홍콩 수주 추진현장 공정표(2010.05.06)

1
Stage 2010 2011 2012 2013 2014 2015 Remark M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D XRL 802 XRL 802 ### ### ### ### ### ### ### ### ### 9.0 HK/2009/01 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 37.0 HK/2009/02 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 61.0 XRL C 811B EAST WEST ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 48.0 XRL C 823B Permanent Diaphragm Wall Temporary Wall ### ### ### ### ### ### ### ### ### 45.0 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 200.0 Plant and Diaphragm Wall Rig Mobilization Diaphragm Wall Construction Plant and Diaphragm Wall Rig Demobilization HONG KONG 수수 수수 수수 수수수 Total Rig Nos SET OF D-WALL RIGS (1BC + 1GRAB PER SET) Wan Chai Development Phase 2 Contract HK/2009/01 Shatin -Central Link Protection (Option) SET OF D-WALL RIGS (1BC + 1GRAB PER SET) Wan Chai Development Phase 2 Contract HK/2009/02 SET OF D-WALL RIGS (1BC + 1GRAB PER SET) SET OF D-WALL RIGS (1BC + 1GRAB PER SET) SET OF D-WALL RIGS (1BC + 1GRAB PER SET) TOTAL SET OF D-WALL RIGS (1BC + 1GRAB PER SET)

Transcript of 홍콩 수주 추진현장 공정표(2010.05.06)

Page 1: 홍콩 수주 추진현장 공정표(2010.05.06)

Stage2010 2011 2012 2013 2014 2015

RemarkM J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

XRL 802

XRL 802

1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 9.0

HK/2009/01

Shatin -Central Link Protection (Option)

1.0 1.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 37.0

HK/2009/02

3.0 3.0 3.0 3.0 3.0 2.0 2.0 2.0 3.0 3.0 3.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 3.0 3.0 3.0 61.0

XRL C 811B

EAST

WEST

3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 48.0

XRL C 823B

Permanent Diaphragm Wall

Temporary Wall

5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 45.0

1.0 1.0 1.0 1.0 8.0 8.0 9.0 9.0 9.0 7.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 4.0 3.0 3.0 1.0 1.0 1.0 1.0 1.0 1.0 4.0 3.0 3.0 2.0 2.0 2.0 3.0 3.0 3.0 3.0 3.0 1.0 1.0 1.0 3.0 3.0 3.0 3.0 3.0 200.0

Plant and Diaphragm Wall Rig Mobilization

Diaphragm Wall Construction

Plant and Diaphragm Wall Rig Demobilization

HONG KONG 수주 추진 현장 공정표

TotalRigNos

SET OF D-WALL RIGS (1BC + 1GRAB PER SET)

Wan Chai Development Phase 2 Contract HK/2009/01

SET OF D-WALL RIGS (1BC + 1GRAB PER SET)

Wan Chai Development Phase 2 Contract HK/2009/02

SET OF D-WALL RIGS (1BC + 1GRAB PER SET)

SET OF D-WALL RIGS (1BC + 1GRAB PER SET)

SET OF D-WALL RIGS (1BC + 1GRAB PER SET)

TOTAL SET OF D-WALL RIGS (1BC + 1GRAB PER SET)