RESUMEN DEL MONTO DE INVERSION ALTERNATIVA 1 (EN NUEVOS SOLES ) COMPONENTES F.C TRAMO MEJORAMIENTO PACCHACC - ALTO ANDINO TRABAJOS PRELIMINARES 45,149.99 0.79 35,668.49 EXPLANACIONES 1,124,011.50 0.79 887,969.09 AFIRMADO 160,492.50 0.79 126,789.08 CUNETAS 9,168.30 0.79 7,242.96 OBRAS DE ARTE 332,090.10 0.79 262,351.18 SEÑALIZACIÓN 25,498.41 0.79 20,143.74 CONTROL DE CALIDAD 4,060.00 0.79 3,207.40 MITIGACION AMBIENTAL 23,804.00 0.79 18,805.16 FLETE DE MATERIALES 52,866.83 0.79 41,764.80 SEGURIDAD Y SALUD 10,880.00 0.79 8,595.20 TRAMO CONSTRUCCIÒN PALLALLA - PACCHACC TRABAJOS PRELIMINARES 12,206.66 0.79 9,643.26 EXPLANACIONES 801,877.87 0.79 633,483.52 AFIRMADO 75,520.90 0.79 59,661.51 CUNETAS 5,546.82 0.79 4,381.99 OBRAS DE ARTE 111,878.17 0.79 88,383.75 SEÑALIZACIÓN 17,433.21 0.79 13,772.24 CONTROL DE CALIDAD 1,905.00 0.79 1,504.95 COSTO DIRECTO 2,814,390.26 2,223,368.31 GASTOS GENERALES (6%) 168,863.42 0.79 133,402.10 UTILIDAD (8%) 225,151.22 0.79 177,869.46 SUB TOTAL 3,208,404.90 2,534,639.87 IMPUESTO IGV (18%) 577,512.88 0.79 456,235.18 SUPERVISION (3%) 84,431.71 0.79 66,701.05 EXPEDIENTE TECNICO (3.2%) 90,060.49 0.79 71,147.79 COSTO TOTAL GENERAL 3,960,409.97 3,128,723.88 RESUMEN DEL MONTO DE INVERSION ALTERNATIVA 1 (EN NUEVOS SOLES ) COMPONENTES F.C TRAMO MEJORAMIENTO PACCHACC - ALTO ANDINO TRABAJOS PRELIMINARES 45,149.99 0.79 35,668.49 EXPLANACIONES 1,124,011.50 0.79 887,969.09 AFIRMADO 160,492.50 0.79 126,789.08 CUNETAS 9,168.30 0.79 7,242.96 OBRAS DE ARTE 332,090.10 0.79 262,351.18 SEÑALIZACIÓN 25,498.41 0.79 20,143.74 CONTROL DE CALIDAD 4,060.00 0.79 3,207.40 MITIGACION AMBIENTAL 23,804.00 0.79 18,805.16 FLETE DE MATERIALES 52,866.83 0.79 41,764.80 SEGURIDAD Y SALUD 10,880.00 0.79 8,595.20 COSTO DIRECTO 1,788,021.63 1,412,537.09 GASTOS GENERALES (6%) 107,281.30 0.79 84,752.23 UTILIDAD (8%) 143,041.73 0.79 113,002.97 SUB TOTAL 2,038,344.66 1,610,292.28 IMPUESTO IGV (18%) 366,902.04 0.79 289,852.61 SUPERVISION (3%) 53,640.65 0.79 42,376.11 EXPEDIENTE TECNICO (3.2%) 57,216.69 0.79 45,201.19 COSTO TOTAL GENERAL 2,516,104.04 1,987,722.19 RESUMEN DEL MONTO DE INVERSION ALTERNATIVA 1 (EN NUEVOS SOLES ) COMPONENTES F.C TRAMO CONSTRUCCIÒN PALLALLA - PACCHACC TRABAJOS PRELIMINARES 12,206.66 0.79 9,643.26 EXPLANACIONES 801,877.87 0.79 633,483.52 AFIRMADO 75,520.90 0.79 59,661.51 CUNETAS 5,546.82 0.79 4,381.99 OBRAS DE ARTE 111,878.17 0.79 88,383.75 SEÑALIZACIÓN 17,433.21 0.79 13,772.24 CONTROL DE CALIDAD 1,905.00 0.79 1,504.95 COSTO DIRECTO 1,026,368.63 810,831.22 GASTOS GENERALES (6%) 61,582.12 0.79 48,649.87 UTILIDAD (8%) 82,109.49 0.79 64,866.50 SUB TOTAL 1,170,060.24 924,347.59 IMPUESTO IGV (18%) 210,610.84 0.79 166,382.57 SUPERVISION (3%) 30,791.06 0.79 24,324.94 EXPEDIENTE TECNICO (3.2%) 32,843.80 0.79 25,946.60 COSTO TOTAL GENERAL 1,444,305.94 1,141,001.69 A PRECIOS DE MERCADO A PRECIOS SOCIALES A PRECIOS DE MERCADO A PRECIOS SOCIALES A PRECIOS DE MERCADO A PRECIOS SOCIALES

Transcript of 05-EVAL COSTO.xls

RESUMEN DEL MONTO DE INVERSION ALTERNATIVA 1 (EN NUEVOS SOLES )

COMPONENTES F.C

TRAMO MEJORAMIENTO PACCHACC - ALTO ANDINO

TRABAJOS PRELIMINARES 45,149.99 0.79 35,668.49

EXPLANACIONES 1,124,011.50 0.79 887,969.09

AFIRMADO 160,492.50 0.79 126,789.08

CUNETAS 9,168.30 0.79 7,242.96

OBRAS DE ARTE 332,090.10 0.79 262,351.18

SEÑALIZACIÓN 25,498.41 0.79 20,143.74

CONTROL DE CALIDAD 4,060.00 0.79 3,207.40

MITIGACION AMBIENTAL 23,804.00 0.79 18,805.16

FLETE DE MATERIALES 52,866.83 0.79 41,764.80

SEGURIDAD Y SALUD 10,880.00 0.79 8,595.20

TRAMO CONSTRUCCIÒN PALLALLA - PACCHACC

TRABAJOS PRELIMINARES 12,206.66 0.79 9,643.26

EXPLANACIONES 801,877.87 0.79 633,483.52

AFIRMADO 75,520.90 0.79 59,661.51

CUNETAS 5,546.82 0.79 4,381.99

OBRAS DE ARTE 111,878.17 0.79 88,383.75

SEÑALIZACIÓN 17,433.21 0.79 13,772.24

CONTROL DE CALIDAD 1,905.00 0.79 1,504.95COSTO DIRECTO 2,814,390.26 2,223,368.31GASTOS GENERALES (6%) 168,863.42 0.79 133,402.10UTILIDAD (8%) 225,151.22 0.79 177,869.46SUB TOTAL 3,208,404.90 2,534,639.87IMPUESTO IGV (18%) 577,512.88 0.79 456,235.18SUPERVISION (3%) 84,431.71 0.79 66,701.05EXPEDIENTE TECNICO (3.2%) 90,060.49 0.79 71,147.79COSTO TOTAL GENERAL 3,960,409.97 3,128,723.88

RESUMEN DEL MONTO DE INVERSION ALTERNATIVA 1 (EN NUEVOS SOLES )

COMPONENTES F.CTRAMO MEJORAMIENTO PACCHACC - ALTO ANDINO TRABAJOS PRELIMINARES 45,149.99 0.79 35,668.49 EXPLANACIONES 1,124,011.50 0.79 887,969.09 AFIRMADO 160,492.50 0.79 126,789.08 CUNETAS 9,168.30 0.79 7,242.96 OBRAS DE ARTE 332,090.10 0.79 262,351.18 SEÑALIZACIÓN 25,498.41 0.79 20,143.74 CONTROL DE CALIDAD 4,060.00 0.79 3,207.40 MITIGACION AMBIENTAL 23,804.00 0.79 18,805.16 FLETE DE MATERIALES 52,866.83 0.79 41,764.80 SEGURIDAD Y SALUD 10,880.00 0.79 8,595.20COSTO DIRECTO 1,788,021.63 1,412,537.09GASTOS GENERALES (6%) 107,281.30 0.79 84,752.23UTILIDAD (8%) 143,041.73 0.79 113,002.97SUB TOTAL 2,038,344.66 1,610,292.28IMPUESTO IGV (18%) 366,902.04 0.79 289,852.61SUPERVISION (3%) 53,640.65 0.79 42,376.11EXPEDIENTE TECNICO (3.2%) 57,216.69 0.79 45,201.19COSTO TOTAL GENERAL 2,516,104.04 1,987,722.19

RESUMEN DEL MONTO DE INVERSION ALTERNATIVA 1 (EN NUEVOS SOLES )

COMPONENTES F.C TRAMO CONSTRUCCIÒN PALLALLA - PACCHACC TRABAJOS PRELIMINARES 12,206.66 0.79 9,643.26 EXPLANACIONES 801,877.87 0.79 633,483.52 AFIRMADO 75,520.90 0.79 59,661.51 CUNETAS 5,546.82 0.79 4,381.99 OBRAS DE ARTE 111,878.17 0.79 88,383.75 SEÑALIZACIÓN 17,433.21 0.79 13,772.24 CONTROL DE CALIDAD 1,905.00 0.79 1,504.95COSTO DIRECTO 1,026,368.63 810,831.22GASTOS GENERALES (6%) 61,582.12 0.79 48,649.87UTILIDAD (8%) 82,109.49 0.79 64,866.50SUB TOTAL 1,170,060.24 924,347.59IMPUESTO IGV (18%) 210,610.84 0.79 166,382.57SUPERVISION (3%) 30,791.06 0.79 24,324.94EXPEDIENTE TECNICO (3.2%) 32,843.80 0.79 25,946.60COSTO TOTAL GENERAL 1,444,305.94 1,141,001.69

A PRECIOS DE MERCADO

A PRECIOS SOCIALES

A PRECIOS DE MERCADO

A PRECIOS SOCIALES

A PRECIOS DE MERCADO

A PRECIOS SOCIALES

RESUMEN DEL MONTO DE INVERSION ALTERNATIVA 2 (EN NUEVOS SOLES )

COMPONENTES F.C

TRAMO MEJORAMIENTO PACCHACC - ALTO ANDINO

TRABAJOS PRELIMINARES 45,149.99 0.79 35,668.49

EXPLANACIONES 1,124,011.50 0.79 887,969.09

AFIRMADO 190,890.00 0.79 150,803.10

CUNETAS 9,168.30 0.79 7,242.96

OBRAS DE ARTE 332,090.10 0.79 262,351.18

SEÑALIZACIÓN 25,498.41 0.79 20,143.74

CONTROL DE CALIDAD 4,060.00 0.79 3,207.40

MITIGACION AMBIENTAL 23,804.00 0.79 18,805.16

FLETE DE MATERIALES 52,866.83 0.79 41,764.80

SEGURIDAD Y SALUD 10,880.00 0.79 8,595.20

TRAMO CONSTRUCCIÒN PALLALLA - PACCHACC

TRABAJOS PRELIMINARES 12,206.66 0.79 9,643.26

EXPLANACIONES 801,877.87 0.79 633,483.52

AFIRMADO 89,824.35 0.79 70,961.24

CUNETAS 5,546.82 0.79 4,381.99

OBRAS DE ARTE 111,878.17 0.79 88,383.75

SEÑALIZACIÓN 17,433.21 0.79 13,772.24

CONTROL DE CALIDAD 1,905.00 0.79 1,504.95COSTO DIRECTO 2,859,091.21 2,258,682.06GASTOS GENERALES (6%) 171,545.47 0.79 135,520.92UTILIDAD (8%) 228,727.30 0.79 180,694.56SUB TOTAL 3,259,363.98 2,574,897.54IMPUESTO IGV (18%) 586,685.52 0.79 463,481.56SUPERVISION (3%) 85,772.74 0.79 67,760.46EXPEDIENTE TECNICO (3.2%) 91,490.92 0.79 72,277.83COSTO TOTAL GENERAL 4,023,313.15 3,178,417.39

RESUMEN DEL MONTO DE INVERSION ALTERNATIVA 2

(EN NUEVOS SOLES )

COMPONENTES F.C

TRAMO MEJORAMIENTO PACCHACC - ALTO ANDINO

TRABAJOS PRELIMINARES 45,149.99 0.79 35,668.49

EXPLANACIONES 1,124,011.50 0.79 887,969.09

AFIRMADO 190,890.00 0.79 150,803.10

CUNETAS 9,168.30 0.79 7,242.96

OBRAS DE ARTE 332,090.10 0.79 262,351.18

SEÑALIZACIÓN 25,498.41 0.79 20,143.74

A PRECIOS DE MERCADO

A PRECIOS SOCIALES

A PRECIOS DE MERCADO

A PRECIOS SOCIALES

cronograma fisico

COMPONENTES Unidad de MES 01 MES 02

TRAMO MEJORAMIENTO PACCHACC - ALTO ANDINO

TRABAJOS PRELIMINARES 0 100 EXPLANACIONES 0 40 AFIRMADO 0 0 CUNETAS 0 0 OBRAS DE ARTE 0 0 SEÑALIZACIÓN 0 0 CONTROL DE CALIDAD 0 0 MITIGACION AMBIENTAL 0 0 FLETE DE MATERIALES 0 20 SEGURIDAD Y SALUD 0 20 TRAMO CONSTRUCCIÒN PALLALLA - PACCHACC

TRABAJOS PRELIMINARES 0 100

EXPLANACIONES 0 40

AFIRMADO 0 0

CUNETAS 0 0

OBRAS DE ARTE 0 0

SEÑALIZACIÓN 0 0

CONTROL DE CALIDAD 0 0

GASTOS GENERALES (6%) 0 19UTILIDAD (8%) 0 19IMPUESTO IGV (18%) 0 19SUPERVISION (3%) 0 19EXPEDIENTE TECNICO (3.2%) 100COSTO TOTAL GENERAL

CRONOGRAMA FINANCIERO

COMPONENTES Unidad de MES 01 MES 02

TRAMO MEJORAMIENTO PACCHACC - ALTO ANDINO

TRABAJOS PRELIMINARES 0.00 45149.99 EXPLANACIONES 0.00 449604.60 AFIRMADO 0.00 0.00 CUNETAS 0.00 0.00 OBRAS DE ARTE 0.00 0.00 SEÑALIZACIÓN 0.00 0.00 CONTROL DE CALIDAD 0.00 0.00 MITIGACION AMBIENTAL 0.00 0.00 FLETE DE MATERIALES 0.00 10573.37

Meses

Medida 2016 2016

GLB GLB GLB GLB GLB GLB GLB GLB GLB GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

Meses

Medida 2016 2016

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

SEGURIDAD Y SALUD 0.00 2176.00 TRAMO CONSTRUCCIÒN PALLALLA - PACCHACC

TRABAJOS PRELIMINARES 0.00 12206.66 EXPLANACIONES 0.00 320751.15 AFIRMADO 0.00 0.00 CUNETAS 0.00 0.00 OBRAS DE ARTE 0.00 0.00 SEÑALIZACIÓN 0.00 0.00 CONTROL DE CALIDAD 0.00 0.00COSTO DIRECTO 0 840461.764GASTOS GENERALES (6%) 0 50427.70584UTILIDAD (8%) 0 67236.94112SUB TOTAL 0 958126.411IMPUESTO IGV (18%) 0 172462.754SUPERVISION (3%) 0 25213.85292EXPEDIENTE TECNICO (3.2%) 90,060.49 0COSTO TOTAL GENERAL 90,060.49 1,155,803.02

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

GLB

MES 03 MES 04 MES 05 MES 06 MES 07

2016 2016

0 0 0 0 0 10030 30 0 0 0 1000 40 30 30 0 1000 100 0 0 0 1000 0 0 50 50 1000 0 0 0 100 1000 0 0 100 0 1000 0 0 0 100 100

20 15 15 15 15 10020 15 15 15 15 100

0 0 0 0 0 100

30 30 0 0 0 100

0 40 30 30 0 100

0 100 0 0 0 100

0 0 0 50 50 100

0 0 0 0 100 100

0 0 0 100 0 1006 22 5 23 25 100

6 22 5 23 25 100

6 22 5 23 25 100

6 22 5 23 25 100

100

MES 03 MES 04 MES 05 MES 06 MES 07

2016 2016

0.00 0.00 0.00 0.00 0.00 45149.99337203.45 337203.45 0.00 0.00 0.00 1124011.50

0.00 64197.00 48147.75 48147.75 0.00 160492.500.00 9168.30 0.00 0.00 0.00 9168.300.00 0.00 0.00 166045.05 166045.05 332090.100.00 0.00 0.00 0.00 25498.41 25498.410.00 0.00 0.00 4060.00 0.00 4060.000.00 0.00 0.00 0.00 23804.00 23804.00

10573.37 7930.02 7930.02 7930.02 7930.02 52866.83

Meses

Total por componente 2016 2016 2016

Meses

Total por componente 2016 2016 2016

2176.00 1632.00 1632.00 1632.00 1632.00 10880.00

0.00 0.00 0.00 0.00 0.00 12206.66240563.36 240563.36 0.00 0.00 0.00 801877.87

0.00 30208.36 22656.27 22656.27 0.00 75520.900.00 5546.82 0.00 0.00 0.00 5546.820.00 0.00 0.00 55939.09 55939.09 111878.170.00 0.00 0.00 0.00 17433.21 17433.210.00 0.00 0.00 1905.00 0.00 1905.00

590516.177 696449.3155 80366.0445 308315.1795 298281.7795 2814390.2635430.97062 41786.95893 4821.96267 18498.91077 17896.90677 168863.4247241.29416 55715.94524 6429.28356 24665.21436 23862.54236 225151.22673188.4418 793952.2197 91617.29073 351479.3046 340041.2286 3208404.90121173.9195 142911.3995 16491.11233 63266.27483 61207.42115 577512.8817715.48531 20893.47947 2410.981335 9249.455385 8948.453385 84431.71

0 0 0 0 0 90060.49812,077.85 957,757.10 110,519.38 423,995.03 410,197.10 3960409.97

45,149.991,124,011.50

160,492.509,168.30

332,090.1025,498.41

4,060.0023,804.0052,866.83

10,880.00

12,206.66801,877.87

75,520.905,546.82

111,878.1717,433.21

1,905.002,814,390.26

168,863.42225,151.22

3,208,404.90577,512.88

84,431.7190,060.49

3,960,409.97

PROYECCION DE LA POBLACION DEL AREA DE INFLUENCIA DEL PROYECTO

LOCALIDADESAÑO 0 HORIZONTE DE PROYECCION (AÑOS)2016 2017 2018 2019 2020 2021

Pallalla 709 2.34% 873 894 914 936 958 980Pacchacc 110 135 139 142 145 149 152Alto andino 134 165 169 173 177 181 185TOTAL 953 1174 1201 1229 1258 1287 1317

POB. 2007

TASA DE CRECIM.

PROYECCION DE LA POBLACION DEL AREA DE INFLUENCIA DEL PROYECTOHORIZONTE DE PROYECCION (AÑOS)

2022 2023 2024 2025 20261003 1027 1051 1075 1100

156 159 163 167 171190 194 199 203 208

1348 1380 1412 1445 1479

POBLACION 2007

Pallalla 709Pacchacc 110Alto andino 134TOTAL 953

PERIODO AÑO

0 2016 1,174 2.34%1 2017 1,201 2.34%2 2018 1,229 2.34%3 2019 1,258 2.34%4 2020 1,287 2.34%5 2021 1,317 2.34%6 2022 1,348 2.34%7 2023 1,380 2.34%8 2024 1,412 2.34%9 2025 1,445 2.34%10 2026 1,479 2.34%

Promedio beneficiarios 1,321

LOCALIDADES

BENEFICIARIA

POBLACION OBJETIVA

PROYECTADA

tasa de crecimiento

AÑO 0AÑO 1

MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7

POST INVERSION OPERACIÓN Y MANTENIMIENTO

Entrega del servicio a los beneficiarios

FASE DE INVERSION

Expediente Técnico o estudio definitivo

“CONSTRUCCION Y MEJORAMIENTO DE CAMINO VECINAL PALLALLA - PACCHACC - ALTO ANDINO, DISTRITO DE

ACORIA - HUANCAVELICA - HUANCAVELICA”

AÑO 2 AÑO…. AÑO 10

POST INVERSION OPERACIÓN Y MANTENIMIENTO

Entrega del servicio a los beneficiarios

1RA ALTERNATIVA

Indicador Social En Mejoramiento

VAN (S/) 44,069 832,280 438,174

TIR (%) 9.48% 19.90% 14.69%

2DA ALTERNATIVA

Indicador Social En Mejoramiento

VAN (S/) 20,164 810,622 415,393

TIR (%) 9.22% 19.54% 14.38%

En Construcción

Promedio Total Alternativa 01

En Construcción

Promedio Total Alternativa 02