Post on 03-Jan-2016
description
Just-In-TimeJIT
(JIT)
(1998)
Supply Chain Council , SCC
(JIT)JIT(Just In Time) 1. 2. 3. 4. 5.
(Stevenson)1.2.
Goyal1976
Ha and Kim1997 JITN
Kelle and Silver1990 nWeibull
Zhao and Lau1992
ordering cost setup cost
D P SU
.(1)
.(2)
M
...(3)
(4)
4 0
.(5)
..(6)
Minimize
Subject to ..(7)
5 4 = M
D=100000/P=10000/A=$80/S=$100/ =$3// =$2//U=$5000 1
1
1012511251028774.99913091178128079.54813761100827522.99714551018527164.856*1549*9294*27104.32*51664832027519.9941809723628768.9932000600031684.6622267453438766.9912683268362515.99
1 =6 =1549 =9294$27104.3266.7%627104.32
M 61549929427104.32
(2001)(2005)(2008)18(2)229-258
*