC
N-G077
TOILED
66.0 m²NURSERY CLASSROOM
N-G074
DOSBARTH MEITHRIN
9.2 m²WC
N-G058
TOILED
12.1 m²SENco
N-G066
?
66.0 m²RECEPTION CLASSROOM
N-G088
DOSBARTH DERBYN
12.0 m²WC
N-G084
TOILED
66.0 m²RECEPTION CLASSROOM
N-G080
DOSBARTH DERBYN
60.1 m²YEAR 1 CLASSROOM
N-G071
DOSBARTH BLWYDDYN 1
60.0 m²YEAR 1 CLASSROOM
N-G068
DOSBARTH BLWYDDYN 1
60.1 m²YEAR 2 CLASSROOM
N-G091
DOSBARTH BLWYDDYN 2
10.0 m²WC
N-G078
TOILED
60.1 m²YEAR 2 CLASSROOM
N-G085
DOSBARTH BLWYDDYN 2
67.5 m²ICT/GROUP ROOM/FLOATING CLASSROOM
N-G064
TGCh/YSTAFELL GRWP
150.1 m²MAIN HALL
N-G025
PRIF NEUADD82.2 m²SMALL HALL
N-G021
NEUADD BACH
9.0 m²SMALL GROUP ROOMS (3/3)
N-G082
YSTAFELL GRŴP BACH
10.4 m²STAGING/APPLIANCE STORE
N-G023
STORFA LLWYFAN/CYMHWYSIADAU10.6 m²
CHANGING ROOM
N-G018
YSTAFELL NEWID
10.5 m²CHANGING ROOM
N-G019
YSTAFELL NEWID
2.4 m²SICK BAY
N-G010
BAE SALWCH
13.3 m²GENERAL OFFICE
N-G014
SWYDDFA GYFFREDINOL
14.3 m²WC/HYGIENE FACILITIES
N-G061
TOILED/CYFLEUSTERAU HYLENDID
4.5 m²COMMUNITY STORE
N-G016
STORFA GYMUNEDOL
42.2 m²PLANT
N-G095
?
9.1 m²ENTRANCE/RECEPTION
N-G001
MYNEDFA/DERBYNFA
4.0 m²STAFF WC
N-G051
TOILED STAFF
3.7 m²VISITOR WC
N-G007
TOILEDAU YMWELWYR
7.9 m²INTERVIEW ROOM
N-G013
YSTAFELL CYFWELIAD
7.5 m²CARE/MAINTENANCE
N-G006
GOFALWR/CYNNAL A CHADW
58.0 m²STAFF ROOM
N-G003
YSTAFELL STAFF
65.9 m²WAITING AREA
N-G002
ARDAL AROS
15.0 m²PE STORE
N-G026
STORFA AG
10.0 m²WC
N-G063
TOILED
6.1 m²REPROGRAPHICS BAY
N-G011
BAE
18.6 m²PPA
N-G012
CPA
6.0 m²OFFICE
N-G056
SWYDDFA
6.0 m²KITCHEN
N-G057
CEGIN
3.9 m²STORE
N-G059
STORFA
4.2 m²CHANGING ROOM
N-G060
YSTAFELL NEWID
7.6 m²LOBBY
N-G039
LOBI
EXTERNAL SPRINKLER TANK
3.5 m²STORE
N-G022
STORFA
EXTERNAL TEACHING SPACE
PLANTING BED
PLANTING BED
EXTERNAL TEACHING SPACE
2.0 m²
PLATFORM
LIFT
N-G037
?
BIN STORE
RECYCLING
STORE
MUGA
SCALE DATE DRAWN CHECKED
PROJECT
REV DESCRIPTION DATE BY
THE OLD POLICE STATION, 15 GLYNNE WAY, HAWARDEN, CH5 3NS
Tel: 01244 537 100 | [email protected] | www.agarchitects.co.uk
DRAWING TITLE
JOB No DRAWING No REV
Ainsley Gommon Architects Ltd. Registered in England & Wales No.4187948
Registered Office: 1 Price Street, Hamilton Square, Birkenhead CH41 6JN
THIS DRAWING IS THE COPYRIGHT OF AINSLEY GOMMON ARCHITECTS. DO NOT
SCALE FROM THIS DRAWING. WORK TO FIGURED DIMENSIONS ONLY. CHECK ALL
DIMENSIONS ON SITE. ANY DISCREPANCIES TO BE NOTIFIED TO THE ARCHITECT.
ELEMENTS OF STRUCTURE SHOWN ARE INDICATIVE AND FOR GUIDANCE.
FINAL DESIGN TO BE AS STRUCTURAL ENGINEERS DETAILS AND SPECIFICATION.
@A1
A1PRINTED:
STATUS PURPOSE OF ISSUE
FOR COMMENTS
1 : 200
20/07/2018 14:20:29
P8
PLANNING - GROUND
FLOOR PLAN
29/01/18 GJ MF
YSGOL Y GARNEDD,
BANGOR
for CYNGOR GWYNEDD
C910|YGB-AGA-XX-00-DR-A-0004 |
S03
SCALE 1 : 200
00 - GROUND FLOOR1
Area Schedule (Gross Building)
Area Level
1075.9 m² 01 - FIRST FLOOR
2062.0 m² 00 - GROUND FLOOR
3137.9 m²
VISUAL SCALE 1:200 @ A1
20m4m 16m12m8m0m
P1 SKETCH PROPOSAL 13.02.18 GJ
P2 REVISED SKETCH PROPOSAL 23.02.18 GJ
P3 REVISED SKETCH PROPOSAL 08.03.18 GJ
P4 LAYOUT REVISED FOLLOWING
CONSULTATION MEETINGS
29.03.18 GJ
P5 CONSULTATION ISSUE 30.04.18 GJ
P6 RIBA STAGE 2 FOR APPROVAL DRAWINGS 14.05.18 GJ
C1 STAGE 2 SIGN OFF 06.06.18 GJ
P7 ISSUE FOR COMMENTS 06.06.18 MR
P8 ISSUE FOR PRE-PLANNING CONSULTATION 20.07.18 MR
NORTH