REQUIREMENTS MANAGEMENT DEEP DIVE
Dig into the technical details and get started managing multi-discipline requirements for complex products
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 3
Agenda
Product Overview How RM ties into PLM
Brief Product Demonstration New grid and html editor
Data Model New Itemtypes and Relationships Dependencies
Customization
Slide 3
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 4Slide 4
Concept
Requirements
Design
Architecture
ImplementationMechanical
Soft ware
ElectricalProcesses
Standards
Practi ces
Application
System
Subsystems
Components
PLM(Mechanical)
Access
Access
Requirements System
ALM ?
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 5Slide 5
Concept
Requirements
Design
Architecture
ImplementationMechanical
Soft ware
ElectricalProcesses
Standards
Practi ces
Application
System
Subsystems
Components
validation
verification
traceability
Concept
Requirements
Design
Architecture
ImplementationMechanical
Soft ware
ElectricalProcesses
Standards
Practi ces
Application
System
Subsystems
Components
Integrate RM Across Disciplines
PLM(Mechanical)
Access
Access
Requirements System
ALM
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 6
Why RM Embedded in PLM? Verification - Are we designing the correct system/product?
Have we listened to our customers and captured their needs? Are we making what’s ideal for the market?
Versioning - Are we still making the correct system/product? Keep our requirements synchronized as the system evolves See how our requirements have historically evolved
Traceability - Have we developed the system/product correctly? Do the systems/products/documents satisfy the requirements? Have we missed anything? Close the Loop - Validate with our customers that we are
meeting their needs
Slide 6
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 7
Anything as a Requirement
Slide 7
http://www.url.com
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 8
Aras Requirements Management RM + PLM = Unified Data Model Multi-Discipline Requirements Hierarchy Secure Extended Enterprise Requirements Gathering Requirements in Documents, Chapters, and Content Requirements as part of Configurations Requirements under Change Control Requirements as Affected Items on a Change Requirements Verification & Validation Requirements Trace Matrix
Requirements Integrated
Slide 8
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 9
Demonstration
Slide 9
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 10
Data Model - Itemtypes
Requirement The item that defines a requirement, test case step, spec
paragraph, etc. Building block of a Requirement Document
Requirement Document A collection of requirements Represents a Specification, Test Plan, etc..
Slide 10
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 11
Data Model – Relationships
Requirement Doc Requirement Link between RM Doc and Requirement
Requirement Doc RM UI Relationship for grid
Requirement Doc Files Requirement Doc RM
UI Relationship- reverse item lookup
Slide 11
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 12
Data Model- Relationships
Requirement External Link Link to URL’s
Requirement Out Link Link to other Requirement item
Requirement In Link UI relationship- reverse item lookup
Part Requirement Relationship from Part to Requirement Dependency on PE
Slide 12
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 13
Customization
Methods 40 New methods All start with rm_
Reports Reporting Services reports- Community Download XSLT Reports included
Slide 13
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 14
Discussion & Tech Talk