भाग I / Part I -...

88
ीय रेल िशᭃण संथान, म᭟य रेल, भुसावल. यातायात बᱹक Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank 1 भाग I / Part I ᳯरᲦ थानो कᳱ पुᳶत कᳱिजए / Fill in the blanks: 1. संचालन समय सारणी COM एवं --------- के संयुᲦ हताᭃर से जारी ᳰकया जाता हᱹ। Working time table is issued with the joint signatures of COM and ______. 2. सामा᭠य एवं सहायक िनयम पुितका मᱶ ----------- अ᭟यायहै | There are _________ chapters in the book of G & SR. 3. दुघᭅटना िनयमावली मᱶ -------------- अ᭟याय है | There are _________ chapters in the Accident Manual. 4. थान टेशन पर एअर ेक णाली से सुसिᲯत सवारी गाडी के इंजन एवं ेकयान मᱶ 5.0 kg/cm 2 एवं - -------शर कᳱ माा होनी चािहये। Amount of air pressure in the engine and brake van of a passenger train at the starting station shall be 5.0 kg/cm 2 and _________. 5. मालगाडी के इंजन मᱶ --------- ि.मी .तक ᭢लेट टायर कᳱ सीमा अनुमत हᱹ। ________ mm of flat tyre is permitted in the locomotive of a goods train. 6. जब गाडी उ᭨लंघन िच᭠ह साफ करके खडी हो तब गाडᭅ टेशन माटर को ᳰदन मे हाथ तथा रात मे --- ------- --- ----- िसगनल दᳶशत करेगा Guard shall show hand by day and __________ by night to the S.M. if the train is standing clear of fouling mark. 7. सतᭅकता संके तक, गित संके तक से समतल जगह पर--------- मीटर कᳱ दूरी पर लगाया जाता हᱹ Caution indicator is placed at a distance of _________ metres from the speed indicator on a plain level. 8. एक वैगन मᱶ अिधकतम --------------- लै᭥प ᳰकया जा सकता हᱹ। Maximum No. of _______ clamps is allowed in a wagon. 9. लास .डी.सी कᳱ अिधकतम गित ------------- - km/h होती हᱹ Maximum speed of ‘A’ class ODC is ______ km/h. 10. गाडी का कै च साईिडग मᱶ वेश ----------- कार कᳱ दुघᭅटना है Train entering into sand hump is a _________ type of accident. 11. अिधकतम अनुमेय गित - -------- ---------- ᳇ारा िनधाᭅᳯरत कᳱ जाती है Maximum permissible speed is determined by ____________. 12. साढे आठ मᱶ एक के कवᭅड िवच वाले टनᭅ आऊट से गुजरते समय अिधकतम गित--------होती हᱹ। Maximum speed while running through over 1 in 8 ½ turn-out with curved switch is ________. 13. काशन बोडᭅ टाप बोडᭅ से ---- - ---- मीटर कᳱ दूरी पर लगाते हᱹ।

Transcript of भाग I / Part I -...

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    1

    I / Part I

    / Fill in the blanks:

    1. COM --------- Working time table is issued with the joint signatures of COM and ______.

    2. ----------- | There are _________ chapters in the book of G & SR. 3. -------------- | There are _________ chapters in the Accident Manual. 4. 5.0 kg/cm2 -

    ------- Amount of air pressure in the engine and brake van of a passenger train at the starting

    station shall be 5.0 kg/cm2 and _________. 5. --------- . . ________ mm of flat tyre is permitted in the locomotive of a goods train. 6. ----------

    -------- Guard shall show hand by day and __________ by night to the S.M. if the train is

    standing clear of fouling mark. 7. , --------- Caution indicator is placed at a distance of _________ metres from the speed indicator

    on a plain level. 8. --------------- Maximum No. of _______ clamps is allowed in a wagon. 9. .. -------------- km/h Maximum speed of A class ODC is ______ km/h. 10. ----------- Train entering into sand hump is a _________ type of accident. 11. ------------------- Maximum permissible speed is determined by ____________. 12. -------- Maximum speed while running through over 1 in 8 turn-out with curved switch is

    ________. 13. ---------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    2

    Caution board is placed at a distance of ______ metres from the stop board. 14. ------------ Speed while dropping ballast from material train during run is _________. 15. A ------------- If A marker is extinguished in automatic section, signal is treated as _____. 16. ------------------------ Sound of two hooters means __________________.

    17. MAUQ ------------ Block over lap in MAUQ signaling system is ___________. 18. --------------- Information of permanent speed restrictions is provided in ____________. 19. ------------------ In case of train parting, Guard shall show ____________ by day. 20. ----------------- In case of train parting, Guard shall show ______________ by night. 21. ------------- In case of train dividing, hand brakes of _______ wagons of the remaining load are

    pinned down. 22. . . , -------

    ---------- Loco Pilot shall sound ________ whistle while passing the IBS at ON after being

    authorized by the SM in rear. 23. ------------------ First detonator is placed at a distance of _______ metres from the obstruction in

    narrow gauge. 24. ------------------ Before demanding assisting engine, train is to be protected from _________. 25. ACF -------------------- km/h Speed of the first train during ACF on double line is ____________ km/h. 26. ACF -------- / 602 During ACF on single line, T/B 602 is issued to Loco Pilot to _____________. 27. 5 ----------------- During shunting Impact speed of 5 box wagons is _________. 28. ---------------------- Validity of the brake power certificate of air braked material train is ________.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    3

    29. ---------------- In ghat section, distance between caution and speed indicator is _______. 30. -- When train is divided, Guard shall issue _______ authority to Loco Pilot. 31. ------------------ Number of the Train Intact Arrival Register is __________. 32. -------- km/h Speed of first train during temporary single line working is _______ km/h. 33. ----------- km/h To clear the section, maximum speed of the train with flat tyre is _____ km/h. 34. ---------------- Maximum speed when head light becomes defective is ____________. 35. -------------- Loco Pilot shall sound ____________ whistle to call Guard to Engine. 36. ------------------- Train is protected from __________ in one train only system. 37. ----------- Brake power in the C C rake goods train at a starting station shall be ____%. 38. ---------------- Stop indicator is placed at a distance of ________ metres from the place of obstruction. 39. ----------------

    On seeing defective stop signal during train working, Loco Pilot will sound

    _____________ whistle to inform the same. 40. -------------

    In the absence of red light in hand signal lamp, danger signal can be shown by

    ______________. 41. --------------------- Medical relief van shall be dispatched within __________ minutes from double exit

    siding. 42. --------------- Speed of second train during temporary single line working is _________. 43. MACLS --------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    4

    For exitinguished home signal, Loco Pilot will be issued __________ authority form the station in rear in MACLS system.

    44. ----------------- Speed of train without brake van while passing through a station is _______. 45. --------------- Section controller shall transmit the correct time at _______ hours daily to all the

    stations. 46. ------------------

    Seciton controller is responsible for _________ on a section of a railway provided

    with the system of speech communication. 47. -------------------- Approved special instructions are issued by _____________________. 48. ----------------------- Special instructions are issued by ___________________. 49.

    ------------- While clearing the load with an invalid brake power certificate, if train examiner is

    not available, Loco Pilot and Guard shall ensrue safety of the train and take the train upto ______________________.

    50. -----------------

    T S L is started between those two stations at which cross over facility is available and ____________ is treated as closed.

    51. ------------------- Maximum No. of _______ track machines can be sent for working in a block section. 52. ------------------ Validity of the vacuum braked material train is for __________ days. 53. --------------- km/h Speed of train shall not be more than ______________ km/h in case of whistle failure

    in block section. 54. ---------------- km/h

    Maximum speed of passenger train attached with four wheeler wagon shall be

    ______ km/h. 55. ----------------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    5

    Block competency certificate is given in the prescribed form ____________. 56. --------------------

    Block competency certificate is issued by ____________________. 57. TI SE (Sig) -

    ----------- Gateman competency certificate of interlocked traffic gate is signed by TI and SE

    (Sig) and counter signed by _____________. 58. -----------

    Record of caution order is kept for __________ months. 59.

    ------------ Knowledge of subsidiary rules is examined by ____________ if train working staff of

    another Railway is required to work on our Railway. 60. TI

    ---- All the authorities related to TSL working are examined by TI and its report is

    submitted to DRM within _________ days of resumption of normal working. 61. COM -------------- Rake link book-let is prepared by COM and _________. 62. Sr. DOM ---------------- Station working rules of an interlocked station is prepared by Sr. DOM and _________. 63. ----------------- Station manager of a big station shall inspect the cabins atleast once in _________. 64. ----------------- Signal sighting committee shall submit its report on form _______________. 65.

    ----------------- For overhauling of lever frame at stations, _________ is prepared jointly by DSO and

    DSTE for working of trains. 66. --------------

    When signal is not visible from minimum sighting distance, ________ signal is provided.

    67. 5 -------------------- Sounding of 5 hooters means_____________________. 68. --------------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    6

    If a member disagrees with the reasons of the joint note of an accident, he may give ________________.

    69. 58 5.0 kg/cm2 ------------

    Air pressure in the engine and brake van of a goods train with 58 N Boxes shall be 5.0 kg/cm2 and __________ respectively.

    70. ------------------ Normally the train with hot axle is admitted on ____________. 71. -------------------- .. . . Speed of a train with clamped wagon is __________km/h.

    72. DRM ------------ Accident drill is ordered by DRM and is conducted under the supervision of ________. 73. : 60mm -------- Permissible limit of flat tyre in goods and coaching vehicles is 60mm and

    _________respectively. 74. T/A 602

    ------------- To send the assisting engine into obstructed block section T/A 602 authority is issued

    and the speed of engine shall be _________. 75. -------------- During serious accident, __________ will be the in-charge of control office. 76. -------------- SCOR maintains ________ register when serious accident occurs. 77. ----

    ------------ Whenever new signal is put into use, signal sighting committee submits its joint report

    on _________ form. 78. .. ---------- SM shall inspect the personal store of Guard once in ________months. 79. --------

    Second train during all communication failure shall be dispatched after an interval of

    _____________ minutes. 80. ------------- Second train during TSL will be dispatched after obtaining __________.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    7

    81. ---------

    During thick & foggy weather, line must be clear upto _____ for granting line clear at a B clas station in TALQ signalling system on Double line.

    82. / ------------- _______ bogies can be attached in rear of SLR of Mail/Express train. 83. -------- Point indicator shows _______ light when the points are set for loop line. 84. --------------------- Form number of disconnection and reconnection is __________. 85. 08:00 ,--------- 21:00

    Clocks of control office shall be synchronized with All India Radio at 08:00 hours,

    _______ hours and 21:00 hours. 86. 132 --------

    km/h The maximum speed of special train with 132 tonne bogie well wagon shall be ________

    km/h. 87. C -------------- C class ODC is run with the permission of _____________. 88. ---------- Station Working Rules of Non-interlocked station is signed by ________. 89. ............. Loss of Railway property of __________ is treated as serious accident. 90. --------------- General rules may be modified by ___________. 91. 2003 ------------ Train entering catch siding is a type of _______ accident as per AM 2003. 92. TI, SI / PWI ---------------- Signal sighting committee consists of TI, SI/PWI and _________. 93. -------- During prolonged failure of signals in automatic section, ________ authority is issued. 94. ----------------- Information of caution notice stations is given in ______________. 95. ----

    ------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    8

    If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the sation in rear.

    96. ----------------

    If the Distant signal of a Gate becomes defective in off condition, __________ is issued to Loco Pilot from the station in rear.

    97. -------------- Height gauge is for the safety of ____________. 98. ----------

    Reference of ________________ is written by the side of the Rule if the Rule is corrected. 99. ---------- Accident drill is to be conducted once in ________ if no real accident occurs

    during this period. 100. ---------

    Target time for dispatch of ARME from single exit siding is _______ minutes. 101. ART/MRV -----------

    While ordering ART/MRV each siren shall be sounded for ______ seconds. 102. ART/MRV ------------- While cancelling ART/MRV, each siren shall be sounded for _____ seconds. 103. ----------- Station Master shall give line clear with _______ while granting line clear. 104. ----------

    : SWR shall be re-issued if it is required to issue ______ correction slip. 105. -------- In case of accident, siren is repeated at an interval of _________ minutes. 106. ----------- | Depot in-charge is responsible to test the detonators once in ________.

    107. ---------

    Whenever new signal is placed, caution order is issued to Loco Pilot for _______ days.

    108. -------- |

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    9

    During ACF on single line, when line clear is obtained for more than one train, trains are run at an interval of _________ minutes.

    109. -----------

    It is the responsibility of SM to see that shunting is performed as per ______. 110. ------------------ Distance between two automatic signals is called as _____________. 111. ,----------------- COM CPTM Suburban Working time table is signed by _________, COM and CPTM. 112. -------------- Motorman shall give ________________ beat to release the hand brakes. 113. ------------------ Booked speed is determined by _________. 114. ----------------------- Each motor coach shall consist of _________Traction motors. 115. S ----------- S mark on the EMU coach means __________. 116. 12 ------------ To attach the 12 coach EMU rake, _______ units are to be attached. 117. ----------------------- Motor coach is a _________ coach. 118. A --------------- A jumper is remote control and is used for _________. 119. ACP EMU --------------- In case of ACP, Guard of EMU shall give __________ bell. 120. EMU ------- kg/cm2 4.6 kg/cm2 BP in the Guard cab of EMU shall be ______ kg/cm2 and Motormans cab shall be 4.6

    kg/cm2. 121. , 72 ,----------- 76 The numbers of A, B and C coaches are 72, ____ and 76. 122. ------------- Calling on signal is placed below any stop signal except __________. 123. (AG) ------------------ Illuminated AG marker of semi-automatic signal means _____________. 124. (AG) (A) ---------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    10

    Illuminated A and AG marker of semi-automatic signal means ___________. 125. (AG) (A) ------------ Extinguished A and AG marker of semi-automatic signal means __________. 126. EMU

    ------- Guard shall use _____ bell code to warn the motorman, if motorman voilated the speed. 127. / , ------------

    If the signal is continuously bobbing / flickering, the signal is treated as showing

    ___________ aspect. 128. EMU 15/8

    .. .. ---------

    If the motorman of EMU passes the automatic stop signal at ON, he shall proceed at a speed of 15/8 km/h and stop the train before _____ meters of the obstruction on the track.

    129. ----------------- Adequate distance mentioned in the automatic block system is ____ meters. 130. A EMU -----------

    ----- Motorman of EMU shall give _______ bell code while passing A marker lit gate signal in

    ON position. 131. EMU ----------------- EMU train has ________ and automatic types of working brakes. 132. EMU ------------------ EMU train has _____ type of couplings. 133. EMU ----------- EMU trains of harbour line has ______ number of wooden wedges. 134. EMU ------------------------ To call the Guard to the driving cab, Motorman of EMU train will give ______ bell code. 135. ----- ------------ ----- IBS is a ____________________ class of station. 136. ------------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    11

    Maximum speed of trains during thick & foggy weather in absolute block system is _______.

    137. -------------------

    Maximum speed of trains during thick & foggy weather in automatic block system is _______ when signal is showing double yellow.

    138. -------------------

    Maximum speed of trains during thick & foggy weather in absolute block system is _______when signal is showing green.

    139. -------------

    When the calling on signal is taken off, it indicates the loco pilot to proceed _________ and be prepared to stop short of any obstruction.

    140. 25 KV AC ------------ | Danger zone in 25 KV AC traction is ______meters from OHE. 141. 1500V DC -------------- Danger zone in 1500 DC traction is ________ meters from OHE. 142. -------------- Normal condition of automatic stop signal is _________. 143. 5

    -------- If the IBS signal is ON and Telephone is defective, Loco Pilot shall wait for 5 minutes

    and proceed at a speed of ________. 144. -------- Yearly coaching stock census is taken on _______. 145. -------------------- Interchange point of Central and Western railway is ________. 146. -------- Yearly goods stock census is taken on ________. 147. ----------------- Shunt signal is placed below any stop signal except __________. 148. ------- Hand shunting is not performed in the absence of _________ supervisor. 149. -------------- Controller of wagon pool is ___________.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    12

    150. ------ Permission of _______ is required to run ODC. 151. ------- In passenger train ________ powder vans can be attached. 152. ----------- .. . . | Maximum speed of working of BWL wagon is ________ km/h. 153. () ------ VG is prepared by _________________. 154. --------------- BPC is prepared by _______________.

    155. BWL --------- While working BWL wagon, _____ number of Guard wagons shall be there between the

    BWL wagon and the engine. 156. ---------- Details of wagon detached from train are entered in the_______ register. 157. ------------------ Calling on signal shows ________ light in On condition. 158. ----------------------------- Points are treated as ____________________ if the signal becomes defective. 159. ---------------

    On seeing the hot axle in the train, ______________ bell code is given on block

    instrument to the next station. 160. / -----------

    Before removing the red flag / lamp from the cabin during shuting, it shall be ensured

    that the points are _____________. 161. ------------- At a B class station shunting can be performed in _____ section even after granting line

    clear. 162. --------------- 270 |

    Fog signal post is placed at 270 meters from the __________ signal where double

    distant signal is not provided. 163. --------- Block over lap in multi aspect signaling is _____ meters.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    13

    164. ----------- To perform shunting in block section on a single line _________ is done. 165. ------------- Authority for shunting is _________. 166. ----------------- Subsidiary rules are issued by ____________. 167. ------------------ Axle counter is a __________ for granting line clear. 168. --------------- _________ is the bell code for testing of block instrument. 169. 2011 ------------- Life of detonators manufactured prior to Oct. 2011 is _______ years. 170. 2011 ------------- Life of detonators manufactured after Oct. 2011 is _______ years. 171. ---------------- _________ bell code is given when the train entered the block section. 172. -------- _______ authority is issued to pass the defective stop signal in On position. 173. --------

    Cabin master shall exchange _____ signal with train crew while train is passing through

    the station. 174. ------------ On seeing _______, Cabin master ensures that the train has arrived completely. 175. ------------- To receive the train on obstructed line _______ authority is issued. 176. ------------- If the gateman not attends the phone, _____ authority is issued to the Loco Pilot. 177. --------------- Train entering into slip siding is a ______ type of accident. 178. ------------ Sounding of three hooters imply _________. 179. ------------ Signal overlap in multi aspect signalling system is _________. 180. -------- Speed of TTM while passing through the points is ___________. 181. -----------------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    14

    Authority to proceed on a double line is ____________. 182. ------

    To open communication _____ authority is issued during ACF on single line. 183. --------------- Speed of TTM is determined by ________. 184. . . ----------- TTM supervisor shall immediately ___________ on seeing the danger hand signal of SM

    while passing through the station. 185. ------------ Loco Pilot shall sound ________ whistle to release the hand brakes by Guard. 186. ------------ Authority to proceed in one train only system is ___________. 187. -------- Stop indicator is placed at a distance of _______ meters from the obstruction. 188. ---------- Trap indicator gives ________ light if the switch is open. 189. --------- Loco Pilot shall sound ______ whistle if the train is incomplete. 190. 15

    ------ .. . If the patrolman does not turn up within 15 minutes from the scheduled time, trains in

    that direction will be stopped and caution order of _____ km/h by day. 191. 15

    -------- .. . If the patrolman does not turn up within 15 minutes from the scheduled time, trains in

    that direction will be stopped and caution order of _______ km/h by night is issued. 192. ---------- Calling on signal gives ______ light in on condition 193. ---------- Calling on signal gives _______ light in off condition. 194. ------------ If the patrolman does not turnup upto ____ minutes from the scheduled time, he will be

    treated as delayed. 195. ---------- If the train passed with extinguished tail lamp, SM shall ___ rear block section.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    15

    196. II ----------- km/h Speed of the train while passing through standard II station is _____ km/h. 197. ----------- To

    dispatch the stopping train from station, ______ signal is taken off first. 198. I ------------ km/h Speed of the train while passing through standard I station is _____ km/h. 199. ------------------------ Adequate distance for granting line clear is called as __________. 200. ------------ Block over lap begins from __________ signal. 201. ---------- In multi aspect signalling system, Distant and _____ signals are proved at a C class

    station. 202. -----------------------

    Block section starts from _________________ signal and ends at an adequate distance

    beyond the first stop signal of the station in advance. 203. ------------------- On a double line for performing shunting in the Block Section in advance, line is to be

    ________. 204. -------- If the block instrument becomes defective on a double line, ___ signal is also treated as

    defective. 205. ---------------------------- , Block section is protected by the ______________________ signal. 206. ----------/------------ Line clear is obtained from __________ / ________ to send the train upto IBS. 207. .. -------------

    7 After ACF, all the related authorities are inspected by _____________ and its report is

    sent to DRM within 7 days. 208. 4 ------------------- | Sounding of 4 hooters means ____________. 209. / ------------- Dead engine is attached at ___________ position on a Mail / Express train. 210. -------- |

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    16

    If the points are set for main line, point indicator gives ____ light in the night. 211. ------------ At a C class staion in two aspect signalling system, _______ and home signals are

    provided. 212. --------

    If position light shunt signal is placed below a stop signal, it shows _______ light in ON

    condition. 213. 400 ----- 400 meters beyond the home signal of a C class station is called as _____. 214.

    ----------------------- If the Loco Pilot sounds long short long short whistle and passes the home signal it

    means ____________. 215.

    ------------------------------ If the Loco Pilot stops after passing the home sinal and sounds long short long short

    whistle, it means ___________________. 216. ---------- To start the train from a line with common starter, _____ authority is issued. 217. ------------- The number of line clear ticket in up direction is _________. 218. ------------- The number of line clear ticket in down direction is _________. 219. ------ To start a train from unsignalled line ____ authority is issued. 220. ---------------

    In case of defective head light, _________ bell code is given on block instrument to the

    station in advance. 221. ------------

    Except __________ signal, cabin master shall not show any other signal from his cabin

    during shunting. 222. T/369(3b)

    ---------------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    17

    In case of defective home signal of C class station, T/369(3b) authority is issued on which ______ of the staion in advance is written.

    223. ------------

    Signal that controls the entry of trains into the block section in advance is called as _________.

    224. -------------- Calling on signal shows ______ light in off position in two aspect signalling system. 225. ----------------- Shunt signal is a ___________ signal. 226. IBS -----------

    IBS shows ________ light in normal condition. 227. ------- .. . . While passing through the non-interlocked points, maximum speed of the train shall be

    _________ km/h. 228. --------

    .. . In case of home signal defective the speed of the train while passing over the poins

    shall not be more than ___ km/h. 229. ------------- Number of the caution order is ________. 230. ------------- Number of the Nil caution order is __________. 231. ------------- Number of the Reminder caution order is _________. 232. ---------------

    Warner signal is of ________ shape in TALQ signalling system. 233. -------- .. .

    During TSL working in thick and foggy weather, speed of the first train shall not exceed

    _______ km/h. 234. -------------- In case of train parting ______ bell code is given on block instrument. 235. ----------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    18

    Adequate distance kept beyond the starter signal to take off the home signal is called as _________.

    236. : ------------ To admit the train on loop line, generally the far end points are to be ser for ________. 237. ------------- Capacity of a catch siding is _____________. 238. --------------- Capacity of a slip siding is _____________. 239. . . ---------- Loco Pilot shall sound ________ whistle if SM do not exchange hand signals. 240. --------- Visibility test object is placed at a distance of _____ meters from the station building. 241. -------------- , Sounding of _______ hooters means accident of goods train at home station. 242. ------------------ . In case of block forward, private number of _____________ station is written on shunting

    authority. 243. ------- Signal overlap at a terminal station with multi aspect colour light signalling is ______

    meters. 244. -------- Maximum speed of trains during day in case of OHE failure is ________. 245. -------------------- Signal passed at danger is treated as __________________ accident. 246. 100 1 ------- In case of 1 in 100 rising gradient, _________ siding is provided. 247. ------------ Time taken by train running at MPS is called as __________________. 248. ----- Time taken by train running at booked speed is called as __________. 249. -------------- Station limit is the portion between ___________________. 250. ------------------------- Authorised officer of Central Railway is _____________. 251. ------------------- Illuminated A marker of semi-automatic signal means _______________.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    19

    252. , ------ Block overlap in two aspect signalling system is _________ meters. 253. , ---------- . Block overlap in multiple aspect signalling system is _______ meters. 254. 8 ---------- There are 8 appendices and ________ parts in SWR. 255. 30 ------------

    Target time for departing ART during day is 30 minutes and during night is _________

    minutes. 256. - .. CRS --------- km/h

    Permission to run C class ODC is given by CRS and the maximum speed of train is

    ________ km/h. 257. ------- Maximum No. of ___ four wheelers can be attached in rear of SLR of passenger train. 258. ------

    In case of vehicles escaping on wrong line, ________ bell code is given on block

    instrument to inform the station in advance. 259. --------- Distant signal shows _______ light in normal condition in double Distant signalling is

    provided. 260. ------

    If the vehicles escaped on right line on a double line _______ bell code is given to the

    station in advance. 261. ---- km/h Speed of the last train during ACF on double line is _____ km/h. 262. ------ km/h Maximum speed of shunting of wagons with explosives is _____ km/h. 263. -------------- 09:00 Caution order is carried forward at stations on ________ at 09:00 hours. 264. ----------- Caution order is carried forward at stations on Monday at ______ hours.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    20

    265. ---------- Where there is no TSR, station master shall make entries in ________ 266. ---------------

    DRM nominates ________ for each section to issue caution orders to train crew. 267. . .--------

    If the train passes through without headlight, SM shall give _______ bell code and

    advise the reason. 268. ---------- ________ is measured with the help of anemometer. 269. ---------

    .. . . If the SE (P.way) is not with the train, maximum speed at the spot of lurch shall be

    _____ km/h. 270. --------------- Semi-automatic signal is identified by ________. 271. -------------- Shunting restrictions of station is written in _________. 272. -------------- Signals are normally located to the ________ side of the line. 273. -------------- D class station board is placed _____ meters from the end of the platform. 274. -------------- Passenger warning board is placed at a distance of _______ meters from the first stop

    signal. 275. --------------

    Semaphore of the signal is painted in the colour as it shows in the night in _______

    condition. 276. -------------- Colour of the semaphore calling on signal is ____________. 277. -------------- Colour of the semaphore Distant signal is ___________. 278. -------------- Colour of the semaphore repeating signal is ___________. 279. ---------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    21

    In double Distant signalling, outermost signal is called as _______. 280. -------------- In double Distant signalling, outermost signal post is painted with __________. 281. --------------

    Under approved special instructions, Distant signal can be placed along with the

    _____________________ signal of the station in rear. 282. ------------------------------- Material train is a ____________________ train. 283. -------------------------------- Troop train is a ____________________ train. 284. ------------------------------ In-charge of material train is _____________. 285. -----------

    When more than one shunt signal is placed on a single post, top most signal is provided

    for _________ line. 286. -------------- For passing shunt signal at ON during shunting, it is mentioned on _________. 287. -------------- km/h Maximum speed of shunting is ____________________ km/h. 288. -------------- km/h Maximum shunting speed of passenger train is _________________ km/h. 289. -------------- ____________________ bars are used to indicate the signals not in use. 290. -------------- While performing shunting _________ shall be informed first. 291. -------------- While attaching an engine to a passenger train, it shall be stopped _______ meters

    before the train. 292. -------------- Minimum sighting distance of distant signal is _______ meters. 293. -------------- Minimum sighting distance of inner distant signal is ____ meters. 294. -------------- Minimum sighting distance of warner signal is ____ meters.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    22

    295. -------- 100 km/h Minimum sighting distance of outer signal is _______________ meters where the speed

    is more than 100 km/h. 296. ------------------ 100 km/h

    Minimum sighting distance of outer signal is _______________ meters where the speed

    is less than 100 km/h.

    297. T/409 ----------------------- T/409 is issued for ______________________ speed restrictions. 298. ------------------------- Permission to attach crane by passenger train is given by ______________. 299. -------------- If the distance between obstruction and the train is ______, then it is treated as averted

    collision. 300. 01 --------

    Loco Pilot will pass semi-automatic signal in On position after waiting for 01 minute by

    day and ____ minutes by night. 301. --------- Livestock is attached at ____ position from engine on a goods train. 302. --------- Permission to run goods train without brake van is given by _________. 303. ------------------------------- Damaged wagon is attached at _______________ position on a goods train. 304. -------------------- km/h Maximum speed of train with clamped wagon is _________________ km/h. 305. ------------------ km/h Maximum speed of train with jib of crane facing towards engine is _______________

    km/h. 306. TSL -------- km/h Speed of each train running in the wrong direction during TSL in automatic section is

    ________ km/h. 307. ---------------------- Assisting engine is demanded from the block section through ____________.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    23

    308. --------------

    Engine of a passenger Train can be detached under the circumstances of ________, fire and accident..

    309. --------- Within _____ minutes engine of a passenger train shall be attached after detaching from

    the train. 310. ACP ------------------ In case of ACP, Loco Pilot shall sound ________ whistle. 311. ---------------- To call the Guard to engine loco pilot shall sound ___________ whistle. 312. ------------------ To apply hand brakes by Guard, loco pilot shall sound __________ whistle. 313. ------------------- .. _____________________ type of shunting is prohibited on Central Railway. 314. ---------------------- Number of motor trolly permit is __________________. 315. VTO ------------------------ Reference of VTO is provided in _________________. 316. -------------------- Authorized officer to prepare SWR is ____________________. 317. ---------------------------- Hand shunting is perfomed under the supervision of __________ department. 318. ------------------ Engine shall be towards _____________ while performing shunting at a station with down

    gradient. 319. ----------------------- Maximum No.of _______ petrol tank can be attached to a passenger train. 320. --------------------- Maximum No. of ______________ explosive wagons can be attached to a passenger

    train. 321. -------------------- Maximum No. of ______ explosive wagons can be attached to a goods train. 322. -------------- km/h . When four wheeler attached, speed of passenger train will be ______ km/h. 323. -------------------------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    24

    Marshalling rules of passenger train are framed by _________________. 324. ------------------------- Number of train signal register of double line is __________________. 325. ------------------------ Number of train signal register of single line is ___________________. 326. ------------------------------ Indian Railway Act means ____________________. 327. -------------------------------- Traffic gates are those located between _______________________. 328. ----------- While stabling box load, hand brakes of _______ wagons at both ends shall be pinned

    down. 329. ------------------------ km/h Maximum speed of pushing back is _________ km/h. 330. ------------------------ km/h Speed of train when whistle becomes defective is _____________ km/h. 331. A --------------- At A class station, Neutral zone is the portion between starter and ______________

    signal. 332. A --------------- If there is no advanced starter at A class station, signal overlap will be

    _______________________. 333. --------- Distance between outer and home signals on a double line is _______ meters. 334. ---------

    SLB Distance between outer and home signals on a single line is _________ meters when

    there is advanced starter or SLB in the opposite direction. 335. , -------------------- During shunting, outer, home and _______________ signals are not taken off. 336. ------------------

    While shunting a complete train from one line to the other, _______________ shall be

    present in the brakevan. 337. --------------- km/h

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    25

    Maximum speed of the train while unloading ballast is ____________ km/h. 338. ---------

    SLB Distance between outer and home signals on a single line is _________ meters when

    there is no advanced starter or SLB in the opposite direction. 339. ---------------------- Normally material train will work during ________________. 340. -------------------- Permission of ___________ is required to work the material train in the night. 341. ---------------

    Apart from the regular store, Guard of material train must also possess

    _________________. 342. --------------------

    Loco pilot shall not take alcoholic drinks before ______________ hours from signing on

    duty. 343. --------------------- Loco pilot must have __________ sets of spectacles in his personal store. 344. G 01 -----------

    -- If the G marker Gate signal is at ON, Loco pilot may pass it after stopping for 01 minute

    by day and ____________ minutes by night. 345. --------------- Speed of following tower wagon in the block section is ____________. 346. ------------------- Maximum speed of tower wagon is ________________. 347. ----------------

    Guard of passenger train shall sign on ________ minutes before the actual departure of

    the train. 348. --------

    Guard of goods train shall sign on ________ minutes before the actual departure of the

    train. 349. --------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    26

    Guard of suburban train shall sign on ________ minutes before the actual departure of the train.

    350. ACP ---------------- In case of ACP Guard shall proceed towards the front from _________ side. 351. ACP --------------

    In case of ACP, Assistant Loco Pilot shall proceed towards the rear from ___________

    side. 352. --------------

    Staff of ____________ department shall protect the material train while working in block

    section. 353. --------------

    While protecting the material train, banner flag is placed at a distance of

    _______________ meters from the obstruction. 354. ------------------ km/h Shunting speed of 5 box wagons is _________________ km/h. 355. ---------------- km/h Impact speed of shunting of one box wagon is ___________ km/h. 356. ------------- To receive a train on unsignalled line, ____________ authority is issued. 357. MACLS ------------------

    When the signal is blank in MACLS system, it is treated as showing ___________

    aspect. 358. IBH SM

    -------- If the Advanced starter is defective and IBH is working, SM shall issue _______ authority

    with private number of same station to pass the Advanced starter. 359. IBH SM IBH

    T/369(3b) --------

    If the advanced starter and IBH are defective, SM shall issue T/369(3b) authority with private number of ______ station to pass both advanced starter and IBH.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    27

    360. IBH SM, IBH --------

    If the IBH is defective and advanced starter is working, SM shall issue _________ authority with private number of next station to pass IBH.

    361. ---------------

    In TALQ signalling system, ___________ signal will be treated as defective if home signal becomes defective.

    362. MACLS ----------------

    In MACLS system, if approach signal becomes blank, _____________ authority is issued

    from the station in rear. 363. --------------------------- Signals are treated as ______________ if connected points become defective. 364. ---------------

    km/h Speed of Train over points shall be __________ when the points are clamped and

    padlocked after disconnection of points. 365. ----------------

    Sand hump is a substitute to ________________ and also a means of isolation. 366. / ------------------------ The number of Train examination report is _______________. 367. --------------------- The number of private number sheet is __________________. 368. 6 2

    ----------------- If loco pilot do not work in any section for more than 6 months, road learning for 2 trips

    by day and ____ trip by night is given. 369. 2

    ------- If loco pilot do not work in any section for more than a year, road learning for 2 trips by

    day and ____ trip by night is given. 370. -------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    28

    In automatic and ghat sections, additional road learning for ____ trips may be demanded by the loco pilot.

    371. FP ------- kg/cm2 BP 5 kg/cm2

    At the starting station, passenger train must have _____ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.

    372. FP ------- kg/cm2 BP 4.8 kg/cm2

    At the starting station, passenger train must have _____ kg/cm2 of FP pressure and 4.8 kg/cm2 of BP pressure in the brake van.

    373. 40 BP ------------- kg/cm2

    At the starting station, 40 eight wheeler air braked train must have ______ kg/cm2 of BP pressure in the engine.

    374. 40 BP -

    ---------- kg/cm2 At the starting station, 40 eight wheeler air braked train must have _____ kg/cm2 of BP

    pressure in the brake van. 375. 40 BP --------

    --- kg/cm2 At the starting station, 40 eight wheeler air braked train must have _____ kg/cm2 of FP

    pressure in the engine. 376. 40 BP -----

    -------- kg/cm2 At the starting station, 40 eight wheeler air braked train must have _____ kg/cm2 of FP

    pressure in the brake van. 377. ------------------ At the starting station, passenger train must have _______% of brake power. 378. -------------- In the enroute, passenger train must have __________% of brake power. 379. / ------------ At the starting station, M/E train must have __________% of brake power. 380. / -------------- In the enroute, M/E train must have ___________% of brake power.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    29

    381. CC -------------- At the starting station, CC raked goods train must have _______% of brake power. 382. CC -------------- At the enroute, CC raked goods train must have _______% of brake power. 383. , / 01 --------

    In the automatic section, Loco pilot / motorman are given intensive training for _______

    days after 01 years. 384. ------------------- While pushing back, train shall be stopped at ___________ stop signal. 385. ----------------- | Flasher light is of _____________ colour. 386. T369 (I) ------------Km/h

    | After getting T/369(I) speed over the points while passing the signal is _________ km/h. 387. ---------------- Repeating signal shows _________ light in on condition. 388. -------------------- Colour of the semaphore shunt signal is __________. 389.

    --- ---------------- To pick up the part load from the section, ___________ authority is issued if the same

    loco pilot is proceeding. 390. A R ---------- o In the classification of A to R accidents, ___ and o classes are not included. 391. 2 ------------ Loss of railway property of Rs.more than 2 Crores is treaed as _____ accident. 392. ------------------ Maximum of ____________ cranes can be attached in a passenger train. 393. ------------------ __________ number of Guard wagons shall be attached in either direction of explosive

    wagons. 394. ------------ 'C' ODC ____ and C class ODC shall not be crossed in the block section on double line. 395. B ODC ------------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    30

    Maximum speed of B class ODC is _______. 396. 22.00 --------------

    Station bell shall be rung except 22.00 hours to ____________ hours if the passenger

    train is ready to leave. 397. ----------------

    To start the down passenger train, SM shall ring _______________ bell. 398. ---------------

    To start the up passenger train, SM shall ring _____________ bell. 399. -----------

    To start the passenger train of branch line, SM shall ring ___________ bell. 400. ------------- Train crew shall exchange alright hand signals upto _________ or last points. 401. -------------

    Guard shall exchange alright hand signal from _________ side while the train is started

    from the station. 402. ------------------ Wagon with livestock shall be attached __________ position from engine on a goods

    train. 403. --------------- Wagon with livestock shall be attached __________ position from engine on a passenger

    train. 404. ----------------- Cotton in closed wagon shall be attached __________ position from engine on a goods

    train. 405. , ------------------ Motor vehicle in closed wagon shall be attached __________ position from engine on a

    passenger train. 406. , ------------------ Motor vehicle in closed wagon shall be attached ______ position from engine on a

    goods train.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    31

    407. ---------------------

    Not more than _______________ officials can travel in the locomotive unless authorised by operating official.

    408. ------------------- Goods train without brake van shall not be run during _________________. 409. ------------------ In case of goods train without brake van, Guard is exempted from ________. 410. --------------------------------- | Ruling gradient of the division is mentioned in the ________________. 411. ------------------------------- Load table is mentioned in the ____________________________. 412. --------------------------------- Corridor block is mentioned in the _______________________. 413. , ---------------------- Engineering allowance, loco gain and traffic gain are mentioned in the

    ____________________. 414. --------------------------- Tower wagon shall run as per the rules of working of ____________________. 415. ---------------------- km/h Speed of the following tower wagon is ______________ km/h. 416. ----------------------

    Competency certificate of the gateman of interlocked engineering gate is signed by

    _________. 417. ---------------------

    Competency certificate of the gateman of non- interlocked engineering gate is signed by

    ______________. 418. ----------------

    Competency certificate of the gateman of interlocked engineering gate is issued by

    _________. 419. ------------------- Validity of the competency certificate of the gateman is for ______ years. 420. --------------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    32

    If the passenger train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.

    421. -------------- If the goods train is not arrived ________ minutes beyonds its normal running time, it is

    treated as delayed train. 422. -------------- If the patrol man does not turn up within _________ minutes, he will be treated as

    delayed.

    423. , -------------- Not more than _______ persons including trollyman shall go on a trolly. 424. 4 , --------------

    Not more than _________ persons including trollyman shall go on a 4 HP motor trolly. 425. 6 , --------------

    Not more than _________ persons including trollyman shall go on a 6 HP motory trolly. 426. -------------- In one train only system, information of lost of metal token is given to ______. 427. -------------- Point indicator is provided to indicate ____________. 428. -------------- Trap indicator is provided to indicate _______________. 429. --------------

    When the points are set for main line, point indicator shows white target by day and

    ______ by night. 430. ---------- When the derailing switch is open, trap indicator shows red target by day and _______

    by night. 431. -------------

    - When the points are set for loop line, the point indicator shows no target by day and

    _______________ by night. 432. -------------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    33

    When the derailing switch is open, trap indicator shows _________ by night and no target by day.

    433. -------------- Distant signal is a ______________ signal. 434. -------------- Calling on signal is a ________ signal. 435. SLB -------------- SLB determines the limits of block section and __________.

    436. SLB -------------- SLB determines the limits of Station section and _____________. 437. BSLB -------------- BSLB determines the limits of block section and _____________. 438. BSLB -------------- BSLB determines the limits of Station section and _______________. 439.

    --------------- | Last stop signal means the _______________ of a station controlling the entry of trains

    into the next block section. 440. ................ Adequate distance means the distance sufficient to ensure .................. 441. , .................... D class stations are called as .................. 442. , .................... Stations those do not form the boundary of any block section are called ................... 443. .................... Running line means the line governed by .................. 444.

    ............... Only ............... signal can be placed in Non-interlocked station in two aspect signalling

    system as per approved special instructons. 445. ............... . Signal is first and last stop signal at C class staion.

    446. . , , ..., , , ... ----------------- ----------------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    34

    447. ........................

    On section where passenger carrying trains run, .................. not treated as sole means of communication

    448. ............... ............... Mansoon period treated from ............... to ............... for patrolling purpose.

    449. ............. .............

    Station master will take ............... from gateman in assurance of gate closed otherwise ............... will be issued. 450. ............................

    Blocking of a section of line to electric traffic only called .......................... 451. -------------

    Electrical communication instrument means ______________ 452. ------------

    Place where trains and road cross each other is called as ___________ 453. ---------- 454. ------------------- ---------

    455.

    --------------------

    456. ---------- 457. ---------------- 458. ------------- 459. ( )

    -------------- 460. / --

    ---------------- 461. 5 6 -----------------------

    462. ---------------------

    *****

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    35

    II

    / write the use of the following buttons: 1) EUYN --------------------------------------------------------------------------------- 2) EUUYN --------------------------------------------------------------------------------- 3) WWN --------------------------------------------------------------------------------- 4) EWN --------------------------------------------------------------------------------- 5) YYN ---------------------------------------------------------------------------------

    6) YRN --------------------------------------------------------------------------------- 7) ERN --------------------------------------------------------------------------------- 8) CHYN --------------------------------------------------------------------------------- 9) CHYRN --------------------------------------------------------------------------------- 10) COGGN --------------------------------------------------------------------------------- 11) OYN --------------------------------------------------------------------------------- 12) XXN --------------------------------------------------------------------------------- 13) XRN --------------------------------------------------------------------------------- 14) AGGN ---------------------------------------------------------------------------------

    15) AGGR --------------------------------------------------------------------------------- *****

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    36

    III (A)

    / / Write the colour of the signal / lever: 1 lever of the point ------------------ 2 lever of the lock bar ------------------ 3 lever of the stop signal ------------------ 4 lever of the warner signal ------------------ 5 (450) lever of the Distant signal (450) ------------------

    6 (900) lever of the Distant signal (900) ------------------ 7 lever of the shunt signal ------------------ 8 lever of the signal slot ------------------ 9 spare lever ------------------ 10 route button ------------------ 11 ERN ------------------ 12 WWN ------------------ 13 EUUYN ------------------ 14 EUYN ------------------

    15 COGGN ------------------ 16 Stop signal ------------------ 17 Shunt signal ------------------ 18 CHYRN ------------------ 19 CHYN ------------------ 20 YYN ------------------ 21 YRN ------------------ 22 GXYN ------------------ 23 WXYN ------------------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    37

    *****

    III (B) / Write the colour and shape of the following: 1 / visibility test object ------------------ 2 / fog signal post ------------------ 3 /D class station board ------------------ 4 / Passenger warning board ------------------ 5 /Goods warning board ------------------

    6 AAWS ------------------ 7 SLB ------------------ 8 BSLB ------------------ 9 / / W/L board ------------------ 10 / W board ------------------ 11 /semaphore stop signal ------------------ 12 / semaphore warner signal ------------------ 13 / semaphore Distant signal ------------------ 14 /semaphore calling on signal ------------------ 15 / semaphore shunt signal ------------------

    16 - /semaphore co-acting signal ------------------ 17 /semaphore repeating signal ------------------ 18 /caution indicator ------------------ 19 /speed indicator ------------------ 20 /stop indicator ------------------ 21 /engine stop board ------------------ 22 / continuous down gradient indicator ------------------ 23 /outlying siding board ------------------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    38

    24 T/P / T/P board ------------------ 25 T/G / T/G board ------------------

    *****

    IV / - True / False: 1 -------

    Shunt signal can be placed below last stop signal. 2 -------

    Engine can be detached in ghat section for testing of the bridge. 3 ( ) -------

    Defective engine can be attached to a train to send it to home shed. 4 -------

    Slip siding protects the rear block section. 5 10 -------

    After testing, life of detonators on branch line is extended for 10 years. 6 TSL

    -------

    Second train proceeding on wrong line during TSL will run with normal speed. 7

    ------- In case of ACF on single line, second train is run with normal speed on obtaining line clear from the station in advance.

    8 369(3b) -------

    During shunting T/369(3b) is issued to pass defective shunt signal. 9 512 -------

    T/512 is issued to start the train from unsignalled line.

    10 ------- Train can be pushed back in automatic section if child is fallen down from train.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    39

    11 ------- If a signal is not visible due to curvature, coacting signal is provided.

    12 46 . . -------

    Minimum amount of vacuum in a passenger train at the starting Station shall be 46 cm in the engine.

    13 ------- To unload the material in different places in block section, material train can be devided.

    14 ------- Gateman is competent Railway servent to protect the obstruction.

    15 ------- IBS shows no light in normal condition.

    16 /509 ------- Guard shall issue T/509 to take the part load from block section to next station.

    17 ----- Minimum running time is the time taken when train runs at MPS.

    18 770 ------- Distance between the caution & speed indicators in ghat section is 770 meters.

    19 | ------- Last stop signal can be taken off for the purpose of shunting.

    20 10 km/h | ------- Maximum speed of ballast train while unloading is 10 km/h.

    21 ------- COM is authorised to issue or alter subsidiary rules.

    22 ------- When the points are set for main line, point indicator shows green light in the night.

    23 ------- On getting the private number from the station in rear to pass the IBH at ON, Loco Pilot will proceed at normal speed.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    40

    24 ------- Train without brake van is run with the permission of Sr. DSO.

    25 -------

    Train shall be protected only in rear side before demanding the assisting engine. 26 -------

    Distant signal is a stop signal.

    27 40 .. .. ------- Speed of train without brake van while passing through the station is 40 km/h.

    28 ------ Shunt signal can be used to receive a train on obstructed line.

    29 ------- Loco pilot shall sound two long two short whistles in case of ACP.

    30 ------- If assistance of banker is not required, Loco Pilot of leading loco shall sund two long whistles.

    31 ------- Repeating signal is a stop signal.

    32 T 369 (3b) ------- One copy of T/369(3b) is also given to Guard.

    33 ------- SWR is prepared by CSO.

    34 ------- If passenger losts life in the derailment of a passenger trains, it will be treated as serious accident.

    35 ------- Water may be poured on hot axel to get it cooled.

    36 ------- Excluding Brakevan two Guard wagons are attached at both ends of the wagon filled with A class petroleum.

    37 -------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    41

    Distant signal is the first stop signal at a B class station. 38

    ------- To perform shunting in the block section, calling on signal can be provided below the last stop signal.

    39 25 .. .. -------

    Maximum speed of train proceeding on wrong direction during TSL working in automatic section will be 25 km/h.

    40 ------- Sanction to run ODC is given by Chief Operations Manager.

    41 ------- Without the permission of Guard, engine can be detached by the Loco Pilot out side the station limits.

    42 ------- Traffic gate is located between the outermost signals of a station.

    43 1200 ------- On a plain section, if stop indicator is placed, the distance between caution indicator and the obstruction will be 1200 meters.

    44 ------- Approved special instructions are issued by CRS.

    45 6 ------- Life of detonator is 6 years.

    46 ------- Distance required to ensure safety is called as adequate distance.

    47 ------- D class statons are called as non-block station.

    48 ------- In double Distant signalling territory, inner distant signal shows only green and double yellow aspect.

    49 -------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    42

    Semi-automatic signal can be worked as manually operated. 50 15 km/h -------

    Maximum speed of trains passing over non-interlocked points is 15 km/h. 51 -------

    Petrol tank wagon may loose shunted. 52 -------

    Calling on signal shows green light in Off condition. 53 -------

    Catch siding protects the rear block section. 54 511 -------

    T/511 is issued to start a train from a line with common starter. 55 ------

    Shunt signal placed below stop signal shows two white lights horizontally in On position.

    56 15 km/h ------- Maximum speed of the train with hot axle will be 15 km/h while admitting in loop line.

    57 ------- Automatic signal can be worked manually.

    58 ------- If interlocked, on failure of Starter signal, advanced starter signal is also treated as defective.

    59 275 ------- In case of fog, two detonators are placed at 275 meters from the first stop signal.

    60 80 1 ------- Catch siding is provided where there is 1 in 80 down gradient.

    61 ------- IBS signal shows green light in the normal condition.

    62 | ------- Crane is attached next to engine of a goods train.

    63 / ------- Two bogies can be attached in rear of SLR of M/Express train.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    43

    64 ------- One four wheeler shall not be attached between two bogies.

    65 ------- Dead engine can be attached in rear of a passenger train.

    66 ------- Adequate distance required for granting line clear is called as block over lap.

    67 -------

    TSL can be introduced between those two stations where cross over is provided. 68 :

    ------- While admitting the train on loop line, generally far end points are set for sand hump.

    69 ------- Material train is permitted to work during day time only.

    70 -------

    Second train during ACF on double line runs at normal speed. 71 -------

    Calling on signal shows no light in ON position. 72 -------

    Automatic signal shows green light in normal condition. 73 -------

    Adequate distance required to grant line clear is called as signal over lap. 74

    ------- Calling on signal can be placed below any stop signal except last stop signal.

    75 , , ------- On single line with tokenless block instruments, block instrument is treated as failed if last stop signal becomes defective even after obtaining line clear.

    76 . . . . -------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    44

    On single line, SM will give six pause four beat on block instrument to the SM of the next station in case of escaping of vehicles.

    77 ------- Tower wagon can be sent following a Goods train in Absolute Block System.

    78 ------- In case of emergency, passenger train can be run without brake van.

    79 /509 ------- T/509 is issued to receive a train on obstructed line.

    80 / 1425 ------- T/A 1425 is filled in case of failure of block instrument.

    81 ------- WWN button is used in emergency to cancel the route.

    82 ------- Damaged vehicle can be attached in rear of goods train without brake van.

    83 ------- Train with hot axle is normally admitted on main line.

    84 ------- Trolly can work without block protection.

    85 ------- Motor trolly can run without block protection.

    86 ------- Lorry can work without block protection.

    87 ------- Motor trolly can be run following a train.

    88 ------- Motor trolly can be run following a motor trolly.

    89 ------- In one train system only, line clear is obtained on block instrument.

    90 ------ In one train only system, taking off the last signal is the authority to proceed.

    91 15 ------- Maximum number of persons are permitted on a motor trolly is 15.

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    45

    92 ------- Pilot Guard system is in force in Central Railway.

    93 ------- Following train system is in force in Central Railway.

    94 ------- In automatic block system, two aspect colour light signalling system is used.

    95 ------- Automatic block system is exists on single line sections in central railway.

    96 ------- Automatic block system is exists on double line sections in central railway.

    97 ------- One train only system is applicable on double line section only.

    98 ------- Block instruments with tokens are proveded on double line.

    99 ------- Block over lap is the portion of the block section in rear.

    100 ------- Block over lap is the portion of station section.

    101 ------- Portion between two stations is called block section.

    102 ------- Portion between two block sections at B class station is called station section.

    103 T 609 ------- To divide the train in block section, T/609 is issued.

    104 ------- Green aspect of Distant signal indicates that train is passing through main line.

    105 T 511 ------- T/511 is used as authority to proceed.

    106 T 512 ------- T/512 is used as authority to proceed.

    107 16 | ------- There are 16 chapters in the book of G & SR.

    108 9 | -------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    46

    There are 9 chapters in the Accident Manual. 109 TXR

    ------- Damaged vehicle can be attached in rear of brake van during day time after being certified by TXR

    110 | --------------- Signal overlap not require at Terminal Station.

    111 --------------- Track machine can allow working following a Train.

    112 270 --------------- Fog signal post placed at 270 meters from first stop signal.

    113 T/369(i) --------------- T/369(i) not applicable in Automatic Block signal territory.

    114 ---------------

    IBS can suspend during thick and foggy weather. 115 --------------

    Distatnt signal can place below a stop signal. 116 P ---------------

    P marker fixed on both distant signal in double distant section. 117 / / -12

    --------------- LP/Guard/Motorman working in Automatic section is directed for Intensive training of 1 day in 12 months.

    118 --------------- More than one C class stations are available between two B class station

    119 --------------- More than one IBS provided between two B class station

    120 --------------- IBS can provided between two C Class station.

    121 SPI --------------- SPI can placed on separate post.

    122 G -------------- G board fixes on LSS who protects LC gate also.

    123 -----------

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    47

    Gate man will watch on passing trains with holding folded Red and Green flags. 124

    --------- Where Block proving axle counter or track circuit provided, there is no need to give four beat while clearing the block section.

    125 --------- Where Block proving axle counter or track circuit provided, there is no need to give three beat for entering the train into block section.

    126 --------- Guard / Asstt. Guard is required with Track maintenance machines.

    127 ---------

    Track machines are not permitted to work during thick and foggy weather and all communication fail.

    *****

    V / Answer in one sentence: 1 Meaning of two hooters 2 Meaning of three short whistles 3 609 Use of T/609

    4 Meaning of OFF condition of Warner signal 5 Meaning of four short whistles 6

    Minimum equipment of signals at a C class station with CLS system. 7 Meaning of two long two short whistles 8

    Speed when curved switch is provided on 1 in 8 turnout 9 806 When is T/806 issued 10 Meaning of sounding of four hooters 11 511 Use of T/511

    12 Meaning of long short long short whistle 13 12 Speed over 1 in 12 curved switch

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal Traffic Question Bank

    48

    14 Meaning of green aspect of Distant signal 15 / 602 Use of T/D 602 16

    Gateman showing green flag vertically up and down means 17 TSL

    Duties of Loco pilot while proceeding on wrong line during TSL 18

    Duties of Loco pilot on seeing flasher light 19

    Meaning of Loco pilot sounding long short long short whistle after stopping at the outermost facing point

    20 Meaning of Loco pilot sounding long short long short whistle while passing through the station

    21 MACLS Duties of Loco pilot on seeing blank Distant signal

    22 First duty of Loco pilot when the load stalled on gradient

    23 Duties of Loco pilot on getting information of bursting of points

    24 Duties of SM on getting information of bursting of points

    25 ACF Authority filled by SM after restoration of any of the means of communication after ACF.

    26 T 609 Necessary information filled by Guard on T/609

    27 Precautions to be taken while attaching the parted load

    28 - Duties of Loco pilot of passenger train if pointsman is not present at facing points of the non-interlocked station

  • , , . Zonal Railway Training Institute, Central Railway, Bhusawal