01. Sistema de Agua Potable

Post on 01-Oct-2015

17 views 0 download

description

METRADOS AGUA

Transcript of 01. Sistema de Agua Potable

1. AGUAPLANILLA DE METRADOSOBRA: "INSTALACIN DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN EL CASERIO VILLA PRIMAVERA, DISTRITO DE YARINACOCHA, PROVINCIA DE CORONEL PORTILLO, UCAYALIENTIDAD: PROGRAMA NACIONAL DESANEAMIENTO RURAL (PNSR)FECHA: OCTUBRE - 2014LUGAR: YARINACOCHA - CORONEL PORTILLO - UCAYALI - CASERIO VILLA PRIMAVERASUBPRESUPUESTO: SISTEMA DE AGUA POTABLEITEMPARTIDASVECESDIMENCIONESPARCIALTOTALUNDLARGOANCHOALTO01SISTEMA DE AGUA POTABLE01.01TRABAJOS PROVISIONALES01.01.01CARTEL DE OBRA FULL BANER COLOR DE 3.00 x 5.00 M INC./ESTR. MAD. E INST.1.001.001.00UND01.01.02OFICINAS ADM., ALMACN Y CASETA DE GUARDIANIA1.0025.003.0075.0075.00M201.01.03TRANQUERA T/BARANDA 2.4x2.1M PROV. P/ZEALIZACION-PROTECCION DE OBRA10.0010.0010.00UND01.02SEGURIDAD Y SALUD01.02.01ELABORACIN, IMPLEMENTACIN Y ADMINISTRACIN DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO01.02.01.01ELABORACIN, IMPLEMENTACIN Y ADMINISTRACIN DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO1.001.001.001.00GLB01.02.01.02EQUIPO DE PROTECCIN INDIVIDUAL1.0015.0015.0015.00UND01.02.01.03EQUIPO DE PROTECCIN COLECTIVA1.006.006.006.00UND01.02.01.04SEALIZACION TEMPORAL DE SEGURIDAD1.005.005.005.00UND01.02.01.05CAPACITACIN EN SEGURIDAD Y SALUD1.001.001.001.00GLB01.02.01.06RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO1.001.001.001.00GLB01.03TRANSPORTE Y MOVILIZACIONES DE MATERIALES, EQUIPOS, MAQUINARIAS Y HERRAMIENTAS01.03.01TRANSPORTE DE MATERIAL Y HERRAMIENTAS - AGUA POTABLE1.001.001.00GLB01.04REDES DE DISTRIBUCIN DE AGUA POTABLE01.04.01OBRAS PRELIMINARES01.04.01.01LIMPIEZA DE TERRENO MANUAL5,155.40M2RED DE TUBERIA 1"1ro TRAMO (LT-01 AL LT-06)1.0084.502.00169.002do TRAMO (LT-03 AL LT-06)1.0042.852.0085.703ro TRAMO (LT-36 AL LT-41)1.0094.002.00188.004to TRAMO (LT-18 AL LT-25)1.00124.102.00248.205to TRAMO (LT-14 AL LT-29)1.00124.802.00249.606to TRAMO (LT-30 AL LT-33)1.00114.352.00228.707mo TRAMO (LT-34 AL LT-35)1.0062.602.00125.208vo TRAMO (LT-65 AL LT-67)1.00192.002.00384.009no TRAMO (LT-65 AL LT-66)1.0056.202.00112.4010mo TRAMO (LT-81 AL LT-84)1.00165.502.00331.0011mo TRAMO (LT-81 AL LT-82)1.0060.002.00120.0012mo TRAMO (LT-71 AL LT-73)1.0081.002.00162.0013ro TRAMO (LT-70)1.00134.702.00269.4014to TRAMO (LT-69)1.0074.902.00149.80RED DE TUBERIA 1 1/2"1ER TRAMO (LT-10 AL LT-12)1.00113.202.00226.402DO TRAMO (LT-07 AL LT-13)1.00113.202.00226.403ER TRAMO (LT-67 AL LT-76)1.00243.902.00487.804TO TRAMO (LT-77)1.00122.852.00245.705TO TRAMO (LT-76)1.0068.402.00136.80RED DE TUBERIA 2"1ER TRAMO (SALIDA DE T.E AL LT-50)1.0017.002.0034.002DO TRAMO (LT-49 AL LT-50)1.0033.302.0066.603ro TRAMO (LT-47 AL LT-49)1.0057.802.00115.604to TRAMO (LT-12 AL LT-13)1.0085.402.00170.805to TRAMO (LT-49 AL LT-56)1.00124.452.00248.906to TRAMO (LT-25 AL LT-29)1.0085.902.00171.807mo TRAMO (LT-58 AL LT-59)1.0058.402.00116.808vo TRAMO (LT-57)1.0035.402.0070.80RED DE TUBERIA 3"1ER TRAMO (SALIDA DEL TANQUE)1.007.002.0014.0001.04.01.02TRAZO, NIVELES Y REPLANTEO2,577.70MLRED DE TUBERIA 1"1ro TRAMO (LT-01 AL LT-06)1.0084.5084.502do TRAMO (LT-03 AL LT-06)1.0042.8542.853ro TRAMO (LT-36 AL LT-41)1.0094.0094.004to TRAMO (LT-18 AL LT-25)1.00124.10124.105to TRAMO (LT-14 AL LT-29)1.00124.80124.806to TRAMO (LT-30 AL LT-33)1.00114.35114.357mo TRAMO (LT-34 AL LT-35)1.0062.6062.608vo TRAMO (LT-65 AL LT-67)1.00192.00192.009no TRAMO (LT-65 AL LT-66)1.0056.2056.2010mo TRAMO (LT-81 AL LT-84)1.00165.50165.5011mo TRAMO (LT-81 AL LT-82)1.0060.0060.0012mo TRAMO (LT-71 AL LT-73)1.0081.0081.0013ro TRAMO (LT-70)1.00134.70134.7014to TRAMO (LT-69)1.0074.9074.90RED DE TUBERIA 1 1/2"1ER TRAMO (LT-10 AL LT-12)1.00113.20113.202DO TRAMO (LT-07 AL LT-13)1.00113.20113.203ER TRAMO (LT-67 AL LT-76)1.00243.90243.904TO TRAMO (LT-77)1.00122.85122.855TO TRAMO (LT-76)1.0068.4068.40RED DE TUBERIA 2"1ER TRAMO (SALIDA DE T.E AL LT-50)1.0017.0017.002DO TRAMO (LT-49 AL LT-50)1.0033.3033.303ro TRAMO (LT-47 AL LT-49)1.0057.8057.804to TRAMO (LT-12 AL LT-13)1.0085.4085.405to TRAMO (LT-49 AL LT-56)1.00124.45124.456to TRAMO (LT-25 AL LT-29)1.0085.9085.907mo TRAMO (LT-58 AL LT-59)1.0058.4058.408vo TRAMO (LT-57)1.0035.4035.40RED DE TUBERIA 3"1ER TRAMO (SALIDA DEL TANQUE)1.007.007.0001.04.01.03CINTA SEALIZADORA PARA LIMITE DE SEGURIDAD5,155.40MLRED DE TUBERIA 1"1ro TRAMO (LT-01 AL LT-06)2.0084.50169.002do TRAMO (LT-03 AL LT-06)2.0042.8585.703ro TRAMO (LT-36 AL LT-41)2.0094.00188.004to TRAMO (LT-18 AL LT-25)2.00124.10248.205to TRAMO (LT-14 AL LT-29)2.00124.80249.606to TRAMO (LT-30 AL LT-33)2.00114.35228.707mo TRAMO (LT-34 AL LT-35)2.0062.60125.208vo TRAMO (LT-65 AL LT-67)2.00192.00384.009no TRAMO (LT-65 AL LT-66)2.0056.20112.4010mo TRAMO (LT-81 AL LT-84)2.00165.50331.0011mo TRAMO (LT-81 AL LT-82)2.0060.00120.0012mo TRAMO (LT-71 AL LT-73)2.0081.00162.0013ro TRAMO (LT-70)2.00134.70269.4014to TRAMO (LT-69)2.0074.90149.80RED DE TUBERIA 1 1/2"1ER TRAMO (LT-10 AL LT-12)2.00113.20226.402DO TRAMO (LT-07 AL LT-13)2.00113.20226.403ER TRAMO (LT-67 AL LT-76)2.00243.90487.804TO TRAMO (LT-77)2.00122.85245.705TO TRAMO (LT-76)2.0068.40136.80RED DE TUBERIA 2"1ER TRAMO (SALIDA DE T.E AL LT-50)2.0017.0034.002DO TRAMO (LT-49 AL LT-50)2.0033.3066.603ro TRAMO (LT-47 AL LT-49)2.0057.80115.604to TRAMO (LT-12 AL LT-13)2.0085.40170.805to TRAMO (LT-49 AL LT-56)2.00124.45248.906to TRAMO (LT-25 AL LT-29)2.0085.90171.807mo TRAMO (LT-58 AL LT-59)2.0058.40116.808vo TRAMO (LT-57)2.0035.4070.80RED DE TUBERIA 3"1ER TRAMO (SALIDA DEL TANQUE)2.007.0014.0001.04.02MOVIMIENTOS DE TIERRAS01.04.02.01EXCAVACIN DE ZANJA MANUAL P/AGUA TUB. 1" EN TERRENOARCILLOSO A=0.50M H