Construction Information Session · PDF file1/11/2017 · Construction Information...

Post on 15-Mar-2018

221 views 5 download

Transcript of Construction Information Session · PDF file1/11/2017 · Construction Information...

Construction Information SessionJanuary 11, 2017

AGENDA

PAGE 2

Introduction

Construction Timeline

Pre‐blast inspection process/radius

Vibration monitoring Process

Contact Information

Construction Safety Gear to access site

Impact of Construction near your neighborhood

Questions

PAGE 4

Construction Timelines

Tree Cutting – November 2016

Servicing (Sewers & Roads) – Start January 2017 to December 2017

Housing Construction – Start August 2017 to December 2019 

Rock Removal – Start January 16th, 2017 to March 30th,2017

PAGE 5

Construction Safety Gear to access site

Hard Hat

Safety Vest Steel Toe 

Boots

NO PUBLIC ACCESS !!

CONSTRUCTION ACCESS

ROCK REMOVAL

PAGE 8

Minto CommunitiesDeveloper

Taggart Construction Ltd. Contractor

M‐Roc Ltd.Blaster

Explotech Engineering Ltd.Consultant

PAGE 10

Pre‐blast inspections

• Pre‐blast inspections in the City of Ottawa typically extend out to a radius of 75m from the blasting operations.

• Blast designs are prepared so as to maintain vibrations below damaging levels at the closest properties. Given that vibrations attenuate quickly, this provides an additional level of safety to properties falling further removed.

• Research and experience has demonstrated the 75m inspections radius to be practicable yet conservative. 

PAGE 12

Vibration monitoring

• Blasts create two principal derivatives which initiate concern and annoyance from neighbouring property owners – ground vibration and overpressure.

• All blasts are monitored for both ground vibration and overpressure at the closest properties to ensure compliance with applicable limits and prevent the possibility of damage.

• Multiple monitors are concurrently installed to ensure redundancy in the program.

PAGE 13

Applicable Standards and Specifications

The City regulates the use of explosives through specific mechanisms:

• City of Ottawa Standard Tender Documents for Unit Price Contracts provides S.P. F‐1201 for blasting‐related requirements

• The Ontario Provincial Standard covering the use of explosives is OPSS 120. There are two version, municipal and provincial‐oriented.

• Site Plan and Subdivision agreements (blasting on private property for projects subject to Planning Approval)

• Various aspects of the use of explosives are addressed in Federal (Explosives Act, Dangerous Goods Transportation Act) and Provincial (Pits and Quarry Act, Occupational Health and Safety Act) legislation

PAGE 14

Impacts of construction near your neighborhood

It will be a little bit noisier for a few months. Some sounds you will hear.

‐ Drilling

‐ Blasting

‐ Equipment running and beeping

PAGE 15

BLASTING!!

What you will hear before a blast:

‐ 1 Minute before the Blast –5 Short Whistle

‐ Right before the blast –3 short whistles

‐ All Clear After Blast –1 long whistle

BLASTING

PAGE 17

CONTACT INFORMATION

Construction RelatedMinto Communities Jean‐Michel Le BlancConstruction ManagerT: 613‐782‐5717Email: jleblanc@minto.com

Blasting RelatedExplotech EngineeringT: 613‐723‐2494Email: explotech@explotech.com

Taggart ConstructionAdam LeakeyProject ManagerT: 613‐521‐3000 ext. 224Email: aleaky@taggartconstruction.com

M‐Roc Ltd. Drilling & BlastingT: 613‐838‐4666Email: info@m‐roc.ca

Questions?