홍콩 수주 추진현장 공정표(2010.05.06)
Transcript of 홍콩 수주 추진현장 공정표(2010.05.06)
Stage2010 2011 2012 2013 2014 2015
RemarkM J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
XRL 802
XRL 802
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 9.0
HK/2009/01
Shatin -Central Link Protection (Option)
1.0 1.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 37.0
HK/2009/02
3.0 3.0 3.0 3.0 3.0 2.0 2.0 2.0 3.0 3.0 3.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 3.0 3.0 3.0 61.0
XRL C 811B
EAST
WEST
3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 48.0
XRL C 823B
Permanent Diaphragm Wall
Temporary Wall
5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 45.0
1.0 1.0 1.0 1.0 8.0 8.0 9.0 9.0 9.0 7.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 4.0 3.0 3.0 1.0 1.0 1.0 1.0 1.0 1.0 4.0 3.0 3.0 2.0 2.0 2.0 3.0 3.0 3.0 3.0 3.0 1.0 1.0 1.0 3.0 3.0 3.0 3.0 3.0 200.0
Plant and Diaphragm Wall Rig Mobilization
Diaphragm Wall Construction
Plant and Diaphragm Wall Rig Demobilization
HONG KONG 수주 추진 현장 공정표
TotalRigNos
SET OF D-WALL RIGS (1BC + 1GRAB PER SET)
Wan Chai Development Phase 2 Contract HK/2009/01
SET OF D-WALL RIGS (1BC + 1GRAB PER SET)
Wan Chai Development Phase 2 Contract HK/2009/02
SET OF D-WALL RIGS (1BC + 1GRAB PER SET)
SET OF D-WALL RIGS (1BC + 1GRAB PER SET)
SET OF D-WALL RIGS (1BC + 1GRAB PER SET)
TOTAL SET OF D-WALL RIGS (1BC + 1GRAB PER SET)