Post on 08-Jan-2022
HYDRANT ASSEMBLY
4-01
HYDRANT ASSEMBLY
SERVICE CONNECTION
1 INCH
4-02
SERVICE CONNECTION
1 INCH
SERVICE CONNECTION
2" WATER
4-03
SERVICE CONNECTION
2" WATER
3" AND 4" METERS
STANDARD PLUMBING
CONFIGURATION FOR
4-04
DEPTH REQUIREMENTS
WATER MAIN
4-05
MAIN TRENCH SECTION
WATER
4-06
MAIN TRENCH SECTION
WATER
EXISTING MAIN
CONNECTION TO
4-07
BOX & ASSEMBLY
STANDARD VALVE
4-08
2" BLOWOFF ASSEMBLY
4-09
ASSEMBLY
IN-LINE BLOWOFF
4-10
FOR DEAD END LINE
2" BLOWOFF ASSEMBLY
4-11
AND HYDRANT BOLLARD
VALVE MARKER POST
4-12
EASEMENT LIMITS
FIRE SPRINKLER
UNDERGROUND
4-13
ASSEMBLE WITH FDC
SINGLE SERVICE
DOUBLE CHECK VALVE
4-14
PLAN
RELEASE ASSEMBLY
1" AIR AND VACUUM
4-15
RELEASE ASSEMBLY
2" AIR AND VACUUM
4-16
THRUST LOADS
4-17
THRUST LOADS
SAFE SOIL BEARING LOADS
BLOCKING DETAILS
STANDARD
4-18
SAMPLING STATION
4-19
FOR VEHICLE FILLING
BACKFLOW PREVENTION
4-20
TESTING LIMITS
FIRE SPRINKLER
UNDERGROUND
4-21