深圳市迪威泰实业有限公司 SHENZHEN D-VITEC INDUSTRIALS CO.,LTD. Profile of production...
-
Upload
elijah-hardy -
Category
Documents
-
view
318 -
download
0
Transcript of 深圳市迪威泰实业有限公司 SHENZHEN D-VITEC INDUSTRIALS CO.,LTD. Profile of production...
深圳市迪威泰实业有限公司SHENZHEN D-VITEC INDUSTRIALS CO.,LTD.
Profile of production line
Made Varify Approve
Haihui ou
Jun yang
13 / 5 / /
1 、 Plant View2 、 Meeting room3 、 Development department4 、 Development laboratory5 、 Laboratory for approving new product6 、 Goods receiving and inspection area7 、 Incoming control8 、 Controlling for warehouse of raw incoming9 、 Production control10 、 Inspection of finished product11 、 Warehouse control of finished product
Catalogue
1 、 Plant View(1)
1 、 Plant View(2)
Meeting room
2 、 Meeting room
Development department
3 、 Development department
4 、 Development laboratory ( 1 )
Monitor Test power supply, oscilloscope
4 、 Development laboratory(2)
Reliability laboratory
5 、 Laboratory for approving new product(1)
Reliability laboratory
5 、 Laboratory for approving new product(2)
Constant temperature and humidity testing machine
5 、 Laboratory for approving new product(3)
Drop test machine
5 、 Laboratory for approving new product(4)
Rain tester
5 、 Laboratory for approving new product(5)
Salt spraying tester
5 、 Laboratory for approving new product(6)
Lens testing area
5 、 Laboratory for approving new product(7)
Incoming inspection area
6 、 Goods receiving and inspection area
IQC incoming inspection area
7 、 Incoming control(1)-Incoming inspection room
Unqualified area
Inspection waiting area Qualified area
7 、 Incoming control(2)- Division of incoming inspection area
IQC incoming inspection platform
7 、 Incoming control(3)-Incoming inspection platform
Place for sample of IQC incoming inspection, drawing and acknowledgment
7 、 Incoming control(4)- Sample, drawing and acknowledgment
Place for tooling equipment of IQC incoming inspection
7 、 Incoming control(5)- inspection tooling area
Caliper
thread gauge
block gauge
plug gage
7 、 Incoming control(6)-Incoming inspection tool
digital electric bridge
frequency recorder
test patterns
Multimeter
7 、 Incoming control(7)-Incoming inspection equipment
IQC Incoming inspection program
7 、 Incoming control(8)-Incoming inspection program
7 、 Incoming control(9)- sampling standard
IQC incoming sample standard method
IQC inspection sheet
7 、 Incoming control(10)- inspection sheet
Electronic raw material warehouse
8 、 Controlling for warehouse of raw incoming(1)-Electronic warehouse
Temperature and humidity Control sheet for electronic warehouse
8、 Controlling for warehouse of raw incoming (2) -Temperature and humidity control of electronic warehouse
Cabinet with Temperature and humidity Control of electronic warehouse
8、 Controlling for warehouse of raw incoming (3)- Temperature and humidity
Control for critical element
dehumidifier
8 、 Controlling for warehouse of raw incoming (4)- Damp proof control of electronic warehouse
dehumidifier
vacuum package equipment
8、 Controlling for warehouse of raw incoming (5)- antiseptic and damp proof control of electronic warehouse vacuum package equipment
hardware and packing raw material warehouse
8、 Controlling for warehouse of raw incoming (6)- hardware and packing material warehouse
FIFO control label
8 、 Controlling for warehouse of raw incoming (7)- FIFO control
FIFO control document
8 、 Controlling for warehouse of raw incoming ( (8)- FIFO control
USB assemble line
Material receiving area
DVR assemble line
Place for clearing sensor and sticking filter
9 、 Production control(1)-production line
Finished product and semi-finished product aging shelf
Camera assemble line
Product adjusting line
USB aging shelf
9 、 Production control(2)-production line
Pre-Inspection Area
Final inspection position
Qualified finished product area
packing line
9 、 Production control(3)-production line
Place for instrument and equipment
Place for temporary storage of finished product
place for tool&equipment
place for tool&equipment
9 、 Production control ( 4 ) - tool&equipment
九、 Production control( 5 )—— electric screwdriver and ferrochrome controlSpot check record of electric screwdriver Spot check record of ferrochrome
9 、 Production control( 6 ) -Spot check record of electric screwdriverstate of spot check for electric screwdriver
9、 Production control( 7 ) - control of dust-free for important position in production line
Dust-free room for sticking filter
9、 Production control ( 8 ) - control of dust-free for important position in
production line
Dust-free room for sticking filter
9、 Production control ( 9 )— equip with dust-free control for important
position in production line
Clear the dust-free position before installing housing
Aging test room
9 、 Production control ( 10 )— aging test control
Aging test room
9 、 Production control ( 11 )— aging test controlChecklists for temperature and humidity in aging test room
9 、 Production control ( 12 )—— aging test control
Process of product aging test
9 、 Production control ( 13 )—— aging test control
Record list of product aging test
QA inspection area of finished product
10 、 Inspection of finished product(1)- QA sampling area
Test patterns
Illumination testing box
color card
equipment for testing
10 、 Inspection of finished product ( 2 )—— QA sampling area
QA inspection process
10 、 Inspection of finished product ( 3 ) -inspection process
QA sampling method of finished product
10 、 Inspection of finished product ( 4 ) -sampling method
Place for QA files QA inspection files for finished product
10 、 Inspection of finished product ( 5 ) - inspection file and report
Place for finished product
11 、 Warehouse control of finished product(1)- finished product warehouse
Place for storing goods will be shipping
11 、 Warehouse control of finished product(2)- finished product warehouse
11 、 Warehouse control of finished product(3)-temperature and humidity control
Control chart of temperature and humidity for warehouse
dehumidifier
11 、 Warehouse control of finished product(4)-damp proof control for warehouse
dehumidifier
Thank you!