TECHNICAL PROPOSAL Package 01: Consulting Services For Feasibility and Social/Safeguards Studies of BEN LUC – NH22 and NH22 – BINH CHUAN Section under Ho Chi Minh City Third Ring Road Technical Assistance Project TECH-6 CURRICULUM VITAE (CV) FOR PROPOSED PROFESSIONAL STAFF Position Title & No. Highway Engineer 3 Name of Firm Hung Nghiep Construction Consulting Co., Ltd. Name of Expert: NGUYEN Ngoc Duong Date of birth: 22 June 1985 Citizenship Vietnamese Education: Engineer degree in Bridge and Highway Engineering, University of Transport and Communication, Hochiminh city – VietNam, 2008. Training courses in Supervising for Constructing Traffic Projects, 2012. Certification of Construction Design, MOC, 2013. Employment record relevant to the assignment: Period Employing organization and your title/position. Contact information for references Country Summary of activities performed relevant to the Assignment 08. 2012~ Present Hung Nghiep Construction Consulting Co., Ltd Position: Highway Engineer/Highway Team leader Contact: DUONG Van Hiep Tel: +84 9 1374 2295 E-mail: [email protected] Viet Nam Prepare schedule of works for the projects of design departments. Design road, bridge and infrastructure systems for several projects in Vietnam. Reviewed engineering design and drawings of all infrastructures. Prepared cost estimate on the basis of the design & drawings. 03. 2011~ 08. 2012 Katahira Engineering Co., Ltd. Position: Highway/ Interchange Engineer Contact: LE Ngoc Hieu Tel: +84 9 3738 0768 E-mail: [email protected] Viet Nam Design road alignment, profile, interchange, culvert for projects in Vietnam. Prepared quantity tables. 06. 2010~ 01. 2011 Nippon Koei Engineering Co., Ltd. Position: Highway/ Interchange Engineer Contact: NGUYEN Manh Chung Tel: +84 9 8913 2389 E-mail: [email protected] Viet Nam Design road alignment, profile, interchange, culvert for projects in Vietnam. Prepared quantity tables. 07. 2007~ 05. 2010 Transport Engineering consulting joint stock company No.553 (TECCO 533) Position: Highway/ bridge Engineer Contact: NGO Anh Sang Tel: +84 9 8324 0176 Viet Nam Design road, bridge, culvert, retaining wall, etc for projects in Vietnam. Prepared quantity and cost estimate on the basis of the design & drawings. Membership in Professional Associations and Publications: Bridge, Road and Port Association of Ho Chi Minh city TECH-6 Highway Engineer 3 NGUYEN Ngoc Duong Page 1

Transcript of 06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien

Page 1: 06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien

TECHNICAL PROPOSAL Package 01: Consulting Services For Feasibility and Social/Safeguards Studies ofBEN LUC – NH22 and NH22 – BINH CHUAN Section under Ho Chi Minh City Third Ring Road Technical Assistance Project

TECH-6 CURRICULUM VITAE (CV) FOR PROPOSED PROFESSIONAL STAFF

Position Title & No. Highway Engineer 3Name of Firm Hung Nghiep Construction Consulting Co., Ltd.Name of Expert: NGUYEN Ngoc DuongDate of birth: 22 June 1985Citizenship Vietnamese

Education: Engineer degree in Bridge and Highway Engineering, University of Transport and Communication, Hochiminh

city – VietNam, 2008. Training courses in Supervising for Constructing Traffic Projects, 2012. Certification of Construction Design, MOC, 2013.

Employment record relevant to the assignment:

PeriodEmploying organization and your title/position.Contact information for references

Country Summary of activities performed relevant to the Assignment

08. 2012~Present

Hung Nghiep Construction Consulting Co., LtdPosition: Highway Engineer/Highway Team leaderContact: DUONG Van HiepTel: +84 9 1374 2295E-mail: [email protected]

Viet Nam

Prepare schedule of works for the projects of design departments. Design road, bridge and infrastructure systems for several projects in Vietnam. Reviewed engineering design and drawings of all infrastructures. Prepared cost estimate on the basis of the design & drawings.

03. 2011~08. 2012

Katahira Engineering Co., Ltd.Position: Highway/ Interchange EngineerContact: LE Ngoc HieuTel: +84 9 3738 0768E-mail: [email protected]

Viet Nam Design road alignment, profile, interchange, culvert for projects in Vietnam. Prepared quantity tables.

06. 2010~01. 2011

Nippon Koei Engineering Co., Ltd.Position: Highway/ Interchange EngineerContact: NGUYEN Manh ChungTel: +84 9 8913 2389E-mail: [email protected]

Viet Nam Design road alignment, profile, interchange, culvert for projects in Vietnam. Prepared quantity tables.

07. 2007~05. 2010

Transport Engineering consulting joint stock company No.553 (TECCO 533)Position: Highway/ bridge EngineerContact: NGO Anh SangTel: +84 9 8324 0176

Viet NamDesign road, bridge, culvert, retaining wall, etc for projects in Vietnam. Prepared quantity and cost estimate on the basis of the design & drawings.

Membership in Professional Associations and Publications: Bridge, Road and Port Association of Ho Chi Minh city

Language Skills (indicate only languages in which you can work) : Language Reading Writing SpeakingVietnamese Native Native NativeEnglish Good Good Good

Adequacy for the Assignment:

Detailed Tasks Assigned on Consultant’s Team of Experts:

Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the Assigned Tasks

Fulfill the relevant work on FS in coordination with international specialist in his absence. Coordinate with other project team members. Support the Deputy Team Leader with design and ensuring compliance with Vietnamese specifications, laws and requirements.

(1) Name of assignment or project: Feasibility Study for Constructing Province Road DT852B projects, section from DT849 to Sa Dec city, Dong Thap province, Viet NamYear: October 2015 – presentLocation: Dong Thap, VietnamClient: PMU Dong ThapMain Project Features: Feasibility study to construct new road DT852B to connect from DT849 to Sa Dec city. Total road length: 20.8km (including 1.81km urban road W=25m), width=12m. Total estimation cost of the project is about VND 1,450 billion.Positions held: Highway EngineerActivities performed: Using modern software such as Civil 3D, Infraworks 360,

TECH-6 Highway Engineer 3NGUYEN Ngoc Duong

Page 1

Page 2: 06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien

TECHNICAL PROPOSAL Package 01: Consulting Services For Feasibility and Social/Safeguards Studies ofBEN LUC – NH22 and NH22 – BINH CHUAN Section under Ho Chi Minh City Third Ring Road Technical Assistance Project

Play a key contributing role in the following tasks:- Prepare detailed designs of

structure works;- Preparation of technical

specifications and bills of quantities;

- Assist others with technical details in reports;

- Analysis and design of road and bridge. Including alignment, profile, cross sections, pavement, hydrological and drainage system, embankment structure, soil mechanics, earth retaining wall structures based on topography survey data and soil investigation.

- Using modern software such as Civil 3D, Infraworks 360, Revit, Viasys VDC, Navisworks to make modelling for roads, intersections, interchanges and infrastructure system. Then divide and assign work in part for road team members to work in interactive digital environment.

- On-Site visits.- Working with stakeholders to

collect data for projects.

Revit, Viasys VDC, Navisworks to make modelling for roads, intersections and infrastructure system. Then divide and assign work in part for road team members to work in interactive digital environment.- Detail design for alignment, plan and profile- Detail design for interchanges.- Design cross section.- Design drainage.- Calculation quantities.

(2) Name of assignment or project: Detailed Design for Mekong Delta Region Urban Upgrading Project - Ca Mau City Sub-Project - Funded by World Bank (WB).Year: December 2013 – June 2015Location: Ca Mau province, VietnamClient: Ca Mau city Urban Upgrading Project Management UnitMain Project Features:Implement embankment against erosion, construct walkways, pavements and concrete sewers, plant trees and arrange green grass beds along the river and arroyo banks in LIAs 10, 12, 17, 18. Total embankment length is 3,147 m (of which reinforced concrete embankment is 1,033m long in LIA 17, LIA 18, embankment’s length is 2,114m in the remaining LIAs).Construct new road which serves as main route to LIA 9 and residential quarters of ward 8 in Tinh doi channel. Total length of the road construction is 863.8 m, road width is 12m (including 2 lanes of 6m wide each), pavement’s width is 6.5m at two sides.Positions held: Highway EngineerActivities performed: Using modern software such as Civil 3D, Infraworks 360 to make modelling for roads, intersections and infrastructure system. Then divide and assign work in part for road team members to work in interactive digital environment.- Detail design for alignment, plan and profile- Design cross section.- Design drainage- Calculation quantities.

(3) Name of assignment or project: Feasibility Study for Intermodal Transportation Strengthening Project (Ben Thanh - Suoi Tien Section – HCM city Urban Railway Construction Project – Funded by JICA.Year: December 2013 – July 2014Location: Ho Chi Minh city, VietnamClient: Japan International Cooperation Agency (JICA)Main Project Features:The HCMC UMRT Line 1 project is a mass rapid transit construction project between Ben Thanh and Suoi Tien along the Hanoi Highway. The total route length is 19.7 km long which consists of a 2.2 km long underground section and a 17.5 km long elevated section. The study are to develop an implementation plan of a feeder bus network along the HCMC UMRT Line 1 and to conduct a feasibility study and basic design of intermodal facilities in station areas of the HCMC UMRT Line 1. The design includes:- Design station plaza for 10 stations of the project.- Design bus station, car station, bus parking, car parking, motorcycle’s parking for passengers for 10 stations.- Design additional pedestrian bridges as well as elevator, escalator,… to connect to the designed stations.- Design landscape for the area.

Positions held: Highway EngineerActivities performed:- Detail design for alignment, plan and profile- Design cross section.- Design drainage- Calculation quantities.

(4) Name of assignment or project: Feasibility Study for Second GMS Southern Coastal Corridor Project expressway project – Funded by ADB.Year: 8/2012 – 6/2013Location: Kien Giang, VietnamClient: Cuu Long CIPMMain Project Features:The Second Greater Mekong Sub-region (GMS) Southern Coastal Corridor Project (Second GMS-SCCP) is proposed to construct the missing sections of this GMS road corridor in Kien Giang province in the southern coastal area of Viet Nam.The proposed Second GMS-SCCP will construct the remaining 84km (between Ha Tien to Rach Gia) of QL80 route in Viet Nam; construct the new 7.5km Minh Luong T-junction bypass from the end of the Rach Gia bypass at Rach Soi to the start of the Tac Cau bypass; and (iii) upgrade Ha Tien (formerly Xa Xia) cross border facilities and streamline border crossing procedures. In tune with one of the strategic thrusts of the GMS Strategic Framework (2012-2022), the proposed Second GMS-SCCP is a necessary precondition for promoting broader economic corridor development.

TECH-6 Highway Engineer 3NGUYEN Ngoc Duong

Page 2

Page 3: 06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien

TECHNICAL PROPOSAL Package 01: Consulting Services For Feasibility and Social/Safeguards Studies ofBEN LUC – NH22 and NH22 – BINH CHUAN Section under Ho Chi Minh City Third Ring Road Technical Assistance Project

Positions held: Highway EngineerActivities performed: Using modern software such as Civil 3D and Infraworks 360 to make modelling for roads, intersections, interchanges and infrastructure system. Then divide and assign work in part for road team members to work in interactive digital environment.- Detail design for alignment, plan and profile- Design cross section.- Design drainage- Calculation quantities.

(5) Name of assignment or project: Technical Design for GMS Ben Luc – Long Thanh expressway project – Funded by ADB.Year: 02/2011 - 08/ 2012Location: Ho Chi Minh City and Long An province, VietnamClient: Vietnam Expressway Company (VEC)Main Project Features:Ben Luc-Long Thanh Expressway is one of 16 expressways under Eastern North-South Expressway according to “Development planning of Vietnam expressway network toward 2020 and the vision after 2020”. Project Scale:- Total length of the whole route is about 58.5Km. Location of the project: Long An province ( Ben Luc, Can Giuoc

districts); Ho Chi Minh City (Districts of Binh Chanh, Nha Be, Can Gio) and Dong Nai province (districts of Nhon Trach, Dong Nai).

- Starting point of the project: The intersection point between Ho Chi Minh City- Trung Luong expressway and Ring Road 3 project (at about Km12+100 – Station of HCM –Trung Luong Expressway).

- Ending point of the project: The intersection point with Bien Hoa- Vung Tau expressway, phase 1, the ending point of the project is located at the interchange with National Highway QL51 (at about Km35+350 – Station of National Highway 51).

Positions held: Highway EngineerActivities performed: Using Civil 3D to:- Detail design for alignment, plan and profile.- Detail design for 11 interchanges.- Design cross section.- Design drainage system.- Calculation quantities.

(6) Name of assignment or project: Technical Design for HCM - Long Thanh – Dau Giay expressway project – Funded by ADB.Year: 06/2010 to 01/2012Location: Ho Chi Minh city and Dong Nai province, VietnamClient: Vietnam Expressway Company (VEC)Main Project Features:HCM - Long Thanh – Dau Giay expressway is one of 16 expressways under Eastern North-South Expressway according to “Development planning of Vietnam expressway network toward 2020 and the vision after 2020”. Project Scale:- Total length of the whole route is about 53Km. Location of the project: Ho Chi Minh City and Dong Nai province. This

expressway will connect with planned Long Thanh’s airport which will help create a part of the Southern Economic Corridor under Greater Mekong Subregion (GMS) from Bangkok to Phnom Penh – Ho Chi Minh

- Starting point of the project: The intersection point with East – West highway (An Phu district 2, Ho Chi Minh City)- Ending point of the project: The intersection point with Dau Giay, Dong Nai province.

Positions held: Highway EngineerActivities performed:- Detail design for 02 interchanges: Do Xuan Hop and An Phu- Design alignment, plan, profile and cross section.- Design traffic safety.- Design drainage system.- Calculation quantities.

(7) Name of assignment or project: Feasibility Study and Basic design for Improvement and expand highway No.1A project, Khanh Hoa & Ninh Thuan provinceYear: 03/2010 to 06/2010Location: Khanh Hoa and Ninh Thuan provinces, VietnamClient: Department of Transportation of Khanh Hoa &Ninh thuan provinceMain Project Features: Expansion project to upgrade National Highway 1A section from Cam Ranh - Phan Rang has a total length of over 51 km is a part of the upgrading and expansion of National Highway 1A full part in ensuring traffic demand in the coming yearsPositions held: Highway EngineerActivities performed:- Design alignment, plan, profile and cross section.- Design traffic safety- Design drainage- Calculation quantities.

(8) Name of assignment or project: Construction drawing design for Vinh Hy – Ninh Chu project, Ninh Thuan province

TECH-6 Highway Engineer 3NGUYEN Ngoc Duong

Page 3

Page 4: 06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien

TECHNICAL PROPOSAL Package 01: Consulting Services For Feasibility and Social/Safeguards Studies ofBEN LUC – NH22 and NH22 – BINH CHUAN Section under Ho Chi Minh City Third Ring Road Technical Assistance Project

Year: 01/2010 to 03/2010Location: Ninh Thuan province, VietnamClient: Department of Transportation of Ninh thuan provinceMain Project Features: The project corridor Vinh Hy – Ninh Chu has a total coastal length of over 30 km to help develop the local economy and tourism of the province.Positions held: Highway EngineerActivities performed:- Design alignment, plan, profile and cross section.- Design traffic safety- Design drainage- Calculation quantities.

(9) Name of assignment or project: Construction drawing design for Improvement and expand road No.915 project, Dong nai province,Year: 09/2009 to 03/2010Location: Dong Nai province, VietnamClient: Department of Transportation of Dong Nai provinceMain Project Features: The project has a total coastal length of over 21 km to help develop the local economy and tourism of the province.Positions held: Highway EngineerActivities performed:- Design alignment, plan, profile and cross section.- Design traffic safety- Design drainage- Calculation quantities.

(10) Name of assignment or project: Construction drawing design New construction of 2 bridges on NH1A (Package 2a) – Funded by JBICYear: 2008-2009Location: Hau Giang province, VietnamClient: PMU No.2 - MOTMain Project Features: Design construction drawings for Cai Huu bridge at Km2196+680 on NH1A. To avoid different settlement between existing NH1A road and new embankment, approaching roads near abutments have to be treated by soft soil treatment methods as PVD or SD.Positions held: Highway Engineer.Activities performed: Design approaching road for 2 bridges.

(11) Name of assignment or project: Technical Design for Improvement and expand highway No.53 project, Vinh Long and Tra Vinh provinceYear: 04/2009 to 09/2009Location: Ho Chi Minh city, VietnamClient: Department of Transportation of Vinh Long and Tra Vinh provinceMain Project Features: The project has a total coastal length of over 35 km to help develop the local economy and tourism of the province.Positions held: Highway EngineerActivities performed:- Design alignment, plan, profile and cross section.- Design traffic safety- Design drainage- Calculation quantities.

(12) Name of assignment or project: Technical Design for Nam Can – Dat Mui project, Ca Mau provinceYear: 01/2009 to 04/2009Location: Ca Mau province, VietnamClient: PMU 46Main Project Features: The project has a total coastal length of over 25 km to help develop the local economy and tourism of the province.Positions held: Highway EngineerActivities performed:- Design alignment, plan, profile and cross section.- Design traffic safety- Design drainage- Calculation quantities.

(13) Name of assignment or project: Feasibility Study for Rung Sac Road Project, Ho Chi Minh city, Viet namYear: 2007 to 2008Location: Ho Chi Minh city, VietnamClient: Project Management Unit Can Gio DistrictMain Project Features: The Project involved the construction of the Rung Sac road, include 36.5 Km highway and 07 bridges: Long Giang Xay bridge, Rach Don bridge, An Nghia bridge, Ha Thanh bridge, Loi Giang bridge, Rach La bridge,

TECH-6 Highway Engineer 3NGUYEN Ngoc Duong

Page 4

Page 5: 06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien

TECHNICAL PROPOSAL Package 01: Consulting Services For Feasibility and Social/Safeguards Studies ofBEN LUC – NH22 and NH22 – BINH CHUAN Section under Ho Chi Minh City Third Ring Road Technical Assistance Project

Nong Truong Q.5 bridge.Positions held: Highway EngineerActivities performed:- Design alignment, plan, profile and cross section.- Design traffic safety- Design drainage- Calculation quantities.

Expert’s contact information : [email protected]; Phone : +84 9 8664 2736Certification:I, the undersigned, certify to the best of my knowledge and belief that(i) This CV correctly describes my qualifications and experience (ii) I am not a current employee of the Executing or the Implementing Agency(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in TECH 6 provided team mobilization takes place within the validity of this proposal.(iv) I was not part of the team who wrote the terms of reference for this consulting services assignment(v) I am not currently debarred by a multilateral development bank(vi) I certify that I have been informed by the firm that it is including my CV in the Proposal for the “Package 01: Consulting Services For Feasibility and Social/Safeguards Studies of BEN LUC – NH22 and NH22 – BINH CHUAN Section under Ho Chi Minh City Third Ring Road Technical Assistance Project” . I confirm that I will be available to carry out the assignment for which my CV has been submitted in accordance with the implementation arrangements and schedule set out in the Proposal.If CV is signed by the firm’s authorized representative:(vii) I, as the authorized representative of the firm submitting this Proposal for the “Package 01: Consulting Services For Feasibility and Social/Safeguards Studies of BEN LUC – NH22 and NH22 – BINH CHUAN Section under Ho Chi Minh City Third Ring Road Technical Assistance Project”, certify that I have obtained the consent of the named expert to submit his/her CV, and that s/he will be available to carry out the assignment in accordance with the implementation arrangements and schedule set out in the Proposal, and confirm his/her compliance with paras (i) to (v) above.

I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

Full name of the Expert : NGUYEN Ngoc Duong Date: 15/01/2016 Day/Month/Year

Full name of authorized representative: DUONG Van Hiep

TECH-6 Highway Engineer 3NGUYEN Ngoc Duong