Post on 06-Feb-2018
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
1
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ACTIVIDADES PRELIMINARES
CAMPAMENTO 18 M2 unBASE GRANULAR m³ 2.34 51,480 51,480 51,480 51,031BISAGRA COMÚN 3” un 6.00 4,200 4,200 5,400 4,200GANCHO TEJA ETERNIT 55 MM un 28.00 7,280 7,280 7,252 7,280MANO DE OBRA AA hc 22.60 245,820 245,820 245,820 245,820PORTA CANDADO SIMPLE 3 un 2.00 2,000 2,000 1,802 2,000PUNTILLA CON CABEZA 2” lb 4.00 11,128 11,400 9,424 10,976RECEBO COMÚN m³ 2.34 74,283 74,283 74,283 74,283TABLA CHAPA ORDINARIO 0.30 m 159.00 245,655 0 0 0TABLA DE 2 CM X 10” m 159.00 0 0 0 588,300TABLA OTOBO 0.30 m 159.00 0 250,266 0 0TABLON CATIVO 0.30 m 159.00 0 0 397,500 0TEJA ETERNIT NO.6 un 14.00 444,416 454,804 467,012 444,052VARA DE CLAVO m 22.10 33,150 33,150 33,150 29,459 1,119,413 1,134,684 1,293,124 1,457,402
CAMPAMENTO 9 M2 unBASE GRANULAR m³ 1.17 25,740 25,740 25,740 25,515BISAGRA COMÚN 3” un 3.00 2,100 2,100 2,700 2,100GANCHO TEJA ETERNIT 55 MM un 16.00 4,160 4,160 4,144 4,160MANO DE OBRA AA hc 15.18 165,113 165,113 165,113 165,113PORTA CANDADO SIMPLE 3 un 2.00 2,000 2,000 1,802 2,000PUNTILLA CON CABEZA 2” lb 3.00 8,346 8,550 7,068 8,232RECEBO COMÚN m³ 1.17 37,142 37,142 37,142 37,142TABLA CHAPA ORDINARIO 0.30 m 90.00 139,050 0 0 0TABLA DE 2 CM X 10” m 90.00 0 0 0 333,000TABLA OTOBO 0.30 m 90.00 0 141,660 0 0TABLON CATIVO 0.30 m 90.00 0 0 225,000 0TEJA ETERNIT NO.6 un 8.00 253,952 259,888 266,864 253,744VARA DE CLAVO m 12.40 18,600 18,600 18,600 16,529 656,203 664,953 754,173 847,535
CAMPAMENTO CONTENEDOR M2 ALQUILER msCONTENEDOR BODEGA 20 ms 3.00 1,080,000 1,080,000 1,080,000 1,080,000MONTACARGAS 3.5 TN h 2.00 94,000 94,000 94,000 94,000TRANSPORTE CONTENEDOR 20 un 2.00 520,000 520,000 520,000 520,000 1,694,000 1,694,000 1,694,000 1,694,000
CAMPAMENTO SHELTER M2 ALQUILER msMONTACARGAS 5.0 TN h 2.00 128,000 128,000 128,000 128,000SHELTER OFICINA 40 ms 3.00 4,740,000 4,740,000 4,740,000 4,740,000TRANSPORTE CONTENEDOR 40 un 2.00 650,000 650,000 650,000 650,000 5,518,000 5,518,000 5,518,000 5,518,000
CERCA EN ALAMBRE DE PUA m²ALAMBRE DE PUAS NO 12 kg 4.00 6,480 6,400 6,400 6,900MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351PUNTILLA CON CABEZA 2” lb 0.03 83 86 71 82VARA DE CLAVO m 0.80 1,200 1,200 1,200 1,066 12,114 12,036 12,021 12,400
CERCA EN TABLA m²MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351PUNTILLA CON CABEZA 2” lb 0.07 195 200 165 192TABLA CHAPA 3 M m 3.33 4,802 0 0 4,662TABLA OTOBO 1”X10” 2.9 m 3.33 0 18,981 0 0TABLON CATIVO 3 M m 3.33 0 0 4,995 0VARA DE CLAVO m 1.30 1,950 1,950 1,950 1,733VARA DE CORREDOR L = 6.00 m 1.30 1,243 1,243 1,243 1,243 12,540 26,724 12,704 12,181
CERCA LAMINA BASE H/2.25 mAGUA lt 3.07 37 37 37 37ARENA DE PEGA m³ 0.01 0 0 0 125ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 0ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 5.16 929 1,032 1,156 1,063CUBIERTA TRAPEZOIDAL ACESCO 3.05 un 0.54 14,138 14,138 14,138 14,138LADRILLO BOCADILLO RECOCIDO un 12.88 0 0 0 2,628LADRILLO LIMPIO 10-29 un 12.88 0 5,796 0 0LADRILLO TOLETE RECOCIDO un 12.88 4,122 0 3,297 0MANO DE OBRA AA hc 1.85 20,122 20,122 20,122 20,122PERFIL ABIERTO GALVANIZADO 120 X 60 CAL.16 un 2.45 176,437 176,437 176,437 176,437TORNILLO PARA MADERA 1” NO.6 un 6.55 118 118 118 105 216,212 217,935 215,405 214,654
DEMOL.PLACAS MACIZAS 0.30 m²COMPRESOR DE 2 MARTILLOS h 1.00 34,800 34,800 34,800 34,800MANO DE OBRA AA hc 1.50 16,316 16,316 16,316 16,316VOLQUETA M3 vj 0.40 15,200 14,208 15,020 17,183 66,316 65,324 66,136 68,299
DEMOLICIÓN MUROS 0.15 m²MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351VOLQUETA M3 vj 0.15 5,700 5,328 5,633 6,444 10,051 9,679 9,983 10,795
DEMOLICIÓN MUROS 0.25 m²MANO DE OBRA AA hc 0.46 5,003 5,003 5,003 5,003VOLQUETA M3 vj 0.25 9,500 8,880 9,388 10,740 14,503 13,883 14,391 15,743
DEMOLICIÓN PLACAS ALIGER. 0.25 m²MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877VOLQUETA M3 vj 0.32 12,160 11,366 12,016 13,747 23,037 22,243 22,893 24,624
DEMOLICIÓN PLACAS MACIZAS 0.15 m²COMPRESOR DE 2 MARTILLOS h 1.00 34,800 34,800 34,800 34,800MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877VOLQUETA M3 vj 0.20 7,600 7,104 7,510 8,592 53,277 52,781 53,187 54,269
DEMOLICIÓN PLACAS MACIZAS 0.30 m²COMPRESOR DE 2 MARTILLOS h 1.00 34,800 34,800 34,800 34,800MANO DE OBRA AA hc 1.50 16,316 16,316 16,316 16,316VOLQUETA M3 vj 0.40 15,200 14,208 15,020 17,183 66,316 65,324 66,136 68,299
DEMOLICIÓN PLACAS PISO m²COMPRESOR DE 2 MARTILLOS h 1.00 34,800 34,800 34,800 34,800MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877VOLQUETA M3 vj 0.10 3,800 3,552 3,755 4,296 49,477 49,229 49,432 49,973
DEMOLICIÓN VIGAS Y COLUMNAS m³COMPRESOR DE 2 MARTILLOS h 1.00 34,800 34,800 34,800 34,800MANO DE OBRA AA hc 8.00 87,016 87,016 87,016 87,016VOLQUETA M3 vj 1.00 38,000 35,520 37,550 42,958 159,816 157,336 159,366 164,774
DESCAPOTE A MAQUINA m³CARGADOR FRONTAL d 0.01 2,200 1,740 2,200 2,164VOLQUETA M3 vj 0.37 14,060 13,142 13,894 15,894 16,260 14,882 16,094 18,059
DESMONTE APARATOS SANITARIOS unMANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052VOLQUETA M3 vj 0.10 3,800 3,552 3,755 4,296 16,852 16,604 16,807 17,348
CONSTRUDATA2
DESMONTE CUBIERTAS ASBESTO CEMENTO m²MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263VOLQUETA M3 vj 0.05 1,900 1,776 1,878 2,148 5,163 5,039 5,141 5,411
DESMONTE MARCOS Y PUERTAS unMANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263VOLQUETA M3 vj 0.10 3,800 3,552 3,755 4,296 7,063 6,815 7,018 7,559
EXCAVACION MECANICA m³CARGADOR FRONTAL d 0.02 4,400 3,480 4,400 4,328VOLQUETA M3 vj 0.37 14,060 13,142 13,894 15,894 18,460 16,622 18,294 20,223
EXPLANACION Y EXTENDIDA m³BULLDOZER D-6 h 0.02 900 900 900 900 900 900 900 900
EXPLANACION Y RETIRO m³BULLDOZER D-6 h 0.03 1,350 1,350 1,350 1,350CARGADOR FRONTAL d 0.02 4,400 3,480 4,400 4,328VOLQUETA M3 vj 0.37 14,060 13,142 13,894 15,894 19,810 17,972 19,644 21,573
LETRINA 2.00X1.00 unBASE GRANULAR m³ 0.10 2,200 2,200 2,200 2,181BISAGRA COMÚN 3” un 3.00 2,100 2,100 2,700 2,100CONCRETO CORRIENTE 2000 PSI m³ 0.10 28,385 27,910 23,942 28,420GANCHO TEJA ETERNIT 55 MM un 8.00 2,080 2,080 2,072 2,080MANO DE OBRA AA hc 6.00 65,262 65,262 65,262 65,262PORTA CANDADO SIMPLE 3 un 1.00 1,000 1,000 901 1,000PUNTILLA CON CABEZA 2” lb 1.20 3,338 3,420 2,827 3,293RECEBO COMÚN m³ 0.10 3,175 3,175 3,175 3,175TABLA CHAPA 3 M m 42.00 60,564 0 0 58,800TABLA OTOBO 1”X10” 2.9 m 42.00 0 239,400 0 0TABLON CATIVO 3 M m 42.00 0 0 63,000 0TAZA CAMPESINA MANCESA un 1.00 41,890 41,890 48,000 41,890TEJA TEJALIT DOBLEANCHO NO.4 un 4.00 52,764 55,176 51,796 52,720TUBO DE GRES 4” un 10.00 81,200 61,250 81,500 82,500VARA DE CLAVO m 14.00 21,000 21,000 21,000 18,662 364,958 525,862 368,375 362,082
RED ELECTRICA PROVISIONAL L/50 M unBASTIDOR AMARILLO 2”X2” 3 M m 5.00 0 17,500 0 0CABLE ALUMINIO AISLADO PVC 1/0 AWG m 65.00 738,595 738,595 738,595 738,595CABLE ALUMINIO AISLADO PVC 2/0 AWG m 130.00 1,801,150 1,801,150 1,801,150 1,801,150CAJA CON ESPACIO PARA 4 CIRCUITOS un 1.00 12,180 12,180 12,180 12,180CORREA DE 2X2 DURMIENTE m 5.00 0 0 17,500 0DURMIENTE ORDINARIO 4 M m 5.00 17,500 0 0 0LARGUERO ORDINARIO 3 M m 5.00 0 0 0 4,025MANO DE OBRA BB hc 20.00 239,300 239,300 239,300 239,300TACO TERMOMAGNÉTICO UNIPOLAR HQP 30A un 4.00 19,088 19,088 19,088 19,200TOMA TRIFÁSICA un 5.00 12,400 15,000 16,355 12,400VARA DE CLAVO m 35.00 52,500 52,500 52,500 46,655SUB-CONTRATO ELECTRICO % 38.00 1,099,231 1,100,219 1,100,734 1,091,932 3,991,944 3,995,532 3,997,402 3,965,437
RED PROVISIONAL TELEFONOS unCABLE TELÉFONOS 2 PARES m 65.00 105,430 105,430 105,430 105,430CAJA GALVANIZADA 5800 un 6.00 1,866 1,770 1,866 1,866MANO DE OBRA BB hc 20.00 239,300 239,300 239,300 239,300TOMA TELEFÓNICA un 5.00 12,020 14,600 14,090 12,610VARA DE CLAVO m 30.00 45,000 45,000 45,000 39,990SUB-CONTRATO ELECTRICO % 38.00 153,374 154,318 154,161 151,694 556,990 560,418 559,847 550,890
RELLENO MATERIAL EN SITIO m³BULLDOZER D-6 h 0.02 900 900 900 900VIBROCOMPACTADOR ELÉCTRICO d 0.03 870 870 848 825VOLQUETA M3 vj 0.45 17,100 15,984 16,898 19,331 18,870 17,754 18,646 21,056
REPLANTEO m²BASTIDOR OTOBO 2”X2” 2.9 m 1.00 0 2,500 0 0DURMIENTE ABARCO 4 M m 1.00 4,785 0 0 7,500LARGUERO ABARCO 4 M m 1.00 0 0 2,700 0MANO DE OBRA AA hc 0.28 3,046 3,046 3,046 3,046PUNTILLA CON CABEZA 1” lb 0.02 51 36 51 40PUNTILLA CON CABEZA 2” lb 0.02 56 57 47 55 7,937 5,639 5,843 10,641
REPLANTEO CANCHAS m²BASTIDOR OTOBO 2”X2” 2.9 m 0.10 0 250 0 0DURMIENTE ABARCO 4 M m 0.10 479 0 0 750LARGUERO ABARCO 4 M m 0.10 0 0 270 0MANO DE OBRA AA hc 0.02 218 218 218 218PUNTILLA CON CABEZA 2” lb 0.10 278 285 236 274 974 753 723 1,242
ANÁLISIS COMPUESTOS
BAÑO NO. 1 / 4 AP. ACUACER unCERRADURA SCHLAGE BAÑO A40S ALUMINIO un 1.00 24,824 24,824 22,388 22,388CERÁMICA CORONA CORSICO 20.5X30.5 m² 1.00 22,000 22,000 22,000 22,000DUCHA PISCIS SIN SB SU 8” CR un 1.00 37,800 26,999 26,999 26,999ESPEJO CRISTAL BELGA 5MM m² 0.80 34,400 34,400 34,400 22,643ESTUCO VENECIANO m² 1.00 29,000 30,000 28,500 29,200JUEGO INCRUSTACIONES ACUACER un 1.00 26,500 26,500 26,500 26,500ACCESORIOS DE GRES 4” un 1.00 21,346 21,310 21,177 21,260ESMALTE SOBRE MADERA LLENA m² 2.88 37,796 34,734 36,478 37,960ESTUCO Y VINILO 3 MANOS m² 3.60 32,728 32,870 34,397 34,298INSTALACIÓN Y DOTACION BAÑO NO.1 un 1.00 2,683,189 2,705,149 2,666,513 2,351,028JUEGOS INCRUSTAR un 1.00 77,936 63,233 63,433 63,195OLIMPIA BRILL.BASE 20X20 m² 25.47 936,236 934,398 940,287 931,101PIRLAN DUCHA PORC. 20X20 m 0.90 23,342 23,285 23,383 23,274PUERTAS DUCHAS POLIESTIR. m² 1.70 161,500 190,400 161,500 170,000PUERTAS MARCO Y HOJA un 1.00 255,928 176,896 175,366 201,317 4,404,525 4,346,998 4,283,321 3,983,162
BAÑO NO. 2 / 4 AP. STILO unCERRADURA SCHLAGE BAÑO A40S ALUMINIO un 1.00 24,824 24,824 22,388 22,388ESPEJO CRISTAL BELGA 5MM m² 0.80 34,400 34,400 34,400 22,643REJILLA SOSCO 3X2” un 1.00 3,586 3,500 3,100 3,320ESMALTE SOBRE MADERA LLENA m² 2.88 37,796 34,734 36,478 37,960ESTUCO Y VINILO 3 MANOS m² 3.60 32,728 32,870 34,397 34,298INSTALACIÓN Y DOTACION BAÑO NO.2 un 1.00 2,684,075 2,637,629 2,619,489 2,617,384JUEGOS INCRUSTAR STILO un 1.00 278,431 278,277 278,477 278,238OLIMPIA BRILL.BASE 20X20 m² 25.47 936,236 934,398 940,287 931,101PIRLAN DUCHA PORC. 20X20 m 0.90 23,342 23,285 23,383 23,274PUERTAS DUCHAS POLIESTIR. m² 1.70 161,500 190,400 161,500 170,000PUERTAS MARCO Y HOJA un 1.00 255,928 176,896 175,366 201,317 4,472,845 4,371,212 4,329,264 4,341,922
BAÑO NO. 3 / 3 AP. ACUACER unCERRADURA SCHLAGE BAÑO A40S ALUMINIO un 1.00 24,824 24,824 22,388 22,388ESPEJO CRISTAL BELGA 5MM m² 0.80 34,400 34,400 34,400 22,643REJILLA SOSCO 3X2” un 1.00 3,586 3,500 3,100 3,320ESMALTE SOBRE MADERA LLENA m² 2.88 37,796 34,734 36,478 37,960ESTUCO Y VINILO 3 MANOS m² 2.40 21,819 21,914 22,931 22,865INSTALACIÓN Y DOTACION BAÑO NO.3 un 1.00 2,021,559 1,878,532 1,840,346 1,806,276JUEGOS INCRUSTAR un 1.00 77,936 63,233 63,433 63,195OLIMPIA BRILL.BASE 20X20 m² 21.15 777,440 775,913 780,804 773,175PIRLAN DUCHA PORC. 20X20 m 1.50 38,903 38,809 38,972 38,790PUERTAS DUCHAS POLIESTIR. m² 2.70 256,500 302,400 256,500 270,000PUERTAS MARCO Y HOJA un 1.00 255,928 176,896 175,366 201,317 3,550,690 3,355,155 3,274,718 3,261,930
BAÑO NO. 4 / 3 AP. STILO unCERRADURA SCHLAGE BAÑO A40S ALUMINIO un 1.00 24,824 24,824 22,388 22,388ESPEJO CRISTAL BELGA 5MM m² 0.80 34,400 34,400 34,400 22,643REJILLA SOSCO 3X2” un 1.00 3,586 3,500 3,100 3,320ESMALTE SOBRE MADERA LLENA m² 2.88 37,796 34,734 36,478 37,960ESTUCO Y VINILO 3 MANOS m² 2.40 21,819 21,914 22,931 22,865INSTALACIÓN Y DOTACION BAÑO NO.4 un 1.00 1,882,818 1,917,499 1,900,348 1,905,915JUEGOS INCRUSTAR STILO un 1.00 278,431 278,277 278,477 278,238OLIMPIA BRILL.BASE 20X20 m² 21.15 777,440 775,913 780,804 773,175PIRLAN DUCHA PORC. 20X20 m 1.50 38,903 38,809 38,972 38,790PUERTAS DUCHAS POLIESTIR. m² 2.70 256,500 302,400 256,500 270,000PUERTAS MARCO Y HOJA un 1.00 255,928 176,896 175,366 201,317 3,612,444 3,609,165 3,549,764 3,576,611
BAÑO NO. 5 / 2 AP. ACUACER unCERRADURA SCHLAGE BAÑO A40S ALUMINIO un 1.00 24,824 24,824 22,388 22,388ESPEJO CRISTAL BELGA 5MM m² 0.80 34,400 34,400 34,400 22,643REJILLA SOSCO 3X2” un 1.00 3,586 3,500 3,100 3,320ESMALTE SOBRE MADERA LLENA m² 2.88 37,796 34,734 36,478 37,960ESTUCO Y VINILO 3 MANOS m² 2.25 20,455 20,544 21,498 21,436INSTALACIÓN Y DOTACION BAÑO NO.5 un 1.00 1,646,929 1,504,116 1,466,380 1,437,725JUEGOS INCRUSTAR un 1.00 77,936 63,233 63,433 63,195OLIMPIA BRILL.BASE 20X20 m² 14.40 529,321 528,281 531,611 526,417PUERTAS DUCHAS POLIESTIR. m² 2.70 256,500 302,400 256,500 270,000PUERTAS MARCO Y HOJA un 1.00 255,928 176,896 175,366 201,317 2,887,675 2,692,929 2,611,154 2,606,401
BAÑO NO. 6 / 2 AP. STILO unCERRADURA SCHLAGE BAÑO A40S ALUMINIO un 1.00 24,824 24,824 22,388 22,388ESPEJO CRISTAL BELGA 5MM m² 0.80 34,400 34,400 34,400 22,643REJILLA SOSCO 3X2” un 1.00 3,586 3,500 3,100 3,320ESMALTE SOBRE MADERA LLENA m² 2.88 37,796 34,734 36,478 37,960ESTUCO Y VINILO 3 MANOS m² 2.25 20,455 20,544 21,498 21,436INSTALACIÓN Y DOTACION BAÑO NO.6 un 1.00 1,604,515 1,639,796 1,622,556 1,631,281JUEGOS INCRUSTAR STILO un 1.00 278,431 278,277 278,477 278,238OLIMPIA BRILL.BASE 20X20 m² 14.40 529,321 528,281 531,611 526,417PUERTAS DUCHAS POLIESTIR. m² 2.70 256,500 302,400 256,500 270,000PUERTAS MARCO Y HOJA un 1.00 255,928 176,896 175,366 201,317 3,045,756 3,043,652 2,982,374 3,015,000
INSTALACIÓN Y DOTACION BAÑO NO.1 unBIDÉ CORONA PRESTIGIO un 1.00 572,000 503,000 503,000 503,000LAVAMANOS ATHENAS CONJ. CL-O un 1.00 361,900 314,000 277,724 277,724MEZCLADOR ATHENAS CRO SIN SAL un 1.00 104,000 380,000 380,000 104,000SANITARIO 30948/100 un 1.00 321,000 185,100 184,000 163,500INSTALACIÓN APARATO SANITARIO un 4.00 108,297 108,021 108,380 107,952PUNTO AGUA CALIENTE CPVC un 3.00 233,707 233,707 233,707 232,452
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
3
ANÁLISIS COMPUESTOS / CARPINTERÍA MADERA
PUNTO AGUA FRIA PVC un 4.00 314,569 312,446 312,446 310,284PUNTO DESAGUE PVC 3”;4” un 4.00 378,734 378,734 378,734 370,362SALIDA LAMPARA TOMA PVC un 3.00 288,982 290,141 288,522 281,753 2,683,189 2,705,149 2,666,513 2,351,028
INSTALACIÓN Y DOTACION BAÑO NO.2 unBIDÉ CORONA STILO un 1.00 330,300 249,000 249,000 249,000LAVAMANOS STILO 71580/115 un 1.00 227,586 221,880 205,000 221,880MEZCLADOR ATHENAS CRO-O CON SAL un 1.00 389,000 430,800 430,800 430,800SANITARIO STILO 80538/118 un 1.00 412,900 412,900 412,900 412,900INSTALACIÓN APARATO SANITARIO un 4.00 108,297 108,021 108,380 107,952PUNTO AGUA CALIENTE CPVC un 3.00 233,707 233,707 233,707 232,452PUNTO AGUA FRIA PVC un 4.00 314,569 312,446 312,446 310,284PUNTO DESAGUE PVC 3”;4” un 4.00 378,734 378,734 378,734 370,362SALIDA LAMPARA TOMA PVC un 3.00 288,982 290,141 288,522 281,753 2,684,075 2,637,629 2,619,489 2,617,384
INSTALACIÓN Y DOTACION BAÑO NO.3 unLAVAMANOS ATHENAS CONJ. CL-O un 1.00 361,900 314,000 277,724 277,724MEZCLADOR ATHENAS CRO-O CON SAL un 1.00 389,000 430,800 430,800 430,800SANITARIO 30948/100 un 1.00 321,000 185,100 184,000 163,500INSTALACIÓN APARATO SANITARIO un 3.00 81,223 81,016 81,285 80,964PUNTO AGUA CALIENTE CPVC un 2.00 155,805 155,805 155,805 154,968PUNTO AGUA FRIA PVC un 3.00 235,927 234,334 234,334 232,713PUNTO DESAGUE PVC 3”;4” un 3.00 284,050 284,050 284,050 277,772SALIDA LAMPARA TOMA PVC un 2.00 192,654 193,427 192,348 187,835 2,021,559 1,878,532 1,840,346 1,806,276
INSTALACIÓN Y DOTACION BAÑO NO.4 unLAVAMANOS STILO 71580/115 un 1.00 227,586 221,880 205,000 221,880MEZCLADOR ATHENAS CRO-O CON SAL un 1.00 389,000 430,800 430,800 430,800SANITARIO STILO 80538/118 un 1.00 412,900 412,900 412,900 412,900INSTALACIÓN APARATO SANITARIO un 3.00 81,223 81,016 81,285 80,964PUNTO AGUA CALIENTE CPVC un 2.00 155,805 155,805 155,805 154,968PUNTO AGUA FRIA PVC un 3.00 235,927 234,334 234,334 232,713PUNTO DESAGUE PVC 3”;4” un 3.00 284,050 284,050 284,050 277,772SALIDA LAMPARA TOMA PVC un 1.00 96,327 96,714 96,174 93,918 1,882,818 1,917,499 1,900,348 1,905,915
INSTALACIÓN Y DOTACION BAÑO NO.5 unLAVAMANOS ATHENAS CONJ. CL-O un 1.00 361,900 314,000 277,724 277,724MEZCLADOR ATHENAS CRO-O CON SAL un 1.00 389,000 430,800 430,800 430,800SANITARIO 30948/100 un 1.00 321,000 185,100 184,000 163,500INSTALACIÓN APARATO SANITARIO un 2.00 54,148 54,010 54,190 53,976PUNTO AGUA CALIENTE CPVC un 1.00 77,902 77,902 77,902 77,484PUNTO AGUA FRIA PVC un 2.00 157,285 156,223 156,223 155,142PUNTO DESAGUE PVC 3”;4” un 2.00 189,367 189,367 189,367 185,181SALIDA LAMPARA TOMA PVC un 1.00 96,327 96,714 96,174 93,918 1,646,929 1,504,116 1,466,380 1,437,725
INSTALACIÓN Y DOTACION BAÑO NO.6 unLAVAMANOS STILO 71580/115 un 1.00 227,586 221,880 205,000 221,880MEZCLADOR ATHENAS CRO-O CON SAL un 1.00 389,000 430,800 430,800 430,800SANITARIO STILO 80538/118 un 1.00 412,900 412,900 412,900 412,900INSTALACIÓN APARATO SANITARIO un 2.00 54,148 54,010 54,190 53,976PUNTO AGUA CALIENTE CPVC un 1.00 77,902 77,902 77,902 77,484PUNTO AGUA FRIA PVC un 2.00 157,285 156,223 156,223 155,142PUNTO DESAGUE PVC 3”;4” un 2.00 189,367 189,367 189,367 185,181SALIDA LAMPARA TOMA PVC un 1.00 96,327 96,714 96,174 93,918 1,604,515 1,639,796 1,622,556 1,631,281
CARPINTERIA MADERA
BARANDA EN MADERA mCEDRO MACHO PIEZA 3.0 un 0.70 35,000 35,000 35,000 35,000MANO DE OBRA DD hc 1.00 13,052 13,052 13,052 13,052PUNTILLA SIN CABEZA 1” lb 0.25 673 675 673 548TORNILLO PARA MADERA 2” NO.9 un 2.00 64 52 64 52SUB-CONTRATO CARPINTERIA % 45.00 21,955 21,951 21,955 21,893 70,744 70,730 70,744 70,545
CLOSET FLORMORADO m²BISAGRA COMÚN 3” un 1.00 700 700 900 700MADERA FLORMORADO PIEZA un 0.52 19,302 19,760 19,302 19,302MANO DE OBRA DD hc 6.31 82,358 82,358 82,358 82,358PEGANTE COLBÓN kl 0.25 2,113 1,813 2,113 2,108PUNTILLA SIN CABEZA 1” lb 0.15 404 405 404 329TORNILLO PARA MADERA 2” NO.9 un 4.68 150 122 150 122SUB-CONTRATO CARPINTERIA % 45.00 47,262 47,321 47,352 47,213 152,288 152,478 152,578 152,132
CLOSET FOLDING DOOR AMERICA m²CLOSET AMERICANO METAL m² 1.00 125,860 125,860 141,000 125,860 125,860 125,860 141,000 125,860
CLOSET FOLDING DOOR INGLES m²CLOSET INGLES METAL m² 1.00 134,560 134,560 135,800 134,560 134,560 134,560 135,800 134,560
CLOSET FOLDING DOOR SEVILLA m²CLOSET SEVILLA METAL/REJ. m² 1.00 148,016 148,016 152,000 148,016 148,016 148,016 152,000 148,016
CLOSET FOLDING DOOR VENECIA m²CLOSET VENECIA METAL m² 1.00 154,744 154,744 172,000 154,744 154,744 154,744 172,000 154,744
CLOSET FORRADO FLORMORADO m²BISAGRA COMÚN 3” un 1.39 973 973 1,251 973MADERA FLORMORADO PIEZA un 0.60 22,272 22,800 22,272 22,272MANO DE OBRA DD hc 9.21 120,209 120,209 120,209 120,209PEGANTE COLBÓN kl 0.25 2,113 1,813 2,113 2,108PUNTILLA SIN CABEZA 1” lb 0.50 1,346 1,350 1,346 1,096TORNILLO PARA MADERA 2” NO.9 un 3.85 123 100 123 100SUB-CONTRATO CARPINTERIA % 45.00 66,166 66,260 66,291 66,041 213,201 213,505 213,604 212,799
CLOSET TIPO A FORRADO m²BISAGRA COMÚN 3” un 1.39 973 973 1,251 973CAOBA PIEZA un 1.04 0 14,040 0 0CEDRO CAQUETA PIEZA un 1.04 0 0 0 35,859CEDRO MACHO PIEZA 3.0 un 1.04 84,448 0 0 0MANO DE OBRA DD hc 9.21 120,209 120,209 120,209 120,209PEGANTE COLBÓN kl 0.25 2,113 1,813 2,113 2,108PUNTILLA SIN CABEZA 1” lb 0.50 1,346 1,350 1,346 1,096TABLON ABARCO 1”`X8” un 1.04 0 0 11,440 0TORNILLO PARA MADERA 2” NO.9 un 3.85 123 100 123 100TRIPLEX PIZANO 4 MM 1.22 X 2.44 un 2.18 73,115 73,115 73,115 73,115SUB-CONTRATO CARPINTERIA % 45.00 127,047 95,220 94,318 105,057 409,373 306,819 303,914 338,517
CLOSET TIPO B m²BISAGRA COMÚN 3” un 0.76 532 532 684 532CAOBA PIEZA un 0.87 0 11,745 0 0CEDRO CAQUETA PIEZA un 0.87 0 0 0 29,998CEDRO MACHO PIEZA 3.0 un 0.87 70,644 0 0 0MANO DE OBRA DD hc 6.31 82,358 82,358 82,358 82,358PEGANTE COLBÓN kl 0.25 2,113 1,813 2,113 2,108PUNTILLA SIN CABEZA 1” lb 0.15 404 405 404 329TABLON ABARCO 1”`X8” un 0.87 0 0 9,570 0TORNILLO PARA MADERA 2” NO.9 un 4.68 150 122 150 122TRIPLEX PIZANO 4 MM 1.22 X 2.44 un 2.18 73,115 73,115 73,115 73,115SUB-CONTRATO CARPINTERIA % 45.00 103,192 76,540 75,777 84,852 332,507 246,630 244,170 273,413
CLOSET VARTEL MADERA m²CLOSET MADERA TRIPLEX m² 1.00 180,000 180,000 157,000 187,200 180,000 180,000 157,000 187,200
DIFUSOR - FLORMORADO m²MADERA FLORMORADO PIEZA un 0.80 29,696 30,400 29,696 29,696MANO DE OBRA DD hc 2.69 35,110 35,110 35,110 35,110PEGANTE COLBÓN kl 0.10 845 725 845 843PUNTILLA SIN CABEZA 1” lb 0.10 269 270 269 219SUB-CONTRATO CARPINTERIA % 45.00 29,664 29,927 29,664 29,641 95,584 96,432 95,584 95,509
DIFUSORES- MARCO PARA VIDRIO m²CAOBA PIEZA un 0.80 0 10,800 0 0CEDRO CAQUETA PIEZA un 0.80 0 0 0 27,584CEDRO MACHO PIEZA 3.0 un 0.80 64,960 0 0 0MANO DE OBRA DD hc 2.89 37,720 37,720 37,720 37,720PEGANTE COLBÓN kl 0.10 845 725 845 843PUNTILLA SIN CABEZA 1” lb 0.10 269 270 269 219TABLON ABARCO 1”`X8” un 0.80 0 0 8,800 0SUB-CONTRATO CARPINTERIA % 45.00 46,707 22,282 21,435 29,865 150,502 71,797 69,070 96,232
ENCHAPES MUROS EN TRIPLEX m²LISTON MONTERREY 1X2X3 m 2.00 0 0 844 0LISTON OTOBO m 2.00 0 2,100 0 0LISTÓN DE ORDINARIO m 2.00 0 0 0 1,462LISTÓN M.H. PINO CIPRES m 2.00 17,160 0 0 0MANO DE OBRA DD hc 0.50 6,526 6,526 6,526 6,526PEGANTE BOXER un 0.10 2,545 2,768 2,600 2,723TRIPLEX OKUME PIZANO 4 MM 1.22 X 2.44 un 0.36 14,967 14,967 14,967 14,967SUB-CONTRATO CARPINTERIA % 45.00 18,539 11,862 11,221 11,555 59,736 38,223 36,158 37,232
ENCHAPES MUROS FLORMORADO m²CHAZO MADERA .04X.04 un 2.00 500 500 500 500MANO DE OBRA DD hc 0.50 6,526 6,526 6,526 6,526PEGANTE BOXER un 0.10 2,545 2,768 2,600 2,723TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 0.35 44,820 44,820 44,820 44,820SUB-CONTRATO CARPINTERIA % 45.00 24,476 24,576 24,501 24,556 78,866 79,190 78,947 79,125
HOJA PUERTA FLORMORADO.60 unCAOBA PIEZA un 0.32 0 4,320 0 0CEDRO CAQUETA PIEZA un 0.32 0 0 0 11,034CEDRO MACHO PIEZA 3.0 un 0.32 25,984 0 0 0MANO DE OBRA DD hc 1.72 22,449 22,449 22,449 22,449PEGANTE COLBÓN kl 0.15 1,268 1,088 1,268 1,265PUNTILLA SIN CABEZA 1” lb 0.10 269 270 269 219TABLON ABARCO 1”`X8” un 0.32 0 0 3,520 0TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 1.50 192,086 192,086 192,086 192,086SUB-CONTRATO CARPINTERIA % 45.00 108,925 99,096 98,816 102,174 350,981 319,308 318,408 329,226
CONSTRUDATA4
HOJA PUERTA FLORMORADO.80 unCAOBA PIEZA un 0.34 0 4,590 0 0CEDRO CAQUETA PIEZA un 0.34 0 0 0 11,723CEDRO MACHO PIEZA 3.0 un 0.34 27,608 0 0 0MANO DE OBRA DD hc 1.72 22,449 22,449 22,449 22,449PEGANTE COLBÓN kl 0.15 1,268 1,088 1,268 1,265PUNTILLA SIN CABEZA 1” lb 0.10 269 270 269 219TABLON ABARCO 1”`X8” un 0.34 0 0 3,740 0TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 1.00 128,057 128,057 128,057 128,057SUB-CONTRATO CARPINTERIA % 45.00 80,843 70,404 70,102 73,671 260,494 226,858 225,885 237,385
HOJA PUERTA FLORMORADO.90 unCAOBA PIEZA un 0.36 0 4,860 0 0CEDRO CAQUETA PIEZA un 0.36 0 0 0 12,413CEDRO MACHO PIEZA 3.0 un 0.36 29,232 0 0 0MANO DE OBRA DD hc 1.72 22,449 22,449 22,449 22,449PEGANTE COLBÓN kl 0.15 1,268 1,088 1,268 1,265PUNTILLA SIN CABEZA 1” lb 0.10 269 270 269 219TABLON ABARCO 1”`X8” un 0.36 0 0 3,960 0TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 1.50 192,086 192,086 192,086 192,086SUB-CONTRATO CARPINTERIA % 45.00 110,387 99,339 99,014 102,794 355,690 320,091 319,046 331,226
HOJA PUERTA FORTEC 0.70 unMANO DE OBRA DD hc 0.70 9,136 9,136 9,136 9,136PUERTA FORTEC RESIDENCIAL 0.71 un 1.00 38,541 39,000 39,900 37,840 47,677 48,136 49,036 46,976
HOJA PUERTA FORTEC 0.71 unMANO DE OBRA DD hc 0.70 9,136 9,136 9,136 9,136PUERTA FORTEC RESIDENCIAL 0.71 un 1.00 38,541 39,000 39,900 37,840 47,677 48,136 49,036 46,976
HOJA PUERTA FORTEC 0.91 unMANO DE OBRA DD hc 0.70 9,136 9,136 9,136 9,136PUERTA FORTEC RESIDENCIAL 0.91 un 1.00 79,500 69,540 79,500 67,200 88,636 78,676 88,636 76,336
HOJA PUERTA FORTEC 1.00 unMANO DE OBRA DD hc 0.70 9,136 9,136 9,136 9,136PUERTA FORTEC RESIDENCIAL 0.91 un 1.10 87,450 76,494 87,450 73,920 96,586 85,630 96,586 83,056
HOJA PUERTA FORTEC 1.50 unMANO DE OBRA DD hc 0.70 9,136 9,136 9,136 9,136PUERTA FORTEC RESIDENCIAL 0.51 un 3.00 98,520 119,670 102,000 96,780 107,656 128,806 111,136 105,916
HOJA PUERTA TRIPLEX 0.81 unMANO DE OBRA DD hc 0.70 9,136 9,136 9,136 9,136PUERTA PIZANO 0.30-0.50 un 1.00 67,941 67,941 67,941 67,941 77,077 77,077 77,077 77,077
HOJA PUERTA TRIPLEX 1.01 unMANO DE OBRA DD hc 0.70 9,136 9,136 9,136 9,136PUERTA PIZANO INTERES SOCIAL 0.51 - 0.75 un 1.00 44,409 44,409 44,409 44,409 53,545 53,545 53,545 53,545
MUEBLE BAJO .80 mBISAGRA COMÚN 3” un 4.66 3,262 3,262 4,194 3,262CAOBA PIEZA un 0.90 0 12,150 0 0CEDRO CAQUETA PIEZA un 0.90 0 0 0 31,032CEDRO MACHO PIEZA 3.0 un 0.90 73,080 0 0 0MANO DE OBRA DD hc 8.45 110,289 110,289 110,289 110,289PEGANTE COLBÓN kl 0.20 1,690 1,450 1,690 1,686PUNTILLA SIN CABEZA 1” lb 0.40 1,076 1,080 1,076 877TABLON CEIBA un 0.90 0 0 56,700 0TORNILLO PARA MADERA 2” NO.9 un 6.98 223 181 223 181TRIPLEX PIZANO 4 MM 1.22 X 2.44 un 1.74 58,358 58,358 58,358 58,358SUB-CONTRATO CARPINTERIA % 45.00 111,591 84,047 104,639 92,559 359,570 270,818 337,170 298,244
MUEBLE H/.80 FLORMORADO mBISAGRA COMÚN 3” un 4.66 3,262 3,262 4,194 3,262MADERA FLORMORADO PIEZA un 0.52 19,302 19,760 19,302 19,302MANO DE OBRA DD hc 8.45 110,289 110,289 110,289 110,289PEGANTE COLBÓN kl 0.20 1,690 1,450 1,690 1,686PUNTILLA SIN CABEZA 1” lb 0.45 1,211 1,215 1,211 986TORNILLO PARA MADERA 2” NO.9 un 6.98 223 181 223 181TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 0.70 89,640 89,640 89,640 89,640SUB-CONTRATO CARPINTERIA % 45.00 101,528 101,609 101,948 101,407 327,146 327,407 328,498 326,754
MUEBLE LINOS FLORMORADO m²MADERA FLORMORADO PIEZA un 0.52 19,302 19,760 19,302 19,302MANO DE OBRA DD hc 6.00 78,312 78,312 78,312 78,312PEGANTE COLBÓN kl 0.20 1,690 1,450 1,690 1,686PUNTILLA SIN CABEZA 1” lb 0.15 404 405 404 329TORNILLO PARA MADERA 2” NO.9 un 4.56 146 119 146 119TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 0.35 44,820 44,820 44,820 44,820SUB-CONTRATO CARPINTERIA % 45.00 65,103 65,189 65,103 65,056 209,777 210,055 209,777 209,623
MUEBLE TIPO LINOS m²CAOBA PIEZA un 0.87 0 11,745 0 0CEDRO CAQUETA PIEZA un 0.87 0 0 0 29,998CEDRO MACHO PIEZA 3.0 un 0.87 70,644 0 0 0
MANO DE OBRA DD hc 6.00 78,312 78,312 78,312 78,312PEGANTE COLBÓN kl 0.20 1,690 1,450 1,690 1,686PUNTILLA SIN CABEZA 1” lb 0.15 404 405 404 329TABLON ABARCO 1”`X8” un 0.87 0 0 9,570 0TORNILLO PARA MADERA 2” NO.9 un 4.56 146 119 146 119TRIPLEX PIZANO 4 MM 1.22 X 2.44 un 0.80 26,831 26,831 26,831 26,831SUB-CONTRATO CARPINTERIA % 45.00 80,112 53,488 52,629 61,773 258,139 172,350 169,582 199,048
PASAMANOS ESCAL. .15X.02 mCEDRO MACHO PIEZA 3.0 un 0.10 5,000 5,000 5,000 5,000MANO DE OBRA DD hc 1.00 13,052 13,052 13,052 13,052PUNTILLA SIN CABEZA 1” lb 0.10 269 270 269 219TORNILLO PARA MADERA 2” NO.9 un 2.00 64 52 64 52SUB-CONTRATO CARPINTERIA % 45.00 8,273 8,268 8,273 8,245 26,658 26,642 26,658 26,569
PASAMANOS FLORM. 15X.02 mMADERA FLORMORADO PIEZA un 0.17 6,310 6,460 6,310 6,310MANO DE OBRA DD hc 1.00 13,052 13,052 13,052 13,052PUNTILLA SIN CABEZA 1” lb 0.25 673 675 673 548TORNILLO PARA MADERA 2” NO.9 un 2.00 64 52 64 52SUB-CONTRATO CARPINTERIA % 45.00 9,045 9,108 9,045 8,983 29,144 29,347 29,144 28,945
PIRLAN .10 FLORMORADO mMADERA FLORMORADO PIEZA un 0.09 3,341 3,420 3,341 3,341MANO DE OBRA DD hc 0.92 12,008 12,008 12,008 12,008PUNTILLA SIN CABEZA 1” lb 0.14 377 378 377 307TORNILLO PARA MADERA 2” NO.9 un 2.00 64 52 64 52SUB-CONTRATO CARPINTERIA % 45.00 7,105 7,136 7,105 7,068 22,895 22,994 22,895 22,776
PIRLANES DE MADERA .10 mCAOBA PIEZA un 0.09 0 1,215 0 0CEDRO CAQUETA PIEZA un 0.09 0 0 0 3,103CEDRO MACHO PIEZA 3.0 un 0.09 7,308 0 0 0MANO DE OBRA DD hc 0.92 12,008 12,008 12,008 12,008PUNTILLA SIN CABEZA 1” lb 0.14 377 378 377 307TABLON ABARCO 1”`X8” un 0.09 0 0 990 0TORNILLO PARA MADERA 2” NO.9 un 2.00 64 52 64 52SUB-CONTRATO CARPINTERIA % 45.00 8,890 6,144 6,047 6,961 28,647 19,797 19,486 22,431
PUERTA FLORMORADO MARCO Y HOJA unBISAGRA COMÚN 3” un 3.00 2,100 2,100 2,700 2,100MADERA FLORMORADO PIEZA un 0.44 16,333 16,720 16,333 16,333MANO DE OBRA DD hc 3.00 39,156 39,156 39,156 39,156PEGANTE COLBÓN kl 0.20 1,690 1,450 1,690 1,686PUNTILLA SIN CABEZA 1” lb 0.35 942 945 942 767TORNILLO PARA MADERA 2” NO.9 un 18.00 576 468 576 468TRIPLEX FORMAPLAC 18MM 1.22 X 2.44 un 1.50 192,086 192,086 192,086 192,086SUB-CONTRATO CARPINTERIA % 45.00 113,797 113,816 114,067 113,668 366,679 366,741 367,549 366,264
PUERTAS MARCO Y HOJA unBISAGRA COMÚN 3” un 3.00 2,100 2,100 2,700 2,100CAOBA PIEZA un 0.80 0 10,800 0 0CEDRO CAQUETA PIEZA un 0.80 0 0 0 27,584CEDRO MACHO PIEZA 3.0 un 0.80 64,960 0 0 0MANO DE OBRA DD hc 3.00 39,156 39,156 39,156 39,156PEGANTE COLBÓN kl 0.20 1,690 1,450 1,690 1,686PUNTILLA SIN CABEZA 1” lb 0.35 942 945 942 767TABLON ABARCO 1”`X8” un 0.80 0 0 8,800 0TORNILLO PARA MADERA 2” NO.9 un 18.00 576 468 576 468TRIPLEX PIZANO 4 MM 1.22 X 2.44 un 2.00 67,078 67,078 67,078 67,078SUB-CONTRATO CARPINTERIA % 45.00 79,426 54,899 54,424 62,478 255,928 176,896 175,366 201,317
VENTANERIA EN MADERA m²BISAGRA COMÚN 3” un 1.00 700 700 900 700CAOBA PIEZA un 0.46 0 6,210 0 0CEDRO CAQUETA PIEZA un 0.46 0 0 0 15,861CEDRO MACHO PIEZA 3.0 un 0.46 37,352 0 0 0MANO DE OBRA DD hc 2.50 32,630 32,630 32,630 32,630PEGANTE COLBÓN kl 0.13 1,099 943 1,099 1,096PUNTILLA SIN CABEZA 1” lb 0.13 350 351 350 285TABLON ABARCO 1”`X8” un 0.46 0 0 5,060 0TORNILLO PARA MADERA 2” NO.9 un 6.00 192 156 192 156SUB-CONTRATO CARPINTERIA % 45.00 32,545 18,445 18,104 22,828 104,867 59,435 58,334 73,555
CARPINTERIA METALICA
CAJAS CONTADORES AGUA unANTICORROSIVO ROJO CLARO gl 0.02 640 620 616 616BISAGRA ALUMINIO EXT 2” un 0.51 434 434 459 434LÁMINA COLD ROLLED CAL.16 un 0.37 21,659 21,659 21,659 19,609SOLDADURA ELÉCTRICA 004-3/23” kg 0.68 2,788 2,788 2,788 2,788SUB-CONTRATO ORNAMENTACION % 50.00 12,760 12,750 12,761 11,724 38,281 38,251 38,284 35,171
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
5
CELOSIA ALUMINIO m²CELOSÍA EN ALUMINIO m² 1.00 80,000 79,900 80,000 85,000 80,000 79,900 80,000 85,000
CERRAMIENTO CANCHA TENIS m²MALLA PLASTIFICADA CAL. 10 H= 2.0 m² 1.00 10,904 8,695 10,904 14,904PLATINA HIERRO 1/2 X 1/8 m 1.36 811 811 811 910SOLDADURA SP-13 1/8 kl 0.04 240 232 300 255TUBO ESTRUCT. GALVANIZADO 1” m 0.11 1,136 1,136 1,136 1,137TUBO ESTRUCT. GALVANIZADO 2” m 0.42 8,715 8,601 8,715 8,715ÁNGULO HIERRO 2 1/2” X 3/16” m 0.92 7,994 7,576 7,576 8,694SUB-CONTRATO DE ORNAMENTACION % 50.00 14,900 13,526 14,721 17,307 44,699 40,577 44,162 51,921
ESCALERA DE GATO mANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308SOLDADURA ELÉCTRICA 004-3/23” kg 0.01 41 41 41 41TUBO GALVANIZADO 1” m 5.00 51,560 25,135 62,850 51,560SUB-CONTRATO DE ORNAMENTACION % 50.00 25,961 12,743 31,600 25,955 77,882 38,229 94,799 77,864
MARCOS PUERTAS LAMINA-.80 unANTICORROSIVO ROJO CLARO gl 0.02 640 620 616 616BISAGRA ALUMINIO EXT 3” un 3.00 5,400 5,100 5,700 5,100LÁMINA COLD ROLLED CAL.18 un 0.67 31,422 31,422 31,422 28,407SOLDADURA ELÉCTRICA 004-3/23” kg 0.08 328 328 328 328SUB-CONTRATO DE ORNAMENTACION % 50.00 18,895 18,735 19,033 17,226 56,685 56,205 57,099 51,678
MARCOS TAPAS CAJA INSPECCION unACERO FIGURADO 37000 PSI 1/4” kg 8.40 15,103 18,077 15,103 23,890PLATINA 1 1/4 X 1/4 kg 3.36 64,441 64,441 64,441 40,448SOLDADURA ELÉCTRICA 004-3/23” kg 0.20 820 820 820 820ÁNGULO HIERRO 2” X 1/4” un 3.36 140,959 140,959 141,557 169,210SUB-CONTRATO DE ORNAMENTACION % 50.00 110,662 112,148 110,961 117,183 331,985 336,445 332,882 351,550
MARQUESINAS LAMINA m²ANTICORROSIVO ROJO CLARO gl 0.02 640 620 616 616LÁMINA COLD ROLLED CAL.16 un 0.43 25,172 25,172 25,172 22,789SOLDADURA ELÉCTRICA 004-3/23” kg 0.22 902 902 902 902TUBO ESTRUCT. GALVANIZADO 1” m 1.05 10,847 10,847 10,847 10,850SUB-CONTRATO DE ORNAMENTACION % 50.00 18,780 18,770 18,768 17,579 56,340 56,310 56,304 52,736
PUERTA CANCHA TENIS 1X1 unMALLA PLASTIFICADA CAL. 10 H= 2.0 m² 1.00 10,904 8,695 10,904 14,904PLATINA HIERRO 1/2 X 1/8 m 2.00 1,192 1,192 1,192 1,338SOLDADURA 60.13 DE 1/8 kg 0.05 207 190 207 160TUBO ESTRUCT. GALVANIZADO 1” m 2.00 20,660 20,660 20,660 20,666ÁNGULO HIERRO 2” X 3/16” m 2.00 10,382 9,600 10,382 12,590SUB-CONTRATO DE ORNAMENTACION % 50.00 21,673 20,169 21,673 24,829 65,018 60,506 65,018 74,487
PUERTA ELECTRICA CORREDIZA unMANO DE OBRA AA hc 4.00 43,508 43,508 43,508 43,508PUERTA ELÉCTRICA CORREDIZA un 1.00 5,220,000 5,220,000 5,220,000 5,637,600SUB-CONTRATO DE ORNAMENTACION % 15.00 789,526 789,526 789,526 852,166 6,053,034 6,053,034 6,053,034 6,533,274
PUERTAS LAMINA m²ANTICORROSIVO ROJO CLARO gl 0.05 1,600 1,550 1,540 1,541BISAGRA ALUMINIO EXT 3” un 0.75 1,350 1,275 1,425 1,275LÁMINA COLD ROLLED CAL.16 un 1.50 87,809 87,809 87,809 79,497SOLDADURA ELÉCTRICA 004-3/23” kg 0.97 3,977 3,977 3,977 3,977SUB-CONTRATO DE ORNAMENTACION % 50.00 47,368 47,305 47,375 43,145 142,103 141,916 142,126 129,435
PUERTAS VENTANAS LAMINA m²ANTICORROSIVO ROJO CLARO gl 0.23 7,360 7,130 7,084 7,089BISAGRA ALUMINIO EXT 3” un 1.75 3,150 2,975 3,325 2,975LÁMINA COLD ROLLED CAL.18 un 0.55 25,794 25,794 25,794 23,319SOLDADURA ELÉCTRICA 004-3/23” kg 0.16 656 656 656 656ÁNGULO HIERRO 3/4” X 1/8” m 1.05 1,299 1,208 1,299 1,167SUB-CONTRATO DE ORNAMENTACION % 50.00 19,130 18,881 19,079 17,603 57,389 56,644 57,237 52,809
REJA BANCARIA m²ANTICORROSIVO ROJO CLARO gl 0.20 6,400 6,200 6,160 6,164HIERRO CUADRADO 9 MM un 1.74 12,984 12,984 12,984 12,636SOLDADURA ELÉCTRICA 004-3/23” kg 0.60 2,460 2,460 2,460 2,460SUB-CONTRATO DE ORNAMENTACION % 50.00 10,922 10,822 10,802 10,630 32,766 32,466 32,406 31,890
REJAS LAMINA m²ANTICORROSIVO ROJO CLARO gl 0.02 640 620 616 616LÁMINA COLD ROLLED CAL.18 un 0.21 9,849 9,849 9,849 8,904SOLDADURA ELÉCTRICA 004-3/23” kg 0.46 1,886 1,886 1,886 1,886TUBO MUEBLE CAL.18 1” m 7.35 23,072 23,072 23,072 23,072SUB-CONTRATO DE ORNAMENTACION % 50.00 17,723 17,713 17,711 17,239 53,170 53,140 53,134 51,717
REJILLAS PISO .30 mACERO FIGURADO 60000 PSI 1” kg 10.44 18,771 22,467 18,771 19,251ANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308SOLDADURA ELÉCTRICA 004-3/23” kg 1.00 4,100 4,100 4,100 4,100ÁNGULO HIERRO 3/4” X 1/8” m 4.10 5,072 4,715 5,072 4,555SUB-CONTRATO DE ORNAMENTACION % 50.00 14,131 15,796 14,125 14,107
42,394 47,388 42,376 42,322
SOMBRERETE PARA CHIMENEA T-C unLÁMINA GALVANIZADA .20 un 0.35 14,125 14,125 14,125 14,962SOLDADURA 60.13 DE 1/8 kg 0.20 828 760 828 641TORNILLO ACERO 1/2X1/4” un 8.00 520 496 520 520SUB-CONTRATO DE ORNAMENTACION % 80.00 12,379 12,305 12,379 12,899 27,852 27,686 27,852 29,022
TAPAS SHUT LAMINA unANTICORROSIVO ROJO CLARO gl 0.02 640 620 616 616LÁMINA COLD ROLLED CAL.16 un 0.50 29,270 29,270 29,270 26,499SOLDADURA ELÉCTRICA 004-3/23” kg 0.46 1,886 1,886 1,886 1,886SUB-CONTRATO DE ORNAMENTACION % 50.00 15,898 15,888 15,886 14,501 47,693 47,663 47,657 43,502
VENTANA ALUMINIO CORREDIZA m²VENTANA CORREDIZA 1.2X1.2 m² 1.00 90,000 75,000 90,000 67,000 90,000 75,000 90,000 67,000
VENTANA ALUMINIO ECONOMICA m²VENTANA CORREDIZA 1.2X1.2 m² 1.00 90,000 75,000 90,000 67,000 90,000 75,000 90,000 67,000
VENTANA ALUMINIO FIJA m²VENTANA ALUMINIO FIJA m² 1.00 69,000 78,500 69,000 82,564 69,000 78,500 69,000 82,564
VENTANA ALUMINIO GUILLOTINA m²VENTANA PROYECTANTE 1.5X2.0 m² 1.00 90,000 76,000 90,000 79,885 90,000 76,000 90,000 79,885
VENTANAS LAMINA m²ANTICORROSIVO ROJO CLARO gl 0.23 7,360 7,130 7,084 7,089BISAGRA ALUMINIO EXT 2” un 1.05 893 893 945 893LÁMINA COLD ROLLED CAL.18 un 0.44 20,636 20,636 20,636 18,656MANIJA PARA VENTANA un 1.00 2,000 2,000 2,500 2,000SOLDADURA ELÉCTRICA 004-3/23” kg 0.16 656 656 656 656ÁNGULO HIERRO 3/4” X 1/8” m 1.94 2,400 2,231 2,400 2,155SUB-CONTRATO DE ORNAMENTACION % 50.00 16,972 16,773 17,110 15,724 50,916 50,318 51,331 47,172
CIELOS RASOS
APLIQUE YESO mAPLIQUE DE LUZ un 1.00 38,280 38,280 27,232 33,000 38,280 38,280 27,232 33,000
ARMADURA MADERA Y MALLA m²CUARTON OTOBO 2”X4” 2.9 m 2.16 0 9,720 0 0LISTON ABARCO 3 M m 2.16 0 0 10,800 0MALLA CON VENA 0.60X2.00 un 0.73 3,201 3,285 3,075 2,409MANO DE OBRA AA hc 1.10 11,965 11,965 11,965 11,965PUNTILLA CON CABEZA 2” lb 0.04 111 114 94 110REPISA ORDINARIO 3 M m 2.16 2,179 0 0 2,117 17,456 25,084 25,934 16,600
CIELO RASO BOVEDAS DRYWALL m²CIELO RASO DRY-WALL BÓVEDA m² 1.00 25,000 27,217 25,000 25,000MANO DE OBRA DD hc 1.38 18,012 18,012 18,012 18,012VINILTEX gl 0.04 1,596 1,596 1,869 1,800SUB-CONTRATO INSTALACION % 20.00 8,922 9,365 8,976 8,962 53,529 56,190 53,856 53,774
CIELO RASO DURACUSTIC m²FIBERGLASS DURACUSTIC 5/8” lm 1.00 11,240 12,589 11,240 11,240MANO DE OBRA BB hc 1.00 11,965 11,965 11,965 11,965SUB-CONTRATO INSTALACION % 43.00 9,978 10,558 9,978 9,978 33,183 35,112 33,183 33,183
CIELO RASO PLANO DRYWALL m²CIELO RASO DRY-WALL PLANO m² 1.00 35,620 34,705 33,250 33,950MANO DE OBRA DD hc 1.13 14,749 14,749 14,749 14,749VINILTEX gl 0.04 1,596 1,596 1,869 1,800SUB-CONTRATO INSTALACION % 20.00 10,393 10,210 9,973 10,100 62,358 61,260 59,841 60,599
CIELO RASO TABLEX 19MM m²CUARTON OTOBO 2”X4” 2.9 m 2.54 0 11,430 0 0LISTON ABARCO 3 M m 2.54 0 0 12,700 0MANO DE OBRA AA hc 1.30 14,140 14,140 14,140 14,140MERULEX I.F.A.TRANSPARENTE (20 KG) kg 0.20 1,810 1,810 1,810 1,810PUERTA PIZANOTRIPLEX TABLEX DE 0.51 - 0.75 un 0.27 17,480 17,480 17,480 17,480PUNTILLA CON CABEZA 2” lb 2.06 5,731 5,871 4,853 5,653REPISA ORDINARIO 3 M m 2.54 2,563 0 0 2,489 41,724 50,731 50,983 41,572
CIELO RASO TRIPLEX m²CUARTON OTOBO 2”X4” 2.9 m 2.54 0 11,430 0 0MANO DE OBRA AA hc 1.10 11,965 11,965 11,965 11,965MERULEX I.F.A.TRANSPARENTE (20 KG) kg 0.20 1,810 1,810 1,810 1,810PUNTILLA CON CABEZA 2” lb 2.06 5,731 5,871 4,853 5,653REPISA ORDINARIO 3 M m 2.54 7,620 0 0 0TABLA BURRA CEDRO MACHO 0.10 m 2.54 0 0 8,890 8,890TRIPLEX PIZANO 14 MM 1.22 X 2.44 un 0.27 29,447 29,447 29,447 29,447 56,573 60,523 56,965 57,764
CONSTRUDATA6
CIELOS RASOS / CIMIENTOS
CIELO RASO YESO OCULTO m²CIELO RASO CARRIL OCULTO m² 1.00 33,176 33,176 36,400 29,000 33,176 33,176 36,400 29,000
CIELO RASO YESO SEMI OCULTO m²CIELO RASO CARRIL SEMI OCULTO m² 1.00 38,860 33,176 36,400 39,000 38,860 33,176 36,400 39,000
CORNISAS YESO mCORNISA 16 (CORTINERO) m 1.00 21,692 21,692 20,509 19,000 21,692 21,692 20,509 19,000
LAMINA PLANA ETERNIT m²LISTON MONTERREY 1X2X3 m 4.32 0 0 1,823 0LISTON OTOBO m 4.32 0 4,536 0 0LISTÓN DE ORDINARIO m 4.32 0 0 0 3,158LISTÓN M.H. PINO CIPRES m 4.32 37,066 0 0 0MANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702MEDIA CAÑA CHINGALE LISA m 0.54 814 0 0 814MERULEX I.F.A.TRANSPARENTE (20 KG) kg 0.01 90 90 90 90MOLDURAS VIROLA m 0.54 0 378 0 0PLACA ETERNIT MEDIA X 4MM un 1.37 10,707 10,856 10,993 10,707PUNTILLA CON CABEZA 2” lb 0.27 751 770 636 741REGLILLAS TIRAS 3M m 0.54 0 0 184 0 58,130 25,331 22,428 24,212
LISTON M.H. OTOBO m²LISTON MONTERREY 1X2X3 m 4.32 0 0 1,823 0LISTON OTOBO m 4.32 0 4,536 0 0LISTÓN DE ORDINARIO m 4.32 0 0 0 3,158LISTÓN M.H. PINO CIPRES m 4.32 37,066 0 0 0LISTÓN M.H. VIROLA m² 1.08 11,275 11,275 11,275 11,275MANO DE OBRA AA hc 1.10 11,965 11,965 11,965 11,965MEDIA CAÑA CHINGALE LISA m 0.54 814 0 0 814MOLDURAS VIROLA m 0.54 0 378 0 0PUNTILLA CON CABEZA 2” lb 0.27 751 770 636 741REGLILLAS TIRAS 3M m 0.54 0 0 184 0TOC MADERA TRANSPARENTE kg 0.05 733 580 1,126 733 62,604 29,503 27,009 28,686
LISTON M.H. PINO ROMERON m²LISTON MONTERREY 1X2X3 m 4.32 0 0 1,823 0LISTON OTOBO m 4.32 0 4,536 0 0LISTÓN DE ORDINARIO m 4.32 0 0 0 3,158LISTÓN M.H. PINO CIPRES m 4.32 37,066 0 0 0LISTÓN M.H. PINO ROMERÓN m² 1.08 43,848 43,848 43,848 28,512MANO DE OBRA AA hc 1.10 11,965 11,965 11,965 11,965MEDIA CAÑA CHINGALE LISA m 0.54 814 0 0 814MOLDURAS VIROLA m 0.54 0 378 0 0PUNTILLA CON CABEZA 2” lb 0.27 751 770 636 741REGLILLAS TIRAS 3M m 0.54 0 0 184 0TOC MADERA TRANSPARENTE kg 0.05 733 580 1,126 733 95,177 62,076 59,582 45,923
LUXACELL ACERO m²CIELO RASO ALUZINC CELL 5X5 m² 1.03 249,193 249,193 249,193 249,193 249,193 249,193 249,193 249,193
LUXALON ALUMINIO P 80 m²CIELO RASO ALUMINIO ACÚSTICO 84R V5 m² 1.03 119,398 119,398 119,398 119,398 119,398 119,398 119,398 119,398
LUXALON GALV.ACUST. P 130 m²CIELO RASO ALUZINC ACUSTICO 130B m² 1.03 81,768 81,768 81,768 81,768 81,768 81,768 81,768 81,768
MALLA CON VENA m²MALLA CON VENA 0.60X2.00 un 0.73 3,201 3,285 3,075 2,409MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351PUNTILLA CON CABEZA 2” lb 0.02 56 57 47 55 7,607 7,693 7,473 6,815
CIMIENTOS
BASE AGREGADO PETREO m³BASE GRANULAR m³ 1.30 0 0 0 33,550MANO DE OBRA AA hc 0.70 7,614 7,614 7,614 7,614RECEBO COMÚN m³ 1.30 41,269 0 0 0ROCA MUERTA 5 M3 m³ 1.30 0 41,263 0 0VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714ZAHORRA B-200 m³ 1.30 0 0 20,280 0 50,396 50,337 29,425 42,878
BASE ARENA CEMENTO 1:20 m³AGUA lt 234.00 2,808 2,808 2,808 2,808ARENA DE PEÑA m³ 1.61 49,865 0 0 0ARENA DE REVOQUE m³ 1.61 0 0 16,100 32,200ARENA FINA 5 M3 m³ 1.61 0 41,087 0 0CEMENTO GRIS kg 113.10 20,358 22,620 25,334 23,299MANO DE OBRA AA hc 0.70 7,614 7,614 7,614 7,614VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714 82,159 75,589 53,388 67,635
CICLOPEOS m³AGUA lt 158.00 1,896 1,896 1,896 1,896ARENA AMARILLA PUERTO COLOMBIA m³ 0.30 0 0 4,500 0ARENA GRUESA 5 M3 m³ 0.30 0 7,656 0 0ARENA LAVADA DE PEÑA m³ 0.30 7,500 0 0 0ARENA LAVADA PARA CONCRETO m³ 0.30 0 0 0 5,788CEMENTO GRIS kg 180.00 32,400 36,000 40,320 37,080GRAVA CANTO RODADO 1/2 m³ 0.57 0 0 24,795 0GRAVILLA DE RIO m³ 0.57 31,692 0 0 31,692GRAVILLA FINA 1/2” Y 3/4” m³ 0.57 0 22,800 0 0MANO DE OBRA AA hc 4.70 51,122 51,122 51,122 51,122PIEDRA CICLÓPEA m³ 0.42 0 0 9,030 0PIEDRA ENTRESUELO m³ 0.42 0 0 0 5,788PIEDRA MEDIA ZONGA m³ 0.42 11,340 0 0 0RAJON DE PIEDRA m³ 0.42 0 8,820 0 0 135,950 128,294 131,663 133,366
DEMOLICIÓN CABEZAS PILOTES m³COMPRESOR DE 2 MARTILLOS h 6.95 241,860 241,860 241,860 241,860MANO DE OBRA AA hc 8.91 96,914 96,914 96,914 96,914RETROEXCAVADORA 5-10 d 0.04 14,080 12,528 14,080 14,432VOLQUETA M3 vj 0.45 17,100 15,984 16,898 19,331 369,954 367,286 369,752 372,537
DEMOLICIÓN CIMIENTO ENTERRADOS m³COMPRESOR DE 2 MARTILLOS h 3.50 121,800 121,800 121,800 121,800MANO DE OBRA AA hc 4.02 43,726 43,726 43,726 43,726VOLQUETA M3 vj 0.50 19,000 17,760 18,775 21,479 184,526 183,286 184,301 187,005
EXCAVACION MANUAL CIMIENTOS m³MANO DE OBRA AA hc 0.93 10,116 10,116 10,116 10,116VOLQUETA M3 vj 0.37 14,060 13,142 13,894 15,894 24,176 23,258 24,009 26,010
IMPERMEABILIZACIÓN INTEGRAL MORTERO XYPEX m²AGUA lt 0.32 4 4 4 4MANO DE OBRA CC hc 0.18 2,251 2,251 2,251 2,251XYPEX CONCENTRADO- GRIS kg 0.80 9,240 9,240 9,240 9,240 11,495 11,495 11,495 11,495
PILOTES HINCADOS 25X25 mPILOTES HINCADOS 25X25 m 1.03 81,246 81,246 81,246 81,246 81,246 81,246 81,246 81,246
PLACA FLOTANTE 0.90 CIMIENTOS m²CONCRETO CORRIENTE 3000 PSI m³ 0.46 144,125 143,912 126,303 144,072COSTO ADICIONAL BOMBEO m³ 0.46 10,939 12,646 11,201 10,672CUARTON OTOBO 2”X4” 2.9 m 0.11 0 495 0 0ICOPOR 1 CM/DENS.20/1X1 m² 0.80 2,320 2,000 2,000 0MANO DE OBRA AA hc 1.83 19,905 19,905 19,905 19,905PUNTILLA CON CABEZA 2” lb 0.03 83 86 71 82TABLA 2X10 MADERA COMUN m 0.11 0 0 0 308TABLA CHAPA ORDINARIO 0.30 m 0.11 170 0 0 0TABLON CATIVO 0.30 m 0.11 0 0 275 0VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244 178,746 180,464 161,069 176,283
RELLENOS DE EXCAVACION m³MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526 6,526 6,526 6,526 6,526
RETIRO SOBRANTES TIERRA m³MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351VOLQUETA M3 vj 0.37 14,060 13,142 13,894 15,894 18,411 17,493 18,244 20,245
SOBRECIMIENTO CONCRETO 25X25 m³CONCRETO CORRIENTE 3000 PSI m³ 1.03 322,715 322,238 282,809 322,596DURMIENTE 3 M m 10.10 8,787 0 8,585 0LARGUERO COMUN 3.5X7.5X3 M m 9.35 0 0 0 23,843LARGUERO ORDINARIO 3 M m 10.10 0 0 0 8,131LISTÓN 2”X2”X3 M m 10.10 0 41,309 0 0MANO DE OBRA AA hc 6.89 74,943 74,943 74,943 74,943PUNTILLA CON CABEZA 2” lb 2.67 7,428 7,610 6,291 7,326TABLA CHAPA ORDINARIO 0.30 m 9.35 14,446 0 0 0TABLA OTOBO 0.30 m 9.35 0 14,717 0 0TABLON CATIVO 0.30 m 9.35 0 0 23,375 0VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244 429,523 462,236 397,316 438,082
VIGA AMARRE EN CONCRETO m³CONCRETO CORRIENTE 2500 PSI m³ 1.10 330,612 317,341 281,741 331,122CUARTON OTOBO 2”X4” 2.9 m 3.11 0 13,995 0 0LARGUERO COMUN 3.5X7.5X3 M m 3.52 0 0 0 8,976LISTON ABARCO 3 M m 3.11 0 0 15,550 0MANO DE OBRA AA hc 6.89 74,943 74,943 74,943 74,943PUNTILLA CON CABEZA 2” lb 1.47 4,090 4,190 3,463 4,034REPISA ORDINARIO 3 M m 3.11 9,330 0 0 0TABLA BURRA ORDINARIO 0.30 m 3.52 32,666 0 0 0TABLA OTOBO 0.30 m 3.52 0 5,540 0 0TABLON CATIVO 0.30 m 3.52 0 0 8,800 0TABLON ORDINARIO 3 M m 3.11 0 0 0 8,011VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244 452,843 417,430 385,811 428,330
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
7
CIMIENTOS / CUBIERTAS
VIGA TEE 25X25X20X40 m³CONCRETO CORRIENTE 3000 PSI m³ 1.10 344,648 344,137 302,029 344,520CUARTON OTOBO 2”X4” 2.9 m 2.35 0 10,575 0 0DURMIENTE 3 M m 2.35 2,045 0 1,998 0LARGUERO COMUN 3.5X7.5X3 M m 2.35 0 0 0 5,993LARGUERO ORDINARIO 3 M m 2.35 0 0 0 1,892MANO DE OBRA AA hc 8.97 97,567 97,567 97,567 97,567PUNTILLA CON CABEZA 2” lb 0.60 1,669 1,710 1,414 1,646TABLA CHAPA ORDINARIO 0.30 m 2.35 3,631 0 0 0TABLA OTOBO 0.30 m 2.35 0 3,699 0 0TABLON CATIVO 0.30 m 2.35 0 0 5,875 0VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244 450,763 459,109 410,196 452,861
VIGA TEE 25X25X20X50 m³CONCRETO CORRIENTE 3000 PSI m³ 1.10 344,648 344,137 302,029 344,520CUARTON OTOBO 2”X4” 2.9 m 2.63 0 11,835 0 0DURMIENTE 3 M m 2.63 2,288 0 2,236 0LARGUERO COMUN 3.5X7.5X3 M m 2.45 0 0 0 6,248LARGUERO ORDINARIO 3 M m 2.63 0 0 0 2,117MANO DE OBRA AA hc 8.97 97,567 97,567 97,567 97,567PUNTILLA CON CABEZA 2” lb 0.70 1,947 1,995 1,649 1,921TABLA CHAPA ORDINARIO 0.30 m 2.45 3,785 0 0 0TABLA OTOBO 0.30 m 2.45 0 3,856 0 0TABLON CATIVO 0.30 m 2.45 0 0 6,125 0VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244 451,439 460,811 410,920 453,616
ZAPATAS m³CONCRETO CORRIENTE 3000 PSI m³ 1.03 322,715 322,238 282,809 322,596LARGUERO COMUN 3.5X7.5X3 M m 3.00 0 0 0 7,650LISTON MONTERREY 1X2X3 m 3.00 0 0 1,266 0LISTON OTOBO m 3.00 0 3,150 0 0MANO DE OBRA AA hc 8.27 89,953 89,953 89,953 89,953PLANCHÓN ORDINARIO 3 M m 0.29 797 0 0 0PUNTILLA CON CABEZA 2” lb 0.10 278 285 236 274TABLA CHAPA ORDINARIO 0.30 m 3.00 4,635 0 0 0TABLON ABARCO 3 M m 3.00 0 0 6,000 0TABLON ORDINARIO 3 M m 3.00 0 0 0 7,728TABLON OTOBO 3 M m 3.00 0 24,000 0 0VARA DE CLAVO m 0.50 750 750 750 667VIBRADOR A GASOLINA d 0.10 3,010 3,552 3,285 3,110 422,138 443,927 384,299 431,978
CUBIERTAS
AFINADO CUBIERTAS PLANAS m²AGUA lt 13.93 167 167 167 167ARENA FINA m³ 0.06 0 1,140 0 0ARENA LAVADA DE PEÑA m³ 0.06 1,500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.06 0 0 1,470 0ARENA LAVADA PARA CONCRETO m³ 0.06 0 0 0 1,158CEMENTO GRIS kg 23.38 4,208 4,676 5,237 4,816MANO DE OBRA AA hc 0.70 7,614 7,614 7,614 7,614 13,489 13,597 14,488 13,755
ALISTADO IMPERMEABILIZADO TEJA BARRO m²ALAMBRE DE PUAS NO 12 kg 6.30 10,206 10,080 10,080 10,868ALAMBRE NEGRO NO.18 kg 0.02 34 32 34 36ASFALTO TIPO 190/220 200 KG kg 1.02 1,639 1,639 1,639 1,639CONCRETO CORRIENTE 2500 PSI m³ 0.05 15,028 14,425 12,806 15,051ESTERILLA DE GÚADUA m² 0.85 2,150 2,635 2,150 2,296MANO DE OBRA AA hc 1.80 19,579 19,579 19,579 19,579PERMA GLASS 6 FIBERGLASS m² 1.56 3,493 3,912 3,493 3,493PUNTILLA CON CABEZA 2” lb 0.05 139 143 118 137 52,267 52,444 49,899 53,098
BAJANTE LATON 12 X 6 mLÁMINA GALVANIZADA .22 un 0.20 6,687 6,687 6,687 7,030SOLDADURA ESTAÑO PARA COBRE un 0.30 9,326 9,326 9,326 9,326SUB-CONTRATO DE ORNAMENTACION % 80.00 12,811 12,811 12,811 13,085 28,824 28,824 28,824 29,442
BAJANTE PVC 3” mBAJANTE REF.035103 BLANCO un 1.05 18,732 18,732 17,843 17,843CODO BAJANTE 45° BLANCO un 0.06 256 256 211 244MANO DE OBRA BB hc 0.51 6,102 6,102 6,102 6,102SOLDADURA PVC LIQUIDA 1/4 un 0.08 4,492 4,492 4,492 3,279SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 11,241 11,241 10,886 10,438SUB-CONTRATO ORNAMENTACION % 38.00 11,241 11,241 10,886 10,438 52,066 52,066 50,420 48,344
BAJANTE PVC 4” mBAJANTE RECTANGULAR TRG-A 2.5 M un 1.10 38,434 41,806 38,434 39,496CODO BAJANTE 90° BLANCO un 0.12 513 513 490 569MANO DE OBRA BB hc 0.62 7,418 7,418 7,418 7,418SOLDADURA PVC LIQUIDA 1/4 un 0.08 4,492 4,492 4,492 3,279SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 19,326 20,607 19,317 19,289 70,183 74,836 70,152 70,051
CABALLETE TEJA ETERNIT mCABALLETE ETERNIT PF/7 FIJO un 1.15 24,616 24,512 24,769 24,616GANCHO TEJA ETERNIT 55 MM un 4.60 1,196 1,196 1,191 1,196MANO DE OBRA AA hc 0.54 5,874 5,874 5,874 5,874 31,685 31,582 31,834 31,685
CABALLETE TEJA MOORE mARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 1.48 266 296 332 305MANO DE OBRA AA hc 0.25 2,719 2,719 2,719 2,719TEJA MOORE CABALLETE m 1.03 4,827 4,061 4,061 4,061 8,122 7,332 7,212 7,285
CANAL LATON D/0.50 mLÁMINA GALVANIZADA .22 un 0.25 8,359 8,359 8,359 8,788SOLDADURA ESTAÑO PARA COBRE un 0.40 12,435 12,435 12,435 12,435SUB-CONTRATO HIDRAULICO Y SANITARIO % 80.00 16,635 16,635 16,635 16,978 37,430 37,430 37,430 38,201
CANAL LATON D/0.75 mLÁMINA GALVANIZADA .22 un 0.38 12,706 12,706 12,706 13,357SOLDADURA ESTAÑO PARA COBRE un 0.60 18,653 18,653 18,653 18,653SUB-CONTRATO HIDRAULICO Y SANITARIO % 80.00 25,087 25,087 25,087 25,608SUB-CONTRATO INSTALACION % 80.00 25,087 25,087 25,087 25,608 81,532 81,532 81,532 83,225
CANAL LATON D/1.00 mLÁMINA GALVANIZADA .22 un 0.50 16,718 16,718 16,718 17,575SOLDADURA ESTAÑO PARA COBRE un 0.80 24,870 24,870 24,870 24,870SUB-CONTRATO INSTALACION % 80.00 33,271 33,271 33,271 33,956 74,859 74,859 74,859 76,402
CANAL PVC 3” mCANAL REF.03501002 BLANCO m 1.03 11,711 11,711 9,617 9,617MANO DE OBRA BB hc 0.74 8,854 8,854 8,854 8,854SOPORTE DE CANAL BLANCO un 2.74 4,146 4,146 4,809 4,809TAPA EXTERNA BLANCO un 0.68 2,987 2,987 2,788 2,846TORNILLO PARA MADERA 1” NO.6 un 4.00 72 72 72 64UNIÓN CANAL BLANCO un 0.34 1,776 1,776 1,458 1,692SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 11,227 11,227 10,487 10,595 40,772 40,772 38,085 38,476
CANALETA 43 DE 4.00 m²CANALETA 43 ETERNIT X 400 un 0.60 48,231 48,231 49,325 49,499IGAS GRIS (30 KG) kg 0.12 1,079 1,079 1,079 1,079MANO DE OBRA AA hc 0.83 9,028 9,028 9,028 9,028TORNILLO PARA CANALETA 43 METAL un 0.60 544 670 668 544 58,882 59,008 60,100 60,150
CANALETA 43 DE 5.00 m²CANALETA 43 ETERNIT X 500 un 0.48 43,769 43,769 44,691 44,868IGAS GRIS (30 KG) kg 0.12 1,079 1,079 1,079 1,079MANO DE OBRA AA hc 0.90 9,789 9,789 9,789 9,789TORNILLO PARA CANALETA 43 METAL un 0.48 435 536 534 435 55,072 55,173 56,094 56,171
CANALETA 43 DE 6.00 m²CANALETA 43 ETERNIT X 600 un 0.39 41,937 41,937 42,878 43,051IGAS GRIS (30 KG) kg 0.12 1,079 1,079 1,079 1,079MANO DE OBRA AA hc 0.90 9,789 9,789 9,789 9,789TORNILLO PARA CANALETA 43 METAL un 0.78 707 871 868 707 53,513 53,676 54,614 54,625
CANALETA 90 DE 4.50 m²CANALETA 90 ETERNIT X 450 un 0.26 29,220 29,220 25,509 25,149MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526MASIL GRIS FRIO kg 0.17 2,092 2,079 2,092 2,092TORNILLO PARA CANALETA 90 un 0.26 771 771 771 771 38,609 38,596 34,899 34,538
CANALETA 90 DE 6.00 m²CANALETA 90 ETERNIT X 600 un 0.20 30,038 30,038 26,019 25,854MANO DE OBRA AA hc 0.83 9,028 9,028 9,028 9,028MASIL GRIS FRIO kg 0.17 2,092 2,079 2,092 2,092TORNILLO PARA CANALETA 90 un 0.40 1,186 1,186 1,186 1,186 42,344 42,331 38,326 38,160
CANALETA 90 DE 9.00 m²CANALETA 90 ETERNIT X 900 un 0.13 29,285 29,285 29,285 29,285MANO DE OBRA AA hc 0.83 9,028 9,028 9,028 9,028MASIL GRIS FRIO kg 0.17 2,092 2,079 2,092 2,092TORNILLO PARA CANALETA 90 un 0.39 1,156 1,156 1,157 1,156 41,561 41,548 41,562 41,561
CANALETA ACESCO DE 4.50 m²CANALETA 90 X 4.50 ACESCO un 0.25 35,387 35,387 35,387 35,387MANO DE OBRA AA hc 0.75 8,158 8,158 8,158 8,158TORNILLO PARA CANALETA 90 un 0.59 1,749 1,749 1,750 1,749 45,294 45,293 45,294 45,294
ENTRAMADO TEJA DE BARRO m²CUARTON OTOBO 2”X4” 2.9 m 1.03 0 4,635 0 0LISTON ABARCO 3 M m 1.03 0 0 5,150 0MANO DE OBRA AA hc 1.80 19,579 19,579 19,579 19,579PLANCHÓN ORDINARIO 3 M m 2.62 7,200 0 0 0PUNTILLA CON CABEZA 2” lb 0.30 835 855 707 823REPISA ORDINARIO 3 M m 1.03 1,039 0 0 1,009
CONSTRUDATA8
CUBIERTAS
TABLON ABARCO 3 M m 2.62 0 0 5,240 0TABLON ORDINARIO 3 M m 2.62 0 0 0 6,749TABLON OTOBO 3 M m 2.62 0 20,960 0 0 28,652 46,029 30,675 28,160
ENTRAMADO TEJA MOORE m²CORREA DE 2X2 DURMIENTE m 8.20 0 0 28,700 0CUADROS ABARCO 4X4X320 m 8.20 0 0 0 28,700DURMIENTE ORDINARIO 4 M m 8.20 28,700 0 0 0LISTÓN 2”X2”X3 M m 8.20 0 33,538 0 0MANO DE OBRA AA hc 1.80 19,579 19,579 19,579 19,579PUNTILLA CON CABEZA 2” lb 0.20 556 570 471 549 48,835 53,687 48,750 48,827
ENTRAMADO TEJA ONDULADA m²CUARTON OTOBO 2”X4” 2.9 m 0.51 0 2,295 0 0LARGUERO DE 2” X 4” m 0.51 0 0 0 4,845LISTON ABARCO 3 M m 0.51 0 0 2,550 0MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877PLANCHÓN ORDINARIO 3 M m 2.62 7,200 0 0 0PUNTILLA CON CABEZA 2” lb 0.20 556 570 471 549REPISA ORDINARIO 3 M m 0.51 1,530 0 0 0TABLA BURRA 3 M m 2.62 6,550 0 0 0TABLON ABARCO 3 M m 2.62 0 0 5,240 0TABLON ORDINARIO 3 M m 2.62 0 0 0 6,749TABLON OTOBO 3 M m 2.62 0 20,960 0 0 26,713 34,702 19,138 23,020
FLANCHE LATON 0.08 mLÁMINA GALVANIZADA .22 un 0.20 6,687 6,687 6,687 7,030SOLDADURA ESTAÑO PARA COBRE un 0.20 6,218 6,218 6,218 6,218SUB-CONTRATO DE ORNAMENTACION % 80.00 10,324 10,324 10,324 10,598 23,229 23,229 23,229 23,846
INMUNIZANTE PARA CUBIERTA m²A.C.P.M. gl 0.21 823 823 823 823BROCHA DE CERDA 4” un 0.02 184 184 184 188MANO DE OBRA AA hc 0.20 2,175 2,175 2,175 2,175 3,182 3,182 3,182 3,186
MANTO FIBERGLASS 2M m²MANTO FIBERGLASS 400X m² 1.00 6,546 6,982 6,546 6,546SUB-CONTRATO INSTALACION % 45.00 2,946 3,142 2,946 2,946 9,492 10,124 9,492 9,492
MANTO FIBERGLASS 3M m²MANTO FIBERGLASS 600XT rl 1.00 96,709 108,539 96,709 96,709SUB-CONTRATO INSTALACION % 45.00 43,519 48,843 43,519 43,519 140,228 157,382 140,228 140,228
PERMA PLY 3 CAPAS m²ALUMOL (3 KG) kg 0.24 4,065 4,065 4,065 4,065ASFALTO TIPO 190/220 200 KG kg 2.08 3,343 3,343 3,343 3,343MANO DE OBRA AA hc 0.76 8,267 8,267 8,267 8,267PERMA GLASS 6 FIBERGLASS m² 3.55 7,948 8,903 7,948 7,948 23,622 24,577 23,622 23,622
SHINGLE CON IMPERMEABILIZANTE m²BASE FELT PLUS FIBERGLASS m² 3.00 2,709 3,090 2,709 2,709EMULSIÓN ASFÁLTICA ED/9 CUÑETE 5 GL gl 0.50 3,642 3,642 3,642 3,642MANO DE OBRA AA hc 0.82 8,919 8,919 8,919 8,919PUNTILLA CON CABEZA 1” lb 0.30 760 540 760 607TEJA SHINGLE RECT ONIX BLACK m² 2.20 75,836 69,729 75,836 75,836 91,866 85,920 91,866 91,712
TEJA DE BARRO m²ARENA DE PEÑA m³ 0.05 1,549 0 0 0ARENA DE REVOQUE m³ 0.05 0 0 500 1,000ARENA FINA 5 M3 m³ 0.05 0 1,276 0 0CEMENTO GRIS kg 9.67 1,741 1,934 2,166 1,992MANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052TEJA BAVARA m² 1.03 21,865 21,865 21,865 21,865 38,206 38,127 37,583 37,909
TEJA DE BARRO SOBRE ETERNIT m²ARENA DE PEÑA m³ 0.04 1,239 0 0 0ARENA DE REVOQUE m³ 0.04 0 0 400 800ARENA FINA 5 M3 m³ 0.04 0 1,021 0 0CEMENTO GRIS kg 7.50 1,350 1,500 1,680 1,545MANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702TEJA BAVARA ALFA 30X15 m² 0.50 4,500 4,500 4,500 4,500 15,790 15,722 15,282 15,547
TEJA ESPAÑOLA ETERNIT m²GANCHO TEJA ETERNIT 55 MM un 1.59 413 413 412 413MANO DE OBRA AA hc 0.45 4,895 4,895 4,895 4,895TEJA ETERNIT ESPAÑOLA 0.74 un 0.26 5,381 5,626 5,361 5,377TEJA ETERNIT ESPAÑOLA 1.64 un 0.53 23,766 29,848 29,034 23,766 34,456 40,782 39,702 34,451
TEJA ETERNIT NO.4 m²GANCHO TEJA ETERNIT 55 MM un 2.02 525 525 523 525MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526TEJA ETERNIT NO.4 un 1.01 20,818 21,769 20,435 20,800 27,870 28,820 27,485 27,851
TEJA ETERNIT NO.6 m²GANCHO TEJA ETERNIT 55 MM un 1.30 338 338 337 338MANO DE OBRA AA hc 0.54 5,874 5,874 5,874 5,874TEJA ETERNIT NO.6 un 0.65 20,634 21,116 21,683 20,617
26,845 27,327 27,893 26,828
TEJA ETERNIT NO.8 m²GANCHO TEJA ETERNIT 55 MM un 1.10 286 286 285 286MANO DE OBRA AA hc 0.54 5,874 5,874 5,874 5,874TEJA ETERNIT NO.8 un 0.50 20,598 20,580 21,463 20,580 26,757 26,740 27,621 26,740
TEJA TRANSPARENTE NO.4 m²GANCHO TEJA ETERNIT 55 MM un 2.02 525 525 523 525MANO DE OBRA AA hc 0.45 4,895 4,895 4,895 4,895TEJA MAXILIT ONDULADA PF/7 NO. 4 un 1.01 17,278 17,278 14,446 17,170 22,698 22,698 19,864 22,590
TEJA TRANSPARENTE NO.6 m²GANCHO TEJA ETERNIT 55 MM un 1.30 338 338 337 338MANO DE OBRA AA hc 0.45 4,895 4,895 4,895 4,895TEJA MAXILIT ONDULADA PF/7 NO. 6 un 1.01 26,600 26,600 22,245 25,755 31,833 31,833 27,477 30,988
TRAGANTES 4” unARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 1.00 180 200 224 206CÚPULA TRAGANTE C 4X2” un 1.00 5,670 5,500 5,500 6,325MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351 10,511 10,306 10,175 11,082
TRAGANTES 6” unARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 1.00 180 200 224 206CÚPULA TRAGANTE C 6X4” un 1.00 12,600 13,000 12,500 11,098MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351 17,441 17,806 17,175 15,855
DESAGÜES E INST. SUBTERRÁNEAS
ACCESORIOS DE GRES 4” unAGUA lt 0.76 9 9 9 9ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 0.91 164 182 204 187MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526SIFÓN DE GRES 4” un 1.03 14,338 14,338 14,338 14,338 21,346 21,310 21,177 21,260
ACCESORIOS DE GRES 6” unAGUA lt 1.59 19 19 19 19ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 1.87 337 374 419 385MANO DE OBRA AA hc 0.70 7,614 7,614 7,614 7,614SIFÓN DE GRES 6” un 1.03 17,922 17,922 17,963 13,184 26,201 26,184 26,115 21,402
CAJA CONTADOR AGUA FIBRIT unBASE GRANULAR m³ 0.02 0 0 0 516CAJA CONTADOR ACUEDUCTO CIMA 530 un 1.00 53,133 40,357 53,133 53,133MANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052RECEBO COMÚN m³ 0.02 635 0 0 0ROCA MUERTA 5 M3 m³ 0.02 0 635 0 0ZAHORRA B-200 m³ 0.02 0 0 312 0 66,820 54,044 66,497 66,702
CAJA INSPECCION FIBRIT TRAFICO LIVIANO unBASE GRANULAR m³ 0.02 0 0 0 516CAJA INSPECCIÓN FIBRIT PANDA 70X70X65 CAI-65F un 1.00 58,282 58,282 58,282 58,282MANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052RECEBO COMÚN m³ 0.02 635 0 0 0ROCA MUERTA 5 M3 m³ 0.02 0 635 0 0TAPA CAJA TRÁFICO LIVIANO 72X72X13 CAI-TL un 1.00 67,868 67,868 54,972 67,868ZAHORRA B-200 m³ 0.02 0 0 312 0 139,837 139,837 126,618 139,719
CAJA INSPECCION FIBRIT TRAFICO PESADO unBASE GRANULAR m³ 0.02 0 0 0 516CAJA INSPECCIÓN FIBRIT PROFUNDA 70X70X97 CAI-95F un 1.00 67,029 67,029 67,029 67,029MANO DE OBRA AA hc 2.00 21,754 21,754 21,754 21,754RECEBO COMÚN m³ 0.02 635 0 0 0ROCA MUERTA 5 M3 m³ 0.02 0 635 0 0TAPA CAJA TRÁFICO PESADO 72X72X13 un 1.00 110,288 110,288 110,288 110,288ZAHORRA B-200 m³ 0.02 0 0 312 0 199,706 199,706 199,383 199,587
CAJAS INSPECCION 100 X 100 unACERO FIGURADO 60000 PSI 1” kg 0.11 198 237 198 203ACERO FIGURADO 60000 PSI 1/2” kg 4.00 7,192 8,608 7,192 7,472ARENA AMARILLA PUERTO COLOMBIA m³ 0.07 0 0 1,050 0
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
9
CUBIERTAS / DESAGÜES E INST. SUBTERRÁNEAS
ARENA FINA m³ 0.22 0 4,180 0 0ARENA GRUESA 5 M3 m³ 0.07 0 1,786 0 0ARENA LAVADA DE PEÑA m³ 0.22 5,500 0 0 0ARENA LAVADA DE RIO m³ 0.07 5,040 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.22 0 0 5,390 0ARENA LAVADA MEISSEN m³ 0.22 0 0 0 4,699ARENA LAVADA PARA CONCRETO m³ 0.07 0 0 0 1,351BASE GRANULAR m³ 0.83 0 0 0 21,421CEMENTO GRIS kg 118.00 21,240 23,600 26,432 24,308GRAVA CANTO RODADO 1/2 m³ 0.11 0 0 4,785 0GRAVILLA DE RIO m³ 0.11 6,116 0 0 6,116GRAVILLA FINA 1/2” Y 3/4” m³ 0.11 0 4,400 0 0LADRILLO BOCADILLO RECOCIDO un 235.80 0 0 0 48,103LADRILLO LIMPIO 10-29 un 235.80 0 106,110 0 0LADRILLO RECOCIDO OSCURO un 235.80 51,876 0 0 0LADRILLO TOLETE RECOCIDO un 235.80 0 0 76,871 0MANO DE OBRA AA hc 5.80 63,087 63,087 63,087 63,087RECEBO COMÚN m³ 0.83 26,348 0 0 0ROCA MUERTA 5 M3 m³ 0.83 0 26,345 0 0ZAHORRA B-200 m³ 0.83 0 0 12,948 0 186,597 238,353 197,952 176,759
CAJAS INSPECCION 40 X 40 unACERO FIGURADO 60000 PSI 1/2” kg 0.60 1,079 1,291 1,079 1,121ALAMBRE NEGRO NO.18 kg 0.01 17 16 17 18ARENA AMARILLA PUERTO COLOMBIA m³ 0.02 0 0 300 0ARENA FINA m³ 0.05 0 950 0 0ARENA GRUESA 5 M3 m³ 0.02 0 510 0 0ARENA LAVADA DE PEÑA m³ 0.05 1,250 0 0 0ARENA LAVADA DE RIO m³ 0.02 1,440 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.05 0 0 1,225 0ARENA LAVADA MEISSEN m³ 0.05 0 0 0 1,068ARENA LAVADA PARA CONCRETO m³ 0.02 0 0 0 386BASE GRANULAR m³ 0.07 0 0 0 1,807CEMENTO GRIS kg 30.74 5,533 6,148 6,886 6,332GRAVA CANTO RODADO 1/2 m³ 0.04 0 0 1,740 0GRAVILLA DE RIO m³ 0.04 2,224 0 0 2,224GRAVILLA FINA 1/2” Y 3/4” m³ 0.04 0 1,600 0 0LADRILLO BOCADILLO RECOCIDO un 36.82 0 0 0 7,511LADRILLO LIMPIO 10-29 un 36.82 0 16,569 0 0LADRILLO RECOCIDO OSCURO un 36.82 8,100 0 0 0LADRILLO TOLETE RECOCIDO un 36.82 0 0 12,003 0MANO DE OBRA AA hc 4.85 52,753 52,753 52,753 52,753RECEBO COMÚN m³ 0.07 2,222 0 0 0ROCA MUERTA 5 M3 m³ 0.07 0 2,222 0 0ZAHORRA B-200 m³ 0.07 0 0 1,092 0 74,619 82,060 77,095 73,220
CAJAS INSPECCION 60 X 60 unACERO FIGURADO 60000 PSI 1/2” kg 0.90 1,618 1,937 1,618 1,681ALAMBRE NEGRO NO.18 kg 0.03 51 48 51 54ARENA AMARILLA PUERTO COLOMBIA m³ 0.03 0 0 450 0ARENA FINA m³ 0.11 0 2,090 0 0ARENA GRUESA 5 M3 m³ 0.03 0 766 0 0ARENA LAVADA DE PEÑA m³ 0.11 2,750 0 0 0ARENA LAVADA DE RIO m³ 0.03 2,160 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.11 0 0 2,695 0ARENA LAVADA MEISSEN m³ 0.11 0 0 0 2,350ARENA LAVADA PARA CONCRETO m³ 0.03 0 0 0 579BASE GRANULAR m³ 0.11 0 0 0 2,839CEMENTO GRIS kg 57.19 10,294 11,438 12,811 11,781GRAVA CANTO RODADO 1/2 m³ 0.06 0 0 2,610 0GRAVILLA DE RIO m³ 0.06 3,336 0 0 3,336GRAVILLA FINA 1/2” Y 3/4” m³ 0.06 0 2,400 0 0LADRILLO BOCADILLO RECOCIDO un 92.80 0 0 0 18,931LADRILLO LIMPIO 10-29 un 92.80 0 41,760 0 0LADRILLO RECOCIDO OSCURO un 92.80 20,416 0 0 0LADRILLO TOLETE RECOCIDO un 92.80 0 0 30,253 0MANO DE OBRA AA hc 5.13 55,799 55,799 55,799 55,799RECEBO COMÚN m³ 0.11 3,492 0 0 0ROCA MUERTA 5 M3 m³ 0.11 0 3,492 0 0ZAHORRA B-200 m³ 0.11 0 0 1,716 0 99,917 119,729 108,003 97,350
CAJAS INSPECCION 80 X 80 unACERO FIGURADO 60000 PSI 1/2” kg 3.20 5,754 6,886 5,754 5,978ALAMBRE NEGRO NO.18 kg 0.09 153 144 153 162ARENA AMARILLA PUERTO COLOMBIA m³ 0.05 0 0 750 0ARENA FINA m³ 0.19 0 3,610 0 0ARENA GRUESA 5 M3 m³ 0.05 0 1,276 0 0ARENA LAVADA DE PEÑA m³ 0.19 4,750 0 0 0ARENA LAVADA DE RIO m³ 0.05 3,600 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.19 0 0 4,655 0ARENA LAVADA MEISSEN m³ 0.19 0 0 0 4,058ARENA LAVADA PARA CONCRETO m³ 0.05 0 0 0 965BASE GRANULAR m³ 0.16 0 0 0 4,129CEMENTO GRIS kg 94.38 16,988 18,876 21,141 19,442GRAVA CANTO RODADO 1/2 m³ 0.09 0 0 3,915 0GRAVILLA DE RIO m³ 0.09 5,004 0 0 5,004
GRAVILLA FINA 1/2” Y 3/4” m³ 0.09 0 3,600 0 0LADRILLO BOCADILLO RECOCIDO un 188.64 0 0 0 38,483LADRILLO LIMPIO 10-29 un 188.64 0 84,888 0 0LADRILLO RECOCIDO OSCURO un 188.64 41,501 0 0 0LADRILLO TOLETE RECOCIDO un 188.64 0 0 61,497 0MANO DE OBRA AA hc 5.40 58,736 58,736 58,736 58,736RECEBO COMÚN m³ 0.16 5,079 0 0 0ROCA MUERTA 5 M3 m³ 0.16 0 5,079 0 0ZAHORRA B-200 m³ 0.16 0 0 2,496 0 141,565 183,095 159,097 136,957
CAMARAS ELECTRICAS DOBLES unACERO FIGURADO 60000 PSI 1/2” kg 20.63 37,093 44,396 37,093 38,537ALAMBRE NEGRO NO.18 kg 0.62 1,057 991 1,057 1,116ARENA AMARILLA PUERTO COLOMBIA m³ 0.16 0 0 2,400 0ARENA FINA m³ 0.46 0 8,740 0 0ARENA GRUESA 5 M3 m³ 0.16 0 4,083 0 0ARENA LAVADA DE PEÑA m³ 0.46 11,500 0 0 0ARENA LAVADA DE RIO m³ 0.16 11,520 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.46 0 0 11,270 0ARENA LAVADA MEISSEN m³ 0.46 0 0 0 9,826ARENA LAVADA PARA CONCRETO m³ 0.16 0 0 0 3,087BASE GRANULAR m³ 0.36 0 0 0 9,291CEMENTO GRIS kg 255.58 46,004 51,116 57,250 52,649GRAVA CANTO RODADO 1/2 m³ 0.34 0 0 14,790 0GRAVILLA DE RIO m³ 0.34 18,904 0 0 18,904GRAVILLA FINA 1/2” Y 3/4” m³ 0.34 0 13,600 0 0LADRILLO BOCADILLO RECOCIDO un 527.41 0 0 0 107,592LADRILLO LIMPIO 10-29 un 527.41 0 237,335 0 0LADRILLO RECOCIDO OSCURO un 527.41 116,030 0 0 0LADRILLO TOLETE RECOCIDO un 527.41 0 0 171,936 0MANO DE OBRA AA hc 10.00 108,770 108,770 108,770 108,770RECEBO COMÚN m³ 0.36 11,428 0 0 0ROCA MUERTA 5 M3 m³ 0.36 0 11,427 0 0ZAHORRA B-200 m³ 0.36 0 0 5,616 0 362,307 480,458 410,181 349,771
DUCTO ELECTRICO PVC 3” mBASE GRANULAR m³ 0.01 0 0 0 258DUCTO ELÉCTRICO LIVIANO 3” m 1.03 6,496 6,496 6,496 7,526MANO DE OBRA AA hc 4.00 43,508 43,508 43,508 43,508RECEBO COMÚN m³ 0.01 317 0 0 0ROCA MUERTA 5 M3 m³ 0.01 0 317 0 0UNIÓN CONDUIT PVC 3” un 0.21 963 963 963 963ZAHORRA B-200 m³ 0.01 0 0 156 0 51,285 51,285 51,124 52,256
DUCTOS ELECTRICOS ASBETO CEMENTO 4” mBASE GRANULAR m³ 0.01 0 0 0 258DUCTO ETERNIT 4” m 1.03 11,730 11,730 12,316 12,316MANO DE OBRA AA hc 4.00 43,508 43,508 43,508 43,508RECEBO COMÚN m³ 0.01 317 0 0 0ROCA MUERTA 5 M3 m³ 0.01 0 317 0 0UNIÓN A.C CÓNICA 4” un 0.21 304 304 319 319ZAHORRA B-200 m³ 0.10 0 0 1,560 0 55,859 55,859 57,703 56,401
DUCTOS ELECTRICOS PVC 4” mBASE GRANULAR m³ 0.01 0 0 0 258DUCTO ELÉCTRICO LIVIANO 4” m 1.03 11,298 11,298 11,298 11,298MANO DE OBRA AA hc 4.00 43,508 43,508 43,508 43,508RECEBO COMÚN m³ 0.01 317 0 0 0ROCA MUERTA 5 M3 m³ 0.01 0 317 0 0UNIÓN CONDUIT PVC 4” un 0.21 1,043 1,043 1,043 1,043ZAHORRA B-200 m³ 0.01 0 0 156 0 56,166 56,166 56,005 56,107
EXCAVACION MANUAL m³MANO DE OBRA AA hc 1.25 13,596 13,596 13,596 13,596VOLQUETA M3 vj 0.37 14,060 13,142 13,894 15,894 27,656 26,739 27,490 29,491
POZO SEPTICO ETERNIT unBASE GRANULAR m³ 0.10 0 0 0 2,581MANO DE OBRA AA hc 3.00 32,631 32,631 32,631 32,631RECEBO COMÚN m³ 0.10 3,175 0 0 0ROCA MUERTA 5 M3 m³ 0.10 0 3,174 0 0TANQUE SÉPTICO ETERNIT un 1.00 512,800 512,800 455,403 614,754ZAHORRA B-200 m³ 0.10 0 0 1,560 0 548,606 548,605 489,594 649,966
RELLENO GRAVILLA DE RIO m³GRAVA CANTO RODADO 1/2 m³ 1.00 0 0 43,500 0GRAVILLA DE RIO m³ 1.00 55,600 0 0 55,600GRAVILLA FINA 1/2” Y 3/4” m³ 1.00 0 40,000 0 0MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714 63,640 47,986 51,557 63,840
RELLENOS GRAVILLA FINA m³GRAVILLA FINA 1/2” m³ 1.30 70,876 49,399 70,200 70,200MANO DE OBRA AA hc 0.70 7,614 7,614 7,614 7,614VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714 80,004 58,473 79,345 79,528
CONSTRUDATA10
DESAGÜES E INST. SUBTERRÁNEAS
TAPA POZO EN VIA unMANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877MARCO TAPA POZO MTPA-60 un 1.00 79,042 79,042 79,042 79,042TAPA POZO EN VIAS D/0.60 TPA-60P un 1.00 134,963 134,963 134,963 134,963 224,882 224,882 224,882 224,882
TAPA SUMIDERO 68X33 unMANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702MARCO SUMIDERO 73X38X14 MR-70 un 1.00 26,644 26,644 26,644 26,644SUMIDERO VIAL 68X33X10 R-70P un 1.00 69,816 69,816 69,816 69,816 105,162 105,162 105,162 105,162
TAPA SUMIDERO 95X45 unMANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877MARCO SUMIDERO 100X50X14 un 1.00 65,389 65,389 65,389 65,389SUMIDERO VIAL 95X45X10 un 1.00 220,400 220,400 220,400 220,400 296,666 296,666 296,666 296,666
TUBERIA CONCRETO 12” mAGUA lt 5.27 63 63 63 63ARENA DE PEÑA m³ 0.03 929 0 0 0ARENA DE REVOQUE m³ 0.03 0 0 300 600ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 6.20 1,116 1,240 1,389 1,277MANO DE OBRA AA hc 2.00 21,754 21,754 21,754 21,754TUBO CLASE I CONCRETO SIN REF 12” m 1.03 25,616 25,616 25,616 25,616BASE ARENA CEMENTO 1:20 m³ 0.05 4,108 3,779 2,669 3,382 53,586 53,218 51,792 52,692
TUBERIA CONCRETO 8” mAGUA lt 2.11 25 25 25 25ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 2.48 446 496 556 511MANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702TUBO CALSE II CONCRETO SIN REF 8” m 1.03 18,161 18,161 18,161 18,161BASE ARENA CEMENTO 1:20 m³ 0.03 2,465 2,268 1,602 2,029 30,109 29,907 29,145 29,628
TUBERIA DE GRES 10” mAGUA lt 3.33 40 40 40 40ARENA DE PEÑA m³ 0.02 619 0 0 0ARENA DE REVOQUE m³ 0.02 0 0 200 400ARENA FINA 5 M3 m³ 0.02 0 510 0 0CEMENTO GRIS kg 3.96 713 792 887 816MANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052TUBO DE GRES 10” un 1.03 30,659 30,900 30,900 30,900BASE ARENA CEMENTO 1:20 m³ 0.04 3,286 3,024 2,136 2,705 48,370 48,318 47,215 47,914
TUBERIA DE GRES 4” mAGUA lt 0.76 9 9 9 9ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 0.91 164 182 204 187MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526TUBO DE GRES 4” un 1.03 8,364 6,309 8,395 8,498BASE ARENA CEMENTO 1:20 m³ 0.02 1,643 1,512 1,068 1,353 17,016 14,793 16,301 16,773
TUBERIA DE GRES 6” mAGUA lt 1.59 19 19 19 19ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 1.87 337 374 419 385MANO DE OBRA AA hc 0.70 7,614 7,614 7,614 7,614TUBO DE GRES 6” un 1.03 13,936 12,360 10,753 12,875BASE ARENA CEMENTO 1:20 m³ 0.02 1,643 1,512 1,068 1,353 23,858 22,134 19,973 22,446
TUBERIA DRENAJE GRES 4” mAGUA lt 1.60 19 19 19 19ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 1.50 270 300 336 309MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526TUBO DRENAJE DE GRES 4” m 1.03 10,452 10,452 11,281 10,439BASE AGREGADO PETREO m³ 0.03 1,512 1,510 883 1,286BASE ARENA CEMENTO 1:20 m³ 0.03 2,465 2,268 1,602 2,029 21,554 21,331 20,746 20,809
TUBERIA DRENAJE PVC 100MM mMANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351TRITURADO DE MAQUINA m³ 0.03 0 0 780 1,800TRITURADO DE RÍO m³ 0.03 720 0 0 0TRITURADO PARA BASE m³ 0.03 0 855 0 0TUBO DRENAJE 100MM m 1.00 15,458 15,458 15,458 12,691 20,529 20,664 20,589 18,842
DOTACIONES DEPORTIVAS
MALLA GRUESA (VOLEIBOL) unMALLA NYLON CABLE TENNIS un 1.00 333,248 333,248 333,248 333,248 333,248 333,248 333,248 333,248
MALLA NYLON ( VOLEIBOL) unMALLA NYLON (VOLEIBOL) un 1.00 38,628 38,628 38,628 36,628 38,628 38,628 38,628 36,628
MALLA NYLON (PETROLIZADA) unMALLA NYLON PETROLIZADA VOLEIBOL un 1.00 80,900 80,900 80,900 73,200 80,900 80,900 80,900 73,200
PORTERIA (CANCHA FUTBOL) unMALLA PORTERÍA FÚTBOL un 1.00 171,900 171,900 171,900 184,000PORTERÍA FÚTBOL un 1.00 1,682,000 1,682,000 1,682,000 1,682,000EXCAVACION MANUAL m³ 1.72 47,569 45,990 47,282 50,724 1,901,469 1,899,890 1,901,182 1,916,724
PORTICO MULTIFUNCIONAL(F) unMALLA BASKET un 1.00 8,100 8,100 10,000 8,874MALLA MICROFÚTBOL un 1.00 103,900 103,900 103,900 127,280PORTERÍA MULTIFUNCIONAL un 1.00 2,146,000 2,146,000 2,146,000 2,146,000EXCAVACION MANUAL m³ 1.72 47,569 45,990 47,282 50,724 2,305,569 2,303,990 2,307,182 2,332,878
SOPORTE MALLA TUBO 4” unCONCRETO CORRIENTE 5000 PSI m³ 0.01 3,822 4,145 3,784 3,828MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263TUBO ESTRUCT. GALVANIZADO 2” m 2.07 42,950 42,392 42,950 42,950 50,036 49,799 49,997 50,042
TUBO SOPORTE MALLA unCONCRETO CORRIENTE 2000 PSI m³ 0.01 2,839 2,791 2,394 2,842MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877TUBO ESTRUCT. GALVANIZADO 2” m 3.00 62,247 61,437 62,247 62,247 75,963 75,105 75,518 75,966
ENCHAPES Y ACCESORIOS
BRINDISI 20X25 m²AGUA lt 3.00 36 36 36 36CEMENTO BLANCO kg 0.70 665 595 686 578CERÁMICA CORONA MORAZUL m² 1.03 20,497 20,497 20,497 20,497MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687 33,130 33,048 33,299 33,043
CERAMICA ALFA LISA 20X20 m²AGUA lt 3.00 36 36 36 36CEMENTO BLANCO kg 1.03 979 876 1,009 850CERÁMICA ALFA LISA 20X20 m² 1.03 12,315 12,315 12,315 12,315FIJAMIX ALFA kg 0.30 2,458 2,458 2,458 2,458MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245 25,033 24,930 25,064 24,904
CERAMICA PARED ITALIA 20X20 m²AGUA lt 3.00 36 36 36 36CEMENTO BLANCO kg 0.70 665 595 686 578MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687PISO PLANO PIECENZA m² 1.05 18,659 18,659 18,659 18,659 31,292 31,209 31,461 31,204
DUCHAS CRISTANAC 1.2X.90 unAGUA lt 2.97 36 36 36 36ARENA FINA m³ 0.01 0 190 0 0ARENA LAVADA DE PEÑA m³ 0.01 250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.01 0 0 245 0ARENA LAVADA PARA CONCRETO m³ 0.01 0 0 0 193CEMENTO BLANCO kg 40.77 38,732 34,655 39,955 33,635CEMENTO GRIS kg 6.12 1,102 1,224 1,371 1,261COLOR MINERAL kg 0.10 626 580 580 520MANO DE OBRA AA hc 15.50 168,594 168,594 168,594 168,594MOSAICO VITREO m² 10.74 499,410 499,410 499,410 499,410 708,749 704,688 710,190 703,648
ENCHAPES FACHADA TABLETA m²ARENA DE PEÑA m³ 0.03 929 0 0 0ARENA DE REVOQUE m³ 0.03 0 0 300 600ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 6.71 1,208 1,342 1,503 1,382LADRILLO 10X10 un 60.00 10,320 10,320 10,320 8,160MANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702SIKA-2 (5.5 KG) kg 0.19 1,344 1,344 1,344 1,344 22,503 22,474 22,169 20,188
GABINETES BAÑO PRINCIPAL unCEMENTO BLANCO kg 2.00 1,900 1,700 1,960 1,650GABINETE BAÑO PPAL un 1.00 230,000 246,100 230,000 230,000MANO DE OBRA AA hc 1.29 14,031 14,031 14,031 14,031 245,931 261,831 245,991 245,681
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
11
DOTACIONES DEPORTIVAS / ENCHAPES Y ACCESORIOS
GABINETES BAÑO SERVICIO unCEMENTO BLANCO kg 1.00 950 850 980 825GABINETE BAÑO SERVICIO un 1.00 187,500 200,625 187,500 187,500MANO DE OBRA AA hc 0.94 10,224 10,224 10,224 10,224 198,674 211,699 198,704 198,549
JABONERAS PORCELANA ACUARIO unCEMENTO BLANCO kg 0.50 475 425 490 413JABONERA GRANDE ALLEGRO un 1.03 11,330 10,300 10,300 10,300MANO DE OBRA AA hc 0.48 5,221 5,221 5,221 5,221 17,026 15,946 16,011 15,933
JUEGOS INCRUSTAR unCEMENTO BLANCO kg 1.54 1,463 1,309 1,509 1,271JUEGO INCRUSTACIONES COMPLETO un 1.03 54,719 40,170 40,170 40,170MANO DE OBRA AA hc 2.00 21,754 21,754 21,754 21,754 77,936 63,233 63,433 63,195
JUEGOS INCRUSTAR ACUARIO unCEMENTO BLANCO kg 1.54 1,463 1,309 1,509 1,271JUEGO INCRUSTACIONES ACUACER un 1.03 27,295 27,295 27,295 27,295MANO DE OBRA AA hc 2.00 21,754 21,754 21,754 21,754 50,512 50,358 50,558 50,320
JUEGOS INCRUSTAR STILO unCEMENTO BLANCO kg 1.54 1,463 1,309 1,509 1,271JUEGO INCRUSTACIONES COMPLETO STILO un 1.03 249,775 249,775 249,775 249,775MANO DE OBRA AA hc 2.50 27,193 27,193 27,193 27,193 278,431 278,277 278,477 278,238
LAVADEROS PORCELANA 20X20 unACERO FIGURADO 37000 PSI 1/4” kg 1.18 2,122 2,539 2,122 3,356ARENA AMARILLA PUERTO COLOMBIA m³ 0.02 0 0 300 0ARENA DE PEÑA m³ 0.04 1,239 0 0 0ARENA DE REVOQUE m³ 0.04 0 0 400 0ARENA FINA 5 M3 m³ 0.04 0 1,021 0 0ARENA GRUESA 5 M3 m³ 0.02 0 510 0 0ARENA LAVADA DE RIO m³ 0.02 1,440 0 0 0ARENA LAVADA MEISSEN m³ 0.04 0 0 0 854ARENA LAVADA PARA CONCRETO m³ 0.02 0 0 0 386BLOQUE NO. 4 SANTAFÉ un 12.36 9,789 10,444 11,334 11,334CEMENTO BLANCO kg 2.66 2,527 2,261 2,607 2,195CEMENTO GRIS kg 22.30 4,014 4,460 4,995 4,594CERÁMICA CORONA EGEO m² 2.66 39,634 39,634 39,634 39,634GRAVA CANTO RODADO 1/2 m³ 0.04 0 0 1,740 0GRAVILLA DE RIO m³ 0.04 2,224 0 0 2,224GRAVILLA FINA 1/2” Y 3/4” m³ 0.04 0 1,600 0 0LARGUERO COMUN 3.5X7.5X3 M m 0.61 0 0 0 1,556MANO DE OBRA AA hc 17.95 195,242 195,242 195,242 195,242PERFIL ALUMINIO 1/2 X 1/2” m 7.36 13,763 13,763 13,763 13,763TABLA CHAPA ORDINARIO 0.30 m 0.61 942 0 0 0TABLA OTOBO 0.30 m 0.61 0 960 0 0TABLON CATIVO 0.30 m 0.61 0 0 1,525 0 272,936 272,435 273,662 275,137
MARMOL GRIS 30X15 m²AGUA lt 6.48 78 78 78 78ARENA FINA m³ 0.04 0 760 0 0ARENA LAVADA DE PEÑA m³ 0.04 1,000 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.04 0 0 980 0ARENA LAVADA PARA CONCRETO m³ 0.04 0 0 0 772CEMENTO BLANCO kg 0.51 485 434 500 421CEMENTO GRIS kg 9.41 1,694 1,882 2,108 1,938MANO DE OBRA AA hc 1.30 14,140 14,140 14,140 14,140MÁRMOL GRIS PAYANDE m² 1.03 203,355 212,555 243,978 212,316 220,751 229,848 261,784 229,665
MARMOL TRAVERTINO ROMANO m²AGUA lt 6.48 78 78 78 78ARENA FINA m³ 0.04 0 760 0 0ARENA LAVADA DE PEÑA m³ 0.04 1,000 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.04 0 0 980 0ARENA LAVADA PARA CONCRETO m³ 0.04 0 0 0 772CEMENTO BLANCO kg 0.51 485 434 500 421CEMENTO GRIS kg 9.41 1,694 1,882 2,108 1,938MANO DE OBRA AA hc 1.30 14,140 14,140 14,140 14,140MÁRMOL TRAVESAÑO ROMANO CLASIC m² 1.03 263,268 263,268 327,159 210,893 280,664 280,561 344,964 228,241
OLIMPIA BRILL.BASE 20X20 m²AGUA lt 3.00 36 36 36 36ARENA FINA 5 M3 m³ 0.02 0 510 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0ARENA LAVADA PARA CONCRETO m³ 0.02 0 0 0 386CEMENTO BLANCO kg 0.70 665 595 686 578CERÁMICA CORONA MACEDONIA m² 1.05 23,625 23,625 23,625 23,625MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687 36,758 36,686 36,917 36,557
PAPEL COLGADURA GISELLE m²PAPEL WOODCREST rl 0.21 11,760 12,911 11,865 11,693 11,760 12,911 11,865 11,693
PAPEL COLGADURA TIPO 1 m²VINILO MURAL T/COL gl 0.21 8,925 8,421 8,925 8,247 8,925 8,421 8,925 8,247
PAPEL COLGADURA WOODCREST m²PAPEL WOODCREST rl 0.21 11,760 12,911 11,865 11,693 11,760 12,911 11,865 11,693
PIEDRA CREMA m²AGUA lt 6.48 78 78 78 78ARENA FINA m³ 0.04 0 760 0 0ARENA LAVADA DE PEÑA m³ 0.04 1,000 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.04 0 0 980 0ARENA LAVADA PARA CONCRETO m³ 0.04 0 0 0 772CEMENTO BLANCO kg 0.51 485 434 500 421CEMENTO GRIS kg 9.41 1,694 1,882 2,108 1,938MANO DE OBRA AA hc 1.30 14,140 14,140 14,140 14,140PIEDRA CREMA E= 20 MM m² 1.03 47,972 47,972 47,972 37,312 65,368 65,266 65,778 54,661
PIEDRA MUÑECA m²AGUA lt 6.48 78 78 78 78ARENA FINA m³ 0.04 0 760 0 0ARENA LAVADA DE PEÑA m³ 0.04 1,000 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.04 0 0 980 0ARENA LAVADA PARA CONCRETO m³ 0.04 0 0 0 772CEMENTO BLANCO kg 0.51 485 434 500 421CEMENTO GRIS kg 9.41 1,694 1,882 2,108 1,938MANO DE OBRA AA hc 1.30 14,140 14,140 14,140 14,140PIEDRA MUÑECA E= 20MM m² 1.03 88,415 94,270 108,368 94,270 105,811 111,563 126,174 111,619
PIRLAN DUCHA PORC. 20X20 mCEMENTO BLANCO kg 0.60 570 510 588 495CERÁMICA CORONA EGEO m² 0.50 7,450 7,450 7,450 7,450MANO DE OBRA AA hc 1.60 17,403 17,403 17,403 17,403PEGACOR BLANCO kg 0.60 512 509 540 512 25,935 25,873 25,981 25,860
PORC.ESFUMADO BASE 20X20 m²AGUA lt 3.00 36 36 36 36CEMENTO BLANCO kg 0.90 855 765 882 743CERÁMICA ESFUMADO 20X25 m² 1.05 19,425 20,895 20,895 22,575MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687 32,248 33,616 33,893 35,286
PORC.PLANO ESTANCIA 11X22 m²AGUA lt 3.00 36 36 36 36CEMENTO BLANCO kg 0.90 855 765 882 743CERÁMICA PORCELANA ARCADIA BL m² 1.05 15,712 15,712 17,325 15,712MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687 28,536 28,433 30,323 28,423
PORC.ROSSO ITALIA 20X20 m²AGUA lt 3.00 36 36 36 36CEMENTO BLANCO kg 0.90 855 765 882 743CERÁMICA PARED PARIS m² 1.05 24,801 24,801 28,875 22,890MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687 37,624 37,522 41,873 35,601
REJILLAS PLASTICAS SOSCO 3X2 unMANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263PEGACOR BLANCO kg 0.20 171 170 180 171REJILLA PLAST. 3X2 SOSCO un 1.00 1,901 1,800 1,500 1,568 5,335 5,233 4,943 5,002
REJILLAS SIFON unCEMENTO GRIS kg 0.60 108 120 134 124MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263REJILLA SIFÓN S 4.5X3.5 un 1.00 4,580 4,580 3,379 4,580 7,951 7,963 6,777 7,967
REJILLAS SIFON 20X20 unCEMENTO GRIS kg 1.00 180 200 224 206MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263REJILLA SIFÓN PC 20X20 un 1.00 17,464 17,464 17,464 17,464 20,907 20,927 20,951 20,933
REJILLAS SOSCO 3X 2 unCEMENTO GRIS kg 0.20 36 40 45 41MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263REJILLA SOSCO 3X2” un 1.00 3,586 3,500 3,100 3,320 6,885 6,803 6,408 6,624
REJILLAS VENTILACIÓN 20X20 unCEMENTO GRIS kg 0.20 36 40 45 41MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263REJILLA SIFÓN PC 20X20 un 1.00 17,464 17,464 17,464 17,464 20,763 20,767 20,772 20,768
REMATES BOCEL ALUMINIO mCEMENTO BLANCO kg 0.20 190 170 196 165MANO DE OBRA AA hc 0.29 3,154 3,154 3,154 3,154ÁNGULO 1/2” X 1/2” X 1/16” m 1.05 1,114 1,114 1,114 1,114 4,458 4,438 4,464 4,433
CONSTRUDATA12
ENCHAPES Y ACCESORIOS
REMATES BOCEL PORCELANA 0.11 mAGUA lt 0.10 1 1 1 1CEMENTO BLANCO kg 0.51 485 434 500 421MANO DE OBRA AA hc 0.50 5,439 5,439 5,439 5,439PEGACOR BLANCO kg 1.05 896 891 945 896 6,820 6,765 6,885 6,756
REMATES PORCELANA BISELADOS mMANO DE OBRA AA hc 0.58 6,309 6,309 6,309 6,309 6,309 6,309 6,309 6,309
SPACATTO BLANCO m²AGUA lt 2.85 34 34 34 34ARENA FINA m³ 0.04 0 760 0 0ARENA LAVADA DE PEÑA m³ 0.04 1,000 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.04 0 0 980 0ARENA LAVADA PARA CONCRETO m³ 0.04 0 0 0 772CEMENTO GRIS kg 8.31 1,496 1,662 1,861 1,712MANO DE OBRA AA hc 1.60 17,403 17,403 17,403 17,403SPACCATO BLANCO BRASIL m² 1.03 68,109 87,698 68,109 72,136 88,042 107,558 88,388 92,057
SPACATTO TRAVERTINO m²AGUA lt 2.85 34 34 34 34ARENA FINA m³ 0.04 0 760 0 0ARENA LAVADA DE PEÑA m³ 0.04 1,000 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.04 0 0 980 0ARENA LAVADA PARA CONCRETO m³ 0.04 0 0 0 772CEMENTO GRIS kg 8.31 1,496 1,662 1,861 1,712MANO DE OBRA AA hc 1.60 17,403 17,403 17,403 17,403SPACCATO TRAVERTINO BOSCONIA m² 1.03 47,380 47,380 47,380 43,260 67,313 67,239 67,659 63,181
TAPAS REGISTRO 20X20 unCEMENTO GRIS kg 0.20 36 40 45 41MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263TAPA REGISTRO R 20X20 un 1.00 46,930 47,900 49,999 46,200 50,229 51,203 53,307 49,504
TAPAS REGISTRO 6 X 6 unCEMENTO GRIS kg 0.20 36 40 45 41MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263TAPA REGISTRO R 6X6 un 1.00 5,810 5,710 5,372 5,424 9,109 9,013 8,680 8,728
TUBO CORTINA DUCHA unESCUDO GOLPEADOR CERRADURA un 2.00 5,780 6,000 5,780 5,730MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263TUBO CORTINA DUCHA 3/4” m 1.50 5,265 4,350 5,265 4,860 14,308 13,613 14,308 13,853
VALVULAS LAVADERO 2” unCEMENTO GRIS kg 0.20 36 40 45 41MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263VÁLVULA LAVADERO 2” un 1.00 5,000 5,600 5,500 4,374 8,299 8,903 8,808 7,678
VESUBIO 20X20 m²AGUA lt 3.00 36 36 36 36CEMENTO BLANCO kg 1.03 979 876 1,009 850CERÁMICA CORONA m² 1.05 25,725 25,725 25,725 25,725MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687 38,672 38,556 38,851 38,543
ESTRUCTURAS EN CONCRETO
BASE CONCRETO POBRE E=.05 m²MANO DE OBRA AA hc 0.23 2,502 2,502 2,502 2,502CONCRETO 1:3:5 m³ 0.06 9,407 7,022 7,220 7,829 11,909 9,524 9,722 10,331
CASETON DE LONA .80 X .35 mCUARTON OTOBO 2”X4” 2.9 m 2.24 0 10,080 0 0DURMIENTE 3 M m 2.24 1,949 0 1,904 0GRAPA INDUSTRIAL lb 0.03 135 117 135 120LARGUERO ORDINARIO 3 M m 2.24 0 0 0 1,803LISTÓN DE ORDINARIO m 3.14 2,295 2,295 2,295 2,923LONA PLÁSTICA PARA CASETÓN m² 1.96 66,640 66,640 66,640 66,640MANO DE OBRA BB hc 0.08 957 957 957 957PUNTILLA CON CABEZA 2” lb 0.53 1,474 1,511 1,249 1,454 73,450 81,600 73,180 73,898
CASETON DE LONA .80 X .70 mCUARTON OTOBO 2”X4” 2.9 m 3.50 0 15,750 0 0DURMIENTE 3 M m 3.50 3,045 0 2,975 0GRAPA INDUSTRIAL lb 0.03 135 117 135 120LARGUERO ORDINARIO 3 M m 3.50 0 0 0 2,818LISTÓN DE ORDINARIO m 5.52 4,035 4,035 4,035 5,139LONA PLÁSTICA PARA CASETÓN m² 2.80 95,200 95,200 95,200 95,200MANO DE OBRA AA hc 0.10 1,088 1,088 1,088 1,088
PUNTILLA CON CABEZA 1/2” lb 0.90 2,782 2,790 2,782 2,964SUB-CONTRATO CARPINTERIA % 45.00 47,828 53,541 47,796 48,297 154,112 172,521 154,011 155,625
COLUMNAS m³ANDAMIO SECCIÓN ms 0.20 1,740 1,600 1,629 1,740CONCRETO CORRIENTE 3000 PSI m³ 1.10 344,648 344,137 302,029 344,520CUARTON OTOBO 2”X4” 2.9 m 7.26 0 32,670 0 0LISTON ABARCO 3 M m 7.26 0 0 36,300 0MANO DE OBRA AA hc 10.29 111,924 111,924 111,924 111,924PARAL TELESCÓPICO 2.2 M ms 1.00 1,700 1,700 1,700 1,756PUNTILLA CON CABEZA 2” lb 8.00 22,256 22,800 18,848 21,952REPISA ORDINARIO 3 M m 7.26 7,325 0 0 7,115TABLA AMARILLO 0.18 m 2.64 0 33,000 0 0TABLA BURRA CEDRO MACHO 0.28 m 2.64 29,700 0 29,040 29,040VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244 520,497 549,252 502,785 519,291
CONCRETO CICLOPEO m³AGUA lt 158.00 1,896 1,896 1,896 1,896ARENA AMARILLA PUERTO COLOMBIA m³ 0.30 0 0 4,500 0ARENA GRUESA 5 M3 m³ 0.30 0 7,656 0 0ARENA LAVADA DE RIO m³ 0.30 21,600 0 0 0ARENA LAVADA PARA CONCRETO m³ 0.30 0 0 0 5,788CEMENTO GRIS kg 180.00 32,400 36,000 40,320 37,080GRAVA CANTO RODADO 1/2 m³ 0.57 0 0 24,795 0GRAVILLA DE RIO m³ 0.57 31,692 0 0 31,692GRAVILLA FINA 1/2” Y 3/4” m³ 0.57 0 22,800 0 0MANO DE OBRA AA hc 4.70 51,122 51,122 51,122 51,122PIEDRA CICLÓPEA m³ 0.42 0 0 9,030 0PIEDRA ENTRESUELO m³ 0.42 0 0 0 5,788PIEDRA MEDIA ZONGA m³ 0.42 11,340 0 0 0RAJON DE PIEDRA m³ 0.42 0 8,820 0 0 150,050 128,294 131,663 133,366
DEMOLICIÓN CABEZAS PILOTES m³COMPRESOR DE 2 MARTILLOS h 6.95 241,860 241,860 241,860 241,860MANO DE OBRA AA hc 8.91 96,914 96,914 96,914 96,914RETROEXCAVADORA 5-10 d 0.04 14,080 12,528 14,080 14,432VOLQUETA M3 vj 0.25 9,500 8,880 9,388 10,740 362,354 360,182 362,242 363,946
ENTREPISOS METALDECK 2” m²CONCRETO COMÚN 3000 PSI m³ 0.08 25,065 25,028 21,966 25,065MALLA ELECTROSOLDADA Q 3.1 un 0.02 1,224 1,224 1,224 1,224MANO DE OBRA AA hc 0.67 7,288 7,288 7,288 7,288METALDECK 2” CAL 22 m² 1.00 25,609 25,609 25,609 25,609TABLA BURRA ORDINARIO 0.30 m 0.05 85 0 80 80TABLA OTOBO 0.30 m 0.05 0 79 0 0 59,270 59,227 56,166 59,265
ENTREPISOS METALDECK 3” m²CONCRETO COMÚN 3000 PSI m³ 0.08 25,065 25,028 21,966 25,065MALLA ELECTROSOLDADA Q 3.1 un 0.02 1,224 1,224 1,224 1,224MANO DE OBRA AA hc 0.67 7,288 7,288 7,288 7,288METALDECK 3” CAL.22 m² 0.67 18,540 18,540 18,540 18,540TABLA BURRA ORDINARIO 0.30 m 0.05 85 0 80 80TABLA OTOBO 0.30 m 0.05 0 79 0 0 52,201 52,158 49,096 52,196
ENTREPISOS CASETON CON VIGAS m²ACERO FIGURADO 37000 PSI 1/4” kg 4.50 8,091 9,684 8,091 12,798ALAMBRE NEGRO NO.18 kg 0.14 239 224 239 252CONCRETO CORRIENTE 3000 PSI m³ 0.17 53,264 53,185 46,677 53,244ESTERILLA DE GÚADUA m² 1.43 3,616 4,433 3,616 3,862FORMALETA ENTREPISOS ms 0.88 4,083 4,083 4,083 4,083LISTON ABARCO 3 M m 0.05 0 0 250 0LISTÓN 2”X2”X3 M m 0.05 0 205 0 0LISTÓN DE ORDINARIO m 3.87 2,829 2,829 2,829 3,603MANO DE OBRA AA hc 2.01 21,863 21,863 21,863 21,863PUNTILLA CON CABEZA 2” lb 0.02 56 57 47 55REPISA ORDINARIO 3 M m 0.05 50 0 0 49TABLA BURRA ORDINARIO 0.30 m 0.06 102 0 96 96TABLA OTOBO 0.30 m 0.06 0 94 0 0VIBRADOR A GASOLINA d 0.01 301 355 329 311 94,494 97,012 88,120 100,216
ENTREPISOS PLACALISTA m²CONCRETO CORRIENTE 2500 PSI m³ 0.03 9,017 8,655 7,684 9,031MANO DE OBRA AA hc 0.67 7,288 7,288 7,288 7,288PLACA LISTA MURO ESTRUCTURAL m² 1.03 41,818 41,818 35,604 41,818 58,122 57,760 50,575 58,136
ENTREPISOS VIGUETA BLOQUE m²ACERO FIGURADO 37000 PSI 1/4” kg 0.24 432 516 432 683BLOQUE CONCRETO C22-85 un 7.10 11,360 11,360 12,354 12,354CONCRETO CORRIENTE 3000 PSI m³ 0.03 9,399 9,386 8,237 9,396CUARTON OTOBO 2”X4” 2.9 m 0.06 0 270 0 0LISTON ABARCO 3 M m 0.06 0 0 300 0MANO DE OBRA AA hc 1.60 17,403 17,403 17,403 17,403PUNTILLA CON CABEZA 2” lb 0.02 56 57 47 55REPISA ORDINARIO 3 M m 0.06 61 0 0 59TABLA BURRA ORDINARIO 0.30 m 0.07 119 0 112 112TABLA OTOBO 0.30 m 0.07 0 110 0 0VIGUETA I22 6 un 1.03 14,338 14,338 11,948 11,948
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
13
53,167 53,440 50,833 52,009
ENTREPISOS VIGUETA PLACA m²AGUA lt 0.16 2 2 2 2ARENA DE REVOQUE m³ 0.01 0 0 0 200ARENA FINA m³ 0.01 0 190 0 0ARENA LAVADA DE PEÑA m³ 0.01 250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.01 0 0 245 0CEMENTO GRIS kg 0.57 103 114 128 117CONCRETO CORRIENTE 3000 PSI m³ 0.01 3,133 3,129 2,746 3,132CUARTON OTOBO 2”X4” 2.9 m 0.05 0 225 0 0LARGUERO DE 2” X 4” m 0.05 0 0 0 475LISTON ABARCO 2”X4”X3 M m 0.05 0 0 203 0MANO DE OBRA AA hc 1.07 11,638 11,638 11,638 11,638PLAQUETA PL4 (100) un 0.97 22,504 18,003 18,003 18,003PUNTILLA CON CABEZA 2” lb 0.02 56 57 47 55REPISA ORDINARIO 3 M m 0.05 150 0 0 0TABLA BURRA ORDINARIO 0.30 m 0.06 102 0 96 96TABLA OTOBO 0.30 m 0.06 0 94 0 0VIGUETA I22 5 un 0.97 13,502 13,502 11,252 11,252 51,440 46,955 44,360 44,971
ESCALERA MACIZA UN TRAMO m³A.C.P.M. BARRANQUILLA gl 0.22 0 0 821 0A.C.P.M. CALI gl 0.22 0 867 0 0A.C.P.M. MEDELLÍN gl 0.22 0 0 0 854A.C.P.M. BOGOTÁ gl 0.22 862 0 0 0CONCRETO CORRIENTE 3000 PSI m³ 1.10 344,648 344,137 302,029 344,520CUARTON OTOBO 2”X4” 2.9 m 2.74 0 12,330 0 0FORMALETA ENTREPISOS ms 8.69 40,322 40,322 40,322 40,322LARGUERO DE 2” X 4” m 2.74 0 0 0 26,030LISTON ABARCO 3 M m 2.74 0 0 13,700 0MANO DE OBRA AA hc 17.70 192,523 192,523 192,523 192,523PARAL TELESCÓPICO d 2.90 0 316 316 316PARAL TELESCÓPICO 2-4 d 2.90 302 0 0 0PUNTILLA CON CABEZA 2” lb 1.49 4,145 4,247 3,510 4,089REPISA ORDINARIO 3 M m 2.74 8,220 0 0 0TABLA BURRA ORDINARIO 0.30 m 9.12 15,504 0 14,592 14,592TABLA BURRA ORDINARIO 25 m 10.86 81,884 81,884 81,884 81,884TABLA OTOBO 0.30 m 9.12 0 14,355 0 0VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244 689,613 692,402 651,012 706,373
EXCAVACION A MANO m³MANO DE OBRA AA hc 0.70 7,614 7,614 7,614 7,614VOLQUETA M3 vj 0.37 14,060 13,142 13,894 15,894 21,674 20,756 21,507 23,508
GROUTING - FLUIDOCONCRETO m³CONCRETO FLUÍDO 3000 PSI (COSTO ADICIONAL) m³ 1.03 44,805 44,805 41,837 44,805CONCRETO GRAVA FINA 2000 PSI m³ 1.03 303,479 310,170 303,479 303,479MANO DE OBRA AA hc 6.70 72,876 72,876 72,876 72,876 421,160 427,851 418,192 421,160
LADRILLO ESTRUCTURAL SANTA FE m²AGUA lt 5.25 63 63 63 63ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE RIO m³ 0.02 1,440 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0ARENA LAVADA MEISSEN m³ 0.02 0 0 0 427CAL NARE kg 0.50 282 232 300 200CEMENTO GRIS kg 9.53 1,715 1,906 2,135 1,963LADRILLO PORTANTE PRENSADO un 38.08 37,280 39,832 42,726 42,726MANO DE OBRA AA hc 0.67 7,288 7,288 7,288 7,288SIKA-2 (5.5 KG) kg 0.30 2,123 2,123 2,123 2,123VOLQUETA 6 M3 vj 0.02 508 508 508 508 50,699 52,331 55,632 55,298
LOSA MACIZA H/.12 m²CONCRETO CORRIENTE 3000 PSI m³ 0.13 40,731 40,671 35,694 40,716COSTO ADICIONAL BOMBEO m³ 0.13 3,091 3,574 3,166 3,016FORMALETA ENTREPISOS ms 0.80 3,712 3,712 3,712 3,712MANO DE OBRA AA hc 0.68 7,396 7,396 7,396 7,396VIBRADOR A GASOLINA d 0.01 301 355 329 311 55,232 55,708 50,297 55,151
MUROS CONTENCION H/2.00 m³CONCRETO CORRIENTE 3000 PSI m³ 1.03 322,715 322,238 282,809 322,596CUARTON OTOBO 2”X4” 2.9 m 1.97 0 8,865 0 0LARGUERO DE 2” X 4” m 1.97 0 0 0 18,715LISTON ABARCO 3 M m 1.97 0 0 9,850 0MANO DE OBRA AA hc 10.68 116,166 116,166 116,166 116,166PUNTILLA CON CABEZA 2” lb 2.12 5,898 6,042 4,995 5,817REPISA ORDINARIO 3 M m 1.97 5,910 0 0 0TABLA BURRA ORDINARIO 0.30 m 4.34 7,378 0 6,944 6,944TABLA OTOBO 0.30 m 4.34 0 6,831 0 0VARA DE CLAVO m 2.56 3,840 3,840 3,840 3,412VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244 463,112 465,403 425,918 474,895
PASOS PREF.ESCALERAS L/1 unACERO FIGURADO 60000 PSI 1/2” kg 2.97 5,340 6,391 5,340 5,548ALAMBRE NEGRO NO.18 kg 0.12 205 192 205 216CONCRETO CORRIENTE 2500 PSI m³ 0.03 9,017 8,655 7,684 9,031CUARTON OTOBO 2”X4” 2.9 m 0.08 0 360 0 0
DURMIENTE 3 M m 0.08 70 0 68 0LARGUERO ORDINARIO 3 M m 0.08 0 0 0 64MANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052PUNTILLA CON CABEZA 2” lb 0.01 28 29 24 27TABLA BURRA ORDINARIO 0.30 m 0.11 187 0 176 176TABLA OTOBO 0.30 m 0.11 0 173 0 0 27,898 28,852 26,548 28,115
PLACA FLOTANTE 0.90 ESTRUCTURAS m²CONCRETO CORRIENTE 3000 PSI m³ 0.46 144,125 143,912 126,303 144,072COSTO ADICIONAL BOMBEO m³ 0.46 10,939 12,646 11,201 10,672CUARTON OTOBO 2”X4” 2.9 m 0.11 0 495 0 0ICOPOR 1 CM/DENS.20/1X1 m² 0.80 2,320 2,000 2,000 0LARGUERO DE 2” X 4” m 0.11 0 0 0 1,045LISTON ABARCO 2”X4”X3 M m 0.11 0 0 446 0MANO DE OBRA AA hc 2.34 25,452 25,452 25,452 25,452PUNTILLA CON CABEZA 2” lb 0.30 835 855 707 823REPISA ORDINARIO 3 M m 0.11 330 0 0 0VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244VOLQUETA 6 M3 vj 0.11 2,794 2,794 2,794 2,794 187,999 189,576 170,217 186,103
REFUERZOS HIERRO 37000 FG tnACERO FIGURADO 37000 PSI 1/4” kg 1,050.00 1,887,900 2,259,600 1,887,900 2,986,200ALAMBRE NEGRO NO.18 kg 30.00 51,150 47,970 51,150 54,000MANO DE OBRA AA hc 24.82 269,967 269,967 269,967 269,967SEGUETA NICHOLSON un 30.00 93,960 90,000 90,000 90,000 2,302,977 2,667,537 2,299,017 3,400,167
REFUERZOS HIERRO 60000 FG tnACERO FIGURADO 60000 PSI 1/2” kg 1,050.00 1,887,900 2,259,600 1,887,900 1,961,400ALAMBRE NEGRO NO.18 kg 30.00 51,150 47,970 51,150 54,000MANO DE OBRA AA hc 24.82 269,967 269,967 269,967 269,967SEGUETA NICHOLSON un 30.00 93,960 90,000 90,000 90,000 2,302,977 2,667,537 2,299,017 2,375,367
REFUERZOS MALLA kgMALLA ELECTROSOLDADA M-159 Q-4 un 0.02 1,482 1,431 1,482 1,627MANO DE OBRA AA hc 0.04 435 435 435 435 1,918 1,866 1,918 2,062
TANQUE ELEVADO m³CERCO ORDINARIO 3 M m 8.00 9,600 9,600 9,600 8,000CONCRETO CORRIENTE 3000 PSI m³ 1.10 344,648 344,137 302,029 344,520CUARTON OTOBO 2”X4” 2.9 m 4.00 0 18,000 0 0LARGUERO DE 2” X 4” m 4.00 0 0 0 38,000LISTON ABARCO 2”X4”X3 M m 4.00 0 0 16,204 0MANO DE OBRA AA hc 16.08 174,902 174,902 174,902 174,902PUNTILLA CON CABEZA 2” lb 1.60 4,451 4,560 3,770 4,390REPISA ORDINARIO 3 M m 4.00 12,000 0 0 0TABLA AMARILLO 1”X10” 2.9 m 1.05 0 11,263 0 0TABLA BURRA CEDRO MACHO 0.28 m 1.05 11,813 0 11,550 11,550VIBRADOR A GASOLINA d 0.10 3,010 3,552 3,285 3,110 560,423 566,015 521,340 584,473
TANQUE SUBTERRANEO m³CONCRETO CORRIENTE 2000 PSI m³ 0.09 25,547 25,119 21,548 25,578CONCRETO CORRIENTE 3000 PSI m³ 1.10 344,648 344,137 302,029 344,520FORMALETA ENTREPISOS ms 2.53 11,739 11,739 11,739 11,739MANO DE OBRA AA hc 11.95 129,980 129,980 129,980 129,980PUNTILLA CON CABEZA 2” lb 2.12 5,898 6,042 4,995 5,817TABLA BURRA ORDINARIO 0.30 m 0.76 1,292 0 1,216 1,216TABLA OTOBO 0.30 m 0.76 0 1,196 0 0VARA DE CLAVO m 0.47 705 705 705 627VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244 521,012 520,339 473,526 520,721
VIGA AMARRE CONCRETO ESTRUCTURAS m³CONCRETO CORRIENTE 2500 PSI m³ 1.10 330,612 317,341 281,741 331,122CUARTON OTOBO 2”X4” 2.9 m 3.11 0 13,995 0 0LARGUERO DE 2” X 4” m 3.11 0 0 0 29,545LISTON ABARCO 3 M m 3.11 0 0 15,550 0MANO DE OBRA AA hc 6.89 74,943 74,943 74,943 74,943PUNTILLA CON CABEZA 2” lb 1.47 4,090 4,190 3,463 4,034REPISA ORDINARIO 3 M m 3.11 9,330 0 0 0TABLA BURRA ORDINARIO 0.30 m 3.52 5,984 0 5,632 5,632TABLA OTOBO 0.30 m 3.52 0 5,540 0 0UNIÓN PVC SANIT 2” un 0.40 727 727 727 727 425,684 416,736 382,055 446,002
VIGA TEE 25X25X20X50 m³CONCRETO CORRIENTE 3000 PSI m³ 1.10 344,648 344,137 302,029 344,520CUARTON OTOBO 2”X4” 2.9 m 2.63 0 11,835 0 0DURMIENTE 3 M m 2.63 2,288 0 2,236 0LARGUERO COMUN 3.5X7.5X3 M m 2.45 0 0 0 6,248LARGUERO ORDINARIO 3 M m 2.63 0 0 0 2,117MANO DE OBRA AA hc 8.97 97,567 97,567 97,567 97,567PUNTILLA CON CABEZA 2” lb 0.70 1,947 1,995 1,649 1,921TABLA CHAPA ORDINARIO 0.30 m 2.45 3,785 0 0 0TABLA OTOBO 0.30 m 2.45 0 3,856 0 0TABLON CATIVO 0.30 m 2.45 0 0 6,125 0VIBRADOR A GASOLINA d 0.04 1,204 1,421 1,314 1,244 451,439 460,811 410,920 453,616
ZAPATAS ESTRUCTURAS m³CONCRETO CORRIENTE 3000 PSI m³ 1.03 322,715 322,238 282,809 322,596
CONSTRUDATA14
LISTON MONTERREY 1X2X3 m 3.00 0 0 1,266 0LISTON OTOBO m 3.00 0 3,150 0 0LISTÓN DE ORDINARIO m 3.00 0 0 0 2,193MANO DE OBRA AA hc 8.27 89,953 89,953 89,953 89,953PLANCHÓN ORDINARIO 3 M m 3.00 8,244 0 0 0PUNTILLA CON CABEZA 2” lb 0.10 278 285 236 274TABLA CHAPA ORDINARIO 0.30 m 3.00 4,635 0 0 0TABLA DE 2 CM X 10” m 3.00 0 0 0 11,100TABLON CATIVO 0.30 m 3.00 0 0 7,500 0TABLON OTOBO 3 M m 3.00 0 24,000 0 0VARA DE CLAVO m 0.50 750 750 750 667VIBRADOR A GASOLINA d 0.10 3,010 3,552 3,285 3,110 429,585 443,927 385,799 429,893
INSTALACION DE GAS
ACOMETIDA GAS UNIFAMILIAR unCODO CALLE GALVANIZADO 1/2” un 1.00 1,720 1,720 1,720 1,720ELEVADOR PARA GAS 1/2” un 1.00 8,100 8,100 8,100 7,540LOCTIGAS F/MEDIA 36 ML un 0.06 782 782 782 782MANO DE OBRA BB hc 0.65 7,777 7,777 7,777 7,777MEDIDOR DE GAS 2.5 un 1.00 139,200 139,200 139,200 139,200REGULADOR GAS R-4E 4 M3 un 1.00 25,000 25,000 25,000 23,200TEE REDUCIDA POLIETILENO 1X1/2” un 1.00 23,317 23,317 23,317 22,978TUBO GAS GALVANIZADO 1/2” m 1.00 11,455 11,455 7,050 7,120UNIVERSAL GALVANIZADA 1/2” un 1.00 4,600 3,500 4,645 4,543VÁLVULA DE BOLA PARA MEDIDOR un 1.00 10,092 10,092 10,092 10,092TUBERIA ACERO GALVANIZADA 1/2” m 1.00 15,977 15,961 11,331 11,394TUBERIA POLIETILENO 1/2” m 1.00 9,485 9,320 9,066 9,725SUB-CONTRATO INSTALACION % 25.00 64,376 64,056 62,020 61,518 321,881 320,281 310,100 307,589
ADAPTADOR MACHO COBRE 1/2” unADAPTADOR MACHO COBRE 1/2” un 1.03 913 913 913 876LIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630SUB-CONTRATO INSTALACION % 25.00 567 561 561 538 2,836 2,803 2,803 2,692
ADAPTADOR MACHO COBRE 3/4” unADAPTADOR MACHO COBRE 3/4” un 1.03 1,352 1,352 1,352 1,529LIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630SUB-CONTRATO INSTALACION % 25.00 677 671 671 702 3,385 3,353 3,353 3,508
BUSHING GALVANIZADO 1”X1/2” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308BUSHING GALVANIZADO 1”X1/2” un 1.02 4,610 2,135 1,652 2,135LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555 6,747 4,261 3,777 4,259
BUSHING GALVANIZADO 1”X3/4” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308BUSHING GALVANIZADO 1”X3/4” un 1.02 4,335 2,135 2,135 2,135LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555 6,471 4,261 4,259 4,259
BUSHING GALVANIZADO 3/4”X1/2” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308BUSHING GALVANIZADO 3/4”X1/2” un 1.03 2,781 1,674 1,674 1,674LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555 4,917 3,800 3,798 3,798
CAJA MEDIDOR GAS 140X45 unANTICORROSIVO GRIS gl 0.50 12,600 12,600 15,541 13,150BISAGRA COMÚN 2” un 3.00 690 660 828 660ESMALTE HORNEABLE LISO gl 0.50 21,550 21,550 27,000 24,400HIERRO VARILLA 3/8” X 6 M m 6.56 6,678 6,678 5,464 5,720LÁMINA GALVANIZADA .20 un 0.78 31,479 31,479 31,479 33,344MALLA GALVANIZADA CAL 12 1/2X1/2 m² 0.63 16,108 15,341 16,108 17,388MANO DE OBRA BB hc 3.50 41,878 41,878 41,878 41,878SOLDADURA 60.13 DE 1/8 kg 0.70 2,899 2,660 2,899 2,244ÁNGULO HIERRO 3/4” X 1/8” m 8.30 10,267 9,545 10,267 9,221SUB-CONTRATO DE ORNAMENTACION % 10.00 14,415 14,239 15,146 14,801SUB-CONTRATO INSTALACION % 25.00 36,037 35,598 37,866 37,001 194,600 192,227 204,476 199,807
CAJA MEDIDOR GAS 172X45 unANTICORROSIVO GRIS gl 0.60 15,120 15,120 18,649 15,780BISAGRA COMÚN 2” un 3.00 690 660 828 660ESMALTE HORNEABLE LISO gl 0.60 25,860 25,860 32,400 29,280HIERRO VARILLA 3/8” X 6 M m 10.00 10,180 10,180 8,330 8,720LÁMINA GALVANIZADA .20 un 0.93 37,533 37,533 37,533 39,757MALLA GALVANIZADA CAL 12 1/2X1/2 m² 0.77 19,687 18,750 19,687 21,252MANO DE OBRA BB hc 4.00 47,860 47,860 47,860 47,860SOLDADURA 60.13 DE 1/8 kg 0.80 3,313 3,040 3,313 2,565
ÁNGULO HIERRO 3/4” X 1/8” m 9.50 11,752 10,925 11,752 10,555SUB-CONTRATO DE ORNAMENTACION % 10.00 17,199 16,993 18,035 17,643SUB-CONTRATO INSTALACION % 25.00 42,999 42,482 45,088 44,107 232,193 229,402 243,474 238,178
CAJA MEDIDOR GAS 45X45 unANTICORROSIVO GRIS gl 0.20 5,040 5,040 6,216 5,260BISAGRA COMÚN 2” un 2.00 460 440 552 440ESMALTE HORNEABLE LISO gl 0.20 8,620 8,620 10,800 9,760HIERRO VARILLA 3/8” X 6 M m 2.70 2,749 2,749 2,249 2,354LÁMINA GALVANIZADA .20 un 0.28 11,300 11,300 11,300 11,970MALLA GALVANIZADA CAL 12 1/2X1/2 m² 0.16 4,091 3,896 4,091 4,416MANO DE OBRA DD hc 2.00 26,104 26,104 26,104 26,104SOLDADURA 60.13 DE 1/8 kg 0.40 1,656 1,520 1,656 1,282ÁNGULO HIERRO 3/4” X 1/8” m 2.20 2,721 2,530 2,721 2,444SUB-CONTRATO DE ORNAMENTACION % 10.00 6,274 6,220 6,569 6,403SUB-CONTRATO INSTALACION % 25.00 15,685 15,550 16,423 16,008 84,701 83,968 88,682 86,441
CODO CALLE GALVANIZADO 1/2” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308CODO CALLE GALVANIZADO 1/2” un 1.02 1,754 1,754 1,754 1,754LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555 3,891 3,881 3,879 3,879
CODO COBRE 1/2” unCODO 45 COBRE CXC 1/2” un 1.03 1,391 1,437 1,391 1,339LIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630SUB-CONTRATO INSTALACION % 25.00 687 692 680 654 3,433 3,459 3,401 3,271
CODO COBRE 3/4” unCODO 45 COBRE CXC 3/4” un 1.03 3,143 2,282 2,282 3,143LIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630SUB-CONTRATO INSTALACION % 25.00 1,125 903 903 1,105 5,623 4,516 4,516 5,526
CODO COBRE 1” unCODO 45 COBRE CXC 1” un 1.02 6,056 6,056 6,056 5,934LIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630SUB-CONTRATO INSTALACION % 25.00 1,853 1,846 1,846 1,803 9,265 9,232 9,232 9,015
CODO GALVANIZADO 1” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308CODO GALVANIZADO 1” un 1.00 2,760 2,500 3,171 2,978LOCTIGAS F/ALTA 36 ML un 0.02 261 261 198 261LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555 5,157 4,887 5,493 5,363
CODO GALVANIZADO 1/2” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308CODO GALVANIZADO 1/2” un 1.00 2,450 2,950 3,000 3,008LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555 4,586 5,076 5,124 5,132
CODO GALVANIZADO 3/4” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308CODO GALVANIZADO 3/4” un 1.00 972 1,000 860 972LOCTIGAS F/ALTA 36 ML un 0.02 261 261 198 261LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555 3,369 3,387 3,182 3,357
CONDUCTO EVACUACION GAS 15 X 22 mLÁMINA GALVANIZADA .20 un 0.45 18,161 18,161 18,161 19,237SELLADOR USO GENERAL un 0.10 767 767 767 767SOLDADURA 60.13 DE 1/8 kg 0.10 414 380 414 321TORNILLO ACERO 1/2X1/4” un 4.00 260 248 260 260SUB-CONTRATO DE ORNAMENTACION % 80.00 15,682 15,645 15,682 16,468 35,284 35,201 35,284 37,052
COPA COBRE 1 X 1/2” unCOPA COBRE 1 X 1/2” un 1.02 4,223 4,223 4,359 3,856LIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630SUB-CONTRATO ORNAMENTACION % 25.00 1,395 1,388 1,422 1,283 6,974 6,941 7,112 6,417
COPA COBRE 1 X 3/4” unCOPA COBRE 1 X 3/4” un 1.02 3,856 3,856 3,969 3,525LIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630SUB-CONTRATO ORNAMENTACION % 25.00 1,303 1,296 1,325 1,201 6,515 6,482 6,624 6,004
COPA COBRE 3/4 X 1/2” unCOPA COBRE 3/4 X 1/2” un 1.02 1,538 1,538 1,538 1,538LIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630SUB-CONTRATO INSTALACION % 25.00 724 717 717 704 3,618 3,585 3,585 3,520
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
15
ELEVADOR 1/2” unELEVADOR PARA GAS 1/2” un 1.02 8,262 8,262 8,262 7,691LIMPIADOR 7070 un 0.01 175 175 175 162MANO DE OBRA BB hc 0.05 598 598 598 598 9,035 9,035 9,035 8,451
MANGUERA CONEXION FLEXIBLE unLOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANGUERA CONEXIÓN FLEXIBLE un 1.00 5,600 5,600 5,600 5,290MANO DE OBRA BB hc 0.03 359 359 359 359 6,220 6,220 6,220 5,910
MEDIDOR DE GAS 2.5 unLOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.25 2,991 2,991 2,991 2,991MEDIDOR DE GAS 2.5 un 1.02 141,984 141,984 141,984 141,984 145,236 145,236 145,236 145,236
REGULADOR RP40 unLOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555REGULADOR GAS RP40 un 1.02 24,847 24,847 24,847 24,847 26,663 26,663 26,663 26,663
REGULADOR 143 E-METER unLOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555REGULADOR GAS 143 E-METER un 1.02 120,686 120,686 120,686 120,686 122,503 122,503 122,503 122,503
TAPON COBRE 1/2” unLIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630TAPÓN COBRE 1/2” un 1.03 505 505 505 489SUB-CONTRATO INSTALACION % 25.00 465 459 459 442 2,326 2,293 2,293 2,209
TAPON COBRE 3/4” unLIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630TAPÓN COBRE 3/4” un 1.03 1,144 1,144 1,144 1,177SUB-CONTRATO ORNAMENTACION % 25.00 625 619 619 614 3,125 3,093 3,093 3,069
TAPON COBRE 1” unLIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630TAPÓN COBRE 1” un 1.02 1,650 1,650 1,650 1,650SUB-CONTRATO ORNAMENTACION % 25.00 752 745 745 732 3,758 3,725 3,725 3,660
TAPON GALVANIZADO 1” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308CINTA TEFLÓN 10 M 1/2” un 0.01 13 13 15 13LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555TAPÓN MACHO GALVANIZADO 1” un 1.02 2,067 2,067 2,067 2,067 4,216 4,206 4,206 4,203
TAPON GALVANIZADO 1/2” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308CINTA TEFLÓN 10 M 1/2” un 0.01 13 13 15 13LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555TAPÓN MACHO GALVANIZADO 1/2” un 1.03 965 965 965 965 3,114 3,104 3,104 3,102
TAPON GALVANIZADO 3/4” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308CINTA TEFLÓN 10 M 1/2” un 0.01 13 13 15 13LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555TAPÓN MACHO GALVANIZADO 3/4” un 1.03 1,163 1,163 1,163 1,163 3,312 3,302 3,302 3,300
TEE COBRE 1/2” unLIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630TEE COBRE 1/2” un 1.03 3,797 3,797 3,797 3,797SUB-CONTRATO INSTALACION % 25.00 1,288 1,282 1,282 1,269 6,441 6,408 6,408 6,343
TEE COBRE 3/4” unLIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630TEE COBRE 3/4” un 1.03 2,822 2,822 2,822 2,599SUB-CONTRATO INSTALACION % 25.00 1,045 1,038 1,038 969 5,223 5,190 5,190 4,846
TEE COBRE 1” unLIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630TEE COBRE 1” un 1.02 6,675 6,675 6,675 6,675SUB-CONTRATO INSTALACION % 25.00 2,008 2,001 2,001 1,988 10,039 10,006 10,006 9,941
TEE GALVANIZADA 1” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555TEE GALVANIZADA 1” un 1.02 8,313 8,313 5,249 5,249 10,449 10,439 7,373 7,373
TEE GALVANIZADA 1/2” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555TEE GALVANIZADA 1/2” un 1.03 1,154 1,154 1,793 1,793 3,290 3,280 3,917 3,918
TEE GALVANIZADA 3/4” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555TEE GALVANIZADA 3/4” un 1.03 2,853 2,853 2,264 2,262 4,989 4,979 4,388 4,386
TEE REDUCIDA POLIETILENO1X1/2 unTEE REDUCIDA POLIETILENO 1X1/2” un 1.02 23,783 23,783 23,783 23,438SUB-CONTRATO INSTALACION % 35.00 8,324 8,324 8,324 8,203 32,108 32,108 32,108 31,641
TUBERIA ACERO GALVANIZADA 1” mABRAZADERA PLÁSTICA 5/8 un 0.50 40 38 40 40ANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.25 2,991 2,991 2,991 2,991TORNILLO ACERO 1/2X1/4” un 1.00 65 62 65 65TUBO GAS GALVANIZADO 1” m 1.05 23,649 22,050 22,050 22,575UNIÓN GALVANIZADA 1” un 1.02 3,692 3,692 3,373 3,373 31,018 29,404 29,088 29,613
TUBERIA ACERO GALVANIZADA 1/2” mABRAZADERA PLÁSTICA 5/8 un 0.50 40 38 40 40ANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.25 2,991 2,991 2,991 2,991TORNILLO ACERO 1/2X1/4” un 1.00 65 62 65 65TUBO GAS GALVANIZADO 1/2” m 1.05 12,028 12,028 7,403 7,476UNIÓN GALVANIZADA 1/2” un 0.17 272 272 264 253 15,977 15,961 11,331 11,394
TUBERIA ACERO GALVANIZADA 3/4” mABRAZADERA PLÁSTICA 5/8 un 0.50 40 38 40 40ANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.25 2,991 2,991 2,991 2,991TORNILLO ACERO 1/2X1/4” un 1.00 65 62 65 65TUBO GAS GALVANIZADO 3/4” m 1.05 16,037 16,037 9,311 9,311UNIÓN GALVANIZADA 3/4” un 0.17 349 349 349 349 20,062 20,047 13,325 13,325
TUBERIA COBRE 1” mABRAZADERA PLÁSTICA 5/8 un 1.00 80 75 80 80LIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630TORNILLO ACERO 1/2X1/4” un 2.00 130 124 130 130TUBO COBRE TIPO L 1” 20 PIES ASTM B-88 m 1.05 21,720 21,720 21,720 22,360SUB-CONTRATO INSTALACION % 25.00 5,822 5,812 5,815 5,962 29,108 29,062 29,075 29,810
TUBERIA COBRE 1/2” mABRAZADERA PLÁSTICA 5/8 un 1.00 80 75 80 80LIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630TORNILLO ACERO 1/2X1/4” un 2.00 130 124 130 130TUBO COBRE TIPO L 1/2” 20 PIES ASTM B-88 m 1.05 8,810 8,810 8,810 7,713SUB-CONTRATO INSTALACION % 25.00 2,594 2,585 2,587 2,300 12,969 12,923 12,937 11,502
TUBERIA COBRE 3/4” mABRAZADERA PLÁSTICA 3/4 un 1.00 158 158 158 158LIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630TORNILLO ACERO 1/2X1/4” un 2.00 130 124 130 130TUBO COBRE TIPO L 3/4” m 1.05 14,291 14,291 14,291 13,803SUB-CONTRATO INSTALACION % 25.00 3,984 3,976 3,977 3,842 19,918 19,878 19,886 19,212
TUBERIA POLIETILENO 1” mARENA DE PEÑA m³ 0.02 619 0 0 0ARENA DE REVOQUE m³ 0.02 0 0 200 400ARENA FINA 5 M3 m³ 0.02 0 510 0 0CINTA POLIPROPILENO 12 X 40 M un 1.02 1,178 1,122 1,178 1,178MANO DE OBRA BB hc 0.50 5,983 5,983 5,983 5,983TUBO GAS PAVCO 1” m 1.05 3,469 3,469 3,469 4,405 11,249 11,084 10,830 11,965
TUBERIA POLIETILENO 1/2” mARENA DE PEÑA m³ 0.02 619 0 0 0ARENA DE REVOQUE m³ 0.02 0 0 200 400ARENA FINA 5 M3 m³ 0.02 0 510 0 0CINTA POLIPROPILENO 12 X 40 M un 1.02 1,178 1,122 1,178 1,178MANO DE OBRA BB hc 0.50 5,983 5,983 5,983 5,983TUBO GAS PAVCO 1/2” m 1.05 1,705 1,705 1,705 2,164 9,485 9,320 9,066 9,725
UNION COBRE 1/2” unLIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630UNIÓN C/TOPE COBRE 1/2” un 1.03 573 573 515 573
CONSTRUDATA16
SUB-CONTRATO INSTALACION % 25.00 482 476 461 463 2,411 2,378 2,306 2,313
UNION COBRE 3/4” unLIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630UNIÓN C/TOPE COBRE 3/4” un 1.03 1,117 1,117 1,030 1,117SUB-CONTRATO INSTALACION % 25.00 618 612 590 599 3,091 3,058 2,950 2,993
UNIVERSAL COBRE 1/2” unLIMPIADOR 7070 un 0.04 700 700 700 648LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630UNIVERSAL COBRE 1/2” un 1.03 3,830 3,830 3,830 3,830SUB-CONTRATO INSTALACION % 25.00 1,362 1,355 1,355 1,342 6,808 6,775 6,775 6,710
UNIVERSAL COBRE 3/4” unLIMPIADOR 7070 un 0.04 700 700 700 648SOLDADURA 95-5 PLATA lb 0.02 656 630 630 630UNIVERSAL COBRE 3/4” un 1.03 9,283 9,283 9,283 9,549SUB-CONTRATO INSTALACION % 25.00 2,660 2,653 2,653 2,707 13,299 13,267 13,267 13,534
UNIVERSAL GALVANIZADA 1/2” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555UNIVERSAL GALVANIZADA 1/2” un 1.03 4,738 3,605 4,784 4,679 6,874 5,731 6,908 6,804
UNIVERSAL GALVANIZADA 3/4” unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555UNIVERSAL GALVANIZADA 3/4” un 1.03 6,822 8,446 6,822 6,822 8,958 10,572 8,946 8,946
VALVULA DE BOLA 1/2” HNPT unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555VÁLVULA DE BOLA PARA MEDIDOR un 1.03 10,395 10,395 10,395 10,395 12,531 12,521 12,519 12,519
VALVULA DE BOLA PARA MEDIDOR unANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308LOCTIGAS F/MEDIA 36 ML un 0.02 261 261 261 261MANO DE OBRA BB hc 0.13 1,555 1,555 1,555 1,555VÁLVULA DE BOLA PARA MEDIDOR un 1.02 10,294 10,294 10,294 10,294 12,430 12,420 12,418 12,418
INST.SANITARIA/LATONERÍA
ACOMETIDA GALVANIZADA 1/2” 5 M unCHEQUE RED WHITE 1-1/2” un 1.05 87,098 93,450 104,738 107,730CODO GALVANIZADO 1/2” un 2.05 5,023 6,048 6,150 6,166MANO DE OBRA BB hc 4.00 47,860 47,860 47,860 47,860REGISTRO TOYO 1/2” un 1.05 22,363 19,215 22,260 19,556TUBO GALVANIZADO 1/2” m 5.15 25,106 16,928 25,168 25,106SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 71,231 69,730 78,347 78,439 258,680 253,231 284,522 284,858
ACOMETIDA PVC 1/2” 5 M unCHEQUE RED WHITE 1-1/2” un 1.05 87,098 93,450 104,738 107,730CODO 90° PRESIÓN PVC 1/2” un 2.05 701 769 769 769MANO DE OBRA BB hc 3.00 35,895 35,895 35,895 35,895REGISTRO TOYO 1/2” un 1.05 22,363 19,215 22,260 19,556SOLDADURA PVC LIQUIDA 1/4 un 0.05 2,808 2,808 2,808 2,050TUBO PRESIÓN /9 PVC 1/2” m 5.15 13,539 13,539 13,539 13,539SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 61,713 62,957 68,403 68,225 224,117 228,633 248,412 247,764
ACOMETIDA PVC 3/4” 5 M unCHEQUE RED WHITE 1-1/2” un 1.05 87,098 93,450 104,738 107,730CODO 45 COBRE CXC 1/2” un 2.05 2,768 2,860 2,768 2,665CODO 90° PRESIÓN PVC 3/4” un 2.05 1,339 1,472 1,472 1,472MANO DE OBRA BB hc 3.00 35,895 35,895 35,895 35,895REGISTRO TOYO 3/4” un 1.05 28,940 26,880 26,880 27,332SOLDADURA PVC LIQUIDA 1/4 un 0.05 2,808 2,808 2,808 2,050TUBO PRESIÓN /11 PVC 3/4” m 5.15 18,901 18,901 18,901 18,901SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 67,544 69,261 73,515 74,496 245,291 251,526 266,975 270,540
AGUA FRIA Y CALIENTE 1.50 ML unCODO PRESIÓN 1/2” un 1.00 327 330 317 376LIMPIADOR PVC gl 1.00 100,637 100,637 97,420 97,490SOLDADURA CPVC 1/4 GL un 1.00 60,211 60,211 60,211 60,211TUBO CPVC 1/2” m 1.00 5,923 5,923 5,923 5,923TUBO PRESIÓN /13.5 PVC 1/2” m 1.00 1,875 1,875 1,875 1,875SUB-CONTRATO HIDRAULICO SANITARIO % 38.00 64,210 64,211 62,983 63,033 233,183 233,187 228,729 228,908
BAJANTE AGUAS LLUVIAS PVC 3” mCODO 90° 1/4 CXC SANITARIO 3” un 0.06 303 303 303 303MANO DE OBRA BB hc 0.50 5,983 5,983 5,983 5,983TUBO PVC A.LL. 3” m 1.05 5,351 5,309 5,309 5,775SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 4,422 4,406 4,406 4,583 16,058 16,000 16,000 16,643
BAJANTE AGUAS LLUVIAS PVC 4” mCODO 90° 1/4 CXC SANITARIO 4” un 0.06 555 555 555 555MANO DE OBRA BB hc 0.55 6,581 6,581 6,581 6,581TUBO PVC A.LL. 4” m 1.05 11,421 11,421 11,421 11,421SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 7,052 7,052 7,052 7,052 25,609 25,609 25,609 25,609
BAJANTE AGUAS NEGRAS PVC 3” mCODO 90° 1/4 CXC SANITARIO 3” un 0.06 303 303 303 303MANO DE OBRA BB hc 0.50 5,983 5,983 5,983 5,983TUBO PVC SANITARIO 3” m 1.05 13,820 13,820 13,820 13,820SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 7,640 7,640 7,640 7,640 27,745 27,745 27,745 27,745
BAJANTE AGUAS NEGRAS PVC 4” mCODO 90° 1/4 CXC SANITARIO 4” un 0.06 555 555 555 555MANO DE OBRA BB hc 0.55 6,581 6,581 6,581 6,581TUBO PVC SANITARIO 4” m 1.05 19,261 19,261 19,261 19,261SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 10,031 10,031 10,031 10,031 36,428 36,428 36,428 36,428
BAJANTE AGUAS NEGRAS PVC 6” mCODO 90° 1/4 CXC SANITARIO 6” un 0.06 4,614 4,614 4,614 4,614MANO DE OBRA BB hc 0.89 10,649 10,649 10,649 10,649TUBO PVC SANITARIO 6” m 1.05 40,790 40,790 40,790 40,790SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 21,300 21,300 21,300 21,300 77,353 77,353 77,353 77,353
BAJANTE LATON 12X 6 mLÁMINA GALVANIZADA .22 un 0.20 6,687 6,687 6,687 7,030SOLDADURA ESTAÑO PARA COBRE un 0.15 4,663 4,663 4,663 4,663SUB-CONTRATO DE ORNAMENTACION % 80.00 9,080 9,080 9,080 9,355SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 4,313 4,313 4,313 4,443SUB-CONTRATO INSTALACION % 38.00 4,313 4,313 4,313 4,443 29,057 29,057 29,057 29,935
CONEXIÓN TANQUE ELEVADO GALV unCODO GALVANIZADO 1” un 2.10 5,796 5,250 6,659 6,254CODO GALVANIZADO 2” un 2.10 13,041 9,240 13,041 13,910MANO DE OBRA BB hc 20.00 239,300 239,300 239,300 239,300REGISTRO TOYO 2” un 1.00 95,700 94,820 85,000 95,700TUBO GALVANIZADO 1” m 1.05 10,828 5,278 13,199 10,828TUBO GALVANIZADO 2” m 1.05 9,240 9,338 9,338 9,240SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 142,084 138,026 139,284 142,588 515,988 501,252 505,820 517,820
CONEXIÓN TANQUE ELEVADO PVC unCODO 90° PRESIÓN PVC 1” un 2.10 2,690 2,959 2,959 2,959CODO 90° PRESIÓN PVC 2” un 2.10 15,805 17,420 17,420 17,420MANO DE OBRA BB hc 10.00 119,650 119,650 119,650 119,650REGISTRO TOYO 2” un 1.00 95,700 94,820 85,000 95,700SOLDADURA PVC LIQUIDA 1/4 un 0.05 2,808 2,808 2,808 2,050TUBO PRESIÓN /13.5 PVC 1” m 1.05 5,201 5,201 5,201 5,201TUBO PRESIÓN /21 PVC 2” m 1.05 13,070 13,070 13,070 13,070SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 96,871 97,252 93,521 97,299 351,794 353,180 339,628 353,348
FLOTADOR MECANICO unFLOTADOR METÁLICO 2” un 1.00 126,656 126,656 127,200 126,656SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 48,129 48,129 48,336 48,129 174,785 174,785 175,536 174,785
INSTALACIÓN APARATO SANITARIO unCEMENTO BLANCO kg 0.50 475 425 490 413MANO DE OBRA BB hc 1.60 19,144 19,144 19,144 19,144SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 7,455 7,436 7,461 7,431 27,074 27,005 27,095 26,988
INSTALACIÓN BOMBAS AGUA unMANO DE OBRA BB hc 20.00 239,300 239,300 239,300 239,300SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 90,934 90,934 90,934 90,934 330,234 330,234 330,234 330,234
INSTALACIÓN EQUIPO HIDRONEUMATICO unMANO DE OBRA BB hc 45.00 538,425 538,425 538,425 538,425SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 204,602 204,602 204,602 204,602 743,027 743,027 743,027 743,027
LLAVE MANGUERA unLLAVE MANGUERA un 1.00 10,290 10,290 10,290 10,290SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 3,910 3,910 3,910 3,910 14,200 14,200 14,200 14,200
MANOMETRO 150 PSI unMANÓMETRO 150 PSI un 1.00 9,975 9,975 10,000 10,925SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 3,791 3,791 3,800 4,152 13,766 13,766 13,800 15,077
NIPLE PASAMURO 2” unNIPLE PASAMURO 2” un 1.00 40,000 40,000 40,000 40,000SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 15,200 15,200 15,200 15,200 55,200 55,200 55,200 55,200
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
17
NIPLE PASAMURO 4” unNIPLE PASAMURO 4” un 1.00 55,580 50,000 53,000 47,088SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 21,120 19,000 20,140 17,893 76,700 69,000 73,140 64,981
PUNTO AGUA CALIENTE CPVC unCODO 90° CPVC 1/2” un 2.35 2,876 2,876 2,876 2,876CODO 90° CPVC 3/4” un 2.13 4,720 4,720 4,720 4,720MANO DE OBRA BB hc 1.68 20,101 20,101 20,101 20,101SOLDADURA PVC LIQUIDA 1/4 un 0.02 1,123 1,123 1,123 820TUBO CPVC 1/2” m 2.61 15,459 15,459 15,459 15,459TUBO CPVC 3/4” m 1.25 12,171 12,171 12,171 12,171SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 21,451 21,451 21,451 21,336 77,902 77,902 77,902 77,484
PUNTO AGUA FRIA PVC unCODO 90° PRESIÓN PVC 1 1/2” un 0.74 3,398 3,745 3,745 3,745CODO 90° PRESIÓN PVC 1” un 0.77 986 1,085 1,085 1,085CODO 90° PRESIÓN PVC 1/2” un 2.46 841 923 923 923CODO 90° PRESIÓN PVC 3/4” un 1.07 699 768 768 768MANO DE OBRA BB hc 1.68 20,101 20,101 20,101 20,101REGISTRO TOYO 3/4” un 0.50 13,781 12,800 12,800 13,015SOLDADURA PVC LIQUIDA 1/4 un 0.04 2,246 2,246 2,246 1,640TUBO PRESIÓN /11 PVC 3/4” m 0.58 2,129 2,129 2,129 2,129TUBO PRESIÓN /13.5 PVC 1” m 0.49 2,427 2,427 2,427 2,427TUBO PRESIÓN /21 PVC 1 1/2” m 0.43 3,491 3,491 3,491 3,491TUBO PRESIÓN /9 PVC 1/2” m 2.62 6,888 6,888 6,888 6,888SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 21,655 21,509 21,509 21,360 78,642 78,111 78,111 77,571
PUNTO DESAGUE PVC 3”;4” unCODO 90° 1/4 CXC SANITARIO 3” un 2.77 13,975 13,975 13,975 13,975CODO 90° 1/4 CXC SANITARIO 4” un 1.37 12,683 12,683 12,683 12,683MANO DE OBRA BB hc 1.60 19,144 19,144 19,144 19,144SOLDADURA PVC LIQUIDA 1/4 un 0.10 5,616 5,616 5,616 4,099TUBO PVC SANITARIO 3” m 0.93 12,241 12,241 12,241 12,241TUBO PVC SANITARIO 4” m 0.27 4,953 4,953 4,953 4,953SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 26,072 26,072 26,072 25,496 94,683 94,683 94,683 92,591
PUNTO SUMINISTRO GALVANIZADO unCODO GALVANIZADO 1” un 1.51 4,168 3,775 4,788 4,497CODO GALVANIZADO 1/2” un 2.46 6,027 7,257 7,380 7,400CODO GALVANIZADO 3/4” un 1.07 1,040 1,070 920 1,040MANO DE OBRA BB hc 1.85 22,135 22,135 22,135 22,135REGISTRO TOYO 3/4” un 0.50 13,781 12,800 12,800 13,015TUBO GALVANIZADO 1 1/2” m 0.43 7,174 2,993 8,745 7,174TUBO GALVANIZADO 1” m 0.49 5,053 2,463 6,159 5,053TUBO GALVANIZADO 1/2” m 2.62 12,773 8,612 12,804 12,773TUBO GALVANIZADO 3/4” m 0.58 3,647 2,243 4,446 3,647SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 28,803 24,072 30,468 29,159 104,600 87,420 110,646 105,892
RED COBRE 1/2” mCODO 45 COBRE CXC 1/2” un 0.50 675 698 675 650MANO DE OBRA BB hc 0.20 2,393 2,393 2,393 2,393SOLDADURA ESTAÑO PARA COBRE un 0.01 311 311 311 311TUBO COBRE TIPO L 1/2” 20 PIES ASTM B-88 m 1.05 8,810 8,810 8,810 7,713SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 4,632 4,640 4,632 4,206 16,820 16,851 16,820 15,273
RED COBRE 3/4” mCODO 45 COBRE CXC 3/4” un 0.50 1,526 1,108 1,108 1,526MANO DE OBRA BB hc 0.20 2,393 2,393 2,393 2,393SOLDADURA ESTAÑO PARA COBRE un 0.01 311 311 311 311TUBO COBRE TIPO L 3/4” m 1.05 14,291 14,291 14,291 13,803SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 7,038 6,879 6,879 6,852 25,557 24,981 24,981 24,885
RED SUMINISTRO CPVC 1/2” mCODO 90° CPVC 1/2” un 0.50 612 612 612 612MANO DE OBRA BB hc 0.35 4,188 4,188 4,188 4,188SOLDADURA CPVC 1/4 GL un 0.01 602 602 602 602TUBO CPVC 1/2” m 1.05 6,219 6,219 6,219 6,219SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 4,416 4,416 4,416 4,416 16,037 16,037 16,037 16,037
RED SUMINISTRO CPVC 3/4” mCODO 90° CPVC 3/4” un 0.50 1,108 1,108 1,108 1,108MANO DE OBRA BB hc 0.35 4,188 4,188 4,188 4,188SOLDADURA CPVC 1/4 GL un 0.01 602 602 602 602TUBO CPVC 3/4” m 1.05 10,224 10,224 10,224 10,224SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 6,126 6,126 6,126 6,126 22,248 22,248 22,248 22,248
RED SUMINISTRO GALVANIZADO 1 1/2 mCODO GALVANIZADO 1 1/2” un 0.50 2,146 2,146 2,146 2,146MANO DE OBRA BB hc 1.00 11,965 11,965 11,965 11,965TUBO GALVANIZADO 1 1/2” m 1.05 17,518 7,308 21,355 17,518SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 12,019 8,139 13,477 12,019 43,648 29,558 48,943 43,648
RED SUMINISTRO GALVANIZADO 1” mCODO GALVANIZADO 1” un 0.50 1,380 1,250 1,586 1,489MANO DE OBRA BB hc 0.50 5,983 5,983 5,983 5,983TUBO GALVANIZADO 1” m 1.05 10,828 5,278 13,199 10,828SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 6,912 4,754 7,891 6,954 25,102 17,265 28,658 25,253
RED SUMINISTRO GALVANIZADO 1/2” mCODO GALVANIZADO 1/2” un 0.50 1,225 1,475 1,500 1,504MANO DE OBRA BB hc 0.50 5,983 5,983 5,983 5,983TUBO GALVANIZADO 1/2” m 1.05 5,119 3,451 5,131 5,119SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 4,684 4,145 4,793 4,790 17,010 15,054 17,407 17,395
RED SUMINISTRO GALVANIZADO 2 1/2 mCODO GALVANIZADO 2 1/2” un 1.05 8,902 7,875 8,841 8,258MANO DE OBRA BB hc 0.50 5,983 5,983 5,983 5,983TUBERÍA H.G 2 1/2” m 1.05 35,736 35,736 35,736 30,835SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 19,236 18,845 19,212 17,129 69,856 68,439 69,772 62,205
RED SUMINISTRO GALVANIZADO 2” mCODO GALVANIZADO 2” un 0.50 3,105 2,200 3,105 3,312MANO DE OBRA BB hc 1.00 11,965 11,965 11,965 11,965TUBO GALVANIZADO 2” m 1.05 9,240 9,338 9,338 9,240SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 9,238 8,931 9,275 9,316 33,548 32,434 33,683 33,833
RED SUMINISTRO GALVANIZADO 3” mCODO GALVANIZADO 3” un 0.50 39,100 39,100 39,860 39,100MANO DE OBRA BB hc 0.50 5,983 5,983 5,983 5,983TUBERÍA H.G 3” m 1.05 43,247 43,247 43,247 37,317SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 33,565 33,565 33,854 31,312 121,895 121,895 122,944 113,711
RED SUMINISTRO GALVANIZADO 3/4” mCODO GALVANIZADO 3/4” un 0.50 486 500 430 486MANO DE OBRA BB hc 0.50 5,983 5,983 5,983 5,983TUBO GALVANIZADO 3/4” m 1.05 6,602 4,060 8,048 6,602SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 4,967 4,006 5,495 4,967 18,038 14,549 19,956 18,038
RED SUMINISTRO GALVANIZADO 4” mCODO GALVANIZADO 4” un 0.50 51,348 51,348 51,348 51,348MANO DE OBRA BB hc 0.50 5,983 5,983 5,983 5,983TUBERÍA H.G 4” m 1.05 17,590 17,590 17,590 22,337SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 28,469 28,469 28,469 30,273 103,389 103,389 103,389 109,940
RED SUMINISTRO PVC 1 1/2” mCODO 90° PRESIÓN PVC 1 1/2” un 0.50 2,296 2,531 2,531 2,531MANO DE OBRA BB hc 0.43 5,145 5,145 5,145 5,145SOLDADURA PVC LIQUIDA 1/4 un 0.02 1,123 1,123 1,123 820TUBO PRESIÓN /21 PVC 1 1/2” m 1.05 8,524 8,524 8,524 8,524SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 6,493 6,583 6,583 6,467 23,581 23,905 23,905 23,486
RED SUMINISTRO PVC 1” mCODO 90° PRESIÓN PVC 1” un 0.50 641 705 705 705MANO DE OBRA BB hc 0.35 4,188 4,188 4,188 4,188SOLDADURA PVC LIQUIDA 1/4 un 0.01 562 562 562 410TUBO PRESIÓN /13.5 PVC 1” m 1.05 5,201 5,201 5,201 5,201SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 4,024 4,049 4,049 3,991 14,615 14,703 14,703 14,494
RED SUMINISTRO PVC 1/2” mCODO 90° PRESIÓN PVC 1/2” un 0.50 171 188 188 188MANO DE OBRA BB hc 0.35 4,188 4,188 4,188 4,188SOLDADURA PVC LIQUIDA 1/4 un 0.01 562 562 562 410TUBO PRESIÓN /9 PVC 1/2” m 1.05 2,760 2,760 2,760 2,760SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 2,919 2,925 2,925 2,867 10,599 10,622 10,622 10,413
RED SUMINISTRO PVC 2 1/2” mCODO PRESIÓN PVC 90 2 1/2” un 0.50 11,222 11,222 11,222 11,222MANO DE OBRA BB hc 0.35 4,188 4,188 4,188 4,188SOLDADURA PVC LIQUIDA 1/4 un 0.01 562 562 562 410TUBO PRESIÓN PVC 2 1/2” m 1.05 20,389 18,877 17,827 18,878SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 13,817 13,242 12,843 13,185 50,176 48,090 46,642 47,883
RED SUMINISTRO PVC 2” mCODO 90° PRESIÓN PVC 2” un 0.50 3,763 4,148 4,148 4,148MANO DE OBRA BB hc 0.43 5,145 5,145 5,145 5,145SOLDADURA PVC LIQUIDA 1/4 un 0.02 1,123 1,123 1,123 820TUBO PRESIÓN /21 PVC 2” m 1.05 13,070 13,070 13,070 13,070SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 8,779 8,925 8,925 8,809 31,880 32,411 32,411 31,992
RED SUMINISTRO PVC 3/4” mCODO 90° PRESIÓN PVC 3/4” un 0.50 327 359 359 359MANO DE OBRA BB hc 0.35 4,188 4,188 4,188 4,188SOLDADURA PVC LIQUIDA 1/4 un 0.01 562 562 562 410TUBO PRESIÓN /11 PVC 3/4” m 1.05 3,854 3,854 3,854 3,854SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 3,393 3,405 3,405 3,348 12,322 12,367 12,367 12,158
REGISTRO 1” unMANO DE OBRA BB hc 0.30 3,590 3,590 3,590 3,590REGISTRO TOYO 1” un 1.00 34,400 35,400 42,400 34,400UNIVERSAL GALVANIZADA 1” un 1.00 2,138 2,138 2,192 2,138SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 15,248 15,628 18,309 15,248 55,376 56,756 66,490 55,376
REGISTRO 1/2” unMANO DE OBRA BB hc 0.30 3,590 3,590 3,590 3,590REGISTRO TOYO 1/2” un 1.00 21,298 18,300 21,200 18,625
CONSTRUDATA18
UNIVERSAL GALVANIZADA 1/2” un 1.00 4,600 3,500 4,645 4,543SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 11,205 9,648 11,185 10,168 40,693 35,038 40,620 36,925
REGISTRO 3/4” unMANO DE OBRA BB hc 0.30 3,590 3,590 3,590 3,590REGISTRO TOYO 1/2” un 1.00 21,298 18,300 21,200 18,625REGISTRO TOYO 3/4” un 1.00 27,562 25,600 25,600 26,030UNIVERSAL GALVANIZADA 3/4” un 1.00 6,623 8,200 6,623 6,623SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 22,448 21,162 21,665 20,850 81,520 76,852 78,677 75,717
REGISTRO 1 1/2” unMANO DE OBRA BB hc 0.30 3,590 3,590 3,590 3,590REGISTRO PASO DIRECTO 1 1/2” un 1.05 78,750 76,125 78,750 80,892UNIVERSAL GALVANIZADA 1” un 1.00 2,138 2,138 2,192 2,138UNIVERSAL PVC 1/2” un 1.00 2,502 2,502 2,100 2,502SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 33,052 32,055 32,920 33,866 120,032 116,409 119,551 122,988
REGISTRO 2 1/2” unMANO DE OBRA BB hc 0.30 3,590 3,590 3,590 3,590REGISTRO PASO DIRECTO 2 1/2” un 1.00 104,400 110,093 117,000 121,980SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 41,036 43,199 45,824 47,716 149,026 156,882 166,414 173,286
REGISTRO 2” unMANO DE OBRA BB hc 0.30 3,590 3,590 3,590 3,590REGISTRO TOYO 2” un 1.00 95,700 94,820 85,000 95,700UNIVERSAL 2” un 1.00 22,943 22,943 21,851 22,943SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 46,448 46,114 41,967 46,448 168,681 167,466 152,408 168,681
REVENTILACION PVC 3” mCODO 90° 1/4 CXC SANITARIO 3” un 0.14 706 706 706 706MANO DE OBRA BB hc 0.50 5,983 5,983 5,983 5,983TUBO PVC A.LL. 3” m 1.05 5,351 5,309 5,309 5,775SUB-CONTRATO HIDRAULICO SANITARIO % 38.00 4,575 4,559 4,559 4,736SUB-CONTRATO HIDRAULICO Y SANITARIO % 38.00 4,575 4,559 4,559 4,736 21,190 21,116 21,116 21,936
MAMPOSTERIA
ALFAJIAS CONCRETO .15 mACERO FIGURADO 60000 PSI 1/2” kg 0.73 1,313 1,571 1,313 1,364ALAMBRE NEGRO NO.18 kg 0.02 34 32 34 36ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 0.71 128 142 159 146CONCRETO CORRIENTE 2500 PSI m³ 0.02 6,011 5,770 5,123 6,020CUARTON OTOBO 2”X4” 2.9 m 0.36 0 1,620 0 0DURMIENTE 3 M m 0.36 313 0 306 0LARGUERO ORDINARIO 3 M m 0.36 0 0 0 290MANO DE OBRA AA hc 0.77 8,375 8,375 8,375 8,375TABLA CHAPA ORDINARIO 0.10 m 0.18 269 0 0 0TABLA DE 2 CM X 10” m 0.18 0 0 0 666TABLA OTOBO 0.10 m 0.18 0 252 0 0TABLON CATIVO 2X2X15 m 0.18 0 0 243 0 16,753 18,017 15,653 17,097
ALFAJIAS CONCRETO .25 mACERO FIGURADO 60000 PSI 1/2” kg 1.00 1,798 2,152 1,798 1,868ALAMBRE NEGRO NO.18 kg 0.03 51 48 51 54ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 1.19 214 238 267 245CONCRETO CORRIENTE 2500 PSI m³ 0.02 6,011 5,770 5,123 6,020CUARTON OTOBO 2”X4” 2.9 m 0.36 0 1,620 0 0DURMIENTE 3 M m 0.36 313 0 306 0LARGUERO ORDINARIO 3 M m 0.36 0 0 0 290MANO DE OBRA AA hc 1.59 17,294 17,294 17,294 17,294TABLA CHAPA ORDINARIO 0.10 m 0.18 269 0 0 0TABLA DE 2 CM X 10” m 0.18 0 0 0 666TABLA OTOBO 0.10 m 0.18 0 252 0 0TABLON CATIVO 2X2X15 m 0.18 0 0 243 0 26,261 27,629 25,182 26,638
ALFAJIAS EN TABLON mAGUA lt 0.60 7 7 7 7ALFAGÍA TOLETE -6 NATURAL m 0.26 2,615 1,950 2,615 2,615ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 0.93 167 186 208 192MANO DE OBRA AA hc 0.77 8,375 8,375 8,375 8,375TABLÓN TONO NATURAL m² 0.26 2,860 2,860 3,510 2,860 14,334 13,634 14,816 14,249
ALFAJIAS LADRILLO PRENSADO mAGUA lt 1.42 17 17 17 17ARENA DE PEÑA m³ 0.01 310 0 0 0
ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 2.39 430 478 535 492LADRILLO LIMPIO 7X10X24 un 12.87 0 4,376 0 0LADRILLO PRENSADO MACIZO SANTAFÉ un 12.87 6,937 0 0 0LADRILLO PRENSADO SANTAFE un 12.87 0 0 0 6,937MANO DE OBRA AA hc 0.86 9,354 9,354 9,354 9,354TOLETE NO. 3 un 12.87 0 0 4,826 0 17,048 14,480 14,833 17,001
ARCOS 0.25 LADRILLO PRENSADO mARENA DE PEÑA m³ 0.02 619 0 0 0ARENA DE REVOQUE m³ 0.02 0 0 200 400ARENA FINA 5 M3 m³ 0.02 0 510 0 0CEMENTO GRIS kg 5.00 900 1,000 1,120 1,030CUARTON OTOBO 2”X4” 2.9 m 4.00 0 18,000 0 0CUARTON OTOBO 2”X4” 2.9 m 1.60 0 7,200 0 0DURMIENTE 3 M m 4.00 3,480 0 3,400 0LADRILLO LIMPIO 7X10X24 un 15.85 0 5,389 0 0LADRILLO PRENSADO MACIZO SANTAFÉ un 15.85 8,543 0 0 0LADRILLO PRENSADO SANTAFE un 15.85 0 0 0 8,543LARGUERO ORDINARIO 3 M m 4.00 0 0 0 3,220LISTON MONTERREY 1X2X3 m 1.00 0 0 422 0LISTON OTOBO m 1.00 0 1,050 0 0LISTÓN DE ORDINARIO m 1.00 0 0 0 731LISTÓN M.H. PINO CIPRES m 1.00 8,580 0 0 0MANO DE OBRA AA hc 4.35 47,315 47,315 47,315 47,315PUNTILLA CON CABEZA 2” lb 0.40 1,113 1,140 942 1,098TABLA CHAPA ORDINARIO 0.30 m 1.60 2,472 0 0 0TABLA CHAPA ORDINARIO 0.30 m 1.58 2,441 0 0 0TABLA DE 2 CM X 10” m 1.60 0 0 0 5,920TABLA DE 2 CM X 10” m 1.58 0 0 0 5,846TABLA OTOBO 0.30 m 1.58 0 2,487 0 0TABLEX RH 19 MM 1.53 X 2.44 un 0.12 10,604 10,604 10,604 10,604TABLON CATIVO 0.30 m 1.60 0 0 4,000 0TABLON CATIVO 0.30 m 1.58 0 0 3,950 0TOLETE NO. 3 un 15.85 0 0 5,944 0 86,068 94,695 77,897 84,707
CHAZOS PARA CARPINTERIA MADERA unARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 0.10 18 20 22 21CHAZO MADERA 10X10 un 1.03 979 927 979 1,133MANO DE OBRA AA hc 0.15 1,632 1,632 1,632 1,632 2,938 2,834 2,732 2,985
CHIMENEAS 0.80 unACERO FIGURADO 60000 PSI 1/2” kg 5.28 9,493 11,363 9,493 9,863AGUA lt 52.32 628 628 628 628ALAMBRE NEGRO NO.18 kg 0.16 273 256 273 288ARENA AMARILLA PUERTO COLOMBIA m³ 0.07 0 0 1,050 0ARENA DE PEÑA m³ 0.06 1,858 0 0 0ARENA DE REVOQUE m³ 0.06 0 0 600 1,200ARENA FINA 5 M3 m³ 0.06 0 1,531 0 0ARENA GRUESA 5 M3 m³ 0.07 0 1,786 0 0ARENA LAVADA DE RIO m³ 0.07 5,040 0 0 0ARENA LAVADA PARA CONCRETO m³ 0.07 0 0 0 1,351CEMENTO GRIS kg 62.58 11,264 12,516 14,018 12,891GRAVA CANTO RODADO 1/2 m³ 0.01 0 0 435 0GRAVILLA DE RIO m³ 0.01 556 0 0 556GRAVILLA FINA 1/2” Y 3/4” m³ 0.01 0 400 0 0LADRILLO BOCADILLO RECOCIDO un 159.60 0 0 0 32,558LADRILLO COMUN un 159.60 0 51,072 0 0LADRILLO REJILLA un 73.50 24,255 21,315 26,387 21,315LADRILLO TOLETE RECOCIDO un 159.60 51,072 0 0 0LADRILLO TOLETE RECOCIDO un 159.60 0 0 52,030 0MANO DE OBRA AA hc 25.00 271,925 271,925 271,925 271,925 376,365 372,792 376,838 352,575
DINTELES CONCRETO 15X20 mACERO FIGURADO 60000 PSI 1/2” kg 2.90 5,214 6,241 5,214 5,417ALAMBRE NEGRO NO.18 kg 0.11 188 176 188 198CONCRETO CORRIENTE 2500 PSI m³ 0.03 9,017 8,655 7,684 9,031MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877TABLA BURRA ORDINARIO 0.10 m 0.15 161 161 157 157VARA DE CLAVO m 0.01 15 15 15 13 25,472 26,125 24,134 25,693
DINTELES EN BLOQUE 0.15 mACERO FIGURADO 60000 PSI 1/2” kg 1.41 2,535 3,034 2,535 2,634AGUA lt 2.66 32 32 32 32ARENA AMARILLA PUERTO COLOMBIA m³ 0.02 0 0 300 0ARENA GRUESA 5 M3 m³ 0.02 0 510 0 0ARENA LAVADA DE RIO m³ 0.02 1,440 0 0 0ARENA LAVADA PARA CONCRETO m³ 0.02 0 0 0 386BLOQUE NO. 5 SAN JOSE un 3.60 2,376 2,376 2,376 2,376CEMENTO GRIS kg 3.15 567 630 706 649MANO DE OBRA AA hc 0.45 4,895 4,895 4,895 4,895 11,845 11,477 10,843 10,971
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
19
DINTELES EN VARILLA mACERO FIGURADO 60000 PSI 1/2” kg 2.25 4,046 4,842 4,046 4,203AGUA lt 1.77 21 21 21 21ARENA AMARILLA PUERTO COLOMBIA m³ 0.01 0 0 150 0ARENA GRUESA 5 M3 m³ 0.01 0 255 0 0ARENA LAVADA DE RIO m³ 0.01 720 0 0 0ARENA LAVADA PARA CONCRETO m³ 0.01 0 0 0 193CEMENTO GRIS kg 2.10 378 420 470 433MANO DE OBRA AA hc 0.45 4,895 4,895 4,895 4,895TABLA CHAPA ORDINARIO 0.30 m 0.20 309 0 0 0TABLA DE 2 CM X 10” m 0.20 0 0 0 740TABLA OTOBO 0.30 m 0.20 0 315 0 0TABLON CATIVO 0.30 m 0.20 0 0 500 0VARA DE CLAVO m 0.44 660 660 660 587 11,028 11,408 10,742 11,071
ENCHAPES LADRILLO PRENSADO m²AGUA lt 5.20 62 62 62 62ARENA DE PEÑA m³ 0.04 1,239 0 0 0ARENA DE REVOQUE m³ 0.04 0 0 400 800ARENA FINA 5 M3 m³ 0.04 0 1,021 0 0CEMENTO GRIS kg 8.05 1,449 1,610 1,803 1,658CORTADORA DE LADRILLO d 0.05 1,160 1,160 1,160 1,160DISCO DIAMANTE un 0.25 4,320 4,000 4,748 3,727LADRILLO LIMPIO 7X10X24 un 31.00 0 10,540 0 0LADRILLO PRENSADO MACIZO SANTAFÉ un 31.00 16,709 0 0 0LADRILLO PRENSADO SANTAFE un 31.00 0 0 0 16,709MANO DE OBRA AA hc 1.10 11,965 11,965 11,965 11,965TOLETE NO. 3 un 31.00 0 0 11,625 0 36,904 30,358 31,763 36,081
INSTALACIÓN CARPINTERIA METALICA m²MANO DE OBRA AA hc 0.96 10,442 10,442 10,442 10,442MORTERO A.LAVADA 1:3 m³ 0.01 1,881 1,890 2,191 1,977 12,323 12,332 12,633 12,419
MESONES EN CONCRETO m²ACERO FIGURADO 60000 PSI 1/2” kg 8.00 14,384 17,216 14,384 14,944ALAMBRE NEGRO NO.18 kg 0.24 409 384 409 432CERCO ORDINARIO 3 M m 0.65 780 780 780 650CONCRETO CORRIENTE 2500 PSI m³ 0.10 30,056 28,849 25,613 30,102MANO DE OBRA AA hc 1.95 21,210 21,210 21,210 21,210PUNTILLA CON CABEZA 2” lb 0.19 529 542 448 521TABLA CHAPA ORDINARIO 0.10 m 0.46 687 0 0 0TABLA DE 2 CM X 10” m 0.46 0 0 0 1,702TABLA OTOBO 0.10 m 0.46 0 644 0 0TABLON CATIVO 2X2X15 m 0.46 0 0 621 0 68,055 69,625 63,465 69,562
MURO EN BLOQUE CONCRETO 0.10 m²BLOQUE CONCRETO 10X20X40 un 13.27 14,597 13,934 11,080 10,351MANO DE OBRA AA hc 0.72 7,831 7,831 7,831 7,831MORTERO 1:4 m³ 0.01 1,211 1,218 1,111 1,170 23,640 22,983 20,023 19,352
MURO EN BLOQUE CONCRETO 0.20 m²BLOQUE CONCRETO 20X20X40 un 11.49 20,108 23,555 23,555 19,119MANO DE OBRA AA hc 1.12 12,182 12,182 12,182 12,182MORTERO 1:4 m³ 0.05 6,056 6,089 5,555 5,851 38,346 41,826 41,291 37,152
MURO EN BLOQUE NO.4 0.10 m²BLOQUE NO. 4 SANTAFÉ un 13.27 10,510 11,213 12,169 12,169MANO DE OBRA AA hc 1.19 12,944 12,944 12,944 12,944MORTERO 1:4 m³ 0.02 2,423 2,436 2,222 2,340 25,876 26,593 27,334 27,453
MURO EN BLOQUE NO.5 0.12 m²BLOQUE NO. 5 SANTAFE un 13.27 11,903 12,500 13,602 13,602MANO DE OBRA AA hc 0.51 5,547 5,547 5,547 5,547MORTERO 1:4 m³ 0.01 1,211 1,218 1,111 1,170 18,662 19,266 20,260 20,319
MURO EN BLOQUE NO.5 0.23 m²BLOQUE NO. 5 SANTAFE un 26.65 23,905 25,104 27,316 27,316MANO DE OBRA AA hc 1.15 12,509 12,509 12,509 12,509MORTERO 1:4 m³ 0.02 2,423 2,436 2,222 2,340 38,836 40,049 42,047 42,165
MURO DRY-WALL E/10 CM m²MANO DE OBRA DD hc 1.43 18,664 18,664 18,664 18,664PARED EN DRY-WALL E.10 CM. m² 1.00 35,001 28,063 34,000 35,000VINILTEX gl 0.04 1,596 1,596 1,869 1,800SUB-CONTRATO INSTALACION % 20.00 11,052 9,665 10,907 11,093 66,314 57,988 65,440 66,557
MURO EN LADRILLO ESTRUCTURAL 0.15 m²AGUA lt 5.25 63 63 63 63ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE RIO m³ 0.02 1,440 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0ARENA LAVADA MEISSEN m³ 0.02 700 0 0 0CAL NARE kg 0.50 282 232 300 200CEMENTO GRIS kg 9.53 1,715 1,906 2,135 1,963LADRILLO PORTANTE PRENSADO un 38.08 37,280 39,832 42,726 42,726MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877SIKA-2 (5.5 KG) kg 0.30 2,123 2,123 2,123 2,123 54,481 55,412 58,713 57,952
MURO PRENSADO 0.12 m²LADRILLO PRENSADO SANTAFE un 59.00 31,801 31,801 31,801 31,801MANO DE OBRA AA hc 1.06 11,530 11,530 11,530 11,530MORTERO PREMEZCLADO 1:5 m³ 0.03 5,459 5,459 5,232 5,460 48,789 48,789 48,563 48,791
MURO PRENSADO 0.245 m²LADRILLO PRENSADO LIVIANO SANTAFÉ un 118.00 63,012 63,012 63,012 63,012MANO DE OBRA AA hc 1.70 18,491 18,491 18,491 18,491MORTERO 1:4 m³ 0.07 8,479 8,525 7,776 8,191 89,982 90,028 89,279 89,694
MURO RECOCIDO 0.25 m²AGUA lt 11.12 133 133 133 133ARENA DE PEÑA m³ 0.07 2,168 0 0 0ARENA DE REVOQUE m³ 0.07 0 0 700 1,400ARENA FINA 5 M3 m³ 0.07 0 1,786 0 0CEMENTO GRIS kg 18.66 3,359 3,732 4,180 3,844LADRILLO BOCADILLO RECOCIDO un 81.68 0 0 0 16,663LADRILLO TOLETE RECOCIDO un 81.68 26,138 0 20,910 0LADRILLO TOLETE RECOCIDO un 81.69 0 0 26,631 0MANO DE OBRA AA hc 1.86 20,231 20,231 20,231 20,231 52,029 25,883 72,786 42,271
MURO RECOCIDO 0.12 m²AGUA lt 4.63 56 56 56 56ARENA DE PEÑA m³ 0.03 929 0 0 0ARENA DE REVOQUE m³ 0.03 0 0 300 600ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 7.77 1,399 1,554 1,740 1,601LADRILLO BOCADILLO RECOCIDO un 40.84 0 0 0 8,331LADRILLO LIMPIO 10-29 un 40.84 0 18,378 0 0LADRILLO TOLETE RECOCIDO un 40.84 13,069 0 10,455 0MANO DE OBRA AA hc 1.08 11,747 11,747 11,747 11,747 27,199 32,500 24,298 22,335
MURO TOLETE COMUN 0.06 m²LADRILLO BOCADILLO RECOCIDO un 30.60 0 0 0 6,242LADRILLO LIMPIO 10-29 un 30.00 0 13,500 0 0LADRILLO TOLETE RECOCIDO un 30.60 9,792 0 7,834 0MANO DE OBRA AA hc 0.86 9,354 9,354 9,354 9,354MORTERO 1:4 m³ 0.01 1,211 1,218 1,111 1,170 20,358 24,072 18,299 16,767
MURO TOLETE COMUN 0.12 m²LADRILLO BOCADILLO RECOCIDO un 55.00 0 0 0 11,220LADRILLO LIMPIO 10-29 un 55.00 0 24,750 0 0LADRILLO TOLETE RECOCIDO un 55.00 17,600 0 14,080 0MANO DE OBRA AA hc 0.75 8,158 8,158 8,158 8,158MORTERO 1:4 m³ 0.02 2,423 2,436 2,222 2,340 28,180 35,344 24,460 21,718
MURO TOLETE COMUN 0.25 m²LADRILLO BOCADILLO COMUN un 118.00 0 0 0 35,400LADRILLO LIMPIO 10-29 un 118.00 0 53,100 0 0LADRILLO TOLETE RECOCIDO un 118.00 0 0 38,468 0MANO DE OBRA AA hc 1.37 14,901 14,901 14,901 14,901TOLETE COMÚN un 118.00 34,220 0 0 0MORTERO 1:4 m³ 0.03 3,634 3,654 3,333 3,510 52,755 71,655 56,702 53,812
REMATES LADRILLO PRENSADO mAGUA lt 1.75 21 21 21 21ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 2.94 529 588 659 606LADRILLO LIMPIO 7X10X24 un 16.00 0 5,440 0 0LADRILLO PRENSADO MACIZO SANTAFÉ un 16.00 8,624 0 0 0LADRILLO PRENSADO SANTAFE un 15.85 0 0 0 8,543MANO DE OBRA AA hc 0.88 9,572 9,572 9,572 9,572TOLETE NO. 3 un 16.00 0 0 6,000 0 19,056 15,876 16,351 18,942
SOBRECIMIENTOS 0.15 mAGUA lt 4.63 56 56 56 56ARENA DE REVOQUE m³ 0.03 0 0 0 600ARENA FINA m³ 0.03 0 570 0 0ARENA LAVADA DE PEÑA m³ 0.03 750 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.03 0 0 735 0CEMENTO GRIS kg 11.69 2,104 2,338 2,619 2,408LADRILLO BOCADILLO RECOCIDO un 12.10 0 0 0 2,468LADRILLO COMUN un 12.10 0 3,872 0 0LADRILLO TOLETE RECOCIDO un 12.10 3,872 0 3,098 0MANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702SIKA-2 (5.5 KG) kg 0.35 2,477 2,477 2,477 2,477 17,960 18,014 17,685 16,710
SOBRECIMIENTOS 0.25 mAGUA lt 7.04 84 84 84 84ARENA DE REVOQUE m³ 0.04 0 0 0 800ARENA FINA m³ 0.04 0 760 0 0ARENA LAVADA DE PEÑA m³ 0.04 1,000 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.04 0 0 980 0CEMENTO GRIS kg 17.77 3,199 3,554 3,980 3,661LADRILLO BOCADILLO RECOCIDO un 24.21 0 0 0 4,939
CONSTRUDATA20
LADRILLO COMUN un 24.21 0 7,747 0 0LADRILLO TOLETE RECOCIDO un 24.21 7,747 0 6,198 0MANO DE OBRA AA hc 1.12 12,182 12,182 12,182 12,182SIKA-2 (5.5 KG) kg 0.53 3,750 3,750 3,750 3,750 27,963 28,078 27,175 25,416
MORTEROS Y CONCRETOS
CONCRETO 1:2:2 m³AGUA lt 230.00 2,760 2,760 2,760 2,760ARENA AMARILLA PUERTO COLOMBIA m³ 0.74 0 0 11,100 0ARENA GRUESA 5 M3 m³ 0.74 0 18,885 0 0ARENA LAVADA DE RIO m³ 0.74 53,280 0 0 0ARENA LAVADA PARA CONCRETO m³ 0.74 0 0 0 14,277AYUDANTE ALBAÑILERÍA (A) hh 2.00 4,922 4,922 4,922 4,922CEMENTO GRIS kg 441.00 79,380 88,200 98,784 90,846GRAVA CANTO RODADO 1/2 m³ 0.74 0 0 32,190 0GRAVILLA DE RIO m³ 0.74 41,144 0 0 41,144GRAVILLA FINA 1/2” Y 3/4” m³ 0.74 0 29,600 0 0MEZCLADORA A GASOLINA d 0.06 1,810 1,800 2,297 1,905OFICIAL ALBAÑILERIA (A) hh 0.50 3,438 3,438 3,438 3,438 186,733 149,604 155,490 159,292
CONCRETO 1:2:3 m³AGUA lt 210.00 2,520 2,520 2,520 2,520ARENA AMARILLA PUERTO COLOMBIA m³ 0.61 0 0 9,150 0ARENA GRUESA 5 M3 m³ 0.61 0 15,567 0 0ARENA LAVADA DE RIO m³ 0.61 43,920 0 0 0ARENA LAVADA PARA CONCRETO m³ 0.61 0 0 0 11,769AYUDANTE ALBAÑILERÍA (A) hh 2.00 4,922 4,922 4,922 4,922CEMENTO GRIS kg 367.50 66,150 73,500 82,320 75,705GRAVA CANTO RODADO 1/2 m³ 0.92 0 0 40,020 0GRAVILLA DE RIO m³ 0.92 51,152 0 0 51,152GRAVILLA FINA 1/2” Y 3/4” m³ 0.92 0 36,800 0 0MEZCLADORA A GASOLINA d 0.06 1,810 1,800 2,297 1,905OFICIAL ALBAÑILERIA (A) hh 0.50 3,438 3,438 3,438 3,438 173,911 138,547 144,666 151,411
CONCRETO 1:2:4 m³AGUA lt 305.00 3,660 3,660 3,660 3,660ARENA AMARILLA PUERTO COLOMBIA m³ 0.48 0 0 7,200 0ARENA GRUESA 5 M3 m³ 0.53 0 13,526 0 0ARENA LAVADA DE RIO m³ 0.53 38,160 0 0 0ARENA LAVADA PARA CONCRETO m³ 0.53 0 0 0 10,225AYUDANTE ALBAÑILERÍA (A) hh 2.00 4,922 4,922 4,922 4,922CEMENTO GRIS kg 315.00 56,700 63,000 70,560 64,890GRAVA CANTO RODADO 1/2 m³ 1.05 0 0 45,675 0GRAVILLA DE RIO m³ 1.05 58,380 0 0 58,380GRAVILLA FINA 1/2” Y 3/4” m³ 1.05 0 42,000 0 0MEZCLADORA A GASOLINA d 0.06 1,810 1,800 2,297 1,905OFICIAL ALBAÑILERIA (A) hh 0.50 3,438 3,438 3,438 3,438 167,069 132,345 137,751 147,420
CONCRETO 1:3:3 m³AGUA lt 200.00 2,400 2,400 2,400 2,400ARENA AMARILLA PUERTO COLOMBIA m³ 0.79 0 0 11,850 0ARENA GRUESA 5 M3 m³ 0.79 0 20,161 0 0ARENA LAVADA DE RIO m³ 0.79 56,880 0 0 0ARENA LAVADA PARA CONCRETO m³ 0.79 0 0 0 15,241AYUDANTE ALBAÑILERÍA (A) hh 2.00 4,922 4,922 4,922 4,922CEMENTO GRIS kg 315.00 56,700 63,000 70,560 64,890GRAVA CANTO RODADO 1/2 m³ 0.79 0 0 34,365 0GRAVILLA DE RIO m³ 0.79 43,924 0 0 43,924GRAVILLA FINA 1/2” Y 3/4” m³ 0.79 0 31,600 0 0MEZCLADORA A GASOLINA d 0.06 1,810 1,800 2,297 1,905OFICIAL ALBAÑILERIA (A) hh 0.50 3,438 3,438 3,438 3,438 170,073 127,320 129,831 136,720
CONCRETO 1:3:4 m³AGUA lt 198.00 2,376 2,376 2,376 2,376ARENA AMARILLA PUERTO COLOMBIA m³ 0.69 0 0 10,350 0ARENA GRUESA 5 M3 m³ 0.69 0 17,609 0 0ARENA LAVADA DE RIO m³ 0.69 49,680 0 0 0ARENA LAVADA PARA CONCRETO m³ 0.69 0 0 0 13,312AYUDANTE ALBAÑILERÍA (A) hh 2.00 4,922 4,922 4,922 4,922CEMENTO GRIS kg 273.00 49,140 54,600 61,152 56,238GRAVA CANTO RODADO 1/2 m³ 0.92 0 0 40,020 0GRAVILLA DE RIO m³ 0.92 51,152 0 0 51,152GRAVILLA FINA 1/2” Y 3/4” m³ 0.92 0 36,800 0 0MEZCLADORA A GASOLINA d 0.06 1,810 1,800 2,297 1,905OFICIAL ALBAÑILERIA (A) hh 0.50 3,438 3,438 3,438 3,438 162,517 121,544 124,554 133,343
CONCRETO 1:3:5 m³AGUA lt 196.00 2,352 2,352 2,352 2,352ARENA AMARILLA PUERTO COLOMBIA m³ 0.62 0 0 9,300 0ARENA GRUESA 5 M3 m³ 0.62 0 15,822 0 0ARENA LAVADA DE RIO m³ 0.62 44,640 0 0 0ARENA LAVADA PARA CONCRETO m³ 0.62 0 0 0 11,962AYUDANTE ALBAÑILERÍA (A) hh 2.00 4,922 4,922 4,922 4,922
CEMENTO GRIS kg 241.50 43,470 48,300 54,096 49,749GRAVA CANTO RODADO 1/2 m³ 1.01 0 0 43,935 0GRAVILLA DE RIO m³ 1.01 56,156 0 0 56,156GRAVILLA FINA 1/2” Y 3/4” m³ 1.01 0 40,400 0 0MEZCLADORA A GASOLINA d 0.06 1,810 1,800 2,297 1,905OFICIAL ALBAÑILERIA (A) hh 0.50 3,438 3,438 3,438 3,438 156,787 117,034 120,339 130,484
MORTERO 1:10 m³AGUA lt 230.00 2,760 2,760 2,760 2,760ARENA DE PEÑA m³ 1.38 42,741 0 0 0ARENA DE REVOQUE m³ 1.38 0 0 13,800 27,600ARENA FINA 5 M3 m³ 1.38 0 35,218 0 0AYUDANTE ALBAÑILERÍA (A) hh 4.00 9,844 9,844 9,844 9,844CEMENTO GRIS kg 174.00 31,320 34,800 38,976 35,844 86,665 82,622 65,380 76,048
MORTERO 1:4 m³AGUA lt 240.00 2,880 2,880 2,880 2,880ARENA DE PEÑA m³ 1.28 39,644 0 0 0ARENA DE REVOQUE m³ 1.28 0 0 12,800 25,600ARENA FINA 5 M3 m³ 1.28 0 32,666 0 0AYUDANTE ALBAÑILERÍA (A) hh 4.00 9,844 9,844 9,844 9,844CEMENTO GRIS kg 382.00 68,760 76,400 85,568 78,692 121,128 121,790 111,092 117,016
MORTERO 1:5 m³AGUA lt 240.00 2,880 2,880 2,880 2,880ARENA DE PEÑA m³ 1.32 40,883 0 0 0ARENA DE REVOQUE m³ 1.32 0 0 13,200 26,400ARENA FINA 5 M3 m³ 1.32 0 33,686 0 0AYUDANTE ALBAÑILERÍA (A) hh 4.00 9,844 9,844 9,844 9,844CEMENTO GRIS kg 317.00 57,060 63,400 71,008 65,302 110,667 109,810 96,932 104,426
MORTERO 1:6 m³AGUA lt 235.00 2,820 2,820 2,820 2,820ARENA DE PEÑA m³ 1.32 40,883 0 0 0ARENA DE REVOQUE m³ 1.32 0 0 13,200 26,400ARENA FINA 5 M3 m³ 1.32 0 33,686 0 0AYUDANTE ALBAÑILERÍA (A) hh 4.00 9,844 9,844 9,844 9,844CEMENTO GRIS kg 274.00 49,320 54,800 61,376 56,444 102,867 101,150 87,240 95,508
MORTERO A.LAVADA 1:2 m³AGUA lt 250.00 3,000 3,000 3,000 3,000ARENA DE REVOQUE m³ 1.07 0 0 0 21,400ARENA DE RIO m³ 1.07 63,558 62,060 74,900 67,025ARENA FINA m³ 1.07 0 20,330 0 0ARENA LAVADA DE PEÑA m³ 1.07 26,750 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 1.07 0 0 26,215 0AYUDANTE ALBAÑILERÍA (A) hh 4.00 9,844 9,844 9,844 9,844CEMENTO GRIS kg 640.00 115,200 128,000 143,360 131,840 218,352 223,234 257,319 233,109
MORTERO A.LAVADA 1:3 m³AGUA lt 250.00 3,000 3,000 3,000 3,000ARENA DE REVOQUE m³ 1.20 0 0 0 24,000ARENA DE RIO m³ 1.00 59,400 58,000 70,000 62,640ARENA FINA m³ 1.20 0 22,800 0 0ARENA LAVADA DE PEÑA m³ 1.20 30,000 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 1.20 0 0 29,400 0AYUDANTE ALBAÑILERÍA (A) hh 4.00 9,844 9,844 9,844 9,844CEMENTO GRIS kg 477.00 85,860 95,400 106,848 98,262 188,104 189,044 219,092 197,746
OBRAS EXTERIORES
ASEO GENERAL m²ASEO GENERAL - 3 HS SAL. MÍNIMO m² 1.00 4,769 4,769 4,769 4,769 4,769 4,769 4,769 4,769
CAMARA INSPECCION 0.6X0.6 A.P. unLADRILLO COCIDO un 93.00 0 0 0 18,135LADRILLO COCIDO CLARO un 93.00 18,135 0 0 0LADRILLO COMUN un 93.00 0 29,760 0 0LISTON CATIVO m 6.00 0 0 24,306 0LISTON OTOBO m 6.00 0 6,300 0 0LISTÓN DE ORDINARIO m 6.00 4,386 0 0 0MANO DE OBRA AA hc 8.10 88,104 88,104 88,104 88,104TABLA CHAPA ORDINARIO 0.20 m 6.00 6,180 0 0 0TABLA OTOBO 0.20 m 6.00 0 30,900 0 0TABLON CATIVO 0.20 m 6.00 0 0 15,000 0TOLETE RECOCIDO un 93.00 0 0 33,015 0CONCRETO 1:2:4 m³ 0.20 33,414 26,469 27,550 29,484MARCO PARA TAPA CAMARA AP un 1.00 113,938 111,558 111,588 115,263MORTERO A.LAVADA 1:2 m³ 0.08 17,468 17,859 20,586 18,649PAÑETE LISO MUROS 1:4 m² 1.68 12,362 11,056 11,363 11,133REFUERZOS HIERRO 37000 FG tn 0.01 23,030 26,675 22,990 34,002RELLENOS AGREGADO PETREO m³ 0.10 5,330 5,324 3,168 4,554RELLENOS DE EXCAVACION m³ 0.85 5,547 5,547 5,547 5,547REPELLO LISO MUROS 1:4 m² 1.68 10,801 12,342 11,363 11,133
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
21
REPELLO LISO MUROS 1:5 m² 1.68 10,420 11,919 10,888 10,697REVOQUE LISO MUROS 1:4 m² 1.68 10,801 11,056 11,867 12,141TAPA PARA CAMARA AP un 1.00 127,862 131,537 123,497 125,608 487,777 526,407 520,830 484,449
CAMARA INSPECCION 70X60 unACERO FIGURADO 37000 PSI 3/8” kg 11.00 19,778 20,790 19,778 20,548LADRILLO BOCADILLO RECOCIDO un 93.00 0 0 0 18,972LADRILLO LIMPIO 10-29 un 93.00 0 41,850 0 0LADRILLO TOLETE RECOCIDO un 93.00 29,760 0 0 0MANO DE OBRA CC hc 11.50 143,842 143,842 143,842 143,842MARCO TAPA POZO MTPA-60 un 1.00 79,042 79,042 79,042 79,042PLACA IDENTIFICACIÓN 8X5 CM un 1.00 5,250 6,300 5,250 5,250TABLA CHAPA ORDINARIO 0.20 m 5.60 5,768 0 0 0TABLA OTOBO 0.20 m 5.60 0 28,840 0 0TABLON CATIVO 0.20 m 5.60 0 0 14,000 0TAPA POZO EN VIAS D/0.60 TPA-60P un 1.00 134,963 134,963 134,963 134,963CONCRETO 1:2:4 m³ 0.20 33,414 26,469 27,550 29,484MARCO PARA TAPA CAMARA AP un 1.00 113,938 111,558 111,588 115,263MORTERO 1:4 m³ 0.08 9,690 9,743 8,887 9,361PAÑETE IMPERMEABILIZADO MUROS 1:3 m² 1.68 25,394 24,450 19,384 24,458RELLENOS AGREGADO PETREO m³ 0.10 5,330 5,324 3,168 4,554RELLENOS DE EXCAVACION m³ 0.85 5,547 5,547 5,547 5,547REPELLO IMP. MUROS 1:3 m² 1.68 23,833 25,736 19,384 24,458REVOQUE IMP. MUROS 1:3 m² 1.68 23,833 24,450 19,888 25,466TAPA PARA CAMARA AP un 1.00 127,862 131,537 123,497 125,608 787,245 820,442 735,769 766,816
CAMARA INSPECCION DOBLE 140X60 unLADRILLO COCIDO un 135.00 0 0 0 26,325LADRILLO COCIDO CLARO un 135.00 26,325 0 0 0LADRILLO COMUN un 135.00 0 43,200 0 0LISTON CATIVO m 8.40 0 0 34,028 0LISTON OTOBO m 8.40 0 8,820 0 0LISTÓN DE ORDINARIO m 8.40 6,140 0 0 0MANO DE OBRA BB hc 1.00 11,965 11,965 11,965 11,965MANO DE OBRA CC hc 11.42 142,841 142,841 142,841 142,841TABLA CHAPA ORDINARIO 0.20 m 8.40 8,652 0 0 0TABLA OTOBO 0.20 m 8.40 0 43,260 0 0TABLON CATIVO 0.20 m 8.40 0 0 21,000 0TOLETE RECOCIDO un 135.00 0 0 47,925 0CONCRETO 1:2:4 m³ 0.30 50,121 39,704 41,325 44,226MARCO PARA TAPA CAMARA AP un 1.00 113,938 111,558 111,588 115,263MARCO PARA TAPA CAMARA DOBLE un 1.00 157,821 154,199 154,374 160,684MORTERO A.LAVADA 1:2 m³ 0.18 39,303 40,182 46,317 41,960PAÑETE LISO MUROS 1:4 m² 2.58 18,984 16,979 17,450 17,097REFUERZOS HIERRO 37000 FG tn 0.02 46,060 53,351 45,980 68,003RELLENOS AGREGADO PETREO m³ 0.16 8,528 8,518 5,069 7,287RELLENOS DE EXCAVACION m³ 1.12 7,309 7,309 7,309 7,309REPELLO LISO MUROS 1:4 m² 2.58 16,587 18,954 17,450 17,097REVOQUE LISO MUROS 1:4 m² 2.58 16,587 16,979 18,224 18,645TAPA PARA CAMARA AP DOBLE un 3.00 252,258 254,622 240,911 246,251 923,419 972,441 963,757 924,953
CAMARA INSPECCION VIA 120X150 unLADRILLO COCIDO un 379.00 0 0 0 73,905LADRILLO COCIDO CLARO un 379.00 73,905 0 0 0LADRILLO COMUN un 379.00 0 121,280 0 0LISTON CATIVO m 11.20 0 0 45,371 0LISTON OTOBO m 11.20 0 11,760 0 0LISTÓN DE ORDINARIO m 11.20 8,187 0 0 0MANO DE OBRA CC hc 38.80 485,310 485,310 485,310 485,310TABLA CHAPA ORDINARIO 0.20 m 11.20 11,536 0 0 0TABLA OTOBO 0.20 m 11.20 0 57,680 0 0TABLON CATIVO 0.20 m 11.20 0 0 28,000 0TOLETE RECOCIDO un 379.00 0 0 134,545 0CONCRETO 1:2:4 m³ 0.54 90,217 71,466 74,386 79,607MARCO PARA TAPA CAMARA AP un 1.00 113,938 111,558 111,588 115,263MORTERO A.LAVADA 1:2 m³ 0.13 28,386 29,020 33,451 30,304PAÑETE LISO MUROS 1:4 m² 7.21 53,052 47,449 48,764 47,778REFUERZOS HIERRO 37000 FG tn 0.03 69,089 80,026 68,971 102,005RELLENOS AGREGADO PETREO m³ 0.31 16,522 16,504 9,821 14,118RELLENOS DE EXCAVACION m³ 2.41 15,728 15,728 15,728 15,728REPELLO LISO MUROS 1:4 m² 7.21 46,353 52,969 48,764 47,778REVOQUE LISO MUROS 1:4 m² 7.21 46,353 47,449 50,927 52,104TAPA PARA CAMARA AP un 2.00 255,724 263,074 246,993 251,216 1,314,302 1,411,275 1,402,620 1,315,117
CANALIZACION SUBTERRANEA 2X4” AC mADAPTADOR TERMINAL CAMPANA 4” un 0.14 941 941 941 941ARENA DE PEÑA m³ 0.09 2,787 0 0 0ARENA DE REVOQUE m³ 0.09 0 0 900 1,800ARENA FINA 5 M3 m³ 0.09 0 2,297 0 0BASE GRANULAR m³ 0.05 0 0 1,060 0DUCTO ETERNIT 4” m 2.00 22,776 22,776 23,914 23,914MANO DE OBRA AA hc 2.40 26,105 26,105 26,105 26,105RECEBO COMÚN m³ 0.05 1,587 0 0 0ROCA MUERTA 5 M3 m³ 0.05 0 1,587 0 0UNIÓN A.C CÓNICA 4” un 0.50 724 724 760 760ZAHORRA B-200 m³ 0.05 0 0 780 0 54,920 54,429 54,459 53,519
CANALIZACION SUBTERRANEA 2X4” PVC mARENA DE PEÑA m³ 0.09 2,787 0 0 0ARENA DE REVOQUE m³ 0.09 0 0 900 1,800ARENA FINA 5 M3 m³ 0.09 0 2,297 0 0BASE GRANULAR m³ 0.05 0 0 1,060 0DUCTO DOBLE PARED 4” m 2.00 18,492 18,492 18,492 18,492MANO DE OBRA AA hc 2.00 21,754 21,754 21,754 21,754RECEBO COMÚN m³ 0.05 1,587 0 0 0ROCA MUERTA 5 M3 m³ 0.05 0 1,587 0 0UNIÓN PVC SANITARIA 4” un 0.50 2,696 2,696 2,696 2,696ZAHORRA B-200 m³ 0.05 0 0 780 0 47,316 46,825 45,682 44,742
CANALIZACION SUBTERRANEA 4X4” AC mADAPTADOR TERMINAL CAMPANA 4” un 0.28 1,882 1,882 1,882 1,882ARENA DE PEÑA m³ 0.09 2,787 0 0 0ARENA DE REVOQUE m³ 0.09 0 0 900 1,800ARENA FINA 5 M3 m³ 0.09 0 2,297 0 0BASE GRANULAR m³ 0.05 0 0 1,060 0DUCTO ETERNIT 4” m 4.00 45,552 45,552 47,828 47,828MANO DE OBRA AA hc 3.60 39,157 39,157 39,157 39,157RECEBO COMÚN m³ 0.05 1,587 0 0 0ROCA MUERTA 5 M3 m³ 0.05 0 1,587 0 0UNIÓN A.C CÓNICA 4” un 1.00 1,447 1,447 1,519 1,519ZAHORRA B-200 m³ 0.05 0 0 780 0 92,413 91,922 93,126 92,186
CANALIZACION SUBTERRANEA 4X4” PVC mADAPTADOR TERMINAL CAMPANA 4” un 0.28 1,882 1,882 1,882 1,882ARENA DE PEÑA m³ 0.09 2,787 0 0 0ARENA DE REVOQUE m³ 0.09 0 0 900 1,800ARENA FINA 5 M3 m³ 0.09 0 2,297 0 0BASE GRANULAR m³ 0.04 0 0 848 0DUCTO ETERNIT 4” m 4.00 45,552 45,552 47,828 47,828MANO DE OBRA AA hc 3.60 39,157 39,157 39,157 39,157RECEBO COMÚN m³ 0.04 1,270 0 0 0ROCA MUERTA 5 M3 m³ 0.04 0 1,270 0 0UNIÓN PVC SANITARIA 4” un 1.00 5,391 5,391 5,391 5,391ZAHORRA B-200 m³ 0.04 0 0 624 0 96,039 95,549 96,630 96,058
CANALIZACION SUBTERRANEA 6X4” AC mADAPTADOR TERMINAL CAMPANA 4” un 0.35 2,352 2,352 2,352 2,352ARENA DE PEÑA m³ 0.09 2,787 0 0 0ARENA DE REVOQUE m³ 0.09 0 0 900 1,800ARENA FINA 5 M3 m³ 0.09 0 2,297 0 0BASE GRANULAR m³ 0.04 0 0 848 0DUCTO ETERNIT 4” m 6.00 68,328 68,328 71,742 71,742MANO DE OBRA AA hc 4.80 52,210 52,210 52,210 52,210RECEBO COMÚN m³ 0.04 1,270 0 0 0ROCA MUERTA 5 M3 m³ 0.04 0 1,270 0 0UNIÓN A.C CÓNICA 4” un 1.50 2,171 2,171 2,279 2,279ZAHORRA B-200 m³ 0.04 0 0 624 0 129,118 128,627 130,954 130,382
MARCO PARA TAPA CAMARA AP unANTICORROSIVO ROJO CLARO gl 0.08 2,560 2,480 2,464 2,466ESMALTE SINTÉTICO PINTULUX gl 0.08 4,296 4,296 4,276 4,320MANO DE OBRA CC hc 1.96 24,516 24,516 24,516 24,516PLATINA HIERRO 2 X 1/2 X 1/4 m 0.48 1,735 1,680 1,735 1,900SOLDADURA ELÉCTRICA 004-3/23” kg 1.96 8,036 8,036 8,036 8,036TRANSPORTE CAMIÓN vj 0.04 4,176 4,176 4,176 2,641ÁNGULO HIERRO 2 1/2” X 3/16” m 2.98 25,893 24,540 24,540 28,161SUB-CONTRATO ELECTRICO % 30.00 21,363 20,917 20,923 21,612SUB-CONTRATO ORNAMENTACION % 30.00 21,363 20,917 20,923 21,612 113,938 111,558 111,588 115,263
MARCO PARA TAPA CAMARA DOBLE unANTICORROSIVO ROJO CLARO gl 0.12 3,840 3,720 3,696 3,699ESMALTE SINTÉTICO PINTULUX gl 0.12 6,444 6,444 6,413 6,480MANO DE OBRA CC hc 3.10 38,775 38,775 38,775 38,775PLATINA HIERRO 2 X 1/2 X 1/4 m 1.44 5,204 5,040 5,204 5,700SOLDADURA ELÉCTRICA 004-3/23” kg 0.31 1,271 1,271 1,271 1,271TRANSPORTE CAMIÓN vj 0.05 5,220 5,220 5,220 3,302ÁNGULO HIERRO 2 1/2” X 3/16” m 4.36 37,884 35,905 35,905 41,202SUB-CONTRATO ELECTRICO % 30.00 29,591 28,912 28,945 30,128SUB-CONTRATO ORNAMENTACION % 30.00 29,591 28,912 28,945 30,128 157,821 154,199 154,374 160,684
MARCO PARA TAPA CAMARA VEHIC unANTICORROSIVO ROJO CLARO gl 0.15 4,800 4,650 4,620 4,623ESMALTE SINTÉTICO PINTULUX gl 0.15 8,055 8,055 8,017 8,100MANO DE OBRA CC hc 1.46 18,262 18,262 18,262 18,262PLATINA HIERRO 2 X 1/2 X 1/4 m 0.48 1,735 1,680 1,735 1,900SOLDADURA ELÉCTRICA 004-3/23” kg 0.60 2,460 2,460 2,460 2,460TRANSPORTE CAMIÓN vj 0.05 5,220 5,220 5,220 3,302ÁNGULO HIERRO 2 1/2” X 3/16” m 5.76 50,049 47,434 47,434 54,432SUB-CONTRATO DE ORNAMENTACION % 30.00 27,174 26,328 26,324 27,924 117,754 114,088 114,071 121,002
PRADIZACION m²GRAMA KIKUYO m² 1.00 2,302 2,300 2,300 2,320 2,302 2,300 2,300 2,320
CONSTRUDATA22
RELLENOS EN TIERRA m³BULLDOZER D-6 h 0.02 900 900 900 900VIBROCOMPACTADOR A GASOLINA d 0.03 1,136 1,095 1,148 1,286VOLQUETA M3 vj 0.45 17,100 15,984 16,898 19,331 19,136 17,979 18,946 21,517
RELLENOS TIERRA NEGRA m³MANO DE OBRA AA hc 0.70 7,614 7,614 7,614 7,614TIERRA NEGRA m³ 1.30 37,700 37,700 42,900 37,700VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714 46,828 46,774 52,045 47,028
TAPA PARA CAMARA AP unANTICORROSIVO ROJO CLARO gl 0.04 1,280 1,240 1,232 1,233CONCRETO CORRIENTE 3000 PSI m³ 0.03 9,399 9,386 8,237 9,396ESMALTE SINTÉTICO PINTULUX gl 0.04 2,148 2,148 2,138 2,160HIERRO VARILLA 3/8” X 6 M m 9.52 9,691 9,691 7,930 8,301MANO DE OBRA BB hc 1.12 13,401 13,401 13,401 13,401MANO DE OBRA CC hc 1.78 22,264 22,264 22,264 22,264PLACA IDENTIFICACIÓN 8X5 CM un 2.98 15,645 18,774 15,645 15,645PLATINA HIERRO 2 X 1/2 X 1/4 m 2.98 10,770 10,430 10,770 11,795TRANSPORTE CAMIÓN vj 0.03 3,132 3,132 3,132 1,981TUBO ESTRUCT. NEGRA 1/2” m 0.10 450 249 421 450SUB-CONTRATO DE ORNAMENTACION % 45.00 39,681 40,822 38,327 38,982 127,862 131,537 123,497 125,608
TAPA PARA CAMARA AP DOBLE unANTICORROSIVO ROJO CLARO gl 0.03 960 930 924 925CONCRETO CORRIENTE 3000 PSI m³ 0.02 6,266 6,257 5,491 6,264ESMALTE SINTÉTICO PINTULUX gl 0.03 1,611 1,611 1,603 1,620HIERRO VARILLA 3/8” X 6 M m 9.52 9,691 9,691 7,930 8,301MANO DE OBRA BB hc 1.24 14,837 14,837 14,837 14,837MANO DE OBRA CC hc 0.67 8,380 8,380 8,380 8,380PLACA IDENTIFICACIÓN 8X5 CM un 1.00 5,250 6,300 5,250 5,250PLATINA HIERRO 2 X 1/2 X 1/4 m 2.34 8,457 8,190 8,457 9,262TRANSPORTE CAMIÓN vj 0.02 2,088 2,088 2,088 1,321TUBO ESTRUCT. NEGRA 1/2” m 0.10 450 249 421 450SUB-CONTRATO DE ORNAMENTACION % 45.00 26,096 26,340 24,922 25,474 84,086 84,874 80,304 82,084
TAPA PARA CAMARA VEHICULAR unANTICORROSIVO ROJO CLARO gl 0.05 1,600 1,550 1,540 1,541CONCRETO CORRIENTE 3000 PSI m³ 0.02 6,266 6,257 5,491 6,264ESMALTE SINTÉTICO PINTULUX gl 0.05 2,685 2,685 2,672 2,700HIERRO VARILLA 3/8” X 6 M m 9.58 9,752 9,752 7,980 8,354MANO DE OBRA BB hc 2.52 30,152 30,152 30,152 30,152MANO DE OBRA CC hc 4.00 50,032 50,032 50,032 50,032PLACA IDENTIFICACIÓN 8X5 CM un 1.00 5,250 6,300 5,250 5,250PLATINA HIERRO 2 X 1/2 X 1/4 m 4.22 15,251 14,770 15,251 16,703TRANSPORTE CAMIÓN vj 0.04 4,176 4,176 4,176 2,641TUBO ESTRUCT. NEGRA 1/2” m 0.10 450 249 421 450SUB-CONTRATO DE ORNAMENTACION % 45.00 56,527 56,666 55,335 55,839 182,141 182,589 178,301 179,926
PAÑETES-REVOQUES-REPELLOS
ENTRAMADO MADERA CIELO RASO m²CUARTON OTOBO 2”X4” 2.9 m 2.16 0 9,720 0 0LARGUERO DE 2” X 4” m 2.16 0 0 0 20,520LISTON ABARCO 2”X4”X3 M m 2.16 0 0 8,750 0MANO DE OBRA AA hc 0.55 5,982 5,982 5,982 5,982PUNTILLA CON CABEZA 2” lb 0.08 223 228 188 220REPISA ORDINARIO 3 M m 2.16 6,480 0 0 0 12,685 15,930 14,921 26,722
FILOS Y DILATACIONES mAGUA lt 1.50 18 18 18 18ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 1.50 270 300 336 309MANO DE OBRA CC hc 0.16 2,001 2,001 2,001 2,001 2,599 2,574 2,455 2,528
GOTERAS mAGUA lt 1.45 17 17 17 17ARENA DE PEÑA m³ 0.01 310 0 0 0ARENA DE REVOQUE m³ 0.01 0 0 100 200ARENA FINA 5 M3 m³ 0.01 0 255 0 0CEMENTO GRIS kg 3.00 540 600 672 618MANO DE OBRA AA hc 0.23 2,502 2,502 2,502 2,502 3,369 3,374 3,291 3,337
GUADUA BAJO ENTRAMADO m²ALAMBRE NEGRO NO.18 kg 0.05 85 80 85 90ESTERILLA DE GÚADUA m² 1.00 2,529 3,100 2,529 2,701MANO DE OBRA AA hc 0.50 5,439 5,439 5,439 5,439PUNTILLA CON CABEZA 2” lb 0.20 556 570 471 549 8,609 9,188 8,524 8,778
IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA m²MANO DE OBRA AA hc 0.10 1,088 1,088 1,088 1,088SIKA-2 (5.5 KG) kg 0.21 1,486 1,486 1,486 1,486
2,574 2,574 2,574 2,574
IMPERMEABILIZACIÓN INTEGRAL MORTERO TOXEMENT m²MANO DE OBRA AA hc 0.10 1,088 1,088 1,088 1,088TOXEMENT 1-A IMPERMEABILIZANTE INTEGRAL kg 0.21 1,890 1,915 907 1,890 2,978 3,002 1,995 2,978
MALLA BAJO ENTRAMADO m²MALLA CON VENA 0.60X2.00 un 0.73 3,201 3,285 3,075 2,409MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351PUNTILLA CON CABEZA 2” lb 0.04 111 114 94 110 7,663 7,750 7,520 6,870
PAÑETE BAJO GUADUA 1:5 m²AGUA lt 5.90 71 0 0 0ARENA DE PEÑA m³ 0.03 929 0 0 0CEMENTO GRIS kg 6.85 1,165 0 0 0MANO DE OBRA AA hc 0.90 9,789 0 0 0 11,954
PAÑETE BAJO MALLA 1:4 m²AGUA lt 5.00 60 0 0 0ARENA DE PEÑA m³ 0.03 929 0 0 0CEMENTO GRIS kg 10.20 1,836 0 0 0MANO DE OBRA AA hc 0.60 6,526 0 0 0 9,351
PAÑETE BAJO MALLA 1:5 m²AGUA lt 4.17 50 0 0 0ARENA DE PEÑA m³ 0.03 929 0 0 0CEMENTO GRIS kg 8.45 1,521 0 0 0MANO DE OBRA AA hc 0.60 6,526 0 0 0 9,026
PAÑETE BAJO MALLA 1:6 m²AGUA lt 3.60 43 0 0 0ARENA DE PEÑA m³ 0.03 929 0 0 0CEMENTO GRIS kg 7.30 1,314 0 0 0MANO DE OBRA AA hc 0.60 6,526 0 0 0 8,813
PAÑETE CULATAS 1:4 m²AGUA lt 6.98 84 0 0 0ARENA DE PEÑA m³ 0.05 1,549 0 0 0CEMENTO GRIS kg 14.13 2,543 0 0 0MANO DE OBRA AA hc 0.52 5,656 0 0 0 9,832
PAÑETE CULATAS 1:6 m²AGUA lt 6.00 72 0 0 0ARENA DE PEÑA m³ 0.03 929 0 0 0CEMENTO GRIS kg 10.20 1,836 0 0 0MANO DE OBRA AA hc 0.52 5,656 0 0 0SIKA-2 (5.5 KG) kg 0.80 5,661 0 0 0 14,154
PAÑETE IMPERMEABILIZADO MUROS 1:3 m²AGUA lt 7.50 90 0 0 0ARENA DE PEÑA m³ 0.03 929 0 0 0CEMENTO GRIS kg 14.30 2,574 0 0 0MANO DE OBRA AA hc 0.48 5,221 0 0 0TOXEMENT 1-A IMPERMEABILIZANTE INTEGRAL kg 0.70 6,301 0 0 0 15,116
PAÑETE LISO MUROS 1:4 m²AGUA lt 4.80 58 0 0 0ARENA DE PEÑA m³ 0.03 929 0 0 0CEMENTO GRIS kg 7.60 1,368 0 0 0MANO DE OBRA AA hc 0.46 5,003 0 0 0 7,358
PAÑETE LISO MUROS 1:5 m²AGUA lt 4.80 58 0 0 0ARENA DE PEÑA m³ 0.03 929 0 0 0CEMENTO GRIS kg 6.34 1,141 0 0 0MANO DE OBRA AA hc 0.46 5,003 0 0 0 7,131
PAÑETE LISO MUROS 1:6 m²AGUA lt 2.09 25 0 0 0ARENA DE PEÑA m³ 0.03 929 0 0 0CEMENTO GRIS kg 5.48 986 0 0 0MANO DE OBRA AA hc 0.46 5,003 0 0 0 6,944
PAÑETE LISO PLACAS 1:4 m²AGUA lt 5.00 60 0 0 0ARENA DE PEÑA m³ 0.02 619 0 0 0CEMENTO GRIS kg 7.60 1,368 0 0 0MANO DE OBRA AA hc 0.48 5,221 0 0 0 7,268
PAÑETE LISO PLACAS 1:5 m²AGUA lt 4.80 58 0 0 0ARENA DE PEÑA m³ 0.03 929 0 0 0ARENA DE REVOQUE m³ 0.03 0 0 0 0CEMENTO GRIS kg 6.30 1,134 0 0 0MANO DE OBRA AA hc 0.48 5,221 0 0 0 7,342
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
23
PAÑETE LISO PLACAS 1:6 m²AGUA lt 4.70 56 0 0 0ARENA DE PEÑA m³ 0.03 929 0 0 0ARENA DE REVOQUE m³ 0.03 0 0 0 0CEMENTO GRIS kg 5.48 986 0 0 0MANO DE OBRA AA hc 0.48 5,221 0 0 0 7,193
PAÑETE RUSTICO MUROS 1:5 m²AGUA lt 3.22 39 0 0 0ARENA DE PEÑA m³ 0.03 929 0 0 0ARENA DE REVOQUE m³ 0.03 0 0 0 0CEMENTO GRIS kg 6.52 1,174 0 0 0MANO DE OBRA AA hc 0.56 6,091 0 0 0 8,233
PAÑETE RUSTICO PLACAS 1:5 m²AGUA lt 7.20 86 0 0 0ARENA DE PEÑA m³ 0.04 1,239 0 0 0ARENA DE REVOQUE m³ 0.04 0 0 0 0CEMENTO GRIS kg 9.50 1,710 0 0 0MANO DE OBRA AA hc 0.61 6,635 0 0 0 9,670
REPELLO BAJO MALLA 1:4 m²AGUA lt 5.00 0 60 0 0ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 10.20 0 2,040 0 0MANO DE OBRA AA hc 0.60 0 6,526 0 0 9,392
REPELLO BAJO MALLA 1:5 m²AGUA lt 4.17 0 50 0 0ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 8.45 0 1,690 0 0MANO DE OBRA AA hc 0.60 0 6,526 0 0 9,032
REPELLO BAJO MALLA 1:6 m²AGUA lt 3.60 0 43 0 0ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 7.30 0 1,460 0 0MANO DE OBRA AA hc 0.60 0 6,526 0 0 8,795
REPELLO CULATAS 1:4 m²AGUA lt 6.00 0 72 0 0ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 14.13 0 2,826 0 0MANO DE OBRA AA hc 0.52 0 5,656 0 0 9,320
REPELLO CULATAS 1:6 m²AGUA lt 6.00 0 72 0 0ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 10.20 0 2,040 0 0MANO DE OBRA AA hc 0.52 0 5,656 0 0SIKA-2 (5.5 KG) kg 0.80 0 5,661 0 0 14,194
REPELLO IMP. MUROS 1:3 m²AGUA lt 7.50 0 90 0 0ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 14.30 0 2,860 0 0MANO DE OBRA AA hc 0.48 0 5,221 0 0TOXEMENT 1-A IMPERMEABILIZANTE INTEGRAL kg 0.70 0 6,383 0 0 15,319
REPELLO LISO MUROS 1:4 m²AGUA lt 4.80 0 58 0 0ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 7.60 0 1,520 0 0MANO DE OBRA AA hc 0.46 0 5,003 0 0 7,347
REPELLO LISO MUROS 1:5 m²AGUA lt 4.80 0 58 0 0ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 6.34 0 1,268 0 0MANO DE OBRA AA hc 0.46 0 5,003 0 0 7,095
REPELLO LISO MUROS 1:6 m²AGUA lt 2.09 0 25 0 0ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 4.23 0 846 0 0MANO DE OBRA AA hc 0.46 0 5,003 0 0 6,640
REPELLO LISO PLACAS 1:4 m²AGUA lt 5.00 0 60 0 0ARENA FINA 5 M3 m³ 0.02 0 510 0 0CEMENTO GRIS kg 8.00 0 1,600 0 0MANO DE OBRA AA hc 0.48 0 5,221 0 0 7,391
REPELLO LISO PLACAS 1:5 m²AGUA lt 4.80 0 58 0 0ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 6.30 0 1,260 0 0
MANO DE OBRA AA hc 0.48 0 5,221 0 0 7,304
REPELLO LISO PLACAS 1:6 m²AGUA lt 4.70 0 56 0 0ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 5.48 0 1,096 0 0MANO DE OBRA AA hc 0.48 0 5,221 0 0 7,139
REPELLO RUSTICO MUROS 1:5 m²AGUA lt 3.22 0 39 0 0ARENA FINA 5 M3 m³ 0.03 0 766 0 0CEMENTO GRIS kg 6.52 0 1,304 0 0MANO DE OBRA AA hc 0.56 0 6,091 0 0 8,199
REPELLO RUSTICO PLACAS 1:5 m²AGUA lt 7.20 0 86 0 0ARENA FINA 5 M3 m³ 0.04 0 1,021 0 0CEMENTO GRIS kg 9.50 0 1,900 0 0MANO DE OBRA AA hc 0.61 0 6,635 0 0 9,642
REVOQUE BAJO GUADUA 1:5 m²AGUA lt 5.90 0 0 71 71ARENA DE REVOQUE m³ 0.03 0 0 300 600CEMENTO GRIS kg 6.85 0 0 1,534 1,411MANO DE OBRA AA hc 0.90 0 0 9,789 9,789 11,695 11,871
REVOQUE BAJO MALLA 1:4 m²AGUA lt 5.00 0 0 60 60ARENA DE REVOQUE m³ 0.03 0 0 300 600CEMENTO GRIS kg 10.20 0 0 2,285 2,101MANO DE OBRA AA hc 0.60 0 0 6,526 6,526 9,171 9,287
REVOQUE BAJO MALLA 1:5 m²AGUA lt 4.17 0 0 50 50ARENA DE REVOQUE m³ 0.03 0 0 300 600CEMENTO GRIS kg 8.45 0 0 1,893 1,741MANO DE OBRA AA hc 0.60 0 0 6,526 6,526 8,769 8,917
REVOQUE BAJO MALLA 1:6 m²AGUA lt 3.60 0 0 43 43ARENA DE REVOQUE m³ 0.03 0 0 300 600CEMENTO GRIS kg 7.30 0 0 1,635 1,504MANO DE OBRA AA hc 0.60 0 0 6,526 6,526 8,505 8,673
REVOQUE CULATAS 1:4 m²AGUA lt 6.98 0 0 84 84ARENA DE REVOQUE m³ 0.05 0 0 500 1,000CEMENTO GRIS kg 14.13 0 0 3,165 2,911MANO DE OBRA AA hc 0.52 0 0 5,656 5,656 9,405 9,651
REVOQUE CULATAS 1:6 m²AGUA lt 6.00 0 0 72 72ARENA DE REVOQUE m³ 0.03 0 0 300 600CEMENTO GRIS kg 1.20 0 0 269 247MANO DE OBRA AA hc 0.52 0 0 5,656 5,656SIKA-2 (5.5 KG) kg 0.80 0 0 5,661 5,661 11,958 12,236
REVOQUE IMP. MUROS 1:3 m²AGUA lt 7.50 0 0 90 90ARENA DE REVOQUE m³ 0.03 0 0 300 600CEMENTO GRIS kg 14.30 0 0 3,203 2,946MANO DE OBRA AA hc 0.48 0 0 5,221 5,221TOXEMENT 1-A IMPERMEABILIZANTE INTEGRAL kg 0.70 0 0 3,024 6,301 11,838 15,158
REVOQUE LISO MUROS 1:4 m²AGUA lt 4.80 0 0 58 58ARENA DE REVOQUE m³ 0.03 0 0 300 600CEMENTO GRIS kg 7.60 0 0 1,702 1,566MANO DE OBRA AA hc 0.46 0 0 5,003 5,003 7,063 7,227
REVOQUE LISO MUROS 1:5 m²AGUA lt 4.80 0 0 58 58ARENA DE REVOQUE m³ 0.03 0 0 300 600CEMENTO GRIS kg 6.34 0 0 1,420 1,306MANO DE OBRA AA hc 0.46 0 0 5,003 5,003 6,781 6,967
REVOQUE LISO MUROS 1:6 m²AGUA lt 2.09 0 0 25 25ARENA DE REVOQUE m³ 0.03 0 0 300 600CEMENTO GRIS kg 5.48 0 0 1,228 1,129MANO DE OBRA AA hc 0.46 0 0 5,003 5,003 6,556 6,757
REVOQUE LISO PLACAS 1:4 m²AGUA lt 5.00 0 0 60 60ARENA DE REVOQUE m³ 0.02 0 0 200 400CEMENTO GRIS kg 7.60 0 0 1,702 1,566MANO DE OBRA AA hc 0.48 0 0 5,221 5,221
CONSTRUDATA24
7,183 7,247
REVOQUE LISO PLACAS 1:5 m²AGUA lt 4.80 0 0 58 58ARENA DE REVOQUE m³ 0.03 0 0 300 600CEMENTO GRIS kg 6.30 0 0 1,411 1,298MANO DE OBRA AA hc 0.48 0 0 5,221 5,221 6,990 7,176
REVOQUE LISO PLACAS 1:6 m²AGUA lt 4.70 0 0 56 56ARENA DE REVOQUE m³ 0.03 0 0 300 600CEMENTO GRIS kg 5.48 0 0 1,228 1,129MANO DE OBRA AA hc 0.48 0 0 5,221 5,221 6,805 7,006
REVOQUE RUSTI CO PLACAS 1:5 m²AGUA lt 7.20 0 0 86 86ARENA DE REVOQUE m³ 0.04 0 0 400 800CEMENTO GRIS kg 9.50 0 0 2,128 1,957MANO DE OBRA AA hc 0.61 0 0 6,635 6,635 9,249 9,478
REVOQUE RUSTICO MUROS 1:5 m²AGUA lt 3.22 0 0 39 39ARENA DE REVOQUE m³ 0.03 0 0 300 600CEMENTO GRIS kg 6.52 0 0 1,460 1,343MANO DE OBRA AA hc 0.56 0 0 6,091 6,091 7,890 8,073
PINTURA
ANTICORROSIVO SOBRE LAMINA LINEAL mANTICORROSIVO ROJO CLARO gl 0.01 320 310 308 308DISOLVENTE THINNER gl 0.01 107 100 83 100MANO DE OBRA CC hc 0.19 2,377 2,377 2,377 2,377PABMERIL PLIEGO 9” X 11” un 0.63 1,166 1,134 1,166 1,213SUB-CONTRATO PINTURA % 45.00 1,786 1,764 1,770 1,799 5,755 5,685 5,703 5,797
ANTICORROSIVO SOBRE LAMINA LLENA m²ANTICORROSIVO ROJO CLARO gl 0.03 960 930 924 925DISOLVENTE THINNER gl 0.01 107 100 83 100MANO DE OBRA CC hc 0.33 4,128 4,128 4,128 4,128PABMERIL PLIEGO 9” X 11” un 1.05 1,943 1,890 1,943 2,022SUB-CONTRATO PINTURA % 45.00 3,212 3,171 3,185 3,229 10,349 10,219 10,262 10,403
ANTIHUMEDAD FACHADA m²MANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263SIKA TRANSPARENTE 10 (16 KG) kg 0.15 1,697 1,697 1,697 1,697SUB-CONTRATO PINTURA % 45.00 2,232 2,232 2,232 2,232 7,191 7,191 7,191 7,191
BARNIZ SOBRE MUEBLES m²BARNIZ BRILLANTE EXTERIOR gl 0.28 5,096 5,096 5,096 5,096MANO DE OBRA CC hc 1.23 15,385 15,385 15,385 15,385PABMERIL PLIEGO 9” X 11” un 3.15 5,828 5,670 5,828 6,067TAPAPOROS NOGAL gl 0.11 2,750 2,750 3,119 2,750SUB-CONTRATO PINTURA % 45.00 13,076 13,005 13,242 13,184 42,135 41,906 42,669 42,482
CARBURO SOBRE PAÑETE m²AGUA lt 0.20 2 2 2 2CAL kg 1.50 735 675 690 690MANO DE OBRA CC hc 0.18 2,251 2,251 2,251 2,251SUB-CONTRATO PINTURA % 45.00 1,345 1,318 1,325 1,325 4,334 4,247 4,269 4,269
COLORPLAST FACHADA m²RUSTIPLAST m² 1.03 11,351 10,815 11,351 11,351 11,351 10,815 11,351 11,351
DEMARCACION CON MARMOLINA mMANO DE OBRA AA hc 0.10 1,088 1,088 1,088 1,088MARMOLINA bt 0.05 375 280 375 375SUB CONTRATO PINTURA % 45.00 658 615 658 658 2,121 1,983 2,121 2,121
ESGRAFIADO FACHADA m²DECORA PLAST m² 1.00 6,844 6,844 6,844 6,844 6,844 6,844 6,844 6,844
ESMALTE SOBRE LAMINA LINEAL mDISOLVENTE THINNER gl 0.01 107 100 83 100ESMALTE SINTÉTICO PINTULUX gl 0.01 537 537 534 540MANO DE OBRA CC hc 0.20 2,502 2,502 2,502 2,502PABMERIL PLIEGO 9” X 11” un 0.16 296 288 296 308SUB-CONTRATO PINTURA % 45.00 1,549 1,542 1,537 1,552 4,990 4,969 4,952 5,002
ESMALTE SOBRE LAMINA LLENA m²DISOLVENTE THINNER gl 0.03 321 300 250 300ESMALTE SINTÉTICO PINTULUX gl 0.04 2,148 2,148 2,138 2,160MANO DE OBRA CC hc 0.33 4,128 4,128 4,128 4,128PABMERIL PLIEGO 9” X 11” un 1.05 1,943 1,890 1,943 2,022SUB-CONTRATO PINTURA % 45.00 3,843 3,810 3,806 3,874 12,382 12,275 12,264 12,484
ESMALTE SOBRE MADERA LINEAL mDISOLVENTE THINNER gl 0.01 107 100 83 100ESMALTE MATE SUPERSINTÉTICO gl 0.01 567 400 483 560MANO DE OBRA CC hc 0.07 876 876 876 876PABMERIL PLIEGO 9” X 11” un 0.16 296 288 296 308TAPAPOROS NOGAL gl 0.01 250 250 284 250SUB-CONTRATO PINTURA % 45.00 943 861 910 942 3,038 2,775 2,931 3,036
ESMALTE SOBRE MADERA LLENA m²DISOLVENTE THINNER gl 0.02 214 200 167 200ESMALTE MATE SUPERSINTÉTICO gl 0.04 2,267 1,600 1,931 2,240MANO DE OBRA CC hc 0.33 4,128 4,128 4,128 4,128PABMERIL PLIEGO 9” X 11” un 1.05 1,943 1,890 1,943 2,022TAPAPOROS NOGAL gl 0.02 500 500 567 500SUB-CONTRATO PINTURA % 45.00 4,073 3,743 3,931 4,090 13,124 12,061 12,666 13,180
ESMALTE SOBRE MARCOS LAMINA mDISOLVENTE THINNER gl 0.02 214 200 167 200ESMALTE SINTÉTICO PINTULUX gl 0.02 1,074 1,074 1,069 1,080MANO DE OBRA CC hc 0.17 2,126 2,126 2,126 2,126PABMERIL PLIEGO 9” X 11” un 0.60 1,110 1,080 1,110 1,156SUB-CONTRATO PINTURA % 45.00 2,036 2,016 2,012 2,053 6,560 6,496 6,484 6,615
ESMALTE SOBRE MARCOS MADERA m²DISOLVENTE THINNER gl 0.01 107 100 83 100ESMALTE MATE SUPERSINTÉTICO gl 0.02 1,133 800 966 1,120MANO DE OBRA CC hc 0.17 2,126 2,126 2,126 2,126PABMERIL PLIEGO 9” X 11” un 0.60 1,110 1,080 1,110 1,156TAPAPOROS NOGAL gl 0.01 250 250 284 250SUB-CONTRATO PINTURA % 45.00 2,127 1,960 2,056 2,138 6,854 6,317 6,625 6,890
ESMALTE SOBRE MUEBLES m²DISOLVENTE THINNER gl 0.12 1,284 1,200 1,000 1,200ESMALTE MATE SUPERSINTÉTICO gl 0.14 7,933 5,600 6,760 7,840MANO DE OBRA CC hc 1.23 15,385 15,385 15,385 15,385PABMERIL PLIEGO 9” X 11” un 7.00 12,950 12,600 12,950 13,482TAPAPOROS NOGAL gl 0.11 2,750 2,750 3,119 2,750SUB-CONTRATO PINTURA % 45.00 18,136 16,891 17,646 18,296 58,438 54,426 56,859 58,952
ESTUCO m²CAOLIN bt 0.09 945 972 896 983CEMENTO GRIS kg 0.26 47 52 58 54MANO DE OBRA CC hc 0.16 2,001 2,001 2,001 2,001PABMERIL PLIEGO 9” X 11” un 0.02 37 36 37 39YESO CORRIENTE VENCEDOR bt 0.01 119 115 135 119SUB-CONTRATO PINTURA % 45.00 1,417 1,429 1,408 1,438 4,566 4,606 4,535 4,632
ESTUCO Y VINILO 3 MANOS m²CAOLIN bt 0.09 945 972 896 983CEMENTO GRIS kg 0.26 47 52 58 54MANO DE OBRA CC hc 0.25 3,127 3,127 3,127 3,127PABMERIL PLIEGO 9” X 11” un 0.02 37 36 37 39VINILTEX gl 0.05 1,995 1,995 2,336 2,250YESO CORRIENTE VENCEDOR bt 0.01 119 115 135 119SUB-CONTRATO PINTURA % 45.00 2,821 2,834 2,965 2,957 9,091 9,131 9,555 9,527
LACA PISOS MADERA m²BARNIZ VITRIFLEX gl 0.02 1,455 1,455 1,737 1,276DISOLVENTE THINNER gl 0.01 107 100 83 100MANO DE OBRA CC hc 1.23 15,385 15,385 15,385 15,385SUB-CONTRATO PINTURA % 45.00 7,626 7,623 7,743 7,542 24,573 24,563 24,948 24,303
LINEAS TRAFICO 0.10 mBROCHA DE CERDA 4” un 0.05 459 459 459 470MANO DE OBRA CC hc 0.10 1,251 1,251 1,251 1,251PINTURA BLANCA PARA TRAFICO gl 0.01 599 599 620 867SUB-CONTRATO PINTURA % 45.00 1,039 1,039 1,048 1,164 3,347 3,347 3,378 3,752
MARMOLINA SOBRE PAÑETE m²AGUA lt 0.16 2 2 2 2CARBURO NO.2 kg 0.17 544 544 612 570CEMENTO BLANCO kg 1.05 998 893 1,029 866MANO DE OBRA CC hc 0.16 2,001 2,001 2,001 2,001MARMOLINA bt 0.36 2,700 2,016 2,700 2,700SUB-CONTRATO PINTURA % 45.00 2,810 2,455 2,855 2,763 9,055 7,911 9,199 8,901
MARMOPLAST FACHADA m²MARMOLPLAST m² 1.03 9,270 10,197 9,270 9,270 9,270 10,197 9,270 9,270
SILCOPLAST FACHADA m²CARAPLAST m² 1.03 6,930 0 6,930 0SILCOPLAST m² 1.03 0 31,930 0 19,245 6,930 31,930 6,930 19,245
TINTILLA SOBRE MADERA LINEAL mMANO DE OBRA CC hc 0.07 876 876 876 876PABMERIL PLIEGO 9” X 11” un 0.16 296 288 296 308TAPAPOROS NOGAL gl 0.01 250 250 284 250
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
25
TINTILLA PARA MADERA CAFE gl 0.01 300 300 375 300SUB-CONTRATO PINTURA % 45.00 775 771 824 780 2,496 2,485 2,654 2,514
TINTILLA SOBRE MADERA LLENA m²MANO DE OBRA CC hc 0.41 5,128 5,128 5,128 5,128PABMERIL PLIEGO 9” X 11” un 0.50 925 900 925 963TAPAPOROS NOGAL gl 0.02 500 500 567 500TINTILLA PARA MADERA CAFE gl 0.02 600 600 750 600SUB-CONTRATO PINTURA % 45.00 3,219 3,208 3,317 3,236 10,372 10,336 10,687 10,427
TINTILLA SOBRE MUEBLES m²MANO DE OBRA CC hc 1.23 15,385 15,385 15,385 15,385PABMERIL PLIEGO 9” X 11” un 3.15 5,828 5,670 5,828 6,067TAPAPOROS NOGAL gl 0.11 2,750 2,750 3,119 2,750TINTILLA PARA MADERA CAFE gl 0.18 5,400 5,400 6,749 5,400SUB-CONTRATO PINTURA % 45.00 13,213 13,142 13,986 13,321 42,575 42,347 45,066 42,923
VINILO SOBRE PAÑETE 2 MANOS m²MANO DE OBRA CC hc 0.13 1,626 1,626 1,626 1,626VINILTEX gl 0.04 1,596 1,596 1,869 1,800SUB-CONTRATO PINTURA % 45.00 1,450 1,450 1,573 1,542 4,672 4,672 5,067 4,968
WASH-PRIMER SOBRE ALUMINIO m²MANO DE OBRA CC hc 0.50 6,254 6,254 6,254 6,254PABMERIL PLIEGO 9” X 11” un 1.05 1,943 1,890 1,943 2,022WASH PRIMER A PINTURA gl 0.48 8,064 8,064 8,442 8,070WASH PRIMER B CATALIZADOR gl 0.48 4,872 4,872 5,097 4,872SUB-CONTRATO PINTURA % 45.00 9,510 9,486 9,781 9,548 30,642 30,566 31,516 30,766
PISOS - ACABADOS
ACUARELA 20X20 m²AGUA lt 2.85 34 34 34 34ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0CEMENTO BLANCO kg 0.51 485 434 500 421CEMENTO GRIS kg 6.27 1,129 1,254 1,404 1,292CERÁMICA PARED ACUARELA un 1.03 30,210 30,210 30,210 29,870MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245 41,603 41,557 41,884 41,262
ADOQUIN CONCRETO 6 CM m²ADOQUÍN CONCRETO 11X6X20 un 50.00 17,350 19,850 19,500 18,900AGUA lt 2.85 34 34 34 34ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877 28,761 31,141 30,901 30,211
ADOQUIN CONCRETO 8 CM m²ADOQUÍN CONCRETO 11X8X20 un 50.00 19,850 19,850 25,000 21,650AGUA lt 2.85 34 34 34 34ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877 31,261 31,141 36,401 32,961
ADOQUIN GRES PEATONAL m²ADOQUÍN GRES 10X20X2.5 m² 1.03 26,141 23,793 16,722 20,600AGUA lt 2.85 34 34 34 34ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0COLOR MINERAL kg 1.03 6,452 5,974 5,974 5,356MANO DE OBRA AA hc 1.05 11,421 11,421 11,421 11,421 44,548 41,602 34,641 37,811
ADOQUIN GRES VEHICULAR m²ADOQUÍN GRES 10X20X2.5 m² 1.03 26,141 23,793 16,722 20,600AGUA lt 4.53 54 54 54 54ARENA DE REVOQUE m³ 0.03 0 0 0 600ARENA FINA m³ 0.03 0 570 0 0ARENA LAVADA DE PEÑA m³ 0.03 750 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.03 0 0 735 0COLOR MINERAL kg 1.03 6,452 5,974 5,974 5,356MANO DE OBRA AA hc 1.05 11,421 11,421 11,421 11,421 44,819 41,812 34,906 38,031
BALDOSIN DE GRANITO 33X33 m²AGUA lt 2.85 34 34 34 34ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0
ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0BALDOSA ALFA L1 33 X 33 m² 1.03 29,989 31,065 31,065 29,989CEMENTO BLANCO kg 1.03 979 876 1,009 850CEMENTO GRIS kg 6.27 1,129 1,254 1,404 1,292MANO DE OBRA AA hc 0.95 10,333 10,333 10,333 10,333 42,964 43,942 44,336 42,898
BALDOSIN GRANITO 20X20 m²AGUA lt 2.85 34 34 34 34ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0CEMENTO BLANCO kg 1.03 979 876 1,009 850CEMENTO GRIS kg 6.27 1,129 1,254 1,404 1,292CERÁMICA PARED ITALIA 20 m² 1.03 12,494 12,494 12,051 11,742MANO DE OBRA AA hc 0.95 10,333 10,333 10,333 10,333 25,468 25,371 25,322 24,651
CRISTANAC ESPECIAL m²AGUA lt 0.50 6 6 6 6CEMENTO BLANCO kg 3.91 3,715 3,324 3,832 3,226COLOR MINERAL kg 0.01 63 58 58 52MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877MOSAICO VITREO m² 1.03 47,895 47,895 47,895 47,895 62,555 62,160 62,668 62,056
DECORAL DECOTURF II m²RECUBRIMIENTO DECOART m² 1.00 30,740 30,740 30,740 30,740 30,740 30,740 30,740 30,740
GRADAS GRAVILLA mAGUA lt 1.59 19 19 19 19ARENA DE REVOQUE m³ 0.01 0 0 0 200ARENA FINA m³ 0.01 0 190 0 0ARENA LAVADA DE PEÑA m³ 0.01 250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.01 0 0 245 0CEMENTO GRIS kg 3.50 630 700 784 721GRAVA CANTO RODADO 1/2 m³ 0.01 0 0 435 0GRAVILLA DE RIO m³ 0.01 556 0 0 556GRAVILLA FINA 1/2” Y 3/4” m³ 0.01 0 400 0 0MANO DE OBRA AA hc 2.50 27,193 27,193 27,193 27,193 28,648 28,502 28,676 28,689
GRANITO m²AGUA lt 7.41 89 89 89 89ARENA DE REVOQUE m³ 0.09 0 0 0 1,800ARENA FINA m³ 0.09 0 1,710 0 0ARENA LAVADA DE PEÑA m³ 0.09 2,250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.09 0 0 2,205 0CEMENTO BLANCO kg 21.00 19,950 17,850 20,580 17,325CEMENTO GRIS kg 18.70 3,366 3,740 4,189 3,852COLOR MINERAL kg 0.33 2,067 1,914 1,914 1,716DILATACIÓN EN BRONCE PC09 m 1.36 4,243 4,434 4,012 4,733GRANITO TRAVERTINO PERUANO NO. 3 bt 0.75 13,350 15,750 13,875 14,018MANO DE OBRA AA hc 1.50 16,316 16,316 16,316 16,316MARMOLINA bt 0.50 3,750 2,800 3,750 3,750 65,381 64,602 66,929 63,598
GRAVILLA LAVADA m²AGUA lt 3.18 38 38 38 38ARENA DE REVOQUE m³ 0.03 0 0 0 600ARENA FINA m³ 0.03 0 570 0 0ARENA LAVADA DE PEÑA m³ 0.03 750 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.03 0 0 735 0CEMENTO GRIS kg 6.98 1,256 1,396 1,564 1,438DILATACIÓN EN BRONCE PC09 m 0.80 2,496 2,608 2,360 2,784GRAVA CANTO RODADO 1/2 m³ 0.02 0 0 870 0GRAVILLA DE RIO m³ 0.02 1,112 0 0 1,112GRAVILLA FINA 1/2” Y 3/4” m³ 0.02 0 800 0 0MANO DE OBRA AA hc 2.50 27,193 27,193 27,193 27,193 32,845 32,605 32,759 33,165
GUARDAESCOBA GRANITO mCEMENTO BLANCO kg 4.00 3,800 3,400 3,920 3,300GRANITO TRAVERTINO PERUANO NO. 3 bt 0.06 1,068 1,260 1,110 1,121MANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052MARMOLINA bt 0.10 750 560 750 750PULIDA PISOS GRANITO m² 0.40 6,960 5,568 6,960 6,960 25,630 23,840 25,792 25,184
GUARDAESCOBA GRAVILLA mAGUA lt 0.32 4 4 4 4ARENA DE REVOQUE m³ 0.01 0 0 0 200ARENA FINA m³ 0.01 0 190 0 0ARENA LAVADA DE PEÑA m³ 0.01 250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.01 0 0 245 0CEMENTO GRIS kg 0.70 126 140 157 144GRAVA CANTO RODADO 1/2 m³ 0.01 0 0 435 0GRAVILLA DE RIO m³ 0.01 556 0 0 556GRAVILLA FINA 1/2” Y 3/4” m³ 0.01 0 400 0 0MANO DE OBRA AA hc 1.00 10,877 10,877 10,877 10,877 11,813 11,611 11,718 11,781
CONSTRUDATA26
GUARDAESCOBA PISOPAK 7 CM mGUARDAESCOBA PISOPAK 6.8CM m 1.00 0 928 10,288 794MANO DE OBRA AA hc 0.06 653 653 653 653 653 1,581 10,941 1,447
GUARDAESCOBA VINISOL 6.8 MM mGUARDAESCOBA VINISOL 6.8 CM m 1.03 1,932 1,932 1,932 1,932MANO DE OBRA AA hc 0.06 653 653 653 653 2,585 2,585 2,585 2,585
GUARDAESCOBA VIROLA 6 CM mCHAZO MADERA 10X10 un 2.00 1,900 1,800 1,900 2,200GUARDAESCOBA VIROLA 6 CM. m 1.05 1,575 1,575 1,575 1,575LISTON MONTERREY 1X2X3 m 0.15 0 0 63 0LISTON OTOBO m 0.15 0 158 0 0LISTÓN DE ORDINARIO m 0.15 0 0 0 110LISTÓN M.H. PINO CIPRES m 0.15 1,287 0 0 0MANO DE OBRA AA hc 0.20 2,175 2,175 2,175 2,175TIRAS ALISTADO 3 X 3 X 3 m 0.15 0 90 0 0 6,937 5,798 5,714 6,060
GUARDAESCOBA VIROLA 8 CM mCHAZO MADERA .04X.04 un 2.00 500 500 500 500GUARDAESCOBA CEDRO 8 CM. m 1.05 8,400 8,400 8,400 8,400LISTON MONTERREY 1X2X3 m 0.15 0 0 63 0LISTON OTOBO m 0.15 0 158 0 0LISTÓN DE ORDINARIO m 0.15 0 0 0 110LISTÓN M.H. PINO CIPRES m 0.15 1,287 0 0 0MANO DE OBRA AA hc 0.20 2,175 2,175 2,175 2,175 12,362 11,233 11,139 11,185
ISERNA 20X30 m²AGUA lt 2.85 34 34 34 34ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0CEMENTO BLANCO kg 0.51 485 434 500 421CEMENTO GRIS kg 6.27 1,129 1,254 1,404 1,292CERÁMICA CORONA ISERNIA 20.5X30.5 m² 1.03 22,392 22,392 22,660 21,534MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245 33,785 33,739 34,334 32,926
LISTON M.H. AMARILLO m²LISTON MONTERREY 1X2X3 m 0.40 0 0 169 0LISTON OTOBO m 0.40 0 420 0 0LISTÓN DE ORDINARIO m 0.40 0 0 0 292LISTÓN M.H. AMARILLO m² 1.10 22,968 22,968 22,968 18,700LISTÓN M.H. PINO CIPRES m 0.40 3,432 0 0 0MALLA SIN VENA 0.53X2.40 un 0.40 1,560 1,160 1,120 1,560MANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052PUNTILLA CON CABEZA 2” lb 0.27 751 770 636 741 41,764 38,370 37,945 34,346
LISTON M.H. GUAYACAN m²LISTON MONTERREY 1X2X3 m 0.40 0 0 169 0LISTON OTOBO m 0.40 0 420 0 0LISTÓN DE ORDINARIO m 0.40 0 0 0 292LISTÓN M.H. GUAYACAN m² 1.10 58,696 58,696 58,696 58,696LISTÓN M.H. PINO CIPRES m 0.40 3,432 0 0 0MALLA SIN VENA 0.53X2.40 un 0.40 1,560 1,160 1,120 1,560MANO DE OBRA AA hc 1.20 13,052 13,052 13,052 13,052PUNTILLA CON CABEZA 2” lb 0.27 751 770 636 741 77,492 74,098 73,673 74,342
OLIMPIA (BASE)20X20 m²AGUA lt 2.85 34 34 34 34ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0CEMENTO BLANCO kg 0.51 485 434 500 421CEMENTO GRIS kg 6.27 1,129 1,254 1,404 1,292CERÁMICA CORONA EGEO m² 1.03 15,347 15,347 15,347 15,347MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245 26,740 26,694 27,021 26,739
OLIMPIA BRILLANTE 20X20 m²AGUA lt 2.85 34 34 34 34ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0CEMENTO BLANCO kg 0.51 485 434 500 421CEMENTO GRIS kg 6.27 1,129 1,254 1,404 1,292CERÁMICA CORONA MACEDONIA m² 1.03 23,175 23,175 23,175 23,175MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245 34,568 34,522 34,849 34,567
PASO ESCALERA GRANITO mAGUA lt 3.70 44 44 44 44ARENA DE REVOQUE m³ 0.07 0 0 0 1,400ARENA FINA m³ 0.07 0 1,330 0 0ARENA LAVADA DE PEÑA m³ 0.07 1,750 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.07 0 0 1,715 0
CEMENTO BLANCO kg 10.50 9,975 8,925 10,290 8,663CEMENTO GRIS kg 12.00 2,160 2,400 2,688 2,472COLOR MINERAL kg 0.15 940 870 870 780DILATACIÓN EN BRONCE PC09 m 0.20 624 652 590 696GRANITO TRAVERTINO PERUANO NO. 3 bt 0.38 6,764 7,980 7,030 7,102MANO DE OBRA AA hc 2.30 25,017 25,017 25,017 25,017MARMOLINA bt 0.25 1,875 1,400 1,875 1,875PIRLAN ALUMINIO DORADO m 0.80 1,544 1,544 1,544 1,544 50,693 50,163 51,664 49,593
PASOS ESCALERA VINILO unPASOS ESCALERA VINILO un 1.03 13,101 13,101 13,101 13,101 13,101 13,101 13,101 13,101
PIRLANES ALUMINIO mMANO DE OBRA AA hc 0.30 3,263 3,263 3,263 3,263PIRLAN ALUMINIO DORADO m 0.17 328 328 328 328TORNILLO PARA MADERA 1” NO.6 un 3.09 56 56 56 49 3,647 3,647 3,647 3,641
PIRLANES LADRILLO mARENA DE PEÑA m³ 0.02 619 0 0 0ARENA DE REVOQUE m³ 0.02 0 0 200 400ARENA FINA 5 M3 m³ 0.02 0 510 0 0CEMENTO GRIS kg 3.32 598 664 744 684LADRILLO BOCADILLO RECOCIDO un 15.84 0 0 0 3,231LADRILLO LIMPIO 10-29 un 15.84 0 7,128 0 0LADRILLO TOLETE RECOCIDO un 15.84 5,069 0 4,055 0MANO DE OBRA AA hc 0.84 9,137 9,137 9,137 9,137 15,423 17,439 14,135 13,452
PISO EN GRAMA m²GRAMA (SEMILLA) m² 1.10 1,914 1,914 1,914 1,914MANO DE OBRA AA hc 0.10 1,088 1,088 1,088 1,088 3,002 3,002 3,002 3,002
PISO EN POLVO DE LADRILLO m³MANO DE OBRA AA hc 0.70 7,614 7,614 7,614 7,614POLVO DE LADRILLO m² 1.20 3,758 2,368 2,368 2,368VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714 12,886 11,442 11,513 11,696
PISO PARKET GUAYACAN m²GRANADILLO DE 10CM ANCHO POR E= 1.6 CM m² 1.00 104,400 104,400 104,400 104,400 104,400 104,400 104,400 104,400
PISO SINTETICO TENISLEIBO m²CANCHA MÚLTIPLE TENISLEIBO m² 1.00 57,000 57,000 57,000 57,000 57,000 57,000 57,000 57,000
PISO SINTETICO TENISSINCO m²CANCHA TENIS TENISSINCO m² 1.00 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000
PISO VINILO PISOPAK 1.6MM m²INSTALACIÓN PISO VINILO CON PEGANTE m² 1.00 2,088 2,088 2,000 2,000PISOPAK RESIDENCIAL 1.6MM m² 1.00 14,500 14,500 12,000 14,500 16,588 16,588 14,000 16,500
PISO VINILO PISOPAK 3 MM m²INSTALACIÓN PISO VINILO CON PEGANTE m² 1.00 2,088 2,088 2,000 2,000PISOPAK TRÁFICO PESADO 3 MM m² 1.00 25,280 25,280 24,550 21,500 27,368 27,368 26,550 23,500
PLANCHUELA MARMOL BRECCIA m²AGUA lt 2.85 34 34 34 34ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0CEMENTO BLANCO kg 0.51 485 434 500 421CEMENTO GRIS kg 6.27 1,129 1,254 1,404 1,292MANO DE OBRA AA hc 1.30 14,140 14,140 14,140 14,140MÁRMOL BRECCIATO 1”X1” m² 1.03 99,168 99,168 101,764 99,168 115,456 115,410 118,333 115,455
PLANCHUELA MARMOL GRIS m²AGUA lt 2.85 34 34 34 34ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0CEMENTO BLANCO kg 0.51 485 434 500 421CEMENTO GRIS kg 6.27 1,129 1,254 1,404 1,292MANO DE OBRA AA hc 1.30 14,140 14,140 14,140 14,140MÁRMOL GRIS PAYANDE m² 1.03 203,355 212,555 243,978 212,316 219,642 228,797 260,547 228,203
PLANCHUELA TRAVERTINO ROMANO m²AGUA lt 2.85 34 34 34 34ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0CEMENTO BLANCO kg 0.51 485 434 500 421CEMENTO GRIS kg 6.27 1,129 1,254 1,404 1,292MANO DE OBRA AA hc 1.30 14,140 14,140 14,140 14,140MÁRMOL TRAVESAÑO ROMANO CLASIC m² 1.03 263,268 263,268 327,159 210,893 279,555 279,510 343,727 227,179
POLISEC m²MANO DE OBRA AA hc 0.10 1,088 1,088 1,088 1,088
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
27
POLISEC m² 1.13 565 565 565 507 1,653 1,653 1,653 1,595
PULIDA LACADA PISO MADERA m²BARNIZ VITRIFLEX gl 0.10 7,275 7,275 8,687 6,380MANO DE OBRA PULIDA / LACADA PISO MADERA m² 1.00 26,680 23,660 26,680 26,680 33,955 30,935 35,367 33,060
PULIDA PLOMO PISO GRANITO m²PULIDA PISOS GRANITO m² 1.00 17,400 13,920 17,400 17,400 17,400 13,920 17,400 17,400
RECUBRIMIENTO SINTETICO MULTITRUFLEX m²RECUBRIMIENTO MULTITRUFLEX T-MT m² 1.00 17,000 17,000 17,000 17,000 17,000 17,000 17,000 17,000
RECUBRIMIENTO SINTETICO TRUFLEX CANCHA D m²RECUBRIMIENTO TRUFLEX m² 1.00 23,000 23,000 23,000 23,000 23,000 23,000 23,000 23,000
RECUBRIMIENTO SINTETICO TRUFLEX CANCHA DE TENIS m²RECUBRIMIENTO TRUFLEX m² 1.00 23,000 23,000 23,000 23,000 23,000 23,000 23,000 23,000
TABLETA DE GRES 20 X 20 m²AGUA lt 3.00 36 36 36 36ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0CEMENTO GRIS kg 6.59 1,186 1,318 1,476 1,358MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245TABLETA CORRIENTE 20X20 m² 1.03 19,511 19,570 16,995 17,634 30,479 30,549 28,243 28,673
TABLON 25X25 m²AGUA lt 6.48 78 78 78 78ARENA DE REVOQUE m³ 0.04 0 0 0 800ARENA FINA m³ 0.04 0 760 0 0ARENA LAVADA DE PEÑA m³ 0.04 1,000 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.04 0 0 980 0CEMENTO GRIS kg 9.41 1,694 1,882 2,108 1,938MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245TABLÓN LISO MATIZADO m² 1.03 22,145 21,630 22,145 21,630 34,162 33,595 34,556 33,692
TABLON LISO 33X33 m²AGUA lt 6.48 78 78 78 78ARENA DE REVOQUE m³ 0.04 0 0 0 800ARENA FINA m³ 0.04 0 760 0 0ARENA LAVADA DE PEÑA m³ 0.04 1,000 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.04 0 0 980 0CEMENTO GRIS kg 9.41 1,694 1,882 2,108 1,938MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245TABLÓN ALFA LISO 30 X 30 m² 1.05 19,205 19,205 19,205 19,205 31,222 31,170 31,616 31,266
TRACIA 20X20 m²AGUA lt 2.85 34 34 34 34ARENA DE REVOQUE m³ 0.02 0 0 0 400ARENA FINA m³ 0.02 0 380 0 0ARENA LAVADA DE PEÑA m³ 0.02 500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.02 0 0 490 0CEMENTO BLANCO kg 0.51 485 434 500 421CEMENTO GRIS kg 6.27 1,129 1,254 1,404 1,292MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245PEGACOR BLANCO kg 3.15 2,687 2,674 2,835 2,687PISO CORONA GUAJIRA m² 1.03 21,630 24,617 24,617 24,617 35,710 38,639 39,126 38,696
VINISOL 2.0 MM m²VINISOL COMERCIAL 2MM m² 1.03 14,573 14,950 14,847 14,847 14,573 14,950 14,847 14,847
ZOCALO MARMOL NEGRO 7.3CM mAGUA lt 0.45 5 5 5 5ARENA DE REVOQUE m³ 0.01 0 0 0 200ARENA FINA m³ 0.01 0 190 0 0ARENA LAVADA DE PEÑA m³ 0.01 250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.01 0 0 245 0CEMENTO BLANCO kg 0.10 95 85 98 83CEMENTO GRIS kg 0.98 176 196 220 202MANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702ZÓCALO MÁRMOL NEGRO CARACOL m 0.14 325 390 406 357 9,553 9,568 9,676 9,549
ZOCALO MARMOL TRAVERTINO 7.3CM mAGUA lt 0.45 5 5 5 5ARENA DE REVOQUE m³ 0.01 0 0 0 200ARENA FINA m³ 0.01 0 190 0 0ARENA LAVADA DE PEÑA m³ 0.01 250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.01 0 0 245 0CEMENTO BLANCO kg 0.10 95 85 98 83CEMENTO GRIS kg 0.98 176 196 220 202MANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702ZÓCALO MÁRMOL TRAVESAÑO PERUANO CLARO m² 0.14 1,610 1,610 1,610 1,470 10,838 10,788 10,880 10,661
ZOCALO PARA TABLETA 10 CM mAGUA lt 0.50 6 6 6 6ARENA DE REVOQUE m³ 0.01 0 0 0 200ARENA FINA m³ 0.01 0 190 0 0ARENA LAVADA DE PEÑA m³ 0.01 250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.01 0 0 245 0CEMENTO GRIS kg 1.09 196 218 244 225MANO DE OBRA AA hc 0.50 5,439 5,439 5,439 5,439TABLÓN ALFA LISO 15X15 m² 1.05 13,748 13,748 13,748 13,748 19,638 19,600 19,681 19,617
ZOCALO PARA TABLETA 7.5 CM mAGUA lt 0.29 3 3 3 3ARENA DE REVOQUE m³ 0.01 0 0 0 200ARENA FINA m³ 0.01 0 190 0 0ARENA LAVADA DE PEÑA m³ 0.01 250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.01 0 0 245 0CEMENTO GRIS kg 0.63 113 126 141 130MANO DE OBRA AA hc 0.50 5,439 5,439 5,439 5,439TABLÓN ALFA LISO 15X15 m² 1.05 13,748 13,748 13,748 13,748 19,553 19,506 19,576 19,519
PISOS - BASES
ALISTADO ENDURECIDO m²AGUA lt 10.00 120 120 120 120ARENA DE REVOQUE m³ 0.05 0 0 0 1,000ARENA FINA m³ 0.05 0 950 0 0ARENA LAVADA DE PEÑA m³ 0.05 1,250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.05 0 0 1,225 0CEMENTO GRIS kg 19.00 3,420 3,800 4,256 3,914MANO DE OBRA AA hc 0.70 7,614 7,614 7,614 7,614ROCKTOP ROJO kg 3.50 7,186 6,993 7,186 7,186 19,589 19,477 20,400 19,833
ALISTADO IMPERMEABILIZADO PISOS 0.04 m²AGUA lt 10.00 120 120 120 120ARENA DE REVOQUE m³ 0.05 0 0 0 1,000ARENA FINA m³ 0.05 0 950 0 0ARENA LAVADA DE PEÑA m³ 0.05 1,250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.05 0 0 1,225 0CEMENTO GRIS kg 19.00 3,420 3,800 4,256 3,914MANO DE OBRA AA hc 0.45 4,895 4,895 4,895 4,895SIKA-2 (5.5 KG) kg 1.18 8,350 8,350 8,350 8,350 18,034 18,114 18,845 18,278
ALISTADO PARA LISTON m²AGUA lt 0.55 7 7 7 7ARENA DE REVOQUE m³ 0.01 0 0 0 200ARENA FINA m³ 0.01 0 190 0 0ARENA LAVADA DE PEÑA m³ 0.01 250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.01 0 0 245 0CEMENTO GRIS kg 1.22 220 244 273 251LARGUERO ORDINARIO 3 M m 3.00 0 0 0 2,415LISTON MONTERREY 1X2X3 m 3.00 0 0 1,266 0LISTON OTOBO m 3.00 0 3,150 0 0MALLA SIN VENA 0.53X2.40 un 0.20 780 580 560 780MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351TIRAS ALISTADO 3 X 3 X 3 ORD m 3.00 1,500 0 0 0 7,107 8,521 6,702 8,004
ALISTADO PISOS 0.04 m²AGUA lt 10.00 120 120 120 120ARENA DE REVOQUE m³ 0.05 0 0 0 1,000ARENA FINA m³ 0.05 0 950 0 0ARENA LAVADA DE PEÑA m³ 0.05 1,250 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.05 0 0 1,225 0CEMENTO GRIS kg 19.00 3,420 3,800 4,256 3,914MANO DE OBRA AA hc 0.40 4,351 4,351 4,351 4,351 9,141 9,221 9,952 9,385
ALISTADO TERRAZAS 0.08 m²AGUA lt 14.83 178 178 178 178ARENA DE REVOQUE m³ 0.10 0 0 0 2,000ARENA FINA m³ 0.10 0 1,900 0 0ARENA LAVADA DE PEÑA m³ 0.10 2,500 0 0 0ARENA LAVADA JUAN DE ACOSTA m³ 0.10 0 0 2,450 0CEMENTO GRIS kg 24.88 4,478 4,976 5,573 5,125MANO DE OBRA AA hc 0.60 6,526 6,526 6,526 6,526SIKA-2 (5.5 KG) kg 2.24 15,850 15,850 15,850 15,850 29,533 29,430 30,578 29,680
CAÑUELA CONCRETO .20X.12 mCONCRETO CORRIENTE 2000 PSI m³ 0.02 5,677 5,582 4,788 5,684MANO DE OBRA AA hc 0.80 8,702 8,702 8,702 8,702TABLA BURRA 3 M m 0.33 825 0 0 0TABLA MADERA COMUN 3 M m 0.33 0 0 0 893TABLON CATIVO 0.30 m 0.33 0 0 825 0TABLON OTOBO 2”X10” 2.9 m 0.33 0 842 0 0 15,204 15,125 14,315 15,279
CONSTRUDATA28
CONCRETO ANDENES 0.10 m²CONCRETO CORRIENTE 2500 PSI m³ 0.11 33,061 31,734 28,174 33,112LISTÓN PISO ORDINARIO m² 1.02 13,015 13,015 13,015 13,015MANO DE OBRA AA hc 0.66 7,179 7,179 7,179 7,179TABLA CHAPA ORDINARIO 0.10 m 1.02 1,524 0 0 0TABLA DE 2 CM X 10” m 1.02 0 0 0 3,774TABLA OTOBO 0.10 m 1.02 0 1,428 0 0TABLON CATIVO 2X2X15 m 1.02 0 0 1,377 0 54,779 53,356 49,745 57,080
CONCRETO BASE GRADAS m²CONCRETO CORRIENTE 2500 PSI m³ 0.10 30,056 28,849 25,613 30,102MANO DE OBRA AA hc 0.88 9,572 9,572 9,572 9,572TABLA CHAPA ORDINARIO 0.10 m 1.02 1,524 0 0 0TABLA DE 2 CM X 10” m 1.02 0 0 0 3,774TABLA OTOBO 0.10 m 1.02 0 1,428 0 0TABLON CATIVO 2X2X15 m 1.02 0 0 1,377 0 41,151 39,849 36,562 43,448
CONCRETO ESTRIADO RAMPAS m²CONCRETO CORRIENTE 2500 PSI m³ 0.16 48,089 46,159 40,980 48,163LISTÓN PISO ORDINARIO m² 1.02 13,015 13,015 13,015 13,015MANO DE OBRA AA hc 0.88 9,572 9,572 9,572 9,572TABLA CHAPA ORDINARIO 0.10 m 1.02 1,524 0 0 0TABLA DE 2 CM X 10” m 1.02 0 0 0 3,774TABLA OTOBO 0.10 m 1.02 0 1,428 0 0TABLON CATIVO 2X2X15 m 1.02 0 0 1,377 0 72,200 70,174 64,944 74,524
CONCRETO SARDINELES 0.40 mCONCRETO CORRIENTE 2500 PSI m³ 0.05 15,028 14,425 12,806 15,051FORMALETA SARDINEL d 0.05 17 17 17 17MANO DE OBRA AA hc 0.66 7,179 7,179 7,179 7,179VIBRADOR A GASOLINA d 0.03 903 1,066 986 933 23,127 22,686 20,988 23,180
ENSAYOS DENSIDAD TERRENO unENSAYO DENSIDAD TERRENO un 1.00 20,880 20,532 23,200 22,040 20,880 20,532 23,200 22,040
ENSAYOS PROCTOR unENSAYO PROCTOR un 1.00 49,880 40,252 52,200 46,400 49,880 40,252 52,200 46,400
MANTO FIBERGLASS 600 XT m²MANTO FIBERGLASS 600XT rl 1.00 96,709 108,539 96,709 96,709SUB-CONTRATO INSTALACION % 45.00 43,519 48,843 43,519 43,519 140,228 157,382 140,228 140,228
PEGANTE MORTERO-CONCRETO m²ADERCRIL - ADHERENTE kg 0.40 6,792 5,591 6,792 6,792AGUA lt 0.50 6 6 6 6CEMENTO GRIS kg 1.00 180 200 224 206MANO DE OBRA AA hc 0.50 5,439 5,439 5,439 5,439 12,416 11,236 12,460 12,442
PERMA PLY 2 CAPAS m²ASFALTO TIPO 190/220 200 KG kg 1.56 2,507 2,507 2,507 2,507
MANO DE OBRA AA hc 0.66 7,179 7,179 7,179 7,179PERMA GLASS 6 FIBERGLASS m² 2.37 5,306 5,944 5,306 5,306 14,992 15,630 14,992 14,992
PLACA BASE CONCRETO 0.08 m²CONCRETO CORRIENTE 2500 PSI m³ 0.09 27,050 25,964 23,052 27,092MANO DE OBRA AA hc 0.87 9,463 9,463 9,463 9,463TABLA CHAPA ORDINARIO 0.10 m 0.51 762 0 0 0TABLA DE 2 CM X 10” m 0.51 0 0 0 1,887TABLA OTOBO 0.10 m 0.51 0 714 0 0TABLON CATIVO 2X2X15 m 0.51 0 0 689 0 37,275 36,141 33,203 38,442
PLACA BASE CONCRETO 0.10 m²CONCRETO CORRIENTE 2500 PSI m³ 0.11 33,061 31,734 28,174 33,112MANO DE OBRA AA hc 0.66 7,179 7,179 7,179 7,179TABLA CHAPA ORDINARIO 0.10 m 0.51 762 0 0 0TABLA DE 2 CM X 10” m 0.51 0 0 0 1,887TABLA OTOBO 0.10 m 0.51 0 714 0 0TABLON CATIVO 2X2X15 m 0.51 0 0 689 0 41,002 39,627 36,041 42,178
PLACA BASE CONCRETO 0.15 m²CONCRETO CORRIENTE 2500 PSI m³ 0.17 51,095 49,044 43,542 51,173MANO DE OBRA AA hc 0.77 8,375 8,375 8,375 8,375TABLA CHAPA ORDINARIO 0.10 m 1.02 1,524 0 0 0TABLA DE 2 CM X 10” m 1.02 0 0 0 3,774TABLA OTOBO 0.10 m 1.02 0 1,428 0 0TABLON CATIVO 2X2X15 m 1.02 0 0 1,377 0 60,994 58,847 53,294 63,323
RELLENOS AGREGADO PETREO m³BASE GRANULAR m³ 1.34 0 0 0 34,583MANO DE OBRA AA hc 0.85 9,245 9,245 9,245 9,245RECEBO COMÚN m³ 1.34 42,538 0 0 0ROCA MUERTA 5 M3 m³ 1.34 0 42,533 0 0VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714ZAHORRA B-200 m³ 1.34 0 0 20,904 0 53,298 53,238 31,681 45,542
TRITURADO FINO m³MANO DE OBRA AA hc 0.70 7,614 7,614 7,614 7,614TRITURADO FINO m³ 1.03 35,020 26,780 39,140 21,228VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714 44,148 35,854 48,285 30,556
TRITURADO GRUESO m³BASE GRANULAR m³ 0.40 0 0 0 10,323MANO DE OBRA AA hc 0.70 7,614 7,614 7,614 7,614RECEBO COMÚN m³ 0.40 12,698 0 0 0ROCA MUERTA 5 M3 m³ 0.40 0 12,696 0 0TRITURADO DE MAQUINA m³ 0.88 0 0 22,880 52,800TRITURADO DE RÍO m³ 0.88 21,120 21,120 0 0VIBROCOMPACTADOR A GASOLINA d 0.04 1,514 1,460 1,531 1,714ZAHORRA B-200 m³ 0.40 0 0 6,240 0 42,946 42,890 38,265 72,451
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR
ANÁLISIS BOGOTÁ CALI B/QUILLA MEDELLÍN INSUMO UM CANT. VALOR VALOR VALOR VALOR