Post on 04-Apr-2018
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
1/27
TOC.CW.LA1.S01.1
TABLE OF CONSTRUCT
Construct : S01 Computer Security Measures
Aspect : LA1.S01.1 Apply Correct Security Procedures Using Antivirus
Instrument : Demonstration
MARK CRITERIA EVIDENCE NOTE
2
1. Choose antivirussoftware to beused.
Write the name ofthe antivirussoftware.
CompletedACF.CW.LA1.S01.1.
Use any antivirussoftware available e.g.Kaspersky, McAfee
Virus Scan, NortonAntivirus, Trend MicroPC-Cillin, Dr Solomon,AVG, etc.
Scan area can bespecific folder, floppydisk, or flash memory.
Candidate can printscreen the scansummary.
If no virus is detected,criterion four isconsidered done. WriteNo action taken.
Values:
Confident
Responsible
2
2. Start the antivirussoftware andselect area to bescanned.
State the areaselected.
2
3. Scan the selectedarea.
Copy scansummary.
2
4. Choose and applyany or all of thefollowing whenvirus is detected delete/remove,clean/heal,quarantine/moveto vault.
State action taken
8 TOTAL MARK
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
2/27
TOC.CW.LA1.S01.2
TABLE OF CONSTRUCT
Construct : S01 Computer Security MeasuresAspect : LA1.S01.2 Apply Correct Security Procedures Using Anti-Spyware
Instrument : Demonstration
MARK CRITERIA EVIDENCE NOTE
2
1. Choose anti-spyware softwareto be used.
Write the name of
the anti-spywaresoftware.
CompletedACF.CW.LA1.S01.2
Suggested anti-spyware software:Lavasoft Ad-Aware SEPersonal.
Print screen can beused to display scansummary.
If no spyware isdetected, criterion fouris considered done.Write No action taken.
Values:
Confident
Responsible
2
2. Start the anti-spyware softwareand choose a scanmode.
State the scanmode selected.
2
3. Scan the selectedarea.
Copy scan
summary.
2
4. Choose and applyany of the followingwhen spyware isdetected -remove/quarantinethe identifiedobject(s).
State the actiontaken.
8 TOTAL MARK
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
3/27
TOC.CW.LA1.AS02.1
TABLE OF CONSTRUCT
Construct : S02 Impact of ICT on Society
Aspect : LA1.S02.1 Locate and present information on impact of ICT on society
Instrument : Verbal Presentation
MARK CRITERIA EVIDENCE NOTE
1
1. Locate informationfrom more than onesource.
Write the number ofsources referred.
CompletedACF.CW.LA1.S01.2
Suggested anti-spyware software:Lavasoft Ad-Aware SE
Personal.
Print screen can beused to display scansummary.
If no spyware isdetected, criterion fouris considered done.Write No actiontaken.
Values:
Confident
Responsible
2
2. Present theinformation in 5 to 10slides.
Write the number ofslides used.
5
3. Presentation includes:
a. Topic
b. Content
c. Conclusion
d. Sources ofreference
Submit a soft copy orhard copy of thepresentation.
2
4. Displaycooperation.
a. Write thenames of groupmembers.
b. Verbal
verification fromgroup membersOR assessorsobservation.
10 TOTAL MARK
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
4/27
TOC.CW.LA2.S03.1
TABLE OF CONSTRUCT
Construct : S03 PC Assembling
Aspect : LA2.S03.1 Assemble the components of a PC
Instrument : Demonstration
MARK CRITERIA EVIDENCE NOTE
2
1. Fix the processor
correctly.Write processorspecification.
CompletedACF.CW.LA2.S03.1
CAUTION:
Assessor must makesure that the processoris properly fixed by thecandidate to avoidpermanent damage to it.
Installation of floppydrive OR optical drive isrequired if and only ifthey come with the PC.
Candidates must
connect all necessarycables.
Values:
Accurate
Confident
Responsible
2
2. Fix the RAMcorrectly.
Write RAM capacity.
2
3. Install the powersupply unit correctly.
Write power (W) andvoltage (V) of unit.
2
4. Install the hard disk
correctly.Write hard diskcapacity.
2
5. Install the floppy driveAND/OR optical drivecorrectly.
Write drive(s)installed.
1
6. Boot up the computersuccessfully.
2
7. Check BIOS setup.
a. Hard diskdetected
b. Floppy driveAND/ORoptical drivedetected
13 TOTAL MARK
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
5/27
TABLE OF CONSTRUCT
Construct : S04 Software InstallationAspect : LA2.S04.1 Install operating system, application software and utility program
Instrument : Demonstration
MARK CRITERIA EVIDENCE NOTE
3
1. Install anoperating system.
Write the name ofthe operatingsystem installed.
CompletedACF.CW.LA1.S01.2
Suggested anti-spyware software:Lavasoft Ad-Aware SE
Personal.
Print screen can beused to display scansummary.
If no spyware isdetected, criterion fouris considered done.Write No action taken.
Values: Confident
Responsible
3
2. Install applicationsoftware.
Write the name ofthe applicationsoftware installed.
3
3. Install a utilityprogram.
Write the name ofthe utility programinstalled.
9 TOTAL MARK
-
TOC.CW.LA2.SO4.1
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
6/27
TOC.CW.LA2.S05.1
TABLE OF CONSTRUCT
Construct : S05 Current and Future Development of Open Source Software and LatestDevelopment in ICT
Aspect :LA2.S05.1
Explain the latest open source software available and the latestdevelopment in ICT
Instrument : Written Assignment
MARK CRITERIA EVIDENCE NOTE
4
1. Explain the latest open
source OSa. Meaning
b. TWO examples
Written Assignment
Candidate works in
groups of 2 to 4 toconduct study AND/ORfor discussion.
Written assignmentMUST be doneindividually.
Refer toWAF.CW.LA2.S05.1.
Suggested duration:
2 to 4 weeks
Values:
Appreciate
Cooperate
Confident
4
2. Explain the latest opensource applicationsoftware
a. Meaning
b. TWO examples
4
3. Explain the latestdevelopment in ICT
a. ONE hardware
b. ONE software
4
4. Explain pervasivecomputing
a. Meaning
b. TWO examples
2
Follow required writtenassignment format:
a. content format
b. document format
2
Display cooperation.a. Write the names
of groupmembers.
b. Verbal verificationfrom groupmembers orassessorsobservation.
20 TOTAL MARK
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
7/27
WAF.CW.LA2.S05.1
WRITTEN ASSIGNMENT FORMAT
LEARNING AREA: COMPUTER SYSTEM
Construct : S05 Current and Future Development of Open Source Software andLatest Development in ICT
Aspect :LA2.S05.1
Explain the latest open source software available and the latestdevelopment in ICT
Instrument : Written Assignment
Instruction:
Work in groups of two to four to find information and discuss on the latest open source softwareavailable and the latest development in ICT. Complete this written assignment individually.
You are given two to four weeks to complete this assignment.
Content Format
1.0 Introduction
(meaning of open source software, hardware, software, etc)
2.0 The Latest Open Source Operating System (OS)
2.1 Meaning of open source OS
2.2 Examples of open source OS
(explain two examples)
3.0 The Latest Open Source Application Software
3.1 Meaning of open source application software3.2 Examples of open source application software
(explain two examples)
4.0 The Latest Development in ICT
4.1 Hardware
(state specification OR special features of ONE hardware and compare it to previousmodel(s))
4.2 Software
(state year/date of release, special features of ONE software and compare it toprevious version(s))
5.0 Pervasive Computing
5.1 Meaning of pervasive computing
5.2 Examples of pervasive computing
(explain two examples)
6.0 Conclusion
Reference
(give at least two sources of reference)
Document Format
cover pageo Candidates details
o Title: The latest Open Source Software Available and the Latest Development in ICT
page margin - top, bottom, left, and right: 1, paper size - A4
line spacing - 1.5 lines
typeface - Times New Roman, font size- - 12 pts (content), and14 pts for title/heading
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
8/27
number of pages - 3 to 10
TOC.CW.LA3.S06.1
TABLE OF CONSTRUCT
Construct : S06 Network Facilities Setup
Aspect : LA3.S06.1 Crimp and Test UTP Cables
Instrument : Demonstration
MARK CRITERIA EVIDENCE NOTE
2
1. Crimp a Straight Cable
Skin off the cable jacket.
Untwist and straighten eachwire.
Arrange the wires according tothe 568B wiring schematic orderfor both ends.
Cut and insert the wires into aRJ45 connector.
Crimp the cable using acrimping tool.
(assessment done on final product)
Crimped
straight andcrossed cables.
At least 1 meter of UTPcable is recommended.
Candidate may refer tothe wiring schematicmanual in the LearningModule.
The cables must belabelled and kept in asafe place
Values:
Precise
Confident
Abide
2
2. Check the straight cable iscrimped successfully using acable tester.
2
3. Crimp a Crossed Cable
Skin off the cable jacket.
Untwist and straighten eachwire.
Arrange the wires according to
the 568A wiring schematic orderfor one end AND 568B wiringschematic order for the otherend.
Cut and insert the wires into aRJ45 connector.
Crimp the cable using crimpingtool.
(assessment done on final product)
2
4 Check the crossed cable iscrimped successfully using acable tester.
8 TOTAL MARK
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
9/27
TOC.CW.LA3.S06.2
TABLE OF CONSTRUCT
MARK CRITERIA EVIDENCE NOTE
2
1. Set an IP Address.
Write the IP address.
CompletedACF.CW.LA3.S06.2
IP Address and Subnet
Mask given by theassessor.
Values:
accurate
confident
responsible
abide
2
2. Set a Subnet Mask.
Write the subnetmask.
1
3. Choose anothercomputer to test theconfiguration.
Write the IP address ofthe computer.
3
4. Ping the othercomputer.
Copy the ping result.
8 TOTAL MARK
-
Construct : S06 Network Facilities Setup
Aspect : LA3.S06.2 Configure and Test Network Connection
Instrument : Demonstration
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
10/27
TOC.CW.LA3.S07.1
TABLE OF CONSTRUCT
MARK CRITERIA EVIDENCE NOTE
8
1. Describe Mobile
Computing
a. definition
b. specifications,services, frequencies
Written Assignment
Candidates work in
groups of 2 to 4 toconduct the study andfor discussion.
Written assignmentmust be doneindividually.
Suggested duration:2 to 4 weeks
Refer to WrittenAssignment Format inWAF.CW.LA3.S07.1
Values:
cooperate
responsible
abide
4
2. Describe InternetTechnology andServices
a. VoIP
b. BLOG
8
3. Describe types ofnetwork
a. PAN,
b. VPN,
c. WLAN,
d. WIMAX
2
4. Follow required writtenassignment format:
content format
document format
2
5. Display cooperation.
a. Write the namesof group members.
b. Verbalverification fromgroup members orassessorsobservation
24 TOTAL MARK
-
Construct : S07 Current and Future Development in Networks and Communications.
Aspect : LA3.S07.1 Describe the Latest Development in Networks and Communications
Instrument : Written Assignment
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
11/27
WAF.CW.LA3.S07.1
WRITTEN ASSIGNMENT FORMAT
LEARNING AREA: COMPUTER NETWORKS AND COMMUNICATIONS
Construct : S07 Current and Future Development in Networks and Communications
Aspect : LA3.S07.1 Describe the Latest Development in Networks and Communications
Instrument : Written Assignment
Instruction:
Work in groups of two to four to find information and discuss on the latest development inNetworks and Communications. Complete this written assignment individually.
You are given two to four weeks to complete this assignment.
Content format
1.0 Introduction
(Computer Networks and Communications)
2.0 Mobile Computing
2.1 Definition
2.2 Specification, services, and frequencies of Mobile Computing(based on one product e.g. PDA, 3G mobile phone)
3.0 Internet Technology and Services
3.1 VoIP
3.2 BLOG
4.0 Types of network.
4.1 PAN
4.2 VPN
4.3 WLAN
4.4 WIMAX
5.0 Conclusion
(Computer Networks and Communications)
Reference
(give at least two sources of reference)
Document Format (use Word Processor)
cover page
o Candidates details
o Title: The Latest Development in Networks and Communications
page margin - top, bottom, left, and right: 1, paper size - A4 line spacing: 1.5 lines
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
12/27
typeface - Times New Roman, font size - 12 pts (content), 14 pts for title/heading
number of pages - 3 to 10
TOC.CW.LA4.S08.1
TABLE OF CONSTRUCTConstruct : S08 Multimedia Development
Aspect : LA4.S08.1 Apply All The Phases Of Multimedia Production To Produce AnInteractive Educational Multimedia Project.
Instrument : Project
MARK CRITERIA EVIDENCE NOTE
3
1. Analysis Phase
Write the project title,objective and targetaudience.
CompletedRF.CW.LA4.S08.1
and a soft copy of theproduct.
The multimedia productmust be interactive,educational and includeall five multimedia
elements.
Choose any topic fromany subjects taught inschool:
ICT
Bahasa Malaysia
Bahasa Inggeris
Mathematics
Science, etc
Authoring Tools: Tool book
Presentation s/w
Web editor
Values:
Creative
Integrity
Responsible
22. Design Phase
Sketch storyboard.
1
3. Implementation Phase
Develop a multimediaproject based on thestoryboard using anauthoring tool.
Write the name of theauthoring tool used.
2
4. Testing Phase
Test the developedmultimedia product.
Complete the checklist.
7
5. Evaluation Phase
Ask assessor to evaluatethe developed multimediaproduct.
a. Content
match the projectobjective(s)
b. Interface
user friendly
interactive
c.Navigation
all links/buttonsfunctioningcorrectly
d. MultimediaElements
text
graphic
audio
videoc. animation
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
13/27
1
6. Publishing Phase
Submit a softcopy of themultimedia product.
Write the storage mediumused and name of themain file or folder.
16 TOTAL MARK
RF.CW.LA4.S08.1
REPORT FORM
LEARNING AREA : MULTIMEDIA
Name of Candidate
IC No
Index No
Construct : S08 Multimedia Development
Aspect : LA4.S08.1 Apply All The Phases Of Multimedia Production To Produce AnInteractive Educational Multimedia Project.
Instrument : Project
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
14/27
-
1. ANALYSIS PHASE
Project Title
Objective(s)
Target Audience
2. DESIGN PHASE (attach storyboard if space provided not enough)
3. IMPLEMENTATION PHASE
Authoring tool
4. TESTING PHASE
CHECKLIST FORM
Items YES NO
A Content
Match the project goal
B Interface
User-friendly
Interactive
C
Navigation
All links/buttons functioning correctly
5. EVALUATION PHASE
(to be carried out by the assessor using ACF.CW.LA4.S08.1)
6. PUBLISHING PHASE
Storage Medium
Main File/Folder Name
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
15/27
Candidates Signature
------------------------------
TOC.CW.LA4.S09.1
TABLE OF CONSTRUCT
Construct : S09 Current and Future Development of Multimedia
Aspect : LA4.S09.1 Gather Examples of Immersive Multimedia In Education, Business orEntertainment
Instrument : Scrapbook
MARK CRITERIA EVIDENCE NOTE
2
1. Front cover includes
a. topic
b. name of candidate
CompletedRF.CW.LA4.S09.1
AND
Scrapbook
Candidate compilesarticles, pictures,drawings from differenttypes of sources such
as newspapers,magazines, Internet,etc into a scrapbookbased on any of thefollowing:
ImmersiveMultimedia inEducation
ImmersiveMultimedia inBusiness
Immersive
Multimedia in
22. Scrapbook contains at
least SIX pagesexcluding front andback covers.
2
3. Collections are relevantto the topic chosen.
2
4. State source and/or
date in the scrapbook.
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
16/27
Entertainment
Scrapbook must bedone individually.
Values:
creative
responsible
appreciate
2
5. SubmitRF.CW.LA4.S09.1
10 TOTAL MARK
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
17/27
RF.CW.LA4.S09.1
REPORT FORM
LEARNING AREA : MULTIMEDIA
Name of Candidate
IC No
Index No
Construct : S11 Current And Future Development Of Multimedia
Aspect :LA5.S11.1
Gather Examples of Immersive Multimedia In Education, BusinessOr Entertainment
Instrument : Scrapbook
Activity Log (record all activities carried out in compiling the scrapbook)
Date Activity Remarks
Candidates Signature
------------------------------
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
18/27
TOC.CW.LA5.S10.1
TABLE OF CONSTRUCT
Construct : S10 Program Development
Aspect : LA5.S10.1 Apply Program Development Phases To Develop A Problem-SolvingProgram
Instrument : Practical Session
MARK CRITERIA EVIDENCE NOTE
4
1. Problem Analysis
a. Write theproblem statement.
List all the required
input itemsc. Write the expected
output.
d. Write the formula to beused.
CompletedRF.CW.LA5.S10.1
ANDSubmitted program.
Duration of practicalsession: 2 periods
Choose any of the
suggested projects (referto APPENDIX B) orpropose a new project.
Submit
executable fileand/or
project file andform(s).
During evaluation,assessor runs thecandidates program to
validate the output in 4(b)using the data in 4(a).
Values:
1. Accurate
2. Confident
3. Responsible
4. Abide
6
2. Program Design
a. Write thepseudocode.
OR
Draw the flowchart.
b. Sketch theuser interface designfor input.
c. Sketch theuser interface designfor output.
2
3. Coding
Develop a program basedon (1) and (2).
Write the name of theproject file.
6
4. Testing and Debugging
a. State the testdata used for eachinput item listed in 1(b).
b. Write theoutput based on 4(a)
c. Compile the program.
Write down the name ofthe executable file.
2 5. Documentation
Submit report and soft
20 TOTAL MARK
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
19/27
RF.CW.LA5.S10.1
REPORT FORM
LEARNING AREA : PROGRAMMING
Name of Candidate
IC NoIndex No
Construct : S10 Program Development
Aspect : LA5.S10.1 Apply Program Development Phases To Develop A Problem-SolvingProgram
Instrument : Practical Session
Assessment : 1 / 2 / 3 / _
1. Problem Analysis
a. ProblemStatement
b. Required Input
c. ExpectedOutput
d. Formula Used
2. Program Design
a. Pseudocode
OR Flowchart
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
20/27
b. User InterfaceDesign for Input
c. User InterfaceDesign for Output
3. Coding
(refer to program submitted)
Project File Name: __________________
4. Testing and Debugging
a. State the dataused for each inputitem listed in 1(b).
Input item (s) Input data
c. Write the outputbased on the inputdata in 4(a)
Output item(s) Actual Output
e. Name of theexecutable file
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
21/27
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
22/27
RF.CW.LA5.S11.1
REPORT FORM
LEARNING AREA : PROGRAMMING
Name of Candidate
IC No
Index No
Construct : S11 Current And Future Development Of The Latest ProgrammingLanguages
Aspect : LA5.S11.1 Find Out The Latest Programming Languages
Instrument : Report
Name of LatestProgrammingLanguage
1. 2.
Developer
Year Developed
Purpose
Platform
(OS)
Approach
Translator used
Special features
(optional)
Source ofReference
Candidates Signature
------------------------------
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
23/27
TOC.CW.LA6.S12 1
TABLE OF CONSTRUCT
Construct : S12 Database Development
Aspect : LA6.S12.1 Develop A Database ProjectInstrument : Practical Session
MARK CRITERIA EVIDENCE NOTE
21. State the project
title and the objective(s)of the project.
CompletedRF.CW.LA6.S12.1
AND
soft copy of thedatabase project
Duration of practical session:2 periods
Choose any of the suggested
projects in APPENDIX C orpropose a new project.
Draw a line to show therelationship between bothtables.
Example:
TABLE 1 TABLE 2
Field name
.
1:M
or
M:N
or
1:1
Field name
.
Values:
accurate
confident
responsible
8
2. Create all therequired tables.
a. Name eachtable.
b. State thefield names foreach table.
c. State theprimary key(s).
d. Relate thetables.
Draw a line to
show therelationship.
23. Create a form for
each table.
2 4. Enter data into the
tables.
2 5. Create a query
from two tables.
2
6. Create a reportbased on the querycreated.
2
7. Submit the reportform and a soft copy ofthe developed databaseproject.
20 TOTAL MARK
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
24/27
RF.CW.LA6.S12.1
REPORT FORM
LEARNING AREA : INFORMATION SYSTEM
Name of Candidate
IC No
Index No
Construct : S12 Database Development
Aspect : LA6.S12.1 Develop A Database Project
Instrument : Practical Session
Assessment : 1 / 2 / 3 / _1. Project title
Objective(s)
2. Table 1 Table 2
Table name
Field names
Primary key
The relationshipbetween bothtables.
3. Name of forms
4. Number of records entered
Table ________________ Table ___________________
5. Criteria used for query
Field Name:
Criteria:
6. Name of report
7. Name of file
Candidates Signature
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
25/27
------------------------------
TOC.CW.LA6.S13.1
TABLE OF CONSTRUCT
Construct : S13 Current And Future Developments In Information Systems
Aspect : LA6.S13.1 Find Out Current Developments In Computer Information Systems.
Instrument : Report
MARK CRITERIA EVIDENCE NOTE
2
1. Define web-based
application.
CompletedRF.CW.LA6.S13.1
Report must be doneindividually.
Suggested duration: 2weeks
Values:
cooperate
responsible
22. Give an example of web-
based application.
State the function of theapplication.
1
3. Name a programminglanguage used to developweb-based application.
14. Name a DBMS used in
web-based application.
2/05. State an advantage of
web-based applicationcompared to non web-based application.
16. State a vulnerability of
web-based application.
1 7. State source of reference.
10 TOTAL MARK
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
26/27
RF.CW.LA6.S13.1
REPORT FORM
LEARNING AREA : INFORMATION SYSTEM
Name of Candidate
IC No
Index No
Construct : S13 Current And Future Developments In Information Systems
Aspect : LA6.S13.1 Find Out Current Developments In Computer Information Systems.
Instrument : Report
Definition of web-basedapplication
An example of web-based application
Function of theapplication
An example of aprogramming languageused to develop web-based application.
An example of a DBMSused in the web-basedapplication.
An advantage of web-based application(compared to non web-based application)
A vulnerability of web-based application
Source of Reference
Candidates Signature
-
7/30/2019 Toc Waf Rf 2012 Cara Pemberian Markah
27/27
------------------------------