1 RAYMOND J. POLETTO, PE MUESER RUTLEDGE CONSULTING ENGINEERS WWW.MRCE.COM DFI 2012 SHORT COURSE & SPECIALTY SEMINAR: DESIGN & CONSTRUCTABILITY OF DIAPHRAGM WALLS: QUALITY ASSURANCE & QUALITY CONTROL QUALITY ASSURANCE & QUALITY CONTROL: GOALS 1. Limit Defects In Panel Construction 2. Good Cooperation Needed By Owner’s Representative, Design Engineer, Specialty And General Contractors 3. Implement Design Or Work Changes If Field Conditions Or Construction Methods Show Problems 4. Avoid Litigation By Proper Communication

description

fundaciones especiales

Transcript of 07 Poletto PPT 2 fundaciones especiales

Page 1: 07 Poletto PPT 2 fundaciones especiales

1

RAYMOND J. POLETTO, PEMUESER RUTLEDGE CONSULTING ENGINEERSWWW.MR C E . C OM

DFI 2012 SHORT COURSE & SPECIALTY SEMINAR:

DESIGN & CONSTRUCTABILITY OFDIAPHRAGMWALLS:QUALITY ASSURANCE &QUALITY CONTROL

QUALITY ASSURANCE &QUALITY CONTROL: GOALS

1. Limit Defects In PanelConstruction

2. Good CooperationNeeded By Owner’sRepresentative, DesignEngineer, Specialty AndGeneral Contractors

3. Implement Design OrWork Changes If FieldConditions Or ConstructionMethods Show Problems

4. Avoid Litigation ByProper Communication

Page 2: 07 Poletto PPT 2 fundaciones especiales

2

QUALITY ASSURANCE & QUALITYCONTROL: WORK PROCESS

1. Set Out ConstructionProcedures Which AreReasonable Expectations OfAchieving The Slurry WallFunction. (Lateral Or VerticalStructural Element And To LimitThe Flow Of Groundwater)

2. Contractor Provides TheQuality Control Of The SlurryWall Construction Per ContractRequirements Or IndustryStandards

3. Inspections Provide TheQuality Assurance Of TheConstructed Wall And Provide ARecord Of ConstructionProcedures

4. Field Conditions and WorkProcedures Should Be CarefullyReviewed By ExperiencedGeotechnical & StructuralPersonnel Relating Causes AndEffects As Closely As Possible

1. Panel Types andConstruction Methods(Temporary or Permanent Walls)

2. Expect LimitedSeepage of WatertightSystems & PossibleNeed for InteriorDrainage

3. ExpectIrregularities in WallFace

4. Inspection byContractor and byOwner’s Team

5. AddressConstruction Defects& Repairs

6. Review Good or PoorPractices by ConstructionTeam

UNDERSTANDING PROJECTEXPECTATIONS & REQUIREMENTS

Page 3: 07 Poletto PPT 2 fundaciones especiales

3

Panel Types

IndividualLoad BearingElements

SegmentedConcretePanels

ReinforcedConcretePanels

Soldier Beam& ConcreteWalls (SPTC)

Precast WallsPost

TensionedWalls

PANEL CONSTRUCTIONMETHODS

1. Round PipeJoints

2. Steel BeamJoint (Soldier PileTremie Concrete)

3. Key Joint 4. Key Joint withWaterstop

FORMEDWALL JOINTS

Page 4: 07 Poletto PPT 2 fundaciones especiales

4

PANEL JOINTS

SEMICIRCULARPANEL JOINTFORMED BYEND STOP PIPE

Page 5: 07 Poletto PPT 2 fundaciones especiales

5

SPECIAL ENDSTOP DEVICEWITH PVCWATERSTOPFOR KEY INPANEL JOINT

REINFORCED CONCRETE PANELSEQUENCE

Page 6: 07 Poletto PPT 2 fundaciones especiales

6

PANELMETHODWITH HYDROMILL

OVERCUT INPRIMARYPANEL BYHYDROMILL

Page 7: 07 Poletto PPT 2 fundaciones especiales

7

EXPECTWALL SEEPAGE &MOISTURE CONTROL

Watertight WallSystems AllowMinor WallSeepage

Some Wall PanelsMay Have Seepage

Tieback Sleeves &Anchor Heads MayLeak

Seepage &Moisture ControlMethods AreNeeded

IDEALWATER TIGHTNESS OF JOINTS &FACE OF PANELS

Page 8: 07 Poletto PPT 2 fundaciones especiales

8

TYPICALWALL SEEPAGEBEFORE FINAL SEALING

WALL LEAKS BEFORE GROUTING

Page 9: 07 Poletto PPT 2 fundaciones especiales

9

SEALING OFTIEBACKSLEEVES &HEADS

TREATEDWALLWITH INTERIORDRAINAGECOLLECTIONSYSTEM

Page 10: 07 Poletto PPT 2 fundaciones especiales

10

Remove Bentoniteor Cement Fill in

Panel Joint

Fill Wall Voids inPanel Concrete &Cut Floor Slab Keys

Remove Overpoursof Panel Concrete

Trim Concrete atTop of Wall

IRREGULARITIES INWALL FACE

REMOVEBENTONITEFILL IN PANELJOINT

Page 11: 07 Poletto PPT 2 fundaciones especiales

11

FILL WALL VOIDS IN PANELSCUT FLOOR SLAB KEYS

REMOVECONCRETEOVERPOURS INPANELS

Page 12: 07 Poletto PPT 2 fundaciones especiales

12

TRIMCONCRETE ATTOP OFWALL

Proper Inspection by a qualified geotechnical engineer and/orinspector familiar and experienced with installation and testingslurry fluids, concrete and structural steel is essential to thesuccessive completion of this work because to a large extent

problems occur with inaction or inability to understand constructionprocedures, site geological conditions and test results. The

evaluations of these elements are critical in achieving quality work.

Proper Inspection by a qualified geotechnical engineer and/orinspector familiar and experienced with installation and testingslurry fluids, concrete and structural steel is essential to thesuccessive completion of this work because to a large extent

problems occur with inaction or inability to understand constructionprocedures, site geological conditions and test results. The

evaluations of these elements are critical in achieving quality work.

The inspector needs to review the contractor’s work includingsampling of all materials and carefully monitoring and collecting the

required test information for proper quality assurance. Manyprojects have experienced severe problems; cost over runs and

delays because the project owners and construction managementteam relied on untrained, inexperienced and non motivated

inspectors.

The inspector needs to review the contractor’s work includingsampling of all materials and carefully monitoring and collecting the

required test information for proper quality assurance. Manyprojects have experienced severe problems; cost over runs and

delays because the project owners and construction managementteam relied on untrained, inexperienced and non motivated

inspectors.

INSPECTORS ROLE IN CHECKINGWORKQUALITY &MATERIALS

Page 13: 07 Poletto PPT 2 fundaciones especiales

13

• Verification Drilling In Key Stratum (Sometimes Need InRock Or Dense Alluvial and Glacial Deposits)

• Verticality Checks• Bentonite Testing• Concrete Testing• End Bearing: Check for Loose Soil or Rock• Site Monitoring & Instrumentation• Upon Wall Exposure: Visual Checks Of Wall Seepage,Concrete Fascia, Panel Joints And Keys, Sealing Leaks andWall Repairs

• “Industry Practice Standards and DFI Practice GuidelinesFor Structural Wall”

QUALITY ASSURANCE CHECKS

WALLTOLERANCES

Page 14: 07 Poletto PPT 2 fundaciones especiales

14

CONTROL PANEL EXCAVATION BYCHECKING BUCKET DEVIATIONWITHINGUIDEWALLS

TRENCHSUPPORT BYBENTONITESLURRY INVARIOUSSOILS

Page 15: 07 Poletto PPT 2 fundaciones especiales

15

SLURRY FLUIDINSPECTIONREPORT FORM

MAKE SLURRY FLUID CHECKS BEFOREPLACEMENT OF CONCRETE

Page 16: 07 Poletto PPT 2 fundaciones especiales

16

PANEL CAGE FABRICATION

INSTALLATIONOF TYPICALREINFORCINGCAGE

Page 17: 07 Poletto PPT 2 fundaciones especiales

17

SLURRYWALLPANEL REPORTFORM

CHECKS DURING THEPLACEMENT OF CONCRETE

Page 18: 07 Poletto PPT 2 fundaciones especiales

18

POURING TREMIE CONCRETEINTO PANEL

TREMIE CONCRETE REPORT FORM

Page 19: 07 Poletto PPT 2 fundaciones especiales

19

TROUBLE SHOOTING &PROBLEM SOLVING:FIELD RECORDS CAN REVEALPOTENTIAL CORRECTIVE WORKOR DEFECTS

TREMIECONCRETEPOUR CHART

Page 20: 07 Poletto PPT 2 fundaciones especiales

20

MONITORWALL CONDITIONS DURINGEXCAVATION STAGES

MONITOR THEWALL MOVEMENTS &CRACKS IN PAVEMENTSWHILEWAITING FOR LEAK REPAIRS

Page 21: 07 Poletto PPT 2 fundaciones especiales

21

OBSERVE CONSTRUCTION DEFECTS,REPAIRS & CORRECTIVEWORK

CONSEQUENCES OF POORQUALITY CONTROL ORINSPECTION

Page 22: 07 Poletto PPT 2 fundaciones especiales

22

STOPPINGWALL OR TIEBACKANCHOR LEAKS IS VERY IMPORTANT

WALL LEAKS UNATTENDEDWILL IN TIME BE A PROBLEM

Page 23: 07 Poletto PPT 2 fundaciones especiales

23

GoodConstructionInspection &Quality ControlMeasures Assure

BetterConstruction

TimelyCommunicationBetween Parties

Attend to PanelDefects in Timely

Manner