- Fukushima-Daichi nuclear power plant Airport, Sendai,
Japan
- Slide 3
- SENDAI, JAPAN (8.9 MAGNITUDE) HISTORICAL SEISMICITY MAP
http://earthquake.usgs.gov/eqcenter/recenteqsww/
http://earthquake.usgs.gov/earthquakes/world/seismicity_maps/world.pdf
- Slide 4
- http://www.mapsofworld.com/world-major-earthquake.htm
- Slide 5
- Some Major Earthquakes, Past and Present Christchurch, NZ 2011
Talca, Chile 2010 Port-au-Prince, Haiti, 2010 Guandong, China, 2008
Fukuoka, Japan, 2005 Izmit, Turkey, 1999 Northridge, CA, 1994
Mexico City, 1985
- Slide 6
- Slide 7
- Amazing engineering: Buildings Sway Without Collapsing
- Slide 8
- Different model parameters
- Slide 9
- Can we predict how different buildings will respond to an
earthquake? How can we use this information to engineer a safe
structure
- Slide 10
- Acceleration record is messy. No way to integrate Duhamels
integral. No worries, computers to the rescue! Relative motion of
building and ground Impulse Response Function Measured
Acceleration/USGS data
- Slide 11
- is assumed marks |z| max If we found |z| max for a continuous
range of o, wed get the Spectral Displacement (Displacement
Spectrum) Ground acceleration (units of g) Z(t) meters
- Slide 12
- Spectra For El Centro Ground Motion Averaged Spectra To Many
(88) Earthquakes Figure Credits: L A Chopra, Dynamics of
Structures, Chap 6 Right: G. Housner Strong Ground Motion in
Earthquake Engineering, R Wiegel, editor. Natural Period (sec)
Displacement Acceleration Velocity
- Slide 13
- Tripartite Representation S D = spectral displacement S V =
spectral velocity S A = spectral acceleration S A = S V = S D
- Slide 14
- Spectrum for one earthquakeSpectrum averaged over 88
earthquakes
- Slide 15
- Slide 16
- Seattle, WA is a beautiful city, but is prone to large
earthquakes. The monorail on the bridge has previously been
measured to have a natural period of 2 s. Damping is assumed to be
2%. During an earthquake, is the trolley likely to derail? Use the
Housner spectrum to find out! Picture from:
http://bcostin.wordpress.com/2008/02/25/seattle-worlds-fair-1962-postcards/seattle-monorail/
- Slide 17
- You are hired as an architectural engineer to build a
California dream house on a hillside. The structure can be
idealized as shown (on chalkboard). The frame is built out of
concrete (E = 30x10 9 Pa). The support columns have a cross section
of 10 inches squared. Assume damping is 5%. Determine the base
shear in each column, which is more likely to fail?
- Slide 18
- BUCKLINGSMASHING/POUNDING
- Slide 19
- Figure credit: Michael D. Symans, PhD Rensselaer Polytechnic
Institute:
http://www.nibs.org/client/assets/files/bssc/Topic15-7-SeismicIsolation.pdf
- Slide 20
- CONVENTIONAL BUILDINGBASE-ISOLATED BUILDING Figure credit:
Michael D. Symans, PhD Rensselaer Polytechnic Institute:
http://www.nibs.org/client/assets/files/bssc/Topic15-7-SeismicIsolation.pdf
- Slide 21
- Figure credit:s Michael D. Symans, Rensselaer Polytechnic
Institute:
http://c.ymcdn.com/sites/www.nibs.org/resource/resmgr/BSSC/Topic15-7-SeismicIsolation.pdf
Shear Modulus E ~ 0.5 1.0 MPa
- Slide 22
- Reduces shearing in columnsbut increases displacement
- Slide 23
- Rubber Base Isolators
- Slide 24
- UCSD testing facility LBRs in Japan
- Slide 25
- Displacement, u
- Slide 26
- Image credit: http://www.asee.org/documents/sections/pacific-
southwest/2008/Porbaha_Ali_et_al%20Base%20isolation.pdf
- Slide 27
- Image credits:
http://www.asee.org/documents/sections/pacific-southwest/2008/Porbaha_Ali_et_al%20Base%20isolation.pdfhttp://www.asee.org/documents/sections/pacific-southwest/2008/Porbaha_Ali_et_al%20Base%20isolation.pdf
http://nees.buffalo.edu/docs/dec304/FP-DC%20Report-DEMO.pdfhttp://nees.buffalo.edu/docs/dec304/FP-DC%20Report-DEMO.pdf;
laconservancy.org
- Slide 28
- Restoring/Recentering ForceFrictional Force
- Slide 29
- Restoring/Recentering Force Frictional Force
- Slide 30