Post on 10-Feb-2016
Jumlah penduduk 151,536 jiwaTimbulan sampah 1.6 L/org.hariTotal 242,458 L/hari
242 m3/hariPersen Pelayanan 80 %ke TPA 194 m3/hariReduksi di TPA 35 %Ditimbun 126 m3/hariDensitas sampah masuk 300 kg/m3Densitas sampah pemadatan 450 kg/m3Volume ditimbun 30 m3/hariPenimbunan 10 tahun 109,500 m3/10 tahunTinggi tumpukan 6 mLuas lahan penimbunan 18,250 m2Total lahan 26,071 m2Total 3 haJumlah sel 4Luas tiap sel 6,518 m2p:l 2 1l 57 mp 114 m
Sampah Rumah Tangga (m3/hari)
Tahun2,016
Total Sampah Rumah Tangga
Total Sampah Non Rumah Tangga
sampah lepas 200 kg/m3sampah masuk 300 kg/m3sampah di TPA 450 kg/m3
Tahun ke- Tahun Jumlah Penduduk (Jiwa) Reduksi di Sumber
0 2015 151,536 1 2016 154,065 49.301 2% 48.3152 2017 156,637 50.124 2% 49.1213 2018 159,251 50.960 5% 48.4124 2019 161,909 51.811 5% 49.2205 2020 164,611 52.675 5% 50.0426 2021 167,358 53.555 5% 50.8777 2022 170,151 54.448 5% 51.7268 2023 172,991 55.357 5% 52.5899 2024 175,878 56.281 7.00% 52.341
10 2025 178,813 57.220 8.00% 52.64311 2026 179,166 57.333 10.00% 51.60012 2027 182,194 58.302 10.00% 52.47213 2028 185,275 59.288 10.00% 53.35914 2029 188,409 60.291 10.00% 54.26215 2030 191,598 61.311 10.00% 55.180
sampah lepas 200sampah di truk 300sampah di TPA 450
Nama LiftDimensi TPA
Panjang Lebar TinggiLift 1 192 57 1Lift 2 192 57 1Lift 3 187 52 1Lift 4 182 47 1Lift 5 177 42 1Lift 6 172 37 1
Sampah Total (ton/hari)
Sampah setelah reduksi
(ton/hari)
Perhitungan Luas dengan LimasLift 1 ( Galian ke dalam 1 m )Panjang 192 Luas Alas 10675 m2Lebar 57 Luas Atas 10961 m2Kanan 2.5 Volume 10,818 m3Kiri 2.5Lift 2 (Tinggi 1 m )Panjang 192 Luas Alas 10961 m2Lebar 57 Luas Atas 9740 m2Kanan 2.5 Volume 10,344 m3Kiri 2.5Lift 3 (Tinggi 1 m )Panjang 187 Luas Alas 9740 m2Lebar 52 Luas Atas 8570 m2Kanan 2.5 Volume 9,149 m3Kiri 2.5Lift 4 (Tinggi 1 m )Panjang 182 Luas Alas 8570 m2Lebar 47 Luas Atas 7449 m2Kanan 2.5 Volume 8,003 m3Kiri 2.5Lift 5 (Tinggi 1 m )Panjang 177 Luas Alas 7449 m2Lebar 42 Luas Atas 6379 m2Kanan 2.5 Volume 6,907 m3Kiri 2.5Lift 6 (Tinggi 1 m )Panjang 172 Luas Alas 6379 m2Lebar 37 Luas Atas 5359 m2Kanan 2.5 Volume 5,861 m3Kiri 2.5
Volume Total 1 Sel dengan panjang 192 x 96 51,083 m3Satu TPA 204330.72203962 m3
Tingkat Pelayanan
50% 24.157 80.525 29391.556 53.6850% 24.561 81.869 29882.086 54.5870% 33.889 112.962 41231.090 75.3170% 34.454 114.847 41919.216 76.5670% 35.029 116.764 42618.826 77.8480% 40.701 135.672 49520.129 90.4580% 41.381 137.936 50346.595 91.9680% 42.071 140.238 51186.855 93.4980% 41.873 139.577 50945.534 93.0580% 42.114 140.380 51238.846 93.5980% 41.280 137.600 50223.823 91.7380% 41.978 139.925 51072.730 93.2880% 42.687 142.291 51936.347 94.8680% 43.410 144.698 52814.935 96.4780% 44.144 147.147 53708.759 98.10
535786.000
Jalan Truk Lift-1 ( diatas galian tinggi = 1 m)Kiri Kanan pjg atau lbr2.5 2.5 192 2.52.5 2.5 57 2.5 2.52.5 2.5 Lift-2 ( diatas galian tinggi = 1 m)2.5 2.5 192 2.52.5 2.5 57
Lift-3 ( diatas galian tinggi = 1 m) 187 2.5
52
Sampah yang akan diangkut (ton/hari)
Sampah yang akan diangkut (m3/hari)
Sampah yang diangkut
(m3/tahun)
Sampah yang diurug setelah kompaksi
(m3/hari)
Lift-4 ( diatas galian tinggi = 1 m) 182 2.5
47
Lift-5 ( diatas galian tinggi = 1 m) 177 2.5
42
Lift-6 ( diatas galian tinggi = 1 m) 172 2.5
37
Faktor kompaksi = 300/450
19594.370 0 0 0 - 19921.391 0 0 0 - 27487.393 19 6872 94 34,359 27946.144 19 6987 96 34,933 28412.551 19 7103 97 35,516 33013.419 23 8253 113 41,267 33564.397 23 8391 115 41,955 34124.570 23 8531 117 42,656 33963.690 23 8491 116 42,455 34159.231 23 8540 117 42,699 33482.549 23 8371 115 41,853 34048.486 23 8512 117 42,561 34624.231 24 8656 119 43,280 35209.956 24 8802 121 44,012 35805.839 25 8951 123 44,757
2.5 10,675 luas alas 10,961 luas area atas
10,818 m3
2.5 10,961 luas alas 9,740 luas area atas
10,344 m3
2.5 9,740 luas alas 8,570 luas area atas
Sampah yang diurug setelah kompaksi
(m3/tahun)Tanah Penutup
(m3/hari)Tanah Penutup
(m3/tahun)Total yang
ditimbun (m3/hari)Total yang ditimbun
(m3/tahun)
9,149 m3
2.5 8,570 luas alas 7,449 luas area atas
8,003 m3
2.5 7,449 luas alas 6,379 luas area atas
6,907 m3
2.5 6,379 luas alas 5,359 luas area atas
5,861 m3
Volume total 51,083 m3untuk satu zonadengan luas148 x 74Satu TPA 204,330.72 m3dengan 4 zona
146,074
34359.2413611486 230,686 69291.9211526159 281,480 38,447.60 104807.609772942 46,913.33
146074.38414192188029.880187543 146,000.00 230685.592327658273140.204405875315839.242593446357692.428385458400253.036436896443533.325257851487545.770739095532303.070087776
7 76,043
p 400l 190
Total yang diakumulasikan(m3/tah
un)
Densitas Sampah Lepas 200Densitas Sampah Gerobak 200Densitas Sampah Truk 350Densitas Sampah TPA 500
Sampah Di Sumber Rumah Tangga dan Non Rumah Tangga
Tahun ke- Tahun Jumlah Penduduk
a b c =axb d
2014 149049 0.0016 238 5.62%
0 2015 151536 0.0016 242 6.92%
1 2016 154065 0.0016 247 8.23%
2 2017 156637 0.0016 251 9.54%
3 2018 159251 0.0016 255 10.85%
4 2019 161909 0.0016 259 12.15%
5 2020 164611 0.0016 263 13.46%
6 2021 167358 0.0016 268 14.77%
7 2022 170151 0.0016 272 16.08%
8 2023 172991 0.0016 277 17.38%
9 2024 175878 0.0016 281 18.69%
10 2025 178813 0.0016 286 20.00%
Sampah Di TPS3R
Tahun ke Tahun
j k l=jxk m
0 2014 296.2
0 2015 302.8
1 2016 310.7 20% 62.14 50%
2 2017 318.2 20% 63.64 50%
3 2018 325.7 20% 65.14 50%
4 2019 333.3 20% 66.66 50%
5 2020 341 20% 68.2 50%
6 2021 348.8 20% 69.76 50%
7 2022 356.7 20% 71.34 50%
8 2023 364.6 20% 72.92 50%
9 2024 372.6 20% 74.52 50%
10 2025 380.7 20% 76.14 50%
Timbulan Sampah
(m3/hari)
Sampah Rumah Tangga (m3/hari)
Reduksi di Sumber Rumah
Tangga
Sampah Yang dilayani
(m3/hari)
% Sampah ke TPS3R
Sampah K TPS3R (m3/hari)
% Recovery di TPS3R
Sampah Di TPS dan TPST
Tahun ke Tahun
j p q=jxp q
0 2014 296.2
0 2015 302.8
1 2016 310.7 80% 248.56 248.56
2 2017 318.2 80% 254.56 254.56
3 2018 325.7 80% 260.56 260.56
4 2019 333.3 80% 266.64 266.64
5 2020 341 80% 272.8 272.8
6 2021 348.8 80% 279.04 279.04
7 2022 356.7 80% 285.36 285.36
8 2023 364.6 80% 291.68 291.68
9 2024 372.6 80% 298.08 298.08
10 2025 380.7 80% 304.56 304.56
Sampah di TPA
Tahun ke Tahun
aa ab=aa x 90% ac = aa x 10% ad
0 2014
0 2015
1 2016 125.57 113 12.6 90%
2 2017 128.52 115.7 12.9 90%
3 2018 131.57 118.4 13.2 90%
4 2019 134.65 121.2 13.5 90%
Sampah Yang dilayani
(m3/hari)
% Sampah ke TPS
Sampah ke TPS (m3/hari)
Sampah K TPST
(m3/hari)
Sampah Diangkut ke TPA
(m3/hari)
Sampah Langsung Ke
Landfill (90%) (m3/hari)
Sampah dinsenerasi(10%)
(m3/hari)
% Sampah TerInsenerasi
5 2020 137.78 124 13.8 90%
6 2021 140.94 126.8 14.1 90%
7 2022 144.15 129.7 14.4 90%
8 2023 147.35 132.6 14.7 90%
9 2024 150.49 135.4 15 90%
10 2025 153.77 138.4 15.4 90%
Sampah di Landfill
Tahun ke Tahun
ai = ab + ag ak = 20% x aj al = aj + ak
0 2014
0 2015
1 2016 114.3 80.01 16 96.01
2 2017 117 81.9 16.38 98.28
3 2018 119.7 83.79 16.76 100.55
4 2019 122.6 85.82 17.16 102.98
5 2020 125.4 87.78 17.56 105.34
6 2021 128.2 89.74 17.95 107.69
7 2022 131.1 91.77 18.35 110.12
8 2023 134.1 93.87 18.77 112.64
9 2024 136.9 95.83 19.17 115
10 2025 139.9 97.93 19.59 117.52
Nama LiftDimensi TPA
Panjang LebarLift 1 147 147 Lift 2 147 147Lift 3 139 139Lift 4 131 131Lift 5 123 123Lift 6 115 115
Sampah Ke Landfill Total
(m3/hari)
Sampah yang diurug setelah
kompaksi (m3/hari)
Tanah Penutup (m3/hari)
Total yang ditimbun (m3/hari)
aj = ai x ( 350/500)
Perhitungan Luas Lahan dengan Limas
Lift 1 ( Galian ke dalam 1,5 m )
Panjang 147 Luas Alas 19321
Lebar 147 Luas Atas 21609
Kanan 4 Volume 30,682
Kiri 4
Lift 2 (Tinggi 1 m )
Panjang 147 Luas Alas 21609
Lebar 147 Luas Atas 19321
Kanan 4 Volume 20,454
Kiri 4
Lift 3 (Tinggi 1 m )
Panjang 139 Luas Alas 19321
Lebar 139 Luas Atas 17161
Kanan 4 Volume 18,230
Kiri 4
Lift 4 (Tinggi 1 m )
Panjang 131 Luas Alas 17161
Lebar 131 Luas Atas 15129
Kanan 4 Volume 16,134
Kiri 4
Lift 5 (Tinggi 1 m )
Panjang 123 Luas Alas 15129
Lebar 123 Luas Atas 13225
Kanan 4 Volume 14,166
Kiri 4
Lift 6 (Tinggi 1 m )
Panjang 115 Luas Alas 13225
Lebar 115 Luas Atas 11449
Kanan 4 Volume 12,326
Kiri 4
Volume Total 1 Sel dengan panjang 147 x 147 111,993
Satu TPA (3 sel) 335979.5
Sampah Di Sumber Rumah Tangga dan Non Rumah Tangga
e = cxd f g h= f+g i j=hxi
13.39 225.09 170 394.95 75% 296.2
16.79 225.67 173 398.37 76% 302.8
20.29 226.22 176 401.8 77% 310.7
23.91 226.71 179 405.22 79% 318.2
27.64 227.17 181 408.66 80% 325.7
31.48 227.57 185 412.09 81% 333.3
35.45 227.92 188 415.52 82% 341
39.55 228.22 191 418.95 83% 348.8
43.77 228.47 194 422.38 84% 356.7
48.12 228.67 197 425.82 86% 364.6
52.6 228.8 200 429.24 87% 372.6
57.22 228.88 204 432.66 88% 380.7
Sampah Di TPS3R
n=mxl o=l-n
31.07 31.07
31.82 31.82
32.57 32.57
33.33 33.33
34.1 34.1
34.88 34.88
35.67 35.67
36.46 36.46
37.26 37.26
38.07 38.07
Sampah RT di Reduksi
Sampah Diangkut Gerobak
(m3/hari)
Sampah Fasilitas
(m3/hari)
Sampah RT dan Fasilitas Total
(m3/hari)
Tingkat Pelayanan Kota
Sampah Yang dilayani
(m3/hari)
SampahTerecovery di TPS3R (m3/hari)
Sampah residu TPS3R (m3/hari)
Sampah Di TPS dan TPST
r s = qxr t=sx90% u=sx10% v w=vxq
30% 74.6 67.1 7.5 35% 87
30% 76.4 68.8 7.6 35% 89.1
30% 78.2 70.4 7.8 35% 91.2
30% 80 72 8 35% 93.32
30% 81.8 73.6 8.2 35% 95.48
30% 83.7 75.3 8.4 35% 97.66
30% 85.6 77 8.6 35% 99.88
30% 87.5 78.8 8.8 35% 102.09
30% 89.4 80.5 8.9 35% 104.33
30% 91.4 82.3 9.1 35% 106.6
Sampah di TPA
% Sisa Abu
ae af = ad x ac ag = ae x ac
10% 11.3 1.3
10% 11.6 1.3
10% 11.9 1.3
10% 12.2 1.4
% Sampah dikomposkan di
TPST
Sampah dikomposkan di TPST (dari TPS saja) (m3/hari)
Sampah Kompos Produk
(m3/hari)
Sampah Residu Kompos
(m3/hari)
% Sampah Terecovery
Sampah direcovery di
TPST (m3/hari)
Sampah Terinsenerasi
(m3/hari)
Sampah Sisa Abu (m3/hari)
10% 12.4 1.4
10% 12.7 1.4
10% 13 1.4
10% 13.2 1.5
10% 13.5 1.5
10% 13.9 1.5
Sampah di Landfill
am = al x 365
35043.65 70915.85
35872.2 106788.05
36700.75 143488.8
37587.7 181076.5
38449.1 219525.6
39306.85 258832.45
40193.8 299026.25
41113.6 340139.85
41975 382114.85
42894.8 425009.65
Dimensi TPA Jalan TrukNama Lift
Tinggi Kiri Kanan1.5 4 4 Lift 11 4 4 Lift 21 4 4 Lift 31 4 4 Lift 41 4 4 Lift 51 4 4 Lift 6
Total yang ditimbun
(m3/tahun)
Total yang diakumulasikan(
m3/tahun)
Perhitungan Luas Lahan dengan Limas Perhitungan Luas Lahan dengan Limas
Lift 1 ( Galian ke dalam 1,5 m ) Lift 1 ( Galian ke dalam 1,5 m )
m2 Panjang 164
m2 Lebar 164.0
m3 Kanan 4
Kiri 4
Lift 2 (Tinggi 1 m ) Lift 2 (Tinggi 1 m )
m2 Panjang 164
m2 Lebar 164.0
m3 Kanan 4
Kiri 4
Lift 3 (Tinggi 1 m ) Lift 3 (Tinggi 1 m )
m2 Panjang 156
m2 Lebar 156.0
m3 Kanan 4
Kiri 4
Lift 4 (Tinggi 1 m ) Lift 4 (Tinggi 1 m )
m2 Panjang 148
m2 Lebar 148.0
m3 Kanan 4
Kiri 4
Lift 5 (Tinggi 1 m ) Lift 5 (Tinggi 1 m )
m2 Panjang 140
m2 Lebar 140.0
m3 Kanan 4
Kiri 4
Lift 6 (Tinggi 1 m ) Lift 6 (Tinggi 1 m )
m2 Panjang 132
m2 Lebar 132.0
m3 Kanan 4
Kiri 4
m3
m3 Volume Total 1 Sel dengan panjang 186 x 186
Satu TPA ( 3 sel)
luas 65886.76923086.7 ha
Sampah Di TPS dan TPST
y z=y x q aa=z+u+o
35% 87 125.57
35% 89.1 128.52
35% 91.2 131.57
35% 93.32 134.65
35% 95.48 137.78
35% 97.66 140.94
35% 99.88 144.15
35% 102.09 147.35
35% 104.33 150.49
35% 106.6 153.77
% Sampah tidak dikompos dan
recov)
Sampah tidak di recov atau di
kompos (m3/hari)
Sampah Ke Diangkut ke
TPA (m3/hari)
Dimensi TPA Jalan TrukPanjang Lebar Tinggi Kiri Kanan
164.0 164.0 1.5 4 4 164.0 164.0 1 4 4 156.0 156.0 1 4 4 148.0 148.0 1 4 4 140.0 140.0 1 4 4 132.0 132.0 1 4 4
Perhitungan Luas Lahan dengan Limas
Luas Alas 24336 m2
Luas Atas 26896 m2
Volume 38,408 m3
Luas Alas 26896 m2
Luas Atas 24336 m2
Volume 25,605 m3
Luas Alas 24336 m2
Luas Atas 21904 m2
Volume 23,109 m3
Luas Alas 21904 m2
Luas Atas 19600 m2
Volume 20,741 m3
Luas Alas 19600 m2
Luas Atas 17424 m2
Volume 18,501 m3
Luas Alas 17424 m2
Luas Atas 15376 m2
Volume 16,389 m3
Volume Total 1 Sel dengan panjang 186 x 186 142,755 m3
428264 m3
Sampah di Sumber Rumah Tangga
Jumlah Penduduk Tahun 2016 =
Timbulan Sampah per orang =
Densitas Sampah Lepas =
Jumlah Timbulan 1 kota =
Reduksi di Sumber =
Sampah rumah tangga setelah reduksi =
Sampah di Sumber Sejenis Rumah Tangga
Sampah Fasilitas 2016 =
Sampah Total (RT + non RT) =
% Pelayanan =
Sampah dilayani =
Sampah di TPS dan TPS 3R
1. Sampah di TPS3R
% Sampah ke TPS3R =
Sampah Ke TPS3R =
Sampah yang direcovery (50%) =
Sisa Recovery 50% ( ke TPA ) =2. Sampah di TPS
% Sampah Ke TPS =
Sampah Ke TPS =
3. Sampah TPST (dari TPS saja) =
% Jumlah Sampah di Recovery =
% Sampah tidak direcov dan dikomposkan =
% Jumlah Sampah di Komposin =
Sampah di Recovery =
Sampah tidak direcov dan dikompos =
Sampah Di Komposin =
% Produk Kompos =
% Sampah Tidak Terbentuk Kompos =
Sampah Terkompos =
Sampah Tidak Tekomposkan =
Sampah Ke TPA(sisa kompos dan tidak terecov tidak terkompos) =
Total Sampah Ke TPA (dari TPS3R dan TPST) =
Sampah di TPA
Sampah ke TPA =
Sampah DiInsenerasi (10%) =
Sampah Ke Landfill Langsung (90%) =
Sampah Terinenerasi (90%) =
Sampah sisa Abu (10%) =
Total Sampah Ke Landfill =
Densitas Sampah Masuk =
Densitas Sampah di Landfill =
Volume ditimbun =
Penimbunan 10 Tahun =
Tinggi tumpukan =
Luas lahan penimbunan =
Total lahan =
Total =
Jumlah sel =
Luas tiap sel =
p:l =
l =
p =
Sampah di Sumber Rumah Tangga
154065 jiwa
0.32 kg/jiwa.hari
200 kg/m3
247 m3/hari
8.23%
226.7 m3/hari
Sampah di Sumber Sejenis Rumah Tangga
176 m3/hari
402.28 m3/hari
77%
310 m3/hari
Sampah di TPS dan TPS 3R
20%
62 m3/hari
31 m3/hari
31 m3/hari2. Sampah di TPS
80%
248 m3/hari
248 m3/hari
35%
35%
30%
86.8 m3/hari
86.8 m3/hari
74.4 m3/hari
90%
10%
67 m3/hari
7.4 m3/hari
94.2 m3/hari
125.2 m3/hari
Sampah di TPA
125.2 m3/hari
12.5 m3/hari
112.7 m3/hari
11.3 m3/hari
1.2 m3/hari
114 m3/hari
350
500
79.8 m3/hari
291270 m3/tahun
6.5 m3/hari
44810.8 m2
64015.4 m3
6.40154 ha 6,5 ha
3 sel
21338.5 m2
1 1
146.1 m 147 m
146.1 m 147 m
Jalur Blok C C Cr Kumulatif
a
d48-d1 RTH 0.3 0.3 0.3
d1-d2 Total Saluran d48-d1 RTH 0.3
d1-d2 RTH 0.3 0.3
0.3
d35-d2 Kantor 0.7 0.7 0.7
d2-d3 Total Saluran d35-d2 Kantor 0.7
Total Saluran d1-d2 RTH 0.3
d2-d3 RTH 0.3 0.3
0.35
d46-d36 Bangunan 0.7 0.7 0.7
d35-d36 Bangunan 0.7 0.7 0.7
d36-d32 d46-d36 Bangunan 0.7
d35-d36 Bangunan 0.7
d36-d32 Jalan 0.75
0.7
d31-d32 Jalan 0.75 0.75 0.75
d32-d34 d36-d32 Jalan 0.7
d31-d32 Jalan 0.75
d32-d34 Jalan 0.75
0.71
d33-d34 Jalan 0.75 0.75 0.75
d34-d16 d33-d34 Jalan 0.75
d32-d34 Jalan 0.71
d34-d16 Jalan 0.75
0.71
d15-d16 Jalan 0.75 0.75 0.75
d16-d17 d15-d16 Jalan 0.75
d16-d17 Bangunan 0.3
0.32
d17-d18 d16-d17 Bangunan 0.32
d17-d18 Jalan 0.75
0.39
d18-d19 d17-d18 Jalan 0.39
d18-d19 Jalan 0.75
0.4
d19-d20 d18-d19 Jalan 0.4
d19-d20 Jalan 0.75
Bangunan 0.3 0.525
0.32
d4-d30 Jalan 0.75 0.75 0.75
Tipe Daerah Aliran
(dari Tabel)
c = (a1*b1)+(a2*b2)/b1+b2
d15-d4 Jalan 0.75 0.75 0.75
d4-d5 d15-d4 Jalan 0.75
d4-d5 Taman 0.3
0.71
d5-d6 d4-d5 Taman 0.71
d5-d6 Taman 0.3
0.67
d6-d7 d5-d6 Taman 0.67
d6-d7 RTH 0.3
0.48
d7-d8 d6-d7 RTH 0.48
d7-d8 RTH 0.3
0.48
d8-d9 d7-d8 RTH 0.48
d8-d9 RTH 0.3
0.41
d9-d10 d8-d9 RTH 0.41
d9-d10 RTH 0.3
0.41
d10-11 d9-d10 RTH 0.41
d10-11 RTH 0.3
0.39
d11-d12 d10-11 RTH 0.39
d11-d12 RTH 0.3
0.38
d12-d13 d11-d12 RTH 0.38
d12-d13 RTH 0.3
0.37
d48-d49 RTH 0.3 0.3 0.3
d49-d50 d48-d49 RTH 0.3
d49-d50 RTH 0.3
0.3
d50-d45 d49-d50 Taman 0.3
d50-d45 Taman 0.3
0.3
d45-d21 d50-d45 Taman 0.3
d45-d21 Taman 0.3
0.3
d46-d47 Jalan 0.75 0.75
d47-43 d46-d47 Jalan 0.75
d47-43 Jalan 0.75
0.75
d39-d41 Jalan 0.75 0.75 0.75
d39-d40 Jalan 0.75 0.75 0.75
d40-d42 d39-d40 Jalan 0.75
d40-d42 Jalan 0.75
0.75
d41-d42 d39-d41 Jalan 0.75
d41-d42 Jalan 0.75
0.75
d42-d43 d40-d42 Jalan 0.75
d41-d42 Jalan 0.75
d42-d43 Jalan 0.75
0.75
d43-d44 d47-43 Jalan 0.75
d42-d43 Jalan 0.75
0.75
d44-d29 d43-d44 Jalan 0.75
d44-d29 jalan 0.75
0.75
d37-d22 Jalan 0.75 0.75 0.75
d22-d23 d37-d22 Jalan 0.75
d22-d23 Jalan 0.75
0.75
d37-d38 Jalan 0.75 0.75 0.75
d38-d23 d37-d38 Jalan 0.75
d38-d23 Jalan 0.75
0.75
d23-d24 d22-d23 Jalan 0.75
d38-d23 Jalan 0.75
d23-d24 Jalan 0.75
0.75
d25-d24 Jalan 0.75 0.75 0.75
d24-d28 d25-d24 Jalan 0.75
d23-d24 Jalan 0.75
d24-d28 Jalan 0.75
0.75
d28-d27 d24-d28 Jalan 0.75
d28-d27 Jalan 0.75
0.75
d25-d26 Jalan 0.75 0.75 0.75
d26-d27 d25-d26 Jalan 0.75
d26-d27 Jalan 0.75
0.75
d27-d29 d26-d27 Jalan 0.75
d28-d27 Jalan 0.75
d27-d29 Jalan 0.75
0.75
d29-d20 d27-d29 Jalan 0.75
d44-d29 Jalan 0.75
d29-d20 Jalan 0.75
0.75
d20-d21 d19-d20 Bangunan 0.32
d29-d20 Jalan 0.75
d20-d21 Jalan 0.75
0.57
d21-d13 d45-d21 Bangunan 0.3
d20-d21 Jalan 0.57
d21-d13 Taman 0.3
0.42
d13-d14 d12-d13 RTH 0.37
d21-d13 Taman 0.42
d13-d14 RTH 0.3
0.4
b
2.7
2.7
0.05
2.75
0.4
0.4
2.75
0.06
3.21
0.17
0.15
0.17
0.15
0.02
0.34
0.02
0.34
0.02
0.02
0.38
0.01
0.01
0.38
0.02
0.41
0.01
0.01
0.26
0.27
0.27
0.05
0.32
0.32
0.005
0.325
0.325
0.1
0.035
0.46
0.05
Luas area (ha)
0.15
0.15
0.015
0.165
0.165
0.02
0.185
0.185
0.2
0.385
0.385
0.01
0.395
0.395
0.25
0.645
0.645
0.01
0.655
0.655
0.15
0.805
0.805
0.1
0.905
0.905
0.07
0.975
1
1
0.3
1.3
1.3
0.01
1.31
1.31
0.06
1.37
0.12
0.12
0.08
0.2
0.1
0.04
0.04
0.07
0.11
0.1
0.08
0.18
0.11
0.18
0.001
0.291
0.2
0.001
0.201
0.201
0.08
0.281
0.05
0.05
0.05
0.1
0.05
0.05
0.03
0.08
0.1
0.08
0.001
0.181
0.04
0.04
0.181
0.002
0.223
0.223
0.07
0.293
0.06
0.06
0.03
0.09
0.09
0.293
0.001
0.384
0.384
0.281
0.001
0.666
0.46
0.666
0.001
1.127
1.37
1.127
0.1
2.597
0.975
2.597
0.06
3.632
Jalur
Limpasan Saluran
awal akhir awal akhir
d48-d1 200.4 200.15 150 232 200.15 200.1
d1-d2 200.2 200 20 31 200.1 199.8
d35-d2 200.15 199.8 32 164 199.98 199.8
d2-d3 200.1 199.8 50 46 199.8 199.76
d46-d36 200.1 199.6 73 63 199.55 199.53
d35-d36 200 199.6 38 37.5 199.98 199.53
d36-d32 199.75 199.6 5 8 199.55 199.53
d31-d32 199.8 199.6 28 30 199.8 199.53
d32-d34 199.85 199.73 40 37 199.53 199.51
d33-d34 199.9 199.65 29 28.5 199.95 199.51
d34-d16 199.75 199.7 5 8 199.51 199.5
d15-d16 199.8 199.74 30 30 199.8 199.7
d16-d17 199.8 199.75 30 123 199.5 199.49
d17-d18 199.6 198.8 15 128 199.49 198.8
d18-d19 199.1 198.9 5 9.5 198.9 198.8
d19-d20 198.2 197.9 32 238 198.8 197.45
d4-d30 198 197.77 10 45 199.8 199.73
d15-d4 199.8 199.77 10 110 199.9 199.8
d4-d5 199.8 199.65 20 20 199.8 199.73
d5-d6 199.8 199.65 20 19.5 199.73 199.6
d6-d7 199.51 198.9 120 128 199.6 198.9
d7-d8 199 198.87 8 8.1 198.9 198.88
d8-d9 198.9 198.24 130 131 198.88 198.2
d9-d10 198.24 198.2 8 16 198.2 198.18
d10-11 198.2 197.76 67 77 198.18 197.7
d11-d12 197.77 197.67 18 36.5 197.7 197.68
d12-d13 197.67 197.6 35 34 197.68 197.55
d48-d49 199.75 199.27 78 427 200.15 197.53
d49-d50 197.55 197.52 7 106 197.53 197.47
d50-d45 197.45 197.42 8 11 197.47 197.4
d45-d21 197.45 197.42 6 129 197.4 197.38
d46-d47 199.25 199.21 7 347 199.55 197.52
d47-d43 197.7 197.6 7 110 197.52 197.51
d39-d41 198.53 198.5 13 204 198.77 197.6
d39-d40 198.84 198.8 7 100 198.77 198.76
d40-d42 198.8 198.75 7 200 198.76 197.58
d41-d42 197.7 197.68 5 100 197.6 197.58
d42-d43 199.7 197.68 4 8 197.58 197.51
d43-d44 197.45 197.41 7 14.5 197.51 197.48
d44-d29 197.55 197.51 6 110 197.48 197.46
d37-d22 199.75 199.72 6 220 199.55 199.52
d22-d23 199.28 199.25 6 116.6 199.52 198.76
Panjang Limpasan (Lo)
Panjang Saluran (Ld)
d37-d38 199.28 199.25 5 114 199.55 198.8
d38-d23 199.85 199.81 5 200 198.8 198.76
d23-d24 199.85 199.81 5 8 198.76 198.74
d25-d24 199.81 199.78 5 90 198.77 198.74
d24-d28 199.81 199.78 5 11 198.74 198.72
d28-d27 198.53 198.5 5 219.5 198.72 197.54
d25-d26 198.05 198 5 215 198.77 197.55
d26-d27 197.58 197.55 5 100 197.55 197.54
d27-d29 197.58 197.55 5 8 197.54 197.46
d29-d20 197.55 197.51 5 8 197.46 197.45
d20-d21 197.55 197.51 5 4 197.45 197.43
d21-d13 197.7 197.48 39 57 197.43 197.4
d13-d14 197.74 197.55 36 16 197.4 197.38
Saluran Lo Cr Luas (ha) Ho So
d48-d1 150 0.3 2.7 200.4 200.15 0.25 0.002
d1-d2 20 0.3 2.75 200.2 200 0.2 0.01
d35-d2 32 0.7 0.4 200.15 199.8 0.35 0.011
d2-d3 50 0.35 3.21 200.1 199.8 0.3 0.006
d46-d36 73 0.7 0.17 200.1 199.6 0.5 0.007
d35-d36 38 0.7 0.15 200 199.6 0.4 0.011
d36-d32 5 0.7 0.34 199.75 199.6 0.15 0.03
d31-d32 28 0.75 0.02 199.8 199.6 0.2 0.007
d32-d34 40 0.71 0.38 199.85 199.73 0.12 0.003
d33-d34 29 0.75 0.01 199.9 199.65 0.25 0.009
d34-d16 5 0.71 0.41 199.75 199.7 0.05 0.01
d15-d16 30 0.75 0.01 199.8 199.74 0.06 0.002
d16-d17 30 0.32 0.27 199.8 199.75 0.05 0.002
d17-d18 15 0.39 0.32 199.6 198.8 0.8 0.053
d18-d19 5 0.4 0.325 199.1 198.9 0.2 0.04
d19-d20 32 0.32 0.46 198.2 197.9 0.3 0.009
d4-d30 10 0.75 0.05 198 197.77 0.23 0.023
d15-d4 10 0.75 0.15 199.8 199.77 0.03 0.003
d4-d5 20 0.71 0.165 199.8 199.65 0.15 0.008
d5-d6 20 0.67 0.185 199.8 199.65 0.15 0.008
d6-d7 120 0.48 0.385 199.51 198.9 0.61 0.005
d7-d8 8 0.48 0.395 199 198.87 0.13 0.016
d8-d9 130 0.41 0.645 198.9 198.24 0.66 0.005
d9-d10 8 0.41 0.655 198.24 198.2 0.04 0.005
d10-11 67 0.39 0.805 198.2 197.76 0.44 0.007
d11-d12 18 0.38 0.905 197.77 197.67 0.1 0.006
d12-d13 35 0.37 0.975 197.67 197.6 0.07 0.002
d48-d49 78 0.3 1 199.75 199.27 0.48 0.006
d49-d50 7 0.3 1.3 197.55 197.52 0.03 0.004
d50-d45 8 0.3 1.31 197.45 197.42 0.03 0.004
d45-d21 6 0.3 1.37 197.45 197.42 0.03 0.005
d46-d47 7 0.75 0.12 199.25 199.21 0.04 0.006
d47-d43 7 0.75 0.2 197.7 197.6 0.1 0.014
d39-d41 13 0.75 0.1 198.53 198.5 0.03 0.002
d39-d40 7 0.75 0.04 198.84 198.8 0.04 0.006
d40-d42 7 0.75 0.11 198.8 198.75 0.05 0.007
d41-d42 5 0.75 0.18 197.7 197.68 0.02 0.004
d42-d43 4 0.75 0.291 199.7 197.68 2.02 0.505
d43-d44 7 0.75 0.201 197.45 197.41 0.04 0.006
d44-d29 6 0.75 0.281 197.55 197.51 0.04 0.007
d37-d22 6 0.75 0.05 199.75 199.72 0.03 0.005
d22-d23 6 0.75 0.1 199.28 199.25 0.03 0.005
d37-d38 5 0.75 0.05 199.28 199.25 0.03 0.006
d38-d23 5 0.75 0.08 199.85 199.81 0.04 0.008
d23-d24 5 0.75 0.181 199.85 199.81 0.04 0.008
Elevasi awal Limpasan
Elevasi akhir Limpasan
d25-d24 5 0.75 0.04 199.81 199.78 0.03 0.006
d24-d28 5 0.75 0.223 199.81 199.78 0.03 0.006
d28-d27 5 0.75 0.293 198.53 198.5 0.03 0.006
d25-d26 5 0.75 0.06 198.05 198 0.05 0.01
d26-d27 5 0.75 0.09 197.58 197.55 0.03 0.006
d27-d29 5 0.75 0.384 197.58 197.55 0.03 0.006
d29-d20 5 0.75 0.666 197.55 197.51 0.04 0.008
d20-d21 5 0.57 1.127 197.55 197.51 0.04 0.008
d21-d13 39 0.42 2.597 197.7 197.48 0.22 0.006
d13-d14 36 0.4 3.632 197.74 197.55 0.19 0.005
Ld (m) n Vasumsi tc (menit) Cs
0.002 232 0.025 48.9 0.6 6.44 55.34 91.72 0.945 0.206
0.01 31 0.025 18.23 0.6 0.86 19.09 144.23 0.978 0.331
0.011 164 0.025 20.88 0.6 4.56 25.44 131.09 0.918 0.102
0.006 46 0.025 27.31 0.6 1.28 28.59 125.42 0.978 0.391
0.007 63 0.025 30.01 0.6 1.75 31.76 120.19 0.973 0.040
0.011 37.5 0.025 22.1 0.6 1.04 23.14 135.56 0.978 0.040
0.03 8 0.025 9.26 0.6 0.22 9.48 170.04 0.989 0.112
0.007 30 0.025 21.87 0.6 0.83 22.7 136.45 0.982 0.006
0.003 37 0.025 29.15 0.6 1.03 30.18 122.74 0.983 0.092
0.009 28.5 0.025 21.04 0.6 0.79 21.83 138.25 0.982 0.003
0.01 8 0.025 11.54 0.6 0.22 11.76 163.12 0.991 0.132
0.002 30 0.025 28.75 0.6 0.83 29.58 123.73 0.986 0.003
0.002 123 0.025 28.75 0.6 3.42 32.17 119.54 0.950 0.029
0.053 128 0.025 11.87 0.6 3.56 15.43 153.08 0.897 0.053
0.04 9.5 0.025 8.74 0.6 0.26 9 171.57 0.986 0.062
0.009 238 0.025 21.74 0.6 6.61 28.35 125.83 0.896 0.051
0.023 45 0.025 12.27 0.6 1.25 13.52 158.14 0.956 0.016
0.003 110 0.025 18.45 0.6 3.06 21.51 138.92 0.934 0.043
0.008 20 0.025 19.06 0.6 0.56 19.62 143.04 0.986 0.047
0.008 19.5 0.025 19.06 0.6 0.54 19.6 143.08 0.986 0.049
0.005 128 0.025 37.82 0.6 3.56 41.38 106.68 0.959 0.055
0.016 8.1 0.025 12.26 0.6 0.23 12.49 161.02 0.991 0.085
0.005 131 0.025 38.83 0.6 3.64 42.47 105.34 0.959 0.077
0.005 16 0.025 15.47 0.6 0.44 15.91 151.86 0.986 0.113
0.007 77 0.025 29.17 0.6 2.14 31.31 120.9 0.967 0.105
0.006 36.5 0.025 19.5 0.6 1.01 20.51 141.07 0.976 0.135
0.002 34 0.025 30.25 0.6 0.94 31.19 121.09 0.985 0.121
0.006 427 0.025 31.63 0.6 11.86 43.49 104.11 0.880 0.087
0.004 106 0.025 15.48 0.6 2.94 18.42 145.78 0.926 0.158
0.004 11 0.025 16.18 0.6 0.31 16.49 150.41 0.991 0.164
0.005 129 0.025 14.07 0.6 3.58 17.65 147.59 0.908 0.168
0.006 347 0.025 14.28 0.6 9.64 23.92 134.01 0.832 0.034
0.014 110 0.025 12.05 0.6 3.06 15.11 153.91 0.908 0.064
0.002 204 0.025 21.82 0.6 5.67 27.49 127.34 0.907 0.027
0.006 100 0.025 14.28 0.6 2.78 17.06 149.01 0.925 0.012
0.007 200 0.025 13.84 0.6 5.56 19.4 143.53 0.875 0.033
0.004 100 0.025 13.86 0.6 2.78 16.64 150.04 0.923 0.056
0.505 8 0.025 4.89 0.6 0.22 5.11 185.1 0.979 0.112
0.006 14.5 0.025 14.28 0.6 0.4 14.68 155.03 0.987 0.065
0.007 110 0.025 13.16 0.6 3.06 16.22 151.08 0.914 0.088
0.005 220 0.025 14.07 0.6 6.11 20.18 141.79 0.869 0.015
0.005 116.6 0.025 14.07 0.6 3.24 17.31 148.41 0.914 0.031
0.006 114 0.025 12.78 0.6 3.17 15.95 151.76 0.910 0.016
0.008 200 0.025 12.06 0.6 5.56 17.62 147.66 0.864 0.025
0.008 8 0.025 12.06 0.6 0.22 12.28 161.61 0.991 0.061
So Rencana
to (menit)
td (menit)
I (mm/jam
)
Q (m3/dtk)
0.006 90 0.025 12.78 0.6 2.5 15.28 153.47 0.924 0.013
0.006 11 0.025 12.78 0.6 0.31 13.09 159.33 0.988 0.074
0.006 219.5 0.025 12.78 0.6 6.1 18.88 144.71 0.861 0.088
0.01 215 0.025 11.54 0.6 5.97 17.51 147.92 0.854 0.018
0.006 100 0.025 12.78 0.6 2.78 15.56 152.75 0.918 0.029
0.006 8 0.025 12.78 0.6 0.22 13 159.58 0.992 0.128
0.008 8 0.025 12.06 0.6 0.22 12.28 161.61 0.991 0.224
0.008 4 0.025 12.06 0.6 0.11 12.17 161.93 0.996 0.289
0.006 57 0.025 25.16 0.6 1.58 26.74 128.69 0.971 0.390
0.005 16 0.025 25.42 0.6 0.44 25.86 130.3 0.992 0.526
PUH 5
a 9132.92b 44.23
Saluran n Ld (m)elevasi tanah
∆ Hd Sd Sd Rencana Qawal akhir
d48-d1 0.025 232 200.15 200.1 0.05 0.0002 0.0002 0.206
d1-d2 0.025 31 200.1 199.8 0.3 0.0097 0.0097 0.331
d35-d2 0.025 164 199.98 199.8 0.18 0.0011 0.0011 0.102
d2-d3 0.025 46 199.8 199.76 0.04 0.0009 0.0009 0.391
d46-d36 0.025 63 199.55 199.53 0.02 0.0003 0.0003 0.04
d35-d36 0.025 37.5 199.98 199.53 0.45 0.012 0.012 0.04
d36-d32 0.025 8 199.55 199.53 0.02 0.0025 0.0025 0.112
d31-d32 0.025 30 199.8 199.53 0.27 0.009 0.009 0.006
d32-d34 0.025 37 199.53 199.51 0.02 0.0005 0.0005 0.092
d33-d34 0.025 28.5 199.95 199.51 0.44 0.0154 0.0154 0.003
d34-d16 0.025 8 199.51 199.5 0.01 0.0012 0.0012 0.132
d15-d16 0.025 30 199.8 199.7 0.1 0.0033 0.0033 0.003
d16-d17 0.025 123 199.5 199.49 0.01 0.0001 0.0001 0.029
d17-d18 0.025 128 199.49 198.8 0.69 0.0054 0.0054 0.053
d18-d19 0.025 9.5 198.9 198.8 0.1 0.0105 0.0105 0.062
d19-d20 0.025 238 198.8 197.45 1.35 0.0057 0.0057 0.051
d4-d30 0.025 45 199.8 199.73 0.07 0.0016 0.0016 0.016
d15-d4 0.025 110 199.9 199.8 0.1 0.0009 0.0009 0.043
d4-d5 0.025 20 199.8 199.73 0.07 0.0035 0.0035 0.047
d5-d6 0.025 19.5 199.73 199.6 0.13 0.0067 0.0067 0.049
d6-d7 0.025 128 199.6 198.9 0.7 0.0055 0.0055 0.055
d7-d8 0.025 8.1 198.9 198.88 0.02 0.0025 0.0025 0.085
d8-d9 0.025 131 198.88 198.2 0.68 0.0052 0.0052 0.077
d9-d10 0.025 16 198.2 198.18 0.02 0.0012 0.0012 0.113
d10-11 0.025 77 198.18 197.7 0.48 0.0062 0.0062 0.105
d11-d12 0.025 36.5 197.7 197.68 0.02 0.0005 0.0005 0.135
d12-d13 0.025 34 197.68 197.55 0.13 0.0038 0.0038 0.121
d48-d49 0.025 427 200.15 197.53 2.62 0.0061 0.0061 0.087
d49-d50 0.025 106 197.53 197.47 0.06 0.0006 0.0006 0.158
d50-d45 0.025 11 197.47 197.4 0.07 0.0064 0.0064 0.164
d45-d21 0.025 129 197.4 197.38 0.02 0.0002 0.0002 0.168
d46-d47 0.025 347 199.55 197.52 2.03 0.0059 0.0059 0.034
d47-d43 0.025 110 197.52 197.51 0.01 0.0001 0.0001 0.064
d39-d41 0.025 204 198.77 197.6 1.17 0.0057 0.0057 0.027
d39-d40 0.025 100 198.77 198.76 0.01 0.0001 0.0001 0.012
d40-d42 0.025 200 198.76 197.58 1.18 0.0059 0.0059 0.033
d41-d42 0.025 100 197.6 197.58 0.02 0.0002 0.0002 0.056
d42-d43 0.025 8 197.58 197.51 0.07 0.0088 0.0088 0.112
d43-d44 0.025 14.5 197.51 197.48 0.03 0.0021 0.0021 0.065
d44-d29 0.025 110 197.48 197.46 0.02 0.0002 0.0002 0.088
d37-d22 0.025 220 199.55 199.52 0.03 0.0001 0.0001 0.015
d22-d23 0.025 116.6 199.52 198.76 0.76 0.0065 0.0065 0.031
d37-d38 0.025 114 199.55 198.8 0.75 0.0066 0.0066 0.016
d38-d23 0.025 200 198.8 198.76 0.04 0.0002 0.0002 0.025
d23-d24 0.025 8 198.76 198.74 0.02 0.0025 0.0025 0.061
d25-d24 0.025 90 198.77 198.74 0.03 0.0003 0.0003 0.013
d24-d28 0.025 11 198.74 198.72 0.02 0.0018 0.0018 0.074
d28-d27 0.025 219.5 198.72 197.54 1.18 0.0054 0.0054 0.088
d25-d26 0.025 215 198.77 197.55 1.22 0.0057 0.0057 0.018
d26-d27 0.025 100 197.55 197.54 0.01 0.0001 0.0001 0.029
d27-d29 0.025 8 197.54 197.46 0.08 0.01 0.01 0.128
d29-d20 0.025 8 197.46 197.45 0.01 0.0013 0.0013 0.224
d20-d21 0.025 4 197.45 197.43 0.02 0.005 0.005 0.289
d21-d13 0.025 57 197.43 197.4 0.03 0.0005 0.0005 0.39
d13-d14 0.025 16 197.4 197.38 0.02 0.0013 0.0013 0.526
h air b A R C FbHtotal
(m)
0.663 1.326 0.879 0.33 0.14 0.305 0.968
0.382 0.764 0.292 0.19 0.14 0.231 0.613
0.370 0.74 0.274 0.19 0.14 0.228 0.598
0.636 1.272 0.809 0.32 0.14 0.298 0.934
0.332 0.664 0.22 0.17 0.14 0.216 0.548
0.166 0.332 0.055 0.08 0.14 0.152 0.318
0.329 0.658 0.216 0.16 0.14 0.215 0.544
0.086 0.172 0.015 0.04 0.14 0.11 0.196
0.413 0.826 0.341 0.21 0.14 0.24 0.653
0.060 0.12 0.007 0.03 0.14 0.092 0.152
0.401 0.802 0.322 0.2 0.14 0.237 0.638
0.080 0.16 0.013 0.04 0.14 0.106 0.186
0.362 0.724 0.262 0.18 0.14 0.225 0.587
0.215 0.43 0.092 0.11 0.14 0.173 0.388
0.201 0.402 0.081 0.1 0.14 0.168 0.369
0.210 0.42 0.088 0.11 0.14 0.171 0.381
0.172 0.344 0.059 0.09 0.14 0.155 0.327
0.278 0.556 0.155 0.14 0.14 0.197 0.475
0.223 0.446 0.099 0.11 0.14 0.177 0.400
0.200 0.4 0.08 0.1 0.14 0.167 0.367
0.217 0.434 0.094 0.11 0.14 0.174 0.391
0.296 0.592 0.175 0.15 0.14 0.204 0.500
0.249 0.498 0.124 0.12 0.14 0.187 0.436
0.378 0.756 0.286 0.19 0.14 0.23 0.608
0.270 0.54 0.146 0.14 0.14 0.194 0.464
0.476 0.952 0.453 0.24 0.14 0.258 0.734
0.313 0.626 0.196 0.16 0.14 0.209 0.522
0.253 0.506 0.128 0.13 0.14 0.188 0.441
0.488 0.976 0.476 0.24 0.14 0.261 0.749
0.318 0.636 0.202 0.16 0.14 0.211 0.529
0.614 1.228 0.754 0.31 0.14 0.293 0.907
0.179 0.358 0.064 0.09 0.14 0.158 0.337
0.487 0.974 0.474 0.24 0.14 0.261 0.748
0.165 0.33 0.054 0.08 0.14 0.152 0.317
0.260 0.52 0.135 0.13 0.14 0.191 0.451
0.177 0.354 0.063 0.09 0.14 0.157 0.334
0.407 0.814 0.331 0.2 0.14 0.239 0.646
0.259 0.518 0.134 0.13 0.14 0.19 0.449
0.277 0.554 0.153 0.14 0.14 0.197 0.474
0.482 0.964 0.465 0.24 0.14 0.26 0.742
0.283 0.566 0.16 0.14 0.14 0.199 0.482
0.170 0.34 0.058 0.09 0.14 0.154 0.324
0.132 0.264 0.035 0.07 0.14 0.136 0.268
0.301 0.602 0.181 0.15 0.14 0.205 0.506
0.262 0.524 0.137 0.13 0.14 0.192 0.454
0.218 0.436 0.095 0.11 0.14 0.175 0.393
0.299 0.598 0.179 0.15 0.14 0.205 0.504
0.260 0.52 0.135 0.13 0.14 0.191 0.451
0.142 0.284 0.04 0.07 0.14 0.141 0.283
0.362 0.724 0.262 0.18 0.14 0.225 0.587
0.266 0.532 0.142 0.13 0.14 0.193 0.459
0.482 0.964 0.465 0.24 0.14 0.26 0.742
0.412 0.824 0.339 0.21 0.14 0.24 0.652
0.709 1.418 1.005 0.35 0.14 0.315 1.024
0.663 1.326 0.879 0.33 0.14 0.305 0.968
Saluran Lebar (cm) Tinggi(cm) H Air( cm)Dimensi Yang Digunakan
Lebar(cm) Tinggi (cm)
d48-d1 132.6 96.8 66.3 145 105 232
d1-d2 76.4 61.3 38.2 145 105 31
d35-d2 74 59.8 37 145 105 164
d2-d3 127.2 93.4 63.6 145 105 46
d46-d36 66.4 54.8 33.2 145 105 63
d35-d36 33.2 31.8 16.6 145 105 37.5
d36-d32 65.8 54.4 32.9 145 105 8
d31-d32 17.2 19.6 8.6 145 105 30
d32-d34 82.6 65.3 41.3 145 105 37
d33-d34 12 15.2 6 145 105 28.5
d34-d16 80.2 63.8 40.1 145 105 8
d15-d16 16 18.6 8 145 105 30
d16-d17 72.4 58.7 36.2 145 105 123
d17-d18 43 38.8 21.5 145 105 128
d18-d19 40.2 36.9 20.1 145 105 9.5
d19-d20 42 38.1 21 145 105 238
d4-d30 34.4 32.7 17.2 145 105 45
d15-d4 55.6 47.5 27.8 145 105 110
d4-d5 44.6 40 22.3 145 105 20
d5-d6 40 36.7 20 145 105 19.5
d6-d7 43.4 39.1 21.7 145 105 128
d7-d8 59.2 50 29.6 145 105 8.1
d8-d9 49.8 43.6 24.9 145 105 131
d9-d10 75.6 60.8 37.8 145 105 16
d10-11 54 46.4 27 145 105 77
d11-d12 95.2 73.4 47.6 145 105 36.5
d12-d13 62.6 52.2 31.3 145 105 34
d48-d49 50.6 44.1 25.3 145 105 427
d49-d50 97.6 74.9 48.8 145 105 106
d50-d45 63.6 52.9 31.8 145 105 11
d45-d21 122.8 90.7 61.4 145 105 129
d46-d47 35.8 33.7 17.9 145 105 347
d47-d43 97.4 74.8 48.7 145 105 110
d39-d41 33 31.7 16.5 145 105 204
d39-d40 52 45.1 26 145 105 100
d40-d42 35.4 33.4 17.7 145 105 200
d41-d42 81.4 64.6 40.7 145 105 100
d42-d43 51.8 44.9 25.9 145 105 8
d43-d44 55.4 47.4 27.7 145 105 14.5
d44-d29 96.4 74.2 48.2 145 105 110
d37-d22 56.6 48.2 28.3 145 105 220
d22-d23 34 32.4 17 145 105 116.6
d37-d38 26.4 26.8 13.2 145 105 114
d38-d23 60.2 50.6 30.1 145 105 200
d23-d24 52.4 45.4 26.2 145 105 8
Panjang Saluran(m)
d25-d24 43.6 39.3 21.8 145 105 90
d24-d28 59.8 50.4 29.9 145 105 11
d28-d27 52 45.1 26 145 105 219.5
d25-d26 28.4 28.3 14.2 145 105 215
d26-d27 72.4 58.7 36.2 145 105 100
d27-d29 53.2 45.9 26.6 145 105 8
d29-d20 96.4 74.2 48.2 145 105 8
d20-d21 82.4 65.2 41.2 145 105 4
d21-d13 141.8 102.4 70.9 145 105 57
d13-d14 132.6 96.8 66.3 145 105 16
0 0
RBW 14SBW 16Jumlah tah 5Rumus 0.5
Tahun Tingkat Produksi Produksi Gas1 0.0
2.82 5.6
4.93 4.2
3.154 2.8
2.15 1.4
0.76 0.0
13.65
Peak tahun 5
Tahun Tahun
10
91.493
0.213 1.387
20.427
101.28
0.64 1.173
30.853
111.066
1.067 0.96
41.28
120.853
1.493 0.747
51.706
130.64
1.92 0.534
62.133
140.427
2.027 0.32
71.92
150.213
1.813 0.107
81.706 16 0
1.6 16.001
Tingkat Produksi Gas, ft3/yr
Produksi Gas , ft3
Tingkat Produksi
Gas, ft3/yr
Produksi Gas , ft3
Tahun Sampah Mudah Terurai Sampah Sulit Terurai Total ( rapid + slow )
0 0.0 0 0.000
0 0
1 0.0 0 0.000
0.941 0.008
2 1.882 0.016 1.898
1.646 0.023
3 1.411 0.031 1.442
1.176 0.039
4 0.941 0.047 0.988
0.706 0.055
5 0.47 0.062 0.532
0.235 0.07
6 0.0 0.078 0.078
0 0.074
7 0.0 0.07 0.070
0.066
8 0.062 0.062
0.058
9 0.055 0.055
0.051
10 0.047 0.047
0.043
11 0.039 0.039
0.035
12 0.031 0.031
0.027
13 0.023 0.023
0.019
14 0.016 0.016
0.012
15 0.008 0.008
0.004
16 0 0.000
Total 4.704 0.584
TahunTingkat Produksi Gas dari Sampah yang masuk pada Tahun Tertentu, ft3/yr
Tahun - 1 Tahun - 2 Tahun - 3 Tahun - 4 Tahun - 50 0
1 0 0
Tingkat Produksi Gas, ft3/yr
Volume gas, ft3
Tingkat Produksi Gas,
ft3/yr
Volume gas, ft3
Tingkat Produksi Gas, ft3/yr
2 1.897 0 0
3 1.442 1.897 0 0
4 0.988 1.442 1.897 0 0
5 0.533 0.988 1.442 1.897 0
6 0.078 0.533 0.988 1.442 1.897
7 0.07 0.078 0.533 0.988 1.442
8 0.062 0.07 0.078 0.533 0.988
9 0.055 0.062 0.07 0.078 0.533
10 0.047 0.055 0.062 0.07 0.078
11 0.039 0.047 0.055 0.062 0.07
12 0.031 0.039 0.047 0.055 0.062
13 0.023 0.031 0.039 0.047 0.055
14 0.016 0.023 0.031 0.039 0.047
15 0.008 0.016 0.023 0.031 0.039
16 0 0.008 0.016 0.023 0.031
17 0 0.008 0.016 0.023
18 0 0.008 0.016
19 0 0.008
20 0
Tahun Gas akumulasi1 0 02 0.949 0.9493 2.618 3.5674 3.833 7.4
0 5 10 15 20 250
1
2
3
4
5
6
0
5
10
15
20
25
30
Produksi Gas Landfill
Produksi GasAkumulasi Gas
Tahun
Produksi Gas
Akumulasi
Gas
5 4.593 11.9936 4.899 16.8927 4.024 20.9168 2.42 23.3369 1.264 24.6
10 0.544 25.14411 0.292 25.43612 0.253 25.68913 0.214 25.90314 0.175 26.07815 0.136 26.21416 0.097 26.31117 0.062 26.37318 0.035 26.40819 0.016 26.42420 0.004 26.428
0 5 10 15 20 250
1
2
3
4
5
6
0
5
10
15
20
25
30
Produksi Gas Landfill
Produksi GasAkumulasi Gas
Tahun
Produksi Gas
Akumulasi
Gas
h 0.250.5
0.751
4.22.8
Total ( rapid + slow )
0.000
0.949
1.669
1.215
0.761
0.305
0.074
0.066
0.058
0.051
0.043
0.035
0.027
0.019
0.012
0.004
5.288
Tingkat Produksi Gas dari Sampah yang masuk pada Tahun Tertentu, ft3/yr
Gas, ft3Total
0
0 0
0
Volume gas, ft3
Akumulasi Produksi, ft3
0.949 0.949
1.897
2.618 3.567
3.34
3.833 7.4
4.327
4.593 11.993
4.86
4.899 16.892
4.938
4.024 20.916
3.111
2.42 23.336
1.731
1.264 24.6
0.798
0.544 25.144
0.312
0.292 25.436
0.273
0.253 25.689
0.234
0.214 25.903
0.195
0.175 26.078
0.156
0.136 26.214
0.117
0.097 26.311
0.078
0.062 26.373
0.047
0.035 26.408
0.024
0.016 26.424
0.008
0.004 26.428
0
0 5 10 15 20 250
1
2
3
4
5
6
0
5
10
15
20
25
30
Produksi Gas Landfill
Produksi GasAkumulasi Gas
Tahun
Produksi Gas
Akumulasi
Gas
0 5 10 15 20 250
1
2
3
4
5
6
0
5
10
15
20
25
30
Produksi Gas Landfill
Produksi GasAkumulasi Gas
Tahun
Produksi Gas
Akumulasi
Gas
Komponen sampah Komposisi Berat (%) Berat (kg) Moisture (%)
80.01
16002Rapidly decomposableSampah Makanan 66.50 10641.30 78 8300.21Kertas 16.80 2688.30 8 215.06Lain - Lain(debu) 5.52 883.30 8 70.66Total 88.82 14212.90 94.00 8585.93Slowly decomposablePlastik 9.06 1449.80 3 43.494Tekstil 2.91 465.70 13 60.541Kaca 3.44 550.50 2 11.01Keramik 1.51 241.60 5 12.08Logam 0.83 132.80 2 2.656Kayu 2.00 320.00 25 80Total 19.75 3160.40 50.00 209.78
Rapidly decomposable dengan nitrogen = 1
No. KeteranganKomposisi
C H O
1 Total 2413.31 322.60 1984.732 Berat atom (g/mol) 12.01 1.01 163 Mol 200.94 319.41 124.054 Rumus Kimia Sampah 39 62 24
Slowly decomposable dengan nitrogen = 1
No. KeteranganKomposisi
C H O
1 Total 1195.12 143.94 558.202 Berat atom (g/mol) 12.01 1.01 163 Mol 99.51 142.52 34.894 Rumus Kimia Sampah 72 103 25
A. Gas yang Bisa diperolehi. Rapidly
C41H64O22N 14.84H2O ~ 22.56CH4 18.32CO2928.11 219.66 334 796.581
Berat Basah (kg)
1147.77 1147.621
ii. Slowly
C40H58O18N 17.25H2O ~ 22.38CH4 17.63CO21382.76 621.69 678.1125 1309.29752004.45 2004.45
B. Gas Metana dan CO2 yang dihasilkan
i. MethanaBJ methan 0.0448 lb/ft3Conversi 16.019 kg/m3Berat Jenis Metana 0.72 kg/m3
Berat Kering Sampah Rapidly 5626.97 kgBerat Kering Sampah Slowly 2950.62 kg
ii CO2BJ CO2 0.1235 lb/ft3Conversi 16.019 kg/m3Berat Jenis CO2 1.98 kg/m3
Berat Kering Sampah Rapidly 5626.97 kgBerat Kering Sampah Slowly 2950.62 kg
B. Total berat kering yang menghasilkan gasi. Rapidly 0.755 m3/kgii. Slowly 0.8 m3/kg
Percent by weight (dry basis)
C H O N
2341.09 1123.7 149.8 880.2 60.92473.24 1075.9 148.4 1088.2 7.4
812.64 213.7 24.4 16.3 4.0635626.97 2413.31 322.60 1984.73 72.35
1406.31 843.8 101.3 320.6 0.0405.16 222.8 26.7 126.4 18.6539.49 2.7 0.5 2.2 0.216229.52 1.1 0.2 0.9 0.092130.14 5.9 0.8 5.6 0.078240.00 118.8 14.4 102.5 0.5
2950.62 1195.12 143.94 558.20 19.50
Komposisi
N SH2O CH4 CO2 NH3
72.35 0.0014.01 32.075.1643 0
1 0 12.19 20.81 18.1 1
Komposisi
N S H2O CH4 CO2 NH3
19.50 0.0014.01 32.07
1.39 01 0 34.5 42.25 29.75 1
NH317.04
Berat Kering
(kg)
NH317.04
Rapidly 2274.2 m3Slowly 1386.4 m3
Rapidly 1972.4 m3Slowly 973.4 m3
B. Total berat kering yang menghasilkan gasi. Rapidly 0.755 m3/kgii. Slowly 0.8 m3/kg
Sampah yang Cepat terurai
Akhir Tahun ke- Total fraksi Sam
1 00.151 Produksi Gas
2 0.3020.26425
3 0.22650.18875
4 0.1510.11325
5 0.07550.03775
6 0Total 0.755
Sampah yang Sulit terurai
Akhir Tahun keTotal fraksi Sam
1 00.01065 Produksi Gas
2 0.02130.032
3 0.04270.05335
4 0.0640.0747
5 0.08540.09605
6 0.10670.101365
7 0.096030.090695
8 0.085360.080025
9 0.074690.069355
10 0.064020.058685
Laju Produksi Gas, m3/tahun
Produksi Gas m3
Laju Produksi Gas, m3/tahun
Produksi Gas m3
11 0.053350.048015
12 0.042680.037345
13 0.032010.026675
14 0.021340.016005
15 0.010670.005335
16 0Total 0.80025
Sampah Cepat Terurai Sampah Lambat Terurai Total
0 0 0 00 0 0
1 0 0 06.375 0.155 6.53
2 12.75 0.31 13.0611.155 0.47 11.625
3 9.56 0.63 10.197.965 0.785 8.75
4 6.37 0.94 7.314.78 1.1 5.88
5 3.19 1.26 4.451.595 1.415 3.01
6 0 1.57 1.571.495 1.495
7 1.42 1.421.34 1.34
8 1.26 1.261.18 1.18
9 1.1 1.11.02 1.02
10 0.94 0.940.865 0.865
11 0.79 0.790.71 0.71
12 0.63 0.630.55 0.55
13 0.47 0.470.39 0.39
Akhir Tahun ke- Kecepatan
Produksi Gas (m3/tahun)
Produksi Gas (m3)
Kecepatan Produksi Gas (m3/tahun)
Produksi Gas (m3)
Kecepatan Produksi Gas (m3/tahun)
Produksi Gas (m3)
14 0.31 0.310.235 0.235
15 0.16 0.160.08 0.08
16 0 0Total 31.87 11.79 43.66
Berat kering x % Sampah Biodegradable42.202275 kg RBW/kg total sampah
= Total fraksi Sampah x Produksi Gas31.86272 m3/kg sampah
Berat kering x % Sampah Biodegradable
14.753 kg RBW/kg total sampah
= Total fraksi Sampah x Produksi Gas11.80608825 m3/kg sampah
Akhir TahunTotal
1 0 0 02 6.375 0.155 6.533 11.155 0.47 11.6254 7.965 0.785 8.755 4.78 1.1 5.886 1.595 1.415 3.017 0 1.495 1.4958 0 1.34 1.349 0 1.18 1.18
10 0 1.02 1.0211 0 0.865 0.86512 0 0.71 0.7113 0 0.55 0.5514 0 0.39 0.3915 0 0.235 0.23516 0 0.08 0.0817 0 0 0
Total 31.87 11.79 43.66
Sampah Cepat Terurai
Sampah Lambat Terurai
Produksi Gas (m3)
Produksi Gas (m3)
Produksi Gas (m3)