CRONOGRAMA DE AVANCE FISICO - FINANCIERO Obra: "MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA" Dist.: QUEROCOTILLO. Prov.: CUTERVO. Dep.:
Descripcion UNIDAD MES 1 MES 2
Subpresupuesto 001 : MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CR
01.00.00 OBRAS PROVISIONALES 23,736.96 7,813.80
01.01.00 CARTEL DE IDENTIFICACION DE LA OBRA GIGANTOGRAFIA DE 7.20X3.60M UND8,423.16
01.02.00 CAMPAMENTO PROVISIONAL DE OBRA VIAL M27,813.80 7,813.80
01.03.00 MOVILIZACION Y DESMOVILIZACION GLB7,500.00
02.00.00 TRABAJOS PRELIMINARES 62,315.36 3,313.13
02.01.00 LIMPIEZA DE TERRENO MANUAL M219,134.25
02.02.00 TRAZO Y REPLANTEO PRELIMINAR M239867.98
02.03.00 REPOSICION DE CERCO PERIMETRICO C/POSTES DE MADERA Y ALAMBRE DE PUAS M23313.13 3,313.13
03.00.00 EXPLANACIONES 982,854.36 701,837.34
03.01.00 CORTE DE MATERIAL SUELTO CON MAQUINARIA M3363098.98 242065.99
03.02.00 CORTE DE ROCA SUELTA (PERF. Y DISP. ) M3258460.20 172306.80
03.03.00 CORTE DE ROCA FIJA (PERF. Y DISP.) RENDIMIENTO= 300 M3/DIA M3315662.82 210441.88
03.04.00 CONFORMACION DE TERRAPLENES RENDIMIENTO= 1030 M3/DIA M345632.36 30421.57
03.05.00 PERFILADO Y COMPACTADO DE SUBRASANTE M246601.10
04.00.00 TRANSPORTE PAGADO 158,368.12 158,368.12
04.01.00 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO(COEF=1.25) M3K148895.68 148895.68
04.03.00 M3K9472.43 9472.43
05.00.00 PAVIMENTOS 0.00 0.00
05.01.00 EXTRACCION Y APILAMIENTO RENDIMIENTO=575 M3/DIA M3
05.02.00 CARGUIO DE MATERIAL AFIRMADO, RENDIMIENTO=792 M3/DIA M3
05.03.00 COLOCACION DE CAPA DE RODADURA M3
05.04.00 RELLENO CON MATERIAL TIPO OVER(e=0.30m) CON EQUIPO M3
06.00.00 TRANSPORTE PAGADO 0.00 0.00
06.01.00 TRANSPORTE DE MATERIAL DE CANTERA DISTANCIA HASTA 1 KM, R=350.60 M3KM M3K
06.02.00 TRANSPORTE DE MATERIAL DE CANTERA DISTANCIA > 1 KM, R=1000. M3KM M3K
07.00.00 SEALIZACION 7,193.24 7,193.24
07.01.00 SEALES INFORMATIVAS - PANEL M22993.78 2993.78
07.02.00 FABRICACION DE SEALES PREVENTIVAS RENDIMIENTO=30 UND/DIA UND4199.46 4199.46
07.03.00 FABRICACION DE SEALES REGLAMENTARIAS RENDIMIENTO=25 UND/DIA UND
07.04.00 POSTES KILOMETRICOS UND
07.05.00 COLOCACION DE SEALES EN VIA CONSTRUIDA UND
TRANSPORTE DE MATERIAL PROPIO PARA RELLENO, DISTANCIA HASTA 1 KM, R=304.90 M3KM
CRONOGRAMA DE AVANCE FISICO - FINANCIERO Obra: "MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA" Dist.: QUEROCOTILLO. Prov.: CUTERVO. Dep.:
Descripcion UNIDAD MES 1 MES 207.05.00 COLOCACION DE SEALES EN VIA CONSTRUIDA UND
08.00.00 IMPACTO AMBIENTAL 57,415.20 80,410.58
08.01.00 ACONDICIONAMIENTO DE BOTADERO M351856.23 77784.342
08.02.00 RESTAURACION DE CAMPAMENTOS Y PATIOS DE MAQUINAS HA2932.73
08.03.00 RESTAURACION DE CANTERAS USADAS HA
08.04.00 PROGRAMA DE SEALIZACION AMBIENTAL UND2626.24 2626.24
09.00.00 VARIOS 750.00 3,930.00
09.01.00 CAPACITACION OPERACION Y MANTENIMIENTO GLN750.00 750.00
09.02.00 DISEO DE MEZCLAS UND750.00
09.03.00 PRUEBA COMPACTACION SUELOS(PROCTOR MODIFICADO DENSIDAD CAMPO UND2430.00
COSTO DIRECTO 1,292,633.23 962,866.20GASTOS GENERALES 5.00% 64,631.66 48,143.31UTILIDAD 5.00% 64,631.66 48,143.31VALOR REFERENCIAL 1,421,896.55 1,059,152.82IGV (IMPUESTO GENERAL A LAS VENTAS) 18.00% 255,941.38 190,647.51COSTO TOTAL DEL PROYECTO 1,677,837.93 1,249,800.33GASTOS DE SUPERVISION 3.00% 42,656.90 31,774.58ELABORACION DEL EXPEDIENTE 70,000.00 0.00MONTO TOTAL A FINANCIAR 1,790,494.83 1,281,574.91AVANCE MENSUAL 24.34% 17.42%
AVANCE ACUMULADO 24.34% 41.76%
Subpresupuesto 002 : OBRAS DE ARTE, BADENES, ALCANTARILLAS, MUROS
01.00.00 ALCANTARILLA TMC
01.01.00 OBRAS PRELIMINARES 226.32 226.32
01.01.01 LIMPIEZA Y DESFORESTACION MANUAL M269.34 69.34
01.01.02 TRAZO Y REPLANTEO PARA OBRAS DE ARTE M2156.98 156.98
01.02.00 MOVIMIENTO DE TIERRAS 11,055.48 11,055.48
01.02.01 EXCAVACION PARA ESTRUCTURAS ALCANTARILLAS, RENDIMIENTO=35 M3/DIA M37612.25 7,612.25
01.02.02 ELIMINACION DE MATERIAL EXCEDENTE A MANO D=30 mt. M33443.23 3,443.23
01.03.00 AFIRMADO PARA ALCANTARILLAS 544.54 544.54
01.03.01 EXTRACCION Y APILAMIENTO (AFIRMADO) RENDIMIENTO=460 M3/DIA M3431.24 431.24
01.03.02 CARGUIO DE MATERIAL AFIRMADO, RENDIMIENTO= 1040 M3/DIA M3113.31 113.31
01.04.00 ALCANTARILLA TIPO TMC 88,031.43 88,031.43
01.04.01 RELLENO COMPACTADO ESTRUCTURAL PARA ALCANTARILLAS M32629.97 2,629.97
01.04.02 CONCRETO F'C= 175 KG/CM2 M323017.77 23017.77
01.04.03 ENCOFRADO Y DESENCOFRADO DE ALCANTARILLAS M217580.40 17,580.40
01.04.04 CAMA DE ASIENTO E= 0.15 MT11758.36 11,758.36
CRONOGRAMA DE AVANCE FISICO - FINANCIERO Obra: "MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA" Dist.: QUEROCOTILLO. Prov.: CUTERVO. Dep.:
Descripcion UNIDAD MES 1 MES 2
01.04.05 ALCANTARILLA TMC 0=24" C=14 RENDIMIENTO=12 ML/DIA***615.44 615.44
01.04.06 ALCANTARILLA TMC 0=36" C=12 RENDIMIENTO=10 ML/DIA*** M30772.98 30,772.98
01.04.07 EMBOQUILLADO DE PIEDRA EN ALCANTARILLAS M21656.50 1656.50
02.00.00 BADENES
02.01.00 OBRAS PRELIMINARES 994.89 994.89
02.01.01 LIMPIEZA Y DESFORESTACION MANUAL M2101.58 101.58
02.01.02 TRAZO Y REPLANTEO PARA OBRAS DE ARTE M294.93 94.93
02.01.03 REFINE NIVELACION Y COMPACTACION M2798.38 798.38
02.02.00 MOVIMIENTO DE TIERRAS 2,575.92 2,575.92
02.02.01 EXCAVACION PARA ESTRUCTURAS, RENDIMIENTO=35 M3/DIA M31717.66 1,717.66
02.02.02 ELIMINACION DE MATERIAL EXCEDENTE A MANO D=30 mt. M3858.27 858.27
02.03.00 AFIRMADO 122.27 122.27
02.03.01 EXTRACCION Y APILAMIENTO (AFIRMADO) RENDIMIENTO=460 M3/DIA M396.83 96.83
02.03.02 CARGUIO DE MATERIAL AFIRMADO, RENDIMIENTO= 1040 M3/DIA M325.44 25.44
02.04.00 BADEN 22,236.25 22,236.25
02.04.01 RELLENO COMPACTADO ESTRUCTURAL PARA BADENES M3188.48 188.48
02.04.02 Encofrado y Desencofrado en Seco M31669.06 1,669.06
02.04.03 CONCRETO F'C= 175 KG/CM2 M314784.28 14784.28
02.04.04 CONCRETO CICLOPEO FC=140KG/CM2 + 30 % PM. M34724.70 4724.70
02.04.05 JUNTAS ASFALTICAS PARA BADEN M869.73 869.73
03.00.00 CUNETAS 2,118.63 2,118.63
03.01.00 CONFORMACION DE CUNETAS M2118.63 2118.63
04.00.00 MUROS 112,371.16 112,371.16
04.01.00 EXCAVACION PARA ESTRUCTURAS, RENDIMIENTO=35 M3/DIA M317,111.71 17,111.71
04.02.00 RELLENO CON MATERIAL PROPIO M37,785.62 7,785.62
04.03.00 CONCRETO CICLOPEO FC=140 KG/CM2 + 70 % PM. M356448.27 56448.27
04.04.00 ENCOFRADO Y DESENCOFRADO M228046.09 28046.09
04.05.00 JUNTA DE CONSTRUCCION CON TEKNOPORT M21733.42 1733.42
04.06.00 JUNTAS ASFALTICAS PARA MURO M21246.05 1246.05
COSTO DIRECTO 240,276.90 240,276.90GASTOS GENERALES 5.00% 12,013.84 12,013.84UTILIDAD 5.00% 12,013.84 12,013.84VALOR REFERENCIAL 264,304.58 264,304.58IGV (IMPUESTO GENERAL A LAS VENTAS) 18.00% 47,574.82 47,574.82COSTO TOTAL DEL PROYECTO 311,879.40 311,879.40
CRONOGRAMA DE AVANCE FISICO - FINANCIERO Obra: "MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA" Dist.: QUEROCOTILLO. Prov.: CUTERVO. Dep.:
Descripcion UNIDAD MES 1 MES 2GASTOS DE SUPERVISION 3.00% 7,929.14 7,929.14ELABORACION DEL EXPEDIENTE S/. 0.00 0.00 0.00MONTO TOTAL A FINANCIAR 319,808.53 319,808.53AVANCE MENSUAL 20.07% 20.07%
AVANCE ACUMULADO 20.07% 40.14%
Subpresupuesto 003 : PUENTE PALTIC
01.00.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPO Y MAQUINARIA 0.00 0.00
01.01.00 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA GLB
02.00.00 OBRAS PROVISIONALES 0.00 0.00
02.01.00 ALMACEN PROVISIONAL DE LA OBRA M2
02.02.00 CARTEL DE OBRA 3.60X7.20M UND
03.00.00 TRABAJOS PRELIMINARES 0.00 0.00
03.01.00 LIMPIEZA DE TERRENO MANUAL M2
03.02.00 TALA Y RETIRO DE ARBOLES M2
03.03.00 TRAZO Y REPLANTEO M2
03.04.00 APERTURA Y MANTENIMIENTO DE ACCESOS VEHICULARES M2
04.00.00 MOVIMIENTODE TIERRAS 0.00 0.00
04.01.00 CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO M3
04.02.00 CORTE ROCA SUELTA (PERF. Y DISP.) CON MAQUINARIA, RENDIMIENTO=250 M3/DIA M3
04.03.00 EXCAVACION MANUAL EN CONGLOMERADO (INC ROTURA DE ROCA) M3
04.04.00 CORTE ROCA FIJA (PERF. Y DISP.) CON MAQUINARIA, RENDIMIENTO=260 M3/DIA M3
04.05.00 RELLENO CON MATERIAL PROPIO M3
05.00.00 ESTRIBO ELASTICO 0.00 0.00
05.01.00 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS M2
05.02.00 ENCOFRADO Y DESENCOFRADO PARA ESTRIBOS CARA VISTA M2
05.03.00 ACERO CORRUGADO Fy=4200 kg/cm2
05.03.01 ACERO CORRUGADO Fy=4200 kg/cm2 d =5/8" KG
05.03.02 ACERO CORRUGADO Fy=4200 kg/cm2 d =1/2" KG
05.04.00 CONCRETO F'C=210 KG/CM2 M3
05.05.00 ADITIVO EPOXICO PARA UNION DE CONCRETOS M2
06.00.00 VIGA PRINCIPAL 0.00 0.00
06.01.00 ENCOFRADO Y DESENCOFRADO PARA VIGAS PRINCIPALES PUENTE M2
06.02.00 ENCOFRADO Y DESENCOFRADO PARA VIGAS DIAFRAGMA M2
06.03.00
06.03.01 ACERO CORRUGADO Fy=4200 kg/cm2 d = 1" KG
ACERO CORRUGADO Fy=4200
CRONOGRAMA DE AVANCE FISICO - FINANCIERO Obra: "MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA" Dist.: QUEROCOTILLO. Prov.: CUTERVO. Dep.:
Descripcion UNIDAD MES 1 MES 206.03.01 ACERO CORRUGADO Fy=4200 kg/cm2 d = 1" KG
06.03.02 ACERO CORRUGADO Fy=4200 kg/cm2 d =3/4" KG
06.03.03 ACERO CORRUGADO Fy=4200 kg/cm2 d =5/8" KG
06.03.04 ACERO CORRUGADO Fy=4200 kg/cm2 d =1/2" KG
06.04.00 CONCRETO EN VIGAS PRINCIPALES F'C=210 KG/CM2 M3
07.00.00 LOSA 0.00 0.00
07.01.00 ENCOFRADO Y DESENCOFRADO PARA LOSA, PUENTE M2
07.02.00 ACERO CORRUGADO Fy=4200
07.02.01 ACERO CORRUGADO Fy=4200 kg/cm2 d =1/2" KG
07.02.02 CONCRETO F'C=280 KG/CM2 PARA LOSA DE PUENTE M3
08.00.00 ALETAS DE PROTECCION 0.00 0.00
08.01.00 ENCOFRADO Y DESENCOFRADO PARA ALETAS DE PROTECCION M2
08.02.00 ACERO CORRUGADO Fy=4200
08.02.01 ACERO CORRUGADO Fy=4200 kg/cm2 d =5/8" KG
08.02.02 CONCRETO FC=140KG/CM2 + 30 % PM.PARA ALETAS M3
09.00.00 VARIOS 0.00 0.00
09.01.00 BARANDA DE TUBO FO. GDO. PARANTE 3" X 1.1M.ALT M
09.02.00 DRENAJE DE ESTRIBO CON TUBO PVC SAP 4" UND
09.03.00 DISPOSITIVO DE APOYO FIJO y MOVIL , PUENTE UND
09.04.00 JUNTA DE DILATACION METALICA M
10.00.00 SEALIZACION 0.00 0.00
10.01.00 FABRICACION DE SEALES INFORMATIVAS M2
10.02.00 ESTRUCTURA DE SOPORTE M
10.03.00 CIMIENTACION Y MONTAJE DE SEAL INFORMATIVA UND
11.00.00 FALSO PUENTE 0.00 0.00
11.01.00 ENCOFRADO Y DESENCOFRADO PARA FALSO PUENTE 1 er PISO, L=17 M M2
11.02.00 ENCOFRADO Y DESENCOFRADO PARA FALSO PUENTE 2 do PISO, L=17 m M2
11.03.00 ENCOFRADO Y DESENCOFRADO PARA FALSA ZAPATAS M2
11.04.00 EXCAVACION MANUAL EN CONGLOMERADO (INC ROTURA DE ROCA) M3
11.05.00 CONCRETO F'C=100 KG/CM2 PARA ZAPATA DE APOYO M3
12.00.00 PRUEBAS DE CALIDAD 0.00 0.00
CRONOGRAMA DE AVANCE FISICO - FINANCIERO Obra: "MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA" Dist.: QUEROCOTILLO. Prov.: CUTERVO. Dep.:
Descripcion UNIDAD MES 1 MES 212.00.00 PRUEBAS DE CALIDAD 0.00 0.00
12.01 PRUEBA DE RESISTENCIA A LA COMPRENSION DEL CONCRETO UND
12.02.00 DISEO DE MEZCLAS UND
12.03.00 LIMPIEZA FINAL DE OBRA M2
COSTO DIRECTO 0.00 0.00GASTOS GENERALES 10.00% 0.00 0.00UTILIDAD 5.00% 0.00 0.00VALOR REFERENCIAL 0.00 0.00IGV (IMPUESTO GENERAL A LAS VENTAS) 18.00% 0.00 0.00COSTO TOTAL DEL PROYECTO 0.00 0.00GASTOS DE SUPERVISION 10.00% 0.00 0.00ELABORACION DEL EXPEDIENTE S/. 0.00 0.00 0.00
MONTO TOTAL A FINANCIAR 0.00 0.00AVANCE MENSUAL 0.00% 0.00%
AVANCE ACUMULADO 0.00% 0.00%
RESUMEN GENERAL DE PROYECTOCOSTO DIRECTO 1,532,910.13 1,203,143.09GASTOS GENERALES 5.00% 76,645.50 60,157.15UTILIDAD 5.00% 76,645.50 60,157.15VALOR REFERENCIAL 1,686,201.13 1,323,457.39IGV (IMPUESTO GENERAL A LAS VENTAS) 18.00% 303,516.20 238,222.33COSTO TOTAL DEL PROYECTO 1,989,717.33 1,561,679.72GASTOS DE SUPERVISION 50,586.03 39,703.72ELABORACION DEL EXPEDIENTE S/. 0.00 70,000.00 0.00
MONTO TOTAL A FINANCIAR 2,110,303.36 1,601,383.45AVANCE MENSUAL 21.50% 16.32%
AVANCE ACUMULADO 21.50% 37.82%
CRONOGRAMA DE AVANCE FISICO - FINANCIERO"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
CAJAMARCA. Fecha: DICIEMBRE DEL 2013.
MES 3 MES 4 MES 5 MES 6 MES 7
7,813.80 7,813.80 7,813.80 7,813.80 7,813.80
7,813.80 7,813.80 7,813.80 7,813.80 7,813.80
3,313.13 3,313.13 3,313.13 3,313.13 3,313.13
3,313.13 3,313.13 3,313.13 3,313.13 3,313.13
440,590.05 428,939.78 428,939.78 428,939.78 19,417.12
151291.24 151291.24 151291.24 151291.24
107691.75 107691.75 107691.75 107691.75
131526.18 131526.18 131526.18 131526.18
19013.48 19013.48 19013.48 19013.48
31067.40 19417.12 19417.12 19417.12 19417.12
95,020.87 95,020.87 95,020.87 95,020.87 95,020.87
89337.41 89337.41 89337.41 89337.41 89337.41
5683.46 5683.46 5683.46 5683.46 5683.46
46,392.30 116,106.93 104,508.86 104,508.86 104,508.86
37705.15 37705.15 28278.86 28278.86 28278.86
8687.15 8687.15 6515.36 6515.36 6515.36
24303.33 24303.33 24303.33 24303.33
45411.30 45411.30 45411.30 45411.30
54,657.87 54,657.87 40,993.40 40,993.40 40,993.40
15984.44 15984.44 11988.33 11988.33 11988.33
38673.43 38673.43 29005.07 29005.07 29005.07
4,135.62 4,461.77 8,949.16 8,949.16 8,949.16
1496.891 1496.891 1496.891 1496.891 1496.891
2099.728 2099.728 2099.728 2099.728 2099.728
326.15 326.15 326.15 326.15
539.00 539.00 404.25 404.25 404.25
4622.1375 4622.1375 4622.1375
CRONOGRAMA DE AVANCE FISICO - FINANCIERO"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
CAJAMARCA. Fecha: DICIEMBRE DEL 2013.
MES 3 MES 4 MES 5 MES 6 MES 7
1,969.68 4,902.41 1,969.68 5,177.86 275.45
2932.73 2932.73
275.45 275.45
1969.677 1969.677 1969.677 1969.677
2,370.00 1,560.00 1,560.00 1,560.00 1,560.00
750.00 750.00 750.00 750.00 750.00
1620.00 810 810 810 810
656,263.31 716,776.55 693,068.66 696,276.84 281,851.7832,813.17 35,838.83 34,653.43 34,813.84 14,092.5932,813.17 35,838.83 34,653.43 34,813.84 14,092.59721,889.65 788,454.21 762,375.52 765,904.52 310,036.96129,940.14 141,921.76 137,227.59 137,862.81 55,806.65851,829.79 930,375.97 899,603.11 903,767.33 365,843.6121,656.69 23,653.63 22,871.27 22,977.14 9,301.11
0.00 0.00 0.00 0.00 0.00873,486.47 954,029.59 922,474.38 926,744.47 375,144.72
11.87% 12.97% 12.54% 12.60% 5.10%53.64% 66.61% 79.15% 91.75% 96.85%
226.32 226.32 226.32 0.00 0.00
69.34 69.34 69.34
156.98 156.98 156.98
11,055.48 11,055.48 11,055.48 0.00 0.00
7,612.25 7,612.25 7,612.25
3,443.23 3,443.23 3,443.23
544.54 544.54 544.54 0.00 0.00
431.24 431.24 431.24
113.31 113.31 113.31
88,031.43 88,031.43 88,031.43 0.00 0.00
2,629.97 2,629.97 2,629.97
23017.77 23017.77 23017.77
17,580.40 17,580.40 17,580.40
11,758.36 11,758.36 11,758.36
CRONOGRAMA DE AVANCE FISICO - FINANCIERO"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
CAJAMARCA. Fecha: DICIEMBRE DEL 2013.
MES 3 MES 4 MES 5 MES 6 MES 7615.44 615.44 615.44
30,772.98 30,772.98 30,772.98
1656.50 1656.50 1656.50
994.89 994.89 994.89 0.00 0.00
101.58 101.58 101.58
94.93 94.93 94.93
798.38 798.38 798.38
2,575.92 2,575.92 2,575.92 0.00 0.00
1,717.66 1,717.66 1,717.66
858.27 858.27 858.27
122.27 122.27 122.27 0.00 0.00
96.83 96.83 96.83
25.44 25.44 25.44
22,236.25 22,236.25 22,236.25 0.00 0.00
188.48 188.48 188.48
1,669.06 1,669.06 1,669.06
14784.28 14784.28 14784.28
4724.70 4724.70 4724.70
869.73 869.73 869.73
2,118.63 0.00 0.00 0.00 0.00
2118.63
112,371.16 112,371.16 112,371.16 0.00 0.00
17,111.71 17,111.71 17,111.71
7,785.62 7,785.62 7,785.62
56448.27 56448.27 56448.27
28046.09 28046.09 28046.09
1733.42 1733.42 1733.42
1246.05 1246.05 1246.05
240,276.90 238,158.27 238,158.27 0.00 0.0012,013.84 11,907.91 11,907.91 0.00 0.0012,013.84 11,907.91 11,907.91 0.00 0.00264,304.58 261,974.09 261,974.09 0.00 0.0047,574.82 47,155.34 47,155.34 0.00 0.00311,879.40 309,129.43 309,129.43 0.00 0.00
CRONOGRAMA DE AVANCE FISICO - FINANCIERO"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
CAJAMARCA. Fecha: DICIEMBRE DEL 2013.
MES 3 MES 4 MES 5 MES 6 MES 7
7,929.14 7,859.22 7,859.22 0.00 0.000.00 0.00 0.00 0.00 0.00
319,808.53 316,988.65 316,988.65 0.00 0.0020.07% 19.89% 19.89% 0.00% 0.00%60.21% 80.11% 100.00% 100.00% 100.00%
5,898.00 0.00 0.00 5,898.00 0.00
5,898.00 5898.00
3,328.89 1,217.40 1,217.40 1,217.40 0.00
1217.4 1217.4 1217.4 1217
2,111.49
9,439.64 0.00 0.00 0.00 0.00
826.00
1,693.57
2,870.07
4,050.00
20,448.72 0.00 0.00 8,319.16 0.00
1,097.32
1,227.96
15,965.53
2,157.91
8,319.16
41,878.68 107,731.19 0.00 0.00 0.00
7,241.66
21,986.37
31,008.21
10,870.47
77,727.04
776.12
0.00 0.00 92,926.15 0.00 0.00
24,391.99
12,262.98
29,125.18
CRONOGRAMA DE AVANCE FISICO - FINANCIERO"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
CAJAMARCA. Fecha: DICIEMBRE DEL 2013.
MES 3 MES 4 MES 5 MES 6 MES 7
1,603.09
6,160.96
1,430.35
17,951.60
0.00 0.00 64,422.41 0.00 0.00
36,368.61
14,684.02
13,369.78
0.00 0.00 76,853.00 28,872.97 0.00
34,063.92
13916.11
28873 28873
0.00 0.00 11,006.82 23,237.44 0.00
23,237.44
4,884.55
4,498.06
1,624.21
0.00 0.00 0.00 7,309.74 0.00
929.23
5,250.43
1,130.08
0.00 0.00 74,316.35 0.00 0.00
39,420.96
26,326.81
2,969.28
2,246.69
3,352.61
500.00 222.89 445.77 983.47 0.00
CRONOGRAMA DE AVANCE FISICO - FINANCIERO"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
CAJAMARCA. Fecha: DICIEMBRE DEL 2013.
MES 3 MES 4 MES 5 MES 6 MES 7500.00 222.89 445.77 983.47 0.00
### ### ### ###
###
760.58
81,493.93 109,171.48 321,187.90 75,838.17 0.008,149.39 10,917.15 32,118.79 7,583.82 0.004,074.70 5,458.57 16,059.39 3,791.91 0.0093,718.02 125,547.20 369,366.08 87,213.90 0.0016,869.24 22,598.50 66,485.89 15,698.50 0.00110,587.26 148,145.70 435,851.97 102,912.40 0.009,371.80 12,554.72 36,936.61 8,721.39 0.00
0.00 0.00 0.00 0.00 0.00
119,959.06 160,700.41 472,788.57 111,633.79 0.0013.87% 18.58% 54.65% 12.90% 0.00%13.87% 32.44% 87.10% 100.00% 100.00%
978,034.13 1,064,106.29 1,252,414.82 772,115.01 281,851.7852,976.40 58,663.89 78,680.13 42,397.66 14,092.5948,901.71 53,205.31 62,620.73 38,605.75 14,092.59
1,079,912.24 1,175,975.49 1,393,715.68 853,118.42 310,036.96194,384.20 211,675.60 250,868.82 153,561.31 55,806.651,274,296.44 1,387,651.09 1,644,584.50 1,006,679.73 365,843.6138,957.63 44,067.57 67,667.10 31,698.53 9,301.11
0.00 0.00 0.00 0.00 0.00
1,313,254.07 1,431,718.66 1,712,251.60 1,038,378.26 375,144.7213.38% 14.59% 17.45% 10.58% 3.82%51.20% 65.79% 83.24% 93.82% 97.64%
CRONOGRAMA DE AVANCE FISICO - FINANCIERO"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
MES 7 MES 8 TOTAL
7,813.80 15,313.80
8,423.16
7,813.80 7,813.8062,510.40
7,500.0015,000.00
3,313.13 3,313.13
19,134.25
39,867.98
3,313.1326,505.00
19,417.12 0.00
1,210,329.94
861,534.00
1,052,209.40
152,107.87
19417.12155,336.99
95,020.87 0.00
89337.41744,478.42
5683.4647,362.17
104,508.86 104,508.86
28278.86 28278.86188,525.75
6515.36 6515.3643,435.74
24303.33 24303.33121,516.67
45411.30 45411.30227,056.50
40,993.40 40,993.40
11988.33 11988.3379,922.19
29005.07 29005.07193,367.14
8,949.16 8,949.16
1496.891 1496.89114,968.91
2099.728 2099.72820,997.28
326.15 326.151,630.75
404.25 404.252,695.00
4622.1375 4622.137518,488.55
CRONOGRAMA DE AVANCE FISICO - FINANCIERO"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
MES 7 MES 8 TOTAL18,488.55
275.45 236.10
129,640.57
8,798.20
275.45 236.1787.00
13,131.18
1,560.00 810.00
750.005,250.00
750.00
810 8108,100.00
281,851.78 174,124.44 5,473,861.0114,092.59 8,706.22 273,693.0514,092.59 8,706.22 273,693.05310,036.96 191,536.88 6,021,247.1155,806.65 34,476.64 1,083,824.48365,843.61 226,013.52 7,105,071.599,301.11 5,746.11 180,637.41
0.00 0.00 70,000.00375,144.72 231,759.62 ###
5.10% 3.15% 100.00%96.85% 100.00%
0.00 0.00
346.68
784.92
0.00 0.00
38,061.26
17,216.16
0.00 0.00
2,156.18
566.53
0.00 0.00
13,149.87
115,088.87
87,902.00
58,791.79
CRONOGRAMA DE AVANCE FISICO - FINANCIERO"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
MES 7 MES 8 TOTAL
3,077.20
153,864.90
8,282.52
0.00 0.00
507.89
474.66
3,991.89
0.00 0.00
8,588.28
4,291.33
0.00 0.00
484.14
127.21
0.00 0.00
942.42
8,345.28
73,921.40
23,623.50
4,348.66
0.00 0.00
6,355.89
0.00 0.00
85,558.53
38,928.11
282,241.35
140,230.46
8,667.10
6,230.24
0.00 0.00 1,197,147.220.00 0.00 59,857.360.00 0.00 59,857.360.00 0.00 1,316,861.940.00 0.00 237,035.150.00 0.00 1,553,897.09
CRONOGRAMA DE AVANCE FISICO - FINANCIERO"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
MES 7 MES 8 TOTAL0.00 0.00 39,505.860.00 0.00 0.000.00 0.00 ###0.00% 0.00% 100.00%
100.00% 100.00%
0.00 0.00
11,796.00
0.00 0.00
4,869.60
2,111.49
0.00 0.00
826.00
1,693.57
2,870.07
4,050.00
0.00 0.00
1,097.32
1,227.96
15,965.53
2,157.91
8,319.16
0.00 0.00
7,241.66
21,986.37
31,008.21
10,870.47
77,727.04
776.12
0.00 0.00
24,391.99
12,262.98
29,125.18
CRONOGRAMA DE AVANCE FISICO - FINANCIERO"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
MES 7 MES 8 TOTAL29,125.18
1,603.09
6,160.96
1,430.35
17,951.60
0.00 0.00
36,368.61
14,684.02
13,369.78
0.00 0.00
34,063.92
13,916.11
57,745.93
0.00 0.00
23,237.44
4,884.55
4,498.06
1,624.21
0.00 0.00
929.23
5,250.43
1,130.08
0.00 0.00
39,420.96
26,326.81
2,969.28
2,246.69
3,352.61
0.00 0.00
CRONOGRAMA DE AVANCE FISICO - FINANCIERO"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
MES 7 MES 8 TOTAL0.00 0.00
891.54
500.00
760.58
0.00 0.00 587,691.470.00 0.00 58,769.150.00 0.00 29,384.570.00 0.00 675,845.190.00 0.00 121,652.130.00 0.00 797,497.320.00 0.00 67,584.520.00 0.00 0.00
0.00 0.00 865,081.840.00% 0.00% 100.00%
100.00% 100.00%
281,851.78 174,124.44 7,258,699.7014,092.59 8,706.22 392,319.5614,092.59 8,706.22 362,934.99310,036.96 191,536.88 8,013,954.2455,806.65 34,476.64 1,442,511.76365,843.61 226,013.52 9,456,466.009,301.11 5,746.11 287,727.79
0.00 0.00 70,000.00
375,144.72 231,759.62 ###3.82% 2.36% 100.00%
97.64% 100.00%
CRONOGRAMA DE DESEMBOLSOS
Obra: "MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"Dist.: QUEROCOTILLO.Prov.: CUTERVO.Dep.: CAJAMARCA.
Fecha: DICIEMBRE DEL 2013.
DESCRIPCION 1ER MES 2do MES 3er MES 4to MES 5to MES 6to MES 7moMES 8vo MES TOTAL
1.00 COSTO DIRECTO 1,532,910.13 1,203,143.09 978,034.13 1,064,106.29 1,252,414.82 772,115.01 281,851.78 174,124.44 7,258,699.70
2.00 GASTOS GENERALES 76,645.50 60,157.15 52,976.40 58,663.89 78,680.13 42,397.66 14,092.59 8,706.22 392,319.56
3.00 UTILIDAD 76,645.50 60,157.15 48,901.71 53,205.31 62,620.73 38,605.75 14,092.59 8,706.22 362,934.96
4.00 VALOR REFERENCIAL 1,686,201.13 1,323,457.39 1,079,912.24 1,175,975.49 1,393,715.68 853,118.42 310,036.96 191,536.88 8,013,954.22
5.00 IGV (IMPUESTO GENERAL A LAS VENTAS) 303,516.20 238,222.33 194,384.20 211,675.60 250,868.82 153,561.31 55,806.65 34,476.64 1,442,511.75
7.00 COSTO TOTAL DEL PROYECTO 1,989,717.33 1,561,679.72 1,274,296.44 1,387,651.09 1,644,584.50 1,006,679.73 365,843.61 226,013.52 9,456,465.97
8.00 SUPERVISION 50,586.03 39,703.72 38,957.63 44,067.57 67,667.10 31,698.53 9,301.11 5,746.11 287,727.79
9.00 GASTOS DE SUPERVISION 70,000.00 70,000.00
10.00 MONTO TOTAL A FINANCIAR 2,110,303.36 1,601,383.45 1,313,254.07 1,431,718.66 1,712,251.60 1,038,378.26 375,144.72 231,759.62 9,814,193.76
ACUMULADOS 2,110,303.36 3,711,686.81 5,024,940.88 6,456,659.53 8,168,911.13 9,207,289.39 9,582,434.11 9,814,193.74
CRONOGRAMA DE DESEMBOLSOS
Obra: "MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"Dist.: QUEROCOTILLO.Prov.: CUTERVO.Dep.: CAJAMARCA.
Fecha: DICIEMBRE DEL 2013.
DESCRIPCION 1ER MES
01.00.00 OBRAS PROVISIONALES 23,736.96
02.00.00 TRABAJOS PRELIMINARES 62,315.36
03.00.00 EXPLANACIONES 982,854.36
04.00.00 TRANSPORTE PAGADO 158,368.12
05.00.00 PAVIMENTOS 0.00
06.00.00 TRANSPORTE PAGADO 0.00
07.00.00 SEALIZACION 7,193.24
08.00.00 IMPACTO AMBIENTAL 57,415.20
09.00.00 VARIOS 750.00
01.00.00 ALCANTARILLA TMC
01.01.00 OBRAS PRELIMINARES 226.32
01.02.00 MOVIMIENTO DE TIERRAS 11,055.48
01.03.00 AFIRMADO PARA ALCANTARILLAS 544.54
01.04.00 ALCANTARILLA TIPO TMC 88,031.43
02.00.00 BADENES
02.01.00 OBRAS PRELIMINARES 994.89
Subpresupuesto 001 : MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGER - PARIC
Subpresupuesto 002 : OBRAS DE ARTE, BADENES, ALCANTARILLAS, MUROS
02.02.00 MOVIMIENTO DE TIERRAS 2,575.92
02.03.00 AFIRMADO 122.27
02.04.00 BADEN 22,236.25
03.00.00 CUNETAS 2,118.63
04.00.00 MUROS 112,371.16
Subpresupuesto 003 : PUENTE PALTIC
01.00.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPO Y 0.00
02.00.00 OBRAS PROVISIONALES 0.00
03.00.00 TRABAJOS PRELIMINARES 0.00
04.00.00 MOVIMIENTODE TIERRAS 0.00
05.00.00 ESTRIBO ELASTICO 0.00
06.00.00 VIGA PRINCIPAL 0.00
07.00.00 LOSA 0.00
08.00.00 ALETAS DE PROTECCION 0.00
09.00.00 VARIOS 0.00
10.00.00 SEALIZACION 0.00
11.00.00 FALSO PUENTE 0.00
12.00.00 PRUEBAS DE CALIDAD 0.00
COSTO DIRECTO 1,532,910.13
GASTOS GENERALES 10.00% 153,291.01
UTILIDAD 5.00% 76,645.51
VALOR REFERENCIAL 1,762,846.65
IGV (IMPUESTO GENERAL A LAS VENTAS) 18.00% 317,312.40
COSTO TOTAL DEL PROYECTO 2,080,159.04
GASTOS DE SUPERVISION 10.00% 176,284.66
ELABORACION DEL EXPEDIENTE S/. 0.00 0.00
DESEMBOLSOS MENSUALES 2,256,443.71
ACUMULADOS 2,256,443.71
CRONOGRAMA DE DESEMBOLSOS
"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
2do MES 3er MES 4to MES 5to MES 6to MES
7,813.80 7,813.80 7,813.80 7,813.80 7,813.80
3,313.13 3,313.13 3,313.13 3,313.13 3,313.13
701,837.34 440,590.05 428,939.78 428,939.78 428,939.78
158,368.12 95,020.87 95,020.87 95,020.87 95,020.87
0.00 46,392.30 116,106.93 104,508.86 104,508.86
0.00 54,657.87 54,657.87 40,993.40 40,993.40
7,193.24 4,135.62 4,461.77 8,949.16 8,949.16
80,410.58 1,969.68 4,902.41 1,969.68 5,177.86
3,930.00 2,370.00 1,560.00 1,560.00 1,560.00
226.32 226.32 226.32 226.32 0.00
11,055.48 11,055.48 11,055.48 11,055.48 0.00
544.54 544.54 544.54 544.54 0.00
88,031.43 88,031.43 88,031.43 88,031.43 0.00
994.89 994.89 994.89 994.89 0.00
2,575.92 2,575.92 2,575.92 2,575.92 0.00
122.27 122.27 122.27 122.27 0.00
22,236.25 22,236.25 22,236.25 22,236.25 0.00
2,118.63 2,118.63 0.00 0.00 0.00
112,371.16 112,371.16 112,371.16 112,371.16 0.00
0.00 5,898.00 0.00 0.00 5,898.00
0.00 3,328.89 1,217.40 1,217.40 1,217.40
0.00 9,439.64 0.00 0.00 0.00
0.00 20,448.72 0.00 0.00 8,319.16
0.00 41,878.68 107,731.19 0.00 0.00
0.00 0.00 0.00 92,926.15 0.00
0.00 0.00 0.00 64,422.41 0.00
0.00 0.00 0.00 76,853.00 28,872.97
0.00 0.00 0.00 11,006.82 23,237.44
0.00 0.00 0.00 0.00 7,309.74
0.00 0.00 0.00 74,316.35 0.00
0.00 500.00 222.89 445.77 983.47
1,203,143.09 978,034.13 1,064,106.29 1,252,414.82 772,115.01
120,314.31 97,803.41 106,410.63 125,241.48 77,211.50
60,157.15 48,901.71 53,205.31 62,620.74 38,605.75
1,383,614.56 1,124,739.25 1,223,722.23 1,440,277.05 887,932.27249,050.62 202,453.07 220,270.00 259,249.87 159,827.81
1,632,665.18 1,327,192.32 1,443,992.23 1,699,526.91 1,047,760.07138,361.46 112,473.93 122,372.22 144,027.70 88,793.23
0.00 0.00 0.00 0.00 0.00
1,771,026.63 1,439,666.24 1,566,364.46 1,843,554.62 1,136,553.30
4,027,470.34 5,467,136.58 7,033,501.04 8,877,055.66 10,013,608.96
CRONOGRAMA DE DESEMBOLSOS
"MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
7mo MES 8vo MES TOTAL
5,473,861.01
7,813.80 15,313.80 85,933.56
3,313.13 3,313.13 85,507.23
19,417.12 0.00 3,431,518.20
95,020.87 0.00 791,840.59
104,508.86 104,508.86 580,534.66
40,993.40 40,993.40 273,289.33
8,949.16 8,949.16 58,780.49
275.45 236.10 152,356.95
1,560.00 810.00 14,100.00
1,197,147.22
0.00 0.00 1,131.60
0.00 0.00 55,277.42
0.00 0.00 2,722.71
0.00 0.00 440,157.15
0.00 0.00 4,974.44
0.00 0.00 12,879.61
0.00 0.00 611.35
0.00 0.00 111,181.26
0.00 0.00 6,355.89
0.00 0.00 561,855.79
587,691.47
0.00 0.00 11,796.00
0.00 0.00 6,981.09
0.00 0.00 9,439.64
0.00 0.00 28,767.88
0.00 0.00 149,609.87
0.00 0.00 92,926.15
0.00 0.00 64,422.41
0.00 0.00 105,725.96
0.00 0.00 34,244.26
0.00 0.00 7,309.74
0.00 0.00 74,316.35
0.00 0.00 2,152.12
281,851.78 174,124.44 4,521,769.20
28,185.18 17,412.44 452,176.92
14,092.59 8,706.22 226,088.46
324,129.55 200,243.10 5,200,034.5758,343.32 36,043.76 936,006.22
382,472.87 236,286.86 6,136,040.8032,412.96 20,024.31 520,003.46
0.00 0.00 0.00
414,885.82 256,311.17 6,656,044.26
10,428,494.78 10,684,805.96
PROYECTO : "MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE CUTERVO.
UBICACIN : DISTRITO DE QUEROCOTILLO, PROVINCIA DE CUTERVO, DEPARTAMENTO DE CAJAMARCA.
VALORIZACION DE OBRA POR MESES
Item DescripcinPresupuesto
Und. Metrado
Subpresupuesto 001 : MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGER - PARIC
01.00.00 OBRAS PROVISIONALES
01.01.00 CARTEL DE IDENTIFICACION DE LA OBRA GIGANTOGRAFIA DE 7.20X3.60M UND 4.00
01.02.00 CAMPAMENTO PROVISIONAL DE OBRA VIAL M2 600.00
01.03.00 MOVILIZACION Y DESMOVILIZACION GLB 1.00
02.00.00 TRABAJOS PRELIMINARES
02.01.00 LIMPIEZA DE TERRENO MANUAL M2 32.48
02.02.00 TRAZO Y REPLANTEO PRELIMINAR M2 58.00
02.03.00 REPOSICION DE CERCO PERIMETRICO C/POSTES DE MADERA Y ALAMBRE DE PUAS M2 4,500.00
03.00.00 EXPLANACIONES
03.01.00 CORTE DE MATERIAL SUELTO CON MAQUINARIA M3 483,861.75
03.02.00 CORTE DE ROCA SUELTA (PERF. Y DISP. ) M2 25,212.24
03.03.00 CORTE DE ROCA FIJA (PERF. Y DISP.) RENDIMIENTO= 300 M3/DIA M3 8,755.93
03.04.00 CONFORMACION DE TERRAPLENES RENDIMIENTO= 1030 M3/DIA M3 17,022.44
03.05.00 PERFILADO Y COMPACTADO DE SUBRASANTE M2 302,070.49
04.00.00 TRANSPORTE PAGADO
04.01.00 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO(COEF=1.25) M3K 433,941.34
#REF! #REF! M3K 240,941.34
04.03.00 TRANSPORTE DE MATERIAL PROPIO PARA RELLENO, DISTANCIA HASTA 1 KM, R=304.90 M3KM M3K 4,921.76
05.00.00 PAVIMENTOS
05.01.00 EXTRACCION Y APILAMIENTO RENDIMIENTO=575 M3/DIA M3 109,854.56
05.02.00 CARGUIO DE MATERIAL AFIRMADO, RENDIMIENTO=792 M3/DIA M3 120,840.01
05.03.00 COLOCACION DE CAPA DE RODADURA M3 99,659.21
05.04.00 RELLENO CON MATERIAL TIPO OVER(e=0.30m) CON EQUIPO M3 14,954.03
06.00.00 TRANSPORTE PAGADO
06.01.00 TRANSPORTE DE MATERIAL DE CANTERA DISTANCIA HASTA 1 KM, R=350.60 M3KM M3K 83,656.52
06.02.00 TRANSPORTE DE MATERIAL DE CANTERA DISTANCIA > 1 KM, R=1000. M3KM M3K 316,444.92
07.00.00 SEALIZACION
07.01.00 SEALES INFORMATIVAS - PANEL M2 26.18
07.02.00 FABRICACION DE SEALES PREVENTIVAS RENDIMIENTO=30 UND/DIA UND 217.00
07.03.00 FABRICACION DE SEALES REGLAMENTARIAS RENDIMIENTO=25 UND/DIA UND 20.00
07.04.00 POSTES KILOMETRICOS UND 59.00
07.05.00 COLOCACION DE SEALES EN VIA CONSTRUIDA UND 314.00
08.00.00 IMPACTO AMBIENTAL
08.01.00 ACONDICIONAMIENTO DE BOTADERO BOL 173,400.51
08.02.00 RESTAURACION DE CAMPAMENTOS Y PATIOS DE MAQUINAS TON 1.40
08.03.00 RESTAURACION DE CANTERAS USADAS TON 2.92
08.04.00 PROGRAMA DE SEALIZACION AMBIENTAL TON 18.00
09.00.00 VARIOS
09.01.00 CAPACITACION OPERACION Y MANTENIMIENTO GLN 59.00
09.02.00 DISEO DE MEZCLAS UND 3.00
09.03.00 PRUEBA COMPACTACION SUELOS(PROCTOR MODIFICADO DENSIDAD CAMPO UND 180.00
Subpresupuesto 002 : OBRAS DE ARTE, BADENES, ALCANTARILLAS, MUROS
01.00.00 ALCANTARILLA TMC
01.01.00 OBRAS PRELIMINARES
01.01.01 LIMPIEZA Y DESFORESTACION MANUAL M2 2,262.42
01.01.02 TRAZO Y REPLANTEO PARA OBRAS DE ARTE M2 2,262.42
01.02.00 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACION PARA ESTRUCTURAS ALCANTARILLAS, RENDIMIENTO=35 M3/DIA M3 3,595.74
01.02.02 ELIMINACION DE MATERIAL EXCEDENTE A MANO D=30 mt. M3 3,524.77
01.03.00 AFIRMADO PARA ALCANTARILLAS
01.03.01 EXTRACCION Y APILAMIENTO (AFIRMADO) RENDIMIENTO=460 M3/DIA M3 182.90
01.03.02 CARGUIO DE MATERIAL AFIRMADO, RENDIMIENTO= 1040 M3/DIA M3 182.90
01.04.00 ALCANTARILLA TIPO TMC
01.04.01 RELLENO COMPACTADO ESTRUCTURAL PARA ALCANTARILLAS M3 892.02
01.04.02 CONCRETO F'C= 175 KG/CM2 M3 735.41
01.04.03 ENCOFRADO Y DESENCOFRADO DE ALCANTARILLAS M2 5,235.60
01.04.05 ALCANTARILLA TMC 0=24" C=14 RENDIMIENTO=12 ML/DIA*** 0 13.50
01.04.06 ALCANTARILLA TMC 0=36" C=12 RENDIMIENTO=10 ML/DIA*** M 148.50
01.04.07 EMBOQUILLADO DE PIEDRA EN ALCANTARILLAS M2 467.49
#REF! #REF! ### 1,219.26
02.00.00 BADENES
02.01.00 OBRAS PRELIMINARES
02.01.01 LIMPIEZA Y DESFORESTACION MANUAL M2 2,666.59
02.01.02 TRAZO Y REPLANTEO PARA OBRAS DE ARTE M2 2,666.59
02.01.03 REFINE NIVELACION Y COMPACTACION M2 2,666.59
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION PARA ESTRUCTURAS, RENDIMIENTO=35 M3/DIA M3 1,480.25
02.02.02 ELIMINACION DE MATERIAL EXCEDENTE A MANO D=30 mt. M3 1,480.25
02.03.00 AFIRMADO
02.03.01 EXTRACCION Y APILAMIENTO (AFIRMADO) RENDIMIENTO=460 M3/DIA M3 533.32
02.03.02 CARGUIO DE MATERIAL AFIRMADO, RENDIMIENTO= 1040 M3/DIA M3 533.32
02.04.00 BADEN
02.04.01 RELLENO COMPACTADO ESTRUCTURAL PARA BADENES M3 122.79
02.04.02 Encofrado y Desencofrado en Seco M3 1,511.70
02.04.03 CONCRETO F'C= 175 KG/CM2 M3 985.99
02.04.04 CONCRETO CICLOPEO FC=140KG/CM2 + 30 % PM. M3 268.13
02.04.05 JUNTAS ASFALTICAS PARA BADEN M 1,375.84
03.00.00 CUNETAS
03.01.00 CONFORMACION DE CUNETAS M 53,313.00
04.00.00 MUROS
04.01.00 EXCAVACION PARA ESTRUCTURAS, RENDIMIENTO=35 M3/DIA M3 269.10
04.02.00 RELLENO CON MATERIAL PROPIO M3 129.06
04.03.00 CONCRETO CICLOPEO FC=140 KG/CM2 + 70 % PM. M3 280.09
04.04.00 ENCOFRADO Y DESENCOFRADO M2 760.32
04.06.00 JUNTAS ASFALTICAS PARA MURO M2 95.10
Subpresupuesto 003 : PUENTE PALTIC
01.00.00 MOVILIZACION Y DEZMOVILIZACION DE EQUIPO Y MAQUINARIA
01.01.00 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA GLB 1.00
02.00.00 OBRAS PROVISIONALES
02.01.00 ALMACEN PROVISIONAL DE LA OBRA M2 60.00
02.02.00 CARTEL DE OBRA 3.60X7.20M UND 1.00
03.00.00 TRABAJOS PRELIMINARES
03.01.00 LIMPIEZA DE TERRENO MANUAL M2 123.47
03.02.00 TALA Y RETIRO DE ARBOLES M2 12.35
03.03.00 TRAZO Y REPLANTEO M2 123.47
03.04.00 APERTURA Y MANTENIMIENTO DE ACCESOS VEHICULARES M2 1,800.00
04.00.00 MOVIMIENTODE TIERRAS
04.01.00 CORTE DE MATERIAL SUELTO A NIVEL DE SUBRASANTE, CON EQUIPO M3 326.75
04.02.00 CORTE ROCA SUELTA (PERF. Y DISP.) CON MAQUINARIA, RENDIMIENTO=250 M3/DIA M3 118.46
04.03.00 EXCAVACION MANUAL EN CONGLOMERADO (INC ROTURA DE ROCA) M3 40.43
04.04.00 CORTE ROCA FIJA (PERF. Y DISP.) CON MAQUINARIA, RENDIMIENTO=260 M3/DIA M3 103.20
04.05.00 RELLENO CON MATERIAL PROPIO M3 454.08
05.00.00 ESTRIBO ELASTICO
05.01.00 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS M2 43.62
05.02.00 ENCOFRADO Y DESENCOFRADO PARA ESTRIBOS CARA VISTA M2 138.66
05.03.00 ACERO CORRUGADO Fy=4200 kg/cm2
05.03.01 ACERO CORRUGADO Fy=4200 kg/cm2 d =5/8" KG 2,239.98
05.03.02 ACERO CORRUGADO Fy=4200 kg/cm2 d =1/2" KG 2,307.79
05.04.00 CONCRETO F'C=210 KG/CM2 M3 106.35
05.05.00 ADITIVO EPOXICO PARA UNION DE CONCRETOS M2 50.20
06.00.00 VIGA PRINCIPAL
06.01.00 ENCOFRADO Y DESENCOFRADO PARA VIGAS PRINCIPALES PUENTE M2 73.50
06.02.00 ENCOFRADO Y DESENCOFRADO PARA VIGAS DIAFRAGMA M2 46.94
06.03.00
06.03.01 ACERO CORRUGADO Fy=4200 kg/cm2 d = 1" KG 1,610.10
06.03.02 ACERO CORRUGADO Fy=4200 kg/cm2 d =3/4" KG 361.66
06.03.03 ACERO CORRUGADO Fy=4200 kg/cm2 d =5/8" KG 354.93
06.03.04 ACERO CORRUGADO Fy=4200 kg/cm2 d =1/2" KG 855.46
06.04.00 CONCRETO EN VIGAS PRINCIPALES F'C=210 KG/CM2 M3 32.86
07.00.00 LOSA
07.01.00 ENCOFRADO Y DESENCOFRADO PARA LOSA, PUENTE M2 107.92
07.02.00 ACERO CORRUGADO Fy=4200
07.02.01 ACERO CORRUGADO Fy=4200 kg/cm2 d =1/2" KG 2,656.52
07.02.02 CONCRETO F'C=280 KG/CM2 PARA LOSA DE PUENTE M3 19.56
08.00.00 ALETAS DE PROTECCION
08.01.00 ENCOFRADO Y DESENCOFRADO PARA ALETAS DE PROTECCION M2 276.11
08.02.00 ACERO CORRUGADO Fy=4200
08.02.01 ACERO CORRUGADO Fy=4200 kg/cm2 d =5/8" KG 4,560.66
ACERO CORRUGADO Fy=4200
08.02.02 CONCRETO FC=140KG/CM2 + 30 % PM.PARA ALETAS M3 104.29
09.00.00 VARIOS
09.01.00 BARANDA DE TUBO FO. GDO. PARANTE 3" X 1.1M.ALT M 73.20
09.02.00 DRENAJE DE ESTRIBO CON TUBO PVC SAP 4" UND 24.70
09.03.00 DISPOSITIVO DE APOYO FIJO y MOVIL , PUENTE UND 2.00
09.04.00 JUNTA DE DILATACION METALICA M 13.20
10.00.00 SEALIZACION
10.01.00 FABRICACION DE SEALES INFORMATIVAS M2 3.24
10.02.00 ESTRUCTURA DE SOPORTE M 17.60
10.03.00 CIMIENTACION Y MONTAJE DE SEAL INFORMATIVA UND 2.00
11.00.00 FALSO PUENTE
11.01.00 ENCOFRADO Y DESENCOFRADO PARA FALSO PUENTE 1 er PISO, L=17 M M2 99.00
11.02.00 ENCOFRADO Y DESENCOFRADO PARA FALSO PUENTE 2 do PISO, L=17 m M2 99.00
11.03.00 ENCOFRADO Y DESENCOFRADO PARA FALSA ZAPATAS M2 16.25
11.04.00 EXCAVACION MANUAL EN CONGLOMERADO (INC ROTURA DE ROCA) M3 8.13
11.05.00 CONCRETO F'C=100 KG/CM2 PARA ZAPATA DE APOYO M3 8.13
12.00.00 PRUEBAS DE CALIDAD
12.01 PRUEBA DE RESISTENCIA A LA COMPRENSION DEL CONCRETO UND 18.00
12.02.00 DISEO DE MEZCLAS UND 2.00
12.03.00 LIMPIEZA FINAL DE OBRA M2 246.94
COSTO DIRECTO
GASTOS GENERALES(10%)
VALOR REFERENCIAL
GASTOS DE RESIDENCIA (3%)
PRESUPUESTO TOTAL
PROYECTO : "MEJORAMIENTO Y AMPLIACION DE LA VIA VECINAL CRUCE INGUER-PALTIC-SAGASMACHE-LA COLPA Y PARIC, DISTRITO QUEROCOTILLO-CUTERVO, CAJAMARCA"
UBICACIN : DISTRITO DE QUEROCOTILLO, PROVINCIA DE CUTERVO, DEPARTAMENTO DE CAJAMARCA.
VALORIZACION DE OBRA POR MESES
PresupuestoMES 1 MES 2 MES 3 MES 4
P. U. Parcial Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
2,082.03 8,423.16 4.00 8,423.16 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
386.47 62,510.40 75.00 7,813.80 12.50 75.00 7,813.80 12.50 75.00 7,813.80 12.50 75.00 7,813.80 12.50
25,000.00 15,000.00 0.50 7,500.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
966.55 19,134.25 32.48 19,134.25 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
35.03 39,867.98 58.00 39,867.98 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.44 26,505.00 562.50 3,313.13 12.50 562.50 3,313.13 12.50 562.50 3,313.13 12.50 562.50 3,313.13 12.50
5.34 1,210,329.94 145,158.53 363,098.98 30.00 96,772.35 242,065.99 20.00 60,482.72 151,291.24 12.50 60,482.72 151,291.24 12.50
9.71 861,534.00 7,563.67 258,460.20 30.00 5,042.45 172,306.80 20.00 3,151.53 107,691.75 12.50 3,151.53 107,691.75 12.50
22.69 1,052,209.40 2,626.78 315,662.82 30.00 1,751.19 210,441.88 20.00 1,094.49 131,526.18 12.50 1,094.49 131,526.18 12.50
4.49 152,107.87 5,106.73 45,632.36 30.00 3,404.49 30,421.57 20.00 2,127.81 19,013.48 12.50 2,127.81 19,013.48 12.50
1.40 155,336.99 0.00 0.00 0.00 90,621.15 46,601.10 30.00 60,414.10 31,067.40 20.00 37,758.81 19,417.12 12.50
7.12 744,478.42 86,788.27 148,895.68 20.00 86,788.27 148,895.68 20.00 52,072.96 89,337.41 12.00 52,072.96 89,337.41 12.00
3.64 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6.89 47,362.17 984.35 9,472.43 20.00 984.35 9,472.43 20.00 590.61 5,683.46 12.00 590.61 5,683.46 12.00
4.32 188,525.75 0.00 0.00 0.00 0.00 0.00 0.00 21,970.91 37,705.15 20.00 21,970.91 37,705.15 20.00
1.70 43,435.74 0.00 0.00 0.00 0.00 0.00 0.00 24,168.00 8,687.15 20.00 24,168.00 8,687.15 20.00
6.16 121,516.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,931.84 24,303.33 20.00
105.07 227,056.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,990.81 45,411.30 20.00
5.13 79,922.19 0.00 0.00 0.00 0.00 0.00 0.00 16,731.30 15,984.44 20.00 16,731.30 15,984.44 20.00
3.09 193,367.14 0.00 0.00 0.00 0.00 0.00 0.00 63,288.98 38,673.43 20.00 63,288.98 38,673.43 20.00
982.08 14,968.91 5.24 2,993.78 20.00 5.24 2,993.78 20.00 2.62 1,496.89 10.00 2.62 1,496.89 10.00
621.90 20,997.28 43.40 4,199.46 20.00 43.40 4,199.46 20.00 21.70 2,099.73 10.00 21.70 2,099.73 10.00
690.76 1,630.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 326.15 20.00
130.35 2,695.00 0.00 0.00 0.00 0.00 0.00 0.00 11.80 539.00 20.00 11.80 539.00 20.00
149.98 18,488.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.22 129,640.57 69,360.20 51,856.23 40.00 104,040.31 77,784.34 60.00 0.00 0.00 0.00 0.00 0.00 0.00
10,724.87 8,798.20 0.47 2,932.73 33.33 0.00 0.00 0.00 0.00 0.00 0.00 0.47 2,932.73 33.33
845.36 787.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
689.42 13,131.18 3.60 2,626.24 20.00 3.60 2,626.24 20.00 2.70 1,969.68 15.00 2.70 1,969.68 15.00
1,500.00 5,250.00 8.43 750.00 14.29 8.43 750.00 14.29 8.43 750.00 14.29 8.43 750.00 14.29
250.00 750.00 0.00 0.00 0.00 3.00 750.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00
45.00 8,100.00 0.00 0.00 0.00 54.00 2,430.00 30.00 36.00 1,620.00 20.00 18.00 810.00 10.00
0.97 346.68 452.48 69.34 20.00 452.48 69.34 20.00 452.48 69.34 20.00 452.48 69.34 20.00
0.96 784.92 452.48 156.98 20.00 452.48 156.98 20.00 452.48 156.98 20.00 452.48 156.98 20.00
27.61 38,061.26 719.15 7,612.25 20.00 719.15 7,612.25 20.00 719.15 7,612.25 20.00 719.15 7,612.25 20.00
13.81 17,216.16 704.95 3,443.23 20.00 704.95 3,443.23 20.00 704.95 3,443.23 20.00 704.95 3,443.23 20.00
5.98 2,156.18 36.58 431.24 20.00 36.58 431.24 20.00 36.58 431.24 20.00 36.58 431.24 20.00
124.58 566.53 36.58 113.31 20.00 36.58 113.31 20.00 36.58 113.31 20.00 36.58 113.31 20.00
39.27 13,149.87 178.40 2,629.97 20.00 178.40 2,629.97 20.00 178.40 2,629.97 20.00 178.40 2,629.97 20.00
444.92 115,088.87 147.08 23,017.77 20.00 147.08 23,017.77 20.00 147.08 23,017.77 20.00 147.08 23,017.77 20.00
48.52 87,902.00 1,047.12 17,580.40 20.00 1,047.12 17,580.40 20.00 1,047.12 17,580.40 20.00 1,047.12 17,580.40 20.00
321.60 3,077.20 2.70 615.44 20.00 2.70 615.44 20.00 2.70 615.44 20.00 2.70 615.44 20.00
541.13 153,864.90 29.70 30,772.98 20.00 29.70 30,772.98 20.00 29.70 30,772.98 20.00 29.70 30,772.98 20.00
47.13 8,282.52 93.50 1,656.50 20.00 93.50 1,656.50 20.00 93.50 1,656.50 20.00 93.50 1,656.50 20.00
135.09 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0.97 507.89 533.32 101.58 20.00 533.32 101.58 20.00 533.32 101.58 20.00 533.32 101.58 20.00
0.96 474.66 533.32 94.93 20.00 533.32 94.93 20.00 533.32 94.93 20.00 533.32 94.93 20.00
7.90 3,991.89 533.32 798.38 20.00 533.32 798.38 20.00 533.32 798.38 20.00 533.32 798.38 20.00
27.61 8,588.28 296.05 1,717.66 20.00 296.05 1,717.66 20.00 296.05 1,717.66 20.00 296.05 1,717.66 20.00
13.81 4,291.33 296.05 858.27 20.00 296.05 858.27 20.00 296.05 858.27 20.00 296.05 858.27 20.00
5.98 484.14 106.66 96.83 20.00 106.66 96.83 20.00 106.66 96.83 20.00 106.66 96.83 20.00
124.58 127.21 106.66 25.44 20.00 106.66 25.44 20.00 106.66 25.44 20.00 106.66 25.44 20.00
40.22 942.42 24.56 188.48 20.00 24.56 188.48 20.00 24.56 188.48 20.00 24.56 188.48 20.00
32.47 8,345.28 302.34 1,669.06 20.00 302.34 1,669.06 20.00 302.34 1,669.06 20.00 302.34 1,669.06 20.00
444.92 73,921.40 197.20 14,784.28 20.00 197.20 14,784.28 20.00 197.20 14,784.28 20.00 197.20 14,784.28 20.00
378.48 23,623.50 53.63 4,724.70 20.00 53.63 4,724.70 20.00 53.63 4,724.70 20.00 53.63 4,724.70 20.00
18.83 4,348.66 275.17 869.73 20.00 275.17 869.73 20.00 275.17 869.73 20.00 275.17 869.73 20.00
1.01 6,355.89 17,771.00 2,118.63 33.33 17,771.00 2,118.63 33.33 17,771.00 2,118.63 33.33 0.00 0.00 0.00
27.61 85,558.53 53.82 17,111.71 20.00 53.82 17,111.71 20.00 53.82 17,111.71 20.00 53.82 17,111.71 20.00
26.21 38,928.11 25.81 7,785.62 20.00 25.81 7,785.62 20.00 25.81 7,785.62 20.00 25.81 7,785.62 20.00
227.42 282,241.35 56.02 56,448.27 20.00 56.02 56,448.27 20.00 56.02 56,448.27 20.00 56.02 56,448.27 20.00
35.75 140,230.46 152.06 28,046.09 20.00 152.06 28,046.09 20.00 152.06 28,046.09 20.00 152.06 28,046.09 20.00
28.21 6,230.24 19.02 1,246.05 20.00 19.02 1,246.05 20.00 19.02 1,246.05 20.00 19.02 1,246.05 20.00
11,796.00 11,796.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 5,898.00 50.00 0.00 0.00 0.00
162.94 4,869.60 0.00 0.00 0.00 0.00 0.00 0.00 15.00 1,217.40 25.00 15.00 1,217.40 25.00
2,082.03 2,111.49 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,111.49 100.00 0.00 0.00 0.00
2.69 826.00 0.00 0.00 0.00 0.00 0.00 0.00 123.47 826.00 100.00 0.00 0.00 0.00
65.06 1,693.57 0.00 0.00 0.00 0.00 0.00 0.00 12.35 1,693.57 100.00 0.00 0.00 0.00
9.25 2,870.07 0.00 0.00 0.00 0.00 0.00 0.00 123.47 2,870.07 100.00 0.00 0.00 0.00
2.39 4,050.00 0.00 0.00 0.00 0.00 0.00 0.00 1,800.00 4,050.00 100.00 0.00 0.00 0.00
4.91 1,097.32 0.00 0.00 0.00 0.00 0.00 0.00 326.75 1,097.32 100.00 0.00 0.00 0.00
13.36 1,227.96 0.00 0.00 0.00 0.00 0.00 0.00 118.46 1,227.96 100.00 0.00 0.00 0.00
145.06 15,965.53 0.00 0.00 0.00 0.00 0.00 0.00 40.43 15,965.53 100.00 0.00 0.00 0.00
22.87 2,157.91 0.00 0.00 0.00 0.00 0.00 0.00 103.20 2,157.91 100.00 0.00 0.00 0.00
26.21 8,319.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
61.21 7,241.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.62 7,241.66 100.00
113.24 21,986.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 138.66 21,986.37 100.00
4.02 31,008.21 0.00 0.00 0.00 0.00 0.00 0.00 2,239.98 31,008.21 100.00 #REF! #REF! #REF!
4.00 10,870.47 0.00 0.00 0.00 0.00 0.00 0.00 2,307.79 10,870.47 100.00 0.00 0.00 0.00
520.04 77,727.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 106.35 77,727.04 100.00
11.93 776.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.20 776.12 100.00
283.45 24,391.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
233.67 12,262.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.22 29,125.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.09 1,603.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.02 6,160.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.00 1,430.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
484.55 17,951.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
268.09 36,368.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.00 14,684.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
538.98 13,369.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
158.98 34,063.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.02 13,916.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
289.39 57,745.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
86.07 23,237.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
86.11 4,884.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
919.59 4,498.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
149.05 1,624.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
271.16 929.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
300.50 5,250.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
578.88 1,130.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1,007.67 39,420.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
213.73 26,326.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
100.42 2,969.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
145.06 2,246.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
265.99 3,352.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
48.99 891.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.50 222.89 25.00
250.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 500.00 100.00 0.00 0.00 0.00
2.82 760.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
587,691.47 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
58,769.15 #REF! #REF! #REF! #REF!
646,460.62 #REF! #REF! #REF! #REF!
19,393.82 #REF! #REF! #REF! #REF!
------------------------ ------------------------ ------------------------ ------------------------ ------------------------
665,854.44 #REF! #REF! #REF! #REF!
PLAZO DE EJECUCION : 08 MESES
VALORIZACION DE OBRA POR MESES
MES 5 MES 6 MES 7 MES 8
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
75.00 7,813.80 12.50 75.00 7,813.80 12.50 75.00 7,813.80 12.50 75.00 7,813.80
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
562.50 3,313.13 12.50 562.50 3,313.13 12.50 562.50 3,313.13 12.50 562.50 3,313.13
60,482.72 151,291.24 12.50 60,482.72 151,291.24 12.50 0.00 0.00 0.00 0.00 0.00
3,151.53 107,691.75 12.50 3,151.53 107,691.75 12.50 0.00 0.00 0.00 0.00 0.00
1,094.49 131,526.18 12.50 1,094.49 131,526.18 12.50 0.00 0.00 0.00 0.00 0.00
2,127.81 19,013.48 12.50 2,127.81 19,013.48 12.50 0.00 0.00 0.00 0.00 0.00
37,758.81 19,417.12 12.50 37,758.81 19,417.12 12.50 37,758.81 19,417.12 12.50 0.00 0.00
52,072.96 89,337.41 12.00 52,072.96 89,337.41 12.00 52,072.96 89,337.41 12.00 0.00 0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
590.61 5,683.46 12.00 590.61 5,683.46 12.00 590.61 5,683.46 12.00 0.00 0.00
16,478.18 28,278.86 15.00 16,478.18 28,278.86 15.00 16,478.18 28,278.86 15.00 16,478.18 28,278.86
18,126.00 6,515.36 15.00 18,126.00 6,515.36 15.00 18,126.00 6,515.36 15.00 18,126.00 6,515.36
19,931.84 24,303.33 20.00 19,931.84 24,303.33 20.00 19,931.84 24,303.33 20.00 19,931.84 24,303.33
2,990.81 45,411.30 20.00 2,990.81 45,411.30 20.00 2,990.81 45,411.30 20.00 2,990.81 45,411.30
12,548.48 11,988.33 15.00 12,548.48 11,988.33 15.00 12,548.48 11,988.33 15.00 12,548.48 11,988.33
47,466.74 29,005.07 15.00 47,466.74 29,005.07 15.00 47,466.74 29,005.07 15.00 47,466.74 29,005.07
2.62 1,496.89 10.00 2.62 1,496.89 10.00 2.62 1,496.89 10.00 2.62 1,496.89
21.70 2,099.73 10.00 21.70 2,099.73 10.00 21.70 2,099.73 10.00 21.70 2,099.73
4.00 326.15 20.00 4.00 326.15 20.00 4.00 326.15 20.00 4.00 326.15
8.85 404.25 15.00 8.85 404.25 15.00 8.85 404.25 15.00 8.85 404.25
78.50 4,622.14 25.00 78.50 4,622.14 25.00 78.50 4,622.14 25.00 78.50 4,622.14
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.47 2,932.73 33.33 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 1.02 275.45 35.00 1.02 275.45 35.00 0.88 236.10
2.70 1,969.68 15.00 2.70 1,969.68 15.00 0.00 0.00 0.00 0.00 0.00
8.43 750.00 14.29 8.43 750.00 14.29 8.43 750.00 14.29 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.00 810.00 10.00 18.00 810.00 10.00 18.00 810.00 10.00 18.00 810.00
452.48 69.34 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
452.48 156.98 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
719.15 7,612.25 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
704.95 3,443.23 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
36.58 431.24 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
36.58 113.31 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
178.40 2,629.97 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
147.08 23,017.77 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1,047.12 17,580.40 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.70 615.44 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29.70 30,772.98 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
93.50 1,656.50 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
533.32 101.58 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
533.32 94.93 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
533.32 798.38 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
296.05 1,717.66 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
296.05 858.27 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
106.66 96.83 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
106.66 25.44 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
24.56 188.48 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
302.34 1,669.06 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
197.20 14,784.28 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
53.63 4,724.70 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
275.17 869.73 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
53.82 17,111.71 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
25.81 7,785.62 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
56.02 56,448.27 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
152.06 28,046.09 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19.02 1,246.05 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.50 5,898.00 50.00 0.00 0.00 0.00 0.00 0.00
15.00 1,217.40 25.00 15.00 1,217.40 25.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 454.08 8,319.16 100.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
#REF! #REF! #REF! #REF! #REF! #REF! 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
73.50 24,391.99 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
46.94 12,262.98 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1,610.10 29,125.18 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
361.66 1,603.09 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
354.93 6,160.96 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
855.46 1,430.35 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
32.86 17,951.60 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
107.92 36,368.61 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2,656.52 14,684.02 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19.56 13,369.78 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
276.11 34,063.92 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4,560.66 13,916.11 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
52.15 28,872.97 50.00 52.15 28,872.97 50.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 73.20 23,237.44 100.00 0.00 0.00 0.00 0.00 0.00
24.70 4,884.55 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.00 4,498.06 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.20 1,624.21 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 3.24 929.23 100.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 17.60 5,250.43 100.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 2.00 1,130.08 100.00 0.00 0.00 0.00 0.00 0.00
99.00 39,420.96 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
99.00 26,326.81 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.25 2,969.28 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.13 2,246.69 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.13 3,352.61 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.00 445.77 50.00 4.50 222.89 25.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 246.94 760.58 100.00 0.00 0.00 0.00 0.00 0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
------------------------ ------------------------ ------------------------ ------------------------
#REF! #REF! #REF! #REF!
VALORIZACION DE OBRA POR MESES
MES 8
%
0.00
12.50
0.00
0.00
0.00
12.50
0.00
0.00
0.00
0.00
0.00
0.00
#REF!
0.00
15.00
15.00
20.00
20.00
15.00
15.00
10.00
10.00
20.00
15.00
25.00
0.00
0.00
30.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!
#REF!
Crono. Avance Fisico FinacieroCronograma de DesembolsosCronograma POR PARTIDASvalorizacion