學 生 賴佳琪 指導教授 林高正

45
結結結結結結結結結結結結結結結結結結結結結結 結結結結結結結結結結結結結結結結結結結結結結 USING AHP AND FUZZY MATHEMATICAL PROGRAMMING FOR PROJECT PORTFOLIO SELECTION 結結結 結結結 結結結結 結結結 結結結結 結結結 結結結結結結 結結結結結結結 結結結結結結 結結結結結結結 Graduate Program of Industrial Management 碩碩碩碩碩碩碩碩碩碩

description

南台科技大學 工業管理研究所 Graduate Program of Industrial Management 碩士學位論文提案口試. 結合層級分析與模糊數學規劃的專案組合選擇方法 U SING AHP AND F UZZY M ATHEMATICAL P ROGRAMMING FOR P ROJECT P ORTFOLIO S ELECTION. 學 生 賴佳琪 指導教授 林高正. 內容大綱. 緒 論 文獻探討 相對效益數值為明確之專案組合選擇模式 後續研究與預期成果. 緒 論. 研究動機 研究目的 - PowerPoint PPT Presentation

Transcript of 學 生 賴佳琪 指導教授 林高正

  • USING AHP AND FUZZY MATHEMATICAL PROGRAMMINGFOR PROJECT PORTFOLIO SELECTION Graduate Program of Industrial Management

    **

    **

    (1/2)e- **

    ** (2/2)

    (1/3)Baker and Freeland (1975) **

    (2/3) (AHP/ANP) ()LINDOLINGO**

    (3/3) **

    **

    **

    (1/4)Archer & Ghasemzadeh (1999) ()**

    (2/4) **

    (3/4) (i) (ii) (iii) (iv) (v) **

    (4/4) (Time-dependent) **

    **

    **Sharpe and Keelin (1998)

    ** (Ordinal measure) (Cardinal measure) AHP/ANP

    (1/2) (Analytic Hierarchy Process, AHP) Saaty (1986) AHP (Reciprocal comparison) (Homogeneity) (Independence) (Expectations) **

    (2/2)AHP (LLSM) (GPM) GPM **

    ** ( Lee and Kim, 2000)

    () () ( )

    **

    (1/2) (Vagueness) Zadeh (1965) 0 1 **

    (2/2)Dubois and Prade (1997) (Similarity) (Preference) (Uncertainty) **

    (1/2)

    **

    (2/2)Zadeh min max min max Zadeh min max (Maximin) **

    (1/2) (Sample space) vs. (Pattern space) s- (s-algebra) vs. (Discrete topology) vs. Pos S (Possibility measure) **

    (2/2) Nec Pos **

    **

    Archer and Ghasemzadeh (1999) **

    ** (1/3) () ()

    (2/3)**

    (3/3) ()**

    **(1/4)

    ** (2/4)

    **(3/4) ( -)

    (3-2)-(3-4) (3-2)

    **

    0-1 (3-9)

    (Liu, 1998; Liu and Iwamura, 1998)

    (4/4)

    ** (1/4)

    ** (2/4) 35 150 250

    ** (3/4)

    ** (4/4)

    5 (g, b) (1, 1), (1, 0.95), (1, 0.8), (0.9, 0.85), (0.9, 0.7)

    ** (1/3) AHP LLSM GPM

    ** (2/3)

    ** (3/3) () AHP/ANP

  • **

  • Liu and Iwamura (1998) maximax Liu (1998) minimax (Klir and Yuan, 1995) maximax 0 minimax (Gray and Larson, 2008)*