A PRESENTATION ON
PROCESS QUALITY MANAGEMENT
PRESENTED BYSUJIT KUMAR RANJAN
NABIN BISHWAKARMA
NITIN YADAV
SUBMITTED TO : - MRS. NUPUR CHOPRA
7/27/2019 Sujit,Navin,Nitin AQM.pptx
2/35
INTRODUCTION
WHAT IS PROCESS MANAGEMENT
qIt is a planning, controlling, organizing and leadingof any type of activity for its proper execution.
qThe organization senior management is responsiblefor carrying out its management process
7/27/2019 Sujit,Navin,Nitin AQM.pptx
3/35
TYPES OF PROCESS MANAGEMENT
qProcess Quality Management
qBusiness Process Management
qStrategic Process Management
qOrganization Process Management
qDepartment Process Management
7/27/2019 Sujit,Navin,Nitin AQM.pptx
4/35
WHAT IS PROCESS QUALITYMANAGEMENT
qProcess quality management ensures that theprocess will satisfy the needs for which it wasundertaken
q
Processes include- Process planning
Process assurance
Process control
7/27/2019 Sujit,Navin,Nitin AQM.pptx
5/35
WHY PROCESS QUALITYMANAGEMENT
qWhy Process Quality Management? The dynamic environment inwhich business is conducted today is characterized by what has beenreferred to as the six cs these are-
change
complexity customer demands
competitive pressure
cost impacts and
constraints.
All have a great impact on an organizations ability to meet its statedbusiness goals and objectives.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
6/35
DIMENSIONS FOR MEASURINGPROCESS QUALITY
Three principal dimensions are-
1. Effectiveness: The output meets customer needs.
2. Efficiency: When it is effective at the least cost.3.Adaptability: When it remains effective and
efficient in the face of the many changes that occurover time.
The process orientation is vital if management is to meetcustomer needs and ensure organizational health.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
7/35
THE ORIGINS OF PQM
q IBM Corporation was among the first American companies to seethe benefits of identifying and managing business processes.
Manage business processes in the early 1980s
Focus for improvement on job process
Plant manager owns a large part of the manufacturingprocess in product manufacturing.
Control, improve, and optimize the manufacturing process to
meet customer needs and business needs.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
8/35
Contd
q Developed some indispensable concepts and tools, including-
Definition of process requirements
Step-by-step process documentation
Establishment of process measurements Removal of process defects, and
Assurance of process optimization
q
North American companies, including AT&T, FordMotor Company, Motorola, Corning, and Hewlett-Packard, alsobegan applying process management
concepts to their business processes.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
9/35
DEFINITION OF PQM
q Its a set of methods for aligning all components of a business toquality requirement of customer in order to maximize quality &reduce waste.
q For improving quality ,management processes are-
Quality control Quality improvement
Quality planning
7/27/2019 Sujit,Navin,Nitin AQM.pptx
10/35
AN APPLICATION EXAMPLE: THE CONTRACTMANAGEMENT
PROCESS
Special-contract management process (before application of process-management
principles).
Special-contract management process (after application of process-management
principles).
7/27/2019 Sujit,Navin,Nitin AQM.pptx
11/35
METHODOLOGY OF PQM
q They work through the three phases of PQM methodology
1. Planning:Its a most time consuming phase.
2. Transfer : plans developed in the first phase are handedoff from the process team to the operating forces and put
into operation.3. Operational management:Here, the working owner
and team first monitor new process performance,focusing on process effectiveness and efficiencymeasurements.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
12/35
Contd
q In planning phase, in which the process design (or redesign)takes place, involves five steps are:
1. Defining the present process.
2. Determining customer needs and process flow.
3. Establishing process measurements.
4. Conducting analyses of measurement and other data.
5. Designing the new process. The output is the newprocess plan.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
13/35
1)Defining the Current Process
The owner(s) and team collaborate to define the process precisely.
q Effective missions:-
- The purpose and scope of the process.
-Stretch targets for customer needs and business needs.
q The goals for the same process are:-1. Deliver approved price and contract support
document within 30 days of date of customers letter of intent.
2. Achieve a yield of special-contract proposals(percent of proposals closed as sales) of not less than 50
percent.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
14/35
High-level diagram of the special-contract process,an output of process analysis
7/27/2019 Sujit,Navin,Nitin AQM.pptx
15/35
2)Customer Needs and Flowcharting theProcess:
q To do its work well, the team must identify all of the customers,determine their needs, and prioritize the information.
q Determining customer needs and expectations requires
ongoing, disciplined activity.
q Ensure that this activity is incorporated in the day-to-dayconduct of the business process as the customer requirementssub process and assign accountability for its performance.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
16/35
7/27/2019 Sujit,Navin,Nitin AQM.pptx
17/35
Measurement Model
Flowchart of the special-contract management process
7/27/2019 Sujit,Navin,Nitin AQM.pptx
18/35
4) Analyzing the Process:
q Process Analysis performed for following purposes:-
Assess the current process for its effectiveness and efficiency.
Identify the underlying causes of any performance inadequacy.
Identify opportunities for improvement.
Make the improvements.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
19/35
5) Designing (or Redesigning) the Process:
q The team defines the specific operational means for meetingstated product goals.
q The result is a newly developed Process Plan.
q Design changes fall into five broad categories:-
workflow technology
people and organization
physical infrastructure
policy and regulations
7/27/2019 Sujit,Navin,Nitin AQM.pptx
20/35
New Process Plan Creation
q After we have redefined a key process, we must document thenew process and carefully explain the new steps. The new processplan now includes the new process design and its control plan formaintaining the new level of process performance.
Completed process plan
diagram for the special-
contract managementprocess.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
21/35
Initiating PQM Activity
qSelecting the Key Process:
q The Critical Success Factor:
q necessary and sufficient for the attainment of its mission and
vision.q used to select the key business processes and rank them by priority
q The Balanced Business Scorecard:
measures business performance in four dimensions-
1. financial performance
2. performance in the eyes of the customer3. internal process performance and
4. performance in organization learning and innovation
H d h i i k
7/27/2019 Sujit,Navin,Nitin AQM.pptx
22/35
How does the organizations work getdone?
Process map of major business processes at Educational Testing Services.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
23/35
qOrganizing: Assigning Ownership, Selecting the Team,and PQM Infrastructure:
The major advantages of this structure are that there is atthe same time hands on involvement and support of upper
management and adequate management of the process details.
Contd
qEstablishing the Teams Mission and Goals:The preliminary process mission and improvement
goals for the process are communicated to the owners (executiveand working levels) and team by
the quality council. To do their jobs most effectively, the owners and teammust make the missionand goals their own. They do this in the first step of the planning phase:defining the process.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
24/35
Organization infrastructure for processmanagement in multifunctional
organizations
7/27/2019 Sujit,Navin,Nitin AQM.pptx
25/35
The Transfer Phase
q Transferring the New Process Plan to Operations.
The transfer phase consists of three steps:
(1) Planning for implementation problems:- A major PQM effort may involve huge expenditures and precipitate
fundamental change in an organization, affecting thousands of jobs.
All of this poses major management challenges.
(2) Planning for implementation action:- The output of this step is a complex work plan, to be carried out by the Owner
and Process Management Team.
They will benefit from skills in the techniques of Project Management.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
26/35
contd
(3) Deploying the new process plan:- Before actually implementing the new process, the team tests the
process plan.
They test selected components of the process and may carry outcomputer simulations.
The purpose is to predict the performance of the new process anddetermine feasibility.
Design
categories.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
27/35
Contd
q The team must decide how to deploy the new process, There areseveral options:-
Horizontal deployment,function by function.
Vertical deployment, top down, all functions at once. Modularized deployment, activity by activity, until all are
deployed.
Priority deployment, sub processes and activities in prioritysequence, those having the highestpotential for improvement going
first. Trial deployment, a small-scale pilot of the entire process, then
expansion for complete implementation.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
28/35
Operational Management Phase:-Managing the New Process.
q This phase begins when the process is put into operation.
q The major activities are:-
(1) Process quality control:- is an ongoing managerial process,
in which the actual performance of the operating process is evaluated bymeasurements taken at the control points, comparing the measurementsto the quality targets, and taking action on the difference.
The goal is to maintain performance of the business process at itsplanned level.
(2) Process quality improvement:- Monitoring process performance respect to customer requirements, process
owner identifies gaps between what the process is delivering and what isrequired for full customer satisfaction.
Gaps are targets for process quality improvement effort.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
29/35
Contd
(3) Periodic process review and assessment:-
q To ensure that the process is performing according to plan.
q Protect against changes in the design assumptions and anticipatedfuture changes.
Contents
of complete
process plan
7/27/2019 Sujit,Navin,Nitin AQM.pptx
30/35
THE INTEGRATION OF PQM WITH TQM
q Process quality management is an important concept within the TQMframework.
q Organizations have learned not to limit managerial attention to thefinancial dimension.
q gain experience in defining, identifying, and managing the quality
dimension.
q setting a vision, mission, and goals, all in alignment
q PQM is a natural extension of many of the lessons learned in earlyquality improvement activities.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
31/35
SUMMARY AND CRITICAL SUCCESS FACTORSFOR PQM IMPLEMENTATION
q Key Points: PQM is distinguished by the following: A strategic orientation, that is: A clear mission, values, and vision for
the organization
Strategic goals tied to the organization vision, which are shared byexecutive leadership and deployed throughout the organization in the
form of key business objectives Alignment and linkage of the organizations processes to its vision,
strategic goals, and objectives.
A cross-functional orientation in place of the hierarchical organization.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
32/35
Contd
q Cross-functional process teams, supported by the management system(education, communication, performance management, recognitionand reward, compensation, new career path structures, etc.).
q The mission of each team is to dramatically improve the effectiveness,efficiency, and adaptabilityof each major business process to which it is
assigned.q Prime organizational focus on the needs of customers, external and
internal, and business needs such as cost, cycle time, waste elimination.
q The driving of all work processes by quality of products and servicesand overall value creation.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
33/35
Critical Success Factors
q Important factors to the success of a PQM initiative are : Leadership from the top of the organization
Management which communicates the vision, strategic goals, and key business objectivesthroughout the organization.
Vision shared by all in the organization
Employees empowered and accountable to act in support of these key business objectives Expertise in change management available throughout the organization to facilitate
dramatic change
Continuous improvement
To enable the many PQM teams to manage schedules, costs, and work plans coordinatedand implemented.
Executive management promotion of the importance, impact, progress, and success ofthe PQM.
Upper managements obligation is to enable and promote three principal objectives:customer focus, process orientation, and empowered employees at all levels.
7/27/2019 Sujit,Navin,Nitin AQM.pptx
34/35
Reference
qJurans Quality Handbook